CN102071704A - Well lid - Google Patents
Well lid Download PDFInfo
- Publication number
- CN102071704A CN102071704A CN 201010591910 CN201010591910A CN102071704A CN 102071704 A CN102071704 A CN 102071704A CN 201010591910 CN201010591910 CN 201010591910 CN 201010591910 A CN201010591910 A CN 201010591910A CN 102071704 A CN102071704 A CN 102071704A
- Authority
- CN
- China
- Prior art keywords
- lid
- well lid
- cement
- panel
- muscle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Sewage (AREA)
Abstract
The invention relates to a well lid, which comprises a lid body, wherein the lid body is formed by a round panel with a skirt and a stiffening rib which is arranged along the axial direction of the round panel, and the panel with the skirt and the stiffening rib are integrally formed into a whole body. Because the lid body which is formed by the panel with the skirt and the stiffening rib arranged on the panel is adopted, the well lid is applicable to covering underground box culverts, pipelines, blind ditches and surficial channels, bears the ground load of pedestrian and vehicles, so the loading capacity of the well lid is improved, the dead weight (which is lighter than the dead weight of a cast iron well lid, and is greatly lighter than the existing cement well lid with a common structure) is also reduced, and the well lid provides convenience for people to open. Moreover, the lid body is made from cement-base composites, and the materials of the well lid have no recovery value, so the well lid cannot be stolen.
Description
Technical field
The present invention relates to a kind of well lid.
Background technology
Existing well lid generally adopts cast iron to make, and is often stolen because material has recovery value, loses seriously, and vehicle damage and personnel casualty accidents take place inspection shaft often that lose well lid.For antitheft, people one use anti-theft device, for example Chinese patent 95241036,96232738,9927151 or the like in the textural consideration of well lid; The 2nd, on material, consider to make its no recovery value, and for example Chinese patent 97202338,972207516,99231650.2,0213823.9,200510118301.5 or the like.The problem that their exist is: (one) takes the cast iron anti-stealing manhole cover that locks between well lid and walling crib, and no matter how antitheft office tightly still can steal for stealer intentionally, and for the surfaceman, is difficult to open because of the lock core corrosion again.(2) the ordinary construction well lid of existing cement-based material making is from great, and artificial unlatching is difficult.And its periphery is broken easily, and serious meeting integral body collapses.(3) well lid that adopts resin-based materials to make, the non-constant of its anti-wear performance, easily aging, the bearing capacity decay is fast, and under the heavy traffic load action, its safe handling cycle is shorter.(4) need reinforcing bar or steel plate to make skeleton in the well lid lid that existing cement based and resin-based materials are made, thereby still can be stolen unavoidably.
Summary of the invention
Problem to be solved by this invention provides a kind of well lid that is applicable to the passage on the underground box culvert of capping, pipeline, covered conduit and ground, and this well lid not only has advantages of high bearing capacity, and weight is lighter, is convenient to artificial unlatching.
Technical scheme provided by the invention is: a kind of well lid, comprise lid, and lid constitutes by the round panel of band shirt rim with along the stiffening rib that radially is provided with of round panel, and the panel and the stiffening rib of band shirt rim are one-time formed integral body.
Lateral surface bottom, lid shirt rim is provided with the fiber muscle.
Lid shirt rim lateral surface is a taper seat; Lateral surface bottom, lid shirt rim is provided with the groove that the fiber muscle is installed, and shirt rim lateral surface and groove surface are the concentric circles conical surface; The fiber muscle is located at and makes the periphery of fiber muscle hoop in the shirt rim in the groove, preferably makes the lateral surface of fiber muscle and shirt rim lateral surface form same taper seat.
Described stiffening rib longitudinal section is
Shape (wedge shape) or
Shape (arch).The height that is stiffening rib is a head height, and one short, and high one connects the shirt rim, a short center near the panel circle.
The quantity of described stiffening rib is 6~14.
The fiber muscle comprises muscle body and sheath, and the muscle body is the circular ring-type of sealing, and sheath is coated on the muscle surface, fiber muscle cross section parallelogram.
Described lid is by 23.63~47.46wt% cement; 5.56~14.56wt% water; 0.8~5wt% chopped strand (5-25 millimeters long); 34.33~66.49wt% gathers materials; 0~9.96wt% resin mix vibrates and forms.
Following steps are adopted in the lid moulding:
(1), fabrication and installation mould:
The mould of preparation lid comprises: be the face mould of panel top dough model shape, be the moulding side form of the lateral surface of shirt rim, be the bottom surface of panel, the medial surface and the moulding bed die of stiffening rib of shirt rim, the vibration source of power and vibration frequency 50-200Hz is provided for the lid moulding; The side form horizontal is connected on support and with stand spring, and vibration source is installed on the side form base plate between two parties, and the rotating shaft of vibration source is vertical with the bed die plane; The bed die horizontal is on the side form base plate; The face mould horizontal is on side form top;
(2), batching:
Select the double speed high-shear impeller of 900-1200 rev/mins of high speeds, 45-60 rev/mins of low speed for use, earlier cement, water and resin are put into and stirred into cement slurry in the mixer, chopped strand being dropped in the cement slurry then makes it sneak into cement paste equably with high-speed stirred, drop into again and gather materials, make cement-base composite material with stirring at low speed;
(3), moulding:
Cement-base composite material filled out be put in the mould, fill up face mould on the bonnet, obtain base substrate with frequency 50-200Hz 30 to 150 second time of vibration;
(4), maintenance:
Base substrate after the moulding placed maintenance obtains lid under the wet environment.
When on the cover panel multiple color being set, the mould of preparation lid also comprises the filler frame, is used for being the lining subregion of different colours when the filling lining.Filler frame horizontal is on side form top; The pigment of the distribution of (two) adding required color is prepared the cement-base composite material of corresponding color respectively set by step, and (two) prepare the cement-base composite material that does not add pigment set by step, the cement-base composite material that will not add pigment is then filled out and is put in the mould, load onto the filler frame, according to the cover panel design cement-base composite material of required color is filled out respectively in the respective regions that is put into the filler frame, fill up face mould on the bonnet, obtained base substrate in 30 to 150 seconds with frequency 50-200Hz vibration.Face mould and filler frame are openable flexible mould.
Described fiber muscle is by 48~60v%(percent by volume) fiber filament; 32~42v% resin; 5~14v% stainless steel is made.The fiber filament impregnated with resin twined in mould make the muscle body, form sheath with stainless steel wire or stainless steel band along the horizontal uniform winding of muscle body in the muscle surface then and obtain the fiber muscle.
Described fiber muscle mounting method is: the fiber muscle is sleeved on the expander, is alignd in the position that expander and lid are installed the fiber muscle, under external force the fiber muscle is pushed on the lid.
The present invention is owing to adopt the panel and the lid that is arranged on the stiffening rib on the panel of band shirt rim, be applicable to the passage on the underground box culvert of capping, pipeline, covered conduit and ground, carrying ground pedestrian and traffic load, not only improved the supporting capacity (particularly fiber muscle on the periphery hoop of shirt rim) of well lid, but also it is (lighter from escheat than existing casting iron well lid to have alleviated deadweight, the cement well lid that compares to existing ordinary construction is light many), be convenient to artificial unlatching.And lid adopts cement-base composite material to make, and the well lid material does not have recovery value, can not be stolen.
Description of drawings
Fig. 1 is a structural representation of the present invention;
Fig. 2 is the upward view of Fig. 1;
Fig. 3 is the structural representation of fiber muscle of the present invention;
Fig. 4 is the C-C zoomed-in view of Fig. 3;
Fig. 5 is that the present invention adopts expander that the structural representation of fiber muscle is installed on well lid;
Fig. 6 is the mould schematic diagram that the present invention is used to prepare lid;
Fig. 7 is A-A view of Fig. 6;
Fig. 8 is B-B zoomed-in view of Fig. 6.
The specific embodiment
As shown in Figure 1, 2, the present invention includes lid, lid constitutes by the round panel 1 of band shirt rim 3 with along the stiffening rib 2 that radially is provided with of round panel 1, and the panel 1 and the stiffening rib 2 of band shirt rim 3 are one-time formed integral body.3 lateral surface bottoms, lid shirt rim are provided with fiber muscle 4.Lid shirt rim lateral surface be taper seat (promptly from panel under the shirt rim diameter by greatly gradually little); Lateral surface bottom, lid shirt rim is provided with the groove that the fiber muscle is installed, and shirt rim lateral surface and groove surface are the concentric circles conical surface; The fiber muscle is located at and makes the periphery of fiber muscle hoop in the shirt rim in the groove, preferably makes the lateral surface of fiber muscle and shirt rim lateral surface form the concentric circles conical surface.
Described stiffening rib 2 longitudinal sections are
Shape (wedge shape) or
Shape (arch is structure as shown in Figure 1).The height that is stiffening rib is a head height, and one short, and high one connects the shirt rim, a short center near the panel circle.The quantity of stiffening rib is 6~14.
Referring to Fig. 3-4, fiber muscle 4 of the present invention comprises muscle body 5 and sheath 6, and muscle body 5 is the circular ring-type of sealing, and sheath 6 is coated on muscle body 5 surfaces, fiber muscle cross section parallelogram.
Described lid is by 23.63~47.46wt% cement; 5.56~14.56wt% water; 0.8~5wt% chopped strand (5-25 millimeters long); 34.33~66.49wt% gathers materials; 0~9.96wt% resin mix vibrates and forms.
The preparation method of cement-base composite material well lid of the present invention mainly contains following step: get the raw materials ready, lid moulding, preparation fiber muscle, the fiber muscle be installed.
One, gets the raw materials ready
1, will gather materials and sieve, the maximum particle diameter of gathering materials of continuing to employ is that 15 millimeters and its content are no more than 10%;
2, with sand, building stones cleaning, drying;
3, the fiber filament that will prepare lid is made the chopped strand of 5-25 millimeters long;
4, the resin in the bulk container is taken out in right amount, stir.The resin big for viscosity is heated to about 40 ℃ with water-bath earlier, adds thinner, and it is standby to stir;
5, if select for use stainless sheet steel, be made into the steel band of 3-5 mm wides earlier as muscle surface clad material.
Two, lid moulding
The raw material of cement-base composite material well lid lid of the present invention is formed as table 1.
(1), fabrication and installation mould.
Referring to Fig. 6-8, the mould of preparation lid comprises following components:
1, face mould 13---be panel top dough model shape;
2, the filler frame 14---when the filling lining, be the lining subregion (panel of making lid need not the filler frame when being monochromatic) of different colours;
3, side form 9 and side form base plate 11---moulding for the lateral surface of shirt rim, the supporting bed die is installed vibration source;
4, bed die 10---for the medial surface and the stiffening rib of the bottom surface of panel, shirt rim moulding;
5, vibration source 12---and for the lid moulding provides power, its rotating shaft is vertical with the bed die plane, vibration frequency 50-200Hz.
The mould mounting method: the side form horizontal is connected on support and with stand spring, and vibration source is installed on the side form base plate between two parties, and the rotating shaft of vibration source is vertical with the bed die plane; The bed die horizontal is on the side form base plate; The face mould horizontal is on side form top.
(2), preparation cover materials.
Select (900-1200 rev/mins at a high speed of double speed high-shear impeller for use; 45-60 rev/mins of low speed), earlier cement, water, resin are stirred into cement slurry, drop into chopped strand then and make it sneak into cement paste equably, drop into again and gather materials, make cement-base composite material with stirring at low speed with high-speed stirred.
When cover panel is multiple color, must be with materials of different colors preparation respectively as stated above.
(3), filler, vibration moulding.
The cover materials that will not add pigment is earlier filled out and is put in the mould, according to the cover panel design materials of different colors is filled out respectively in the zone that is put into filler frame regulation again, loads onto face mould after filling up, and obtains base substrate in 30 to 150 seconds with frequency 50-200Hz vibration.
If cover panel is monochromatic, then need not the filler frame.
(4), maintenance.
Base substrate after the moulding placed maintenance obtains lid under the wet environment.
Three, preparation fiber muscle
The raw material of cement-base composite material well lid fiber muscle of the present invention is formed as table 2.
(1), allotment resin.
In line with what are used, join what principle, it is an amount of to get spare resin, and according to environment temperature, factors such as operating time are determined gel time and then definite accelerator and hardener dose.Add accelerator earlier, add curing compound after stirring again, use immediately after stirring.
(2), moulding and curing.
The fiber filament impregnated with resin is twined in mould, and moulding is heating and curing by (or mould is outer) in the mould simultaneously.Draw the demoulding under external force, finalize the design through behind the regelate again.
(3), processing finishing.
With sharp perching knife unnecessary burr are scalped, again machined surface is polished.
(4), coat sheath.
Stainless steel wire or stainless steel band along the horizontal uniform winding of fiber muscle, are coated sheath (as Fig. 3) until all twining full formation.
Four, the fiber muscle is installed
With reference to Fig. 5, the lid groove surface is coated with full resin adhesive liquid, and (lubricate during installation is installed the back and is played cementation.), it is the device that external surface is taper seat as selecting expander shown in Figure 5 for use that fiber muscle 4 is sleeved on expander 7(, wherein the maximum gauge of taper seat equals or is slightly larger than the minimum diameter of lid groove) on, alignd in the position that expander 7 and lid are installed fiber muscle 4, under external force 8 effects, fiber muscle 4 is pushed into the lid corresponding site.
Embodiment one:The cement-base composite material well lid, its lid is by the 23.63wt% fluoroaluminate cement; 7.15wt% water; The 4.3wt% boron fibre; 56.92wt% sand, stone; The 8wt% polyurethane resin is made.
Its concrete method for making is: the mould that will prepare lid is divided into several sections such as face mould, filler frame, side form, bed die, vibration source to be made respectively.
The side form horizontal is connected on support and with stand spring, and vibration source is installed on the side form base plate between two parties, and the rotating shaft of vibration source is vertical with the bed die plane; The bed die horizontal is on the side form base plate; The face mould horizontal is on side form top, and face mould and filler frame are openable flexible mould.
Select (900-1200 rev/mins at a high speed of double speed high-shear impeller for use; 45-60 rev/mins of low speed), earlier cement, water, resin are stirred into cement slurry, drop into chopped strand then and make it sneak into cement paste equably, drop into again and gather materials, make cement-base composite material with stirring at low speed with high-speed stirred.Must be during batching with the panel material preparation respectively as stated above of different colours.
The cover materials that will not add pigment is earlier filled out and is put in the mould, according to the cover panel design materials of different colors is filled out respectively in the zone that is put into filler frame regulation again, loads onto face mould after filling up, with frequency 50-200Hz vibration moulding.
Base substrate after the moulding is placed maintenance under the wet environment.
In line with what are used, join what principle, it is an amount of to get spare resin, and according to environment temperature, factors such as operating time are determined gel time and then definite accelerator and hardener dose.Add accelerator earlier, add curing compound after stirring again, use immediately after stirring.
The fiber filament impregnated with resin is twined in mould, and moulding is heating and curing by (or mould is outer) in the mould simultaneously.Draw the demoulding under external force, finalize the design through behind the regelate again.
With sharp perching knife unnecessary burr are scalped, again machined surface is polished.
Stainless steel wire or stainless steel band along the horizontal uniform winding of fiber muscle, are coated sheath until all twining full formation.
The lid groove surface is coated with full resin adhesive liquid, and (lubricate during installation is installed the back and is played cementation.) and the fiber muscle is sleeved on the expander, expander and lid are installed the position of fiber muscle and alignd, under external force the fiber muscle is pushed into the lid corresponding site.
Thus obtained well lid for the round panel of band shirt rim and along round panel radially be provided with 6 stiffening ribs, panel is multiple color pattern, bearing capacity is not less than 240KN, deadweight is not more than 65KG.
Embodiment two:The cement-base composite material well lid, its lid is by the 24.17wt% Portland fly ash cement; 5.56wt% water; The 4.6wt% boron fibre; 57.07wt% sand, stone; The 8.6wt% unsaturated polyester resin is made.
Its concrete method for making is: the mould that will prepare lid is divided into several sections such as face mould, side form, bed die, vibration source to be made respectively.
The side form horizontal is connected on support and with stand spring, and vibration source is installed on the side form base plate between two parties, and the rotating shaft of vibration source is vertical with the bed die plane; The bed die horizontal is on the side form base plate; The face mould horizontal is on side form top, and face mould is openable flexible mould.
Select (900-1200 rev/mins at a high speed of double speed high-shear impeller for use; 45-60 rev/mins of low speed), earlier cement, water, resin are stirred into cement slurry, drop into chopped strand then and make it sneak into cement paste equably, drop into again and gather materials, make cement-base composite material with stirring at low speed with high-speed stirred.
Cover materials filled out be put in the mould, load onto face mould after filling up, with frequency 50-200Hz vibration moulding.
Base substrate after the moulding is placed maintenance under the wet environment.
In line with what are used, join what principle, it is an amount of to get spare resin, and according to environment temperature, factors such as operating time are determined gel time and then definite accelerator and hardener dose.Add accelerator earlier, add curing compound after stirring again, use immediately after stirring.
The fiber filament impregnated with resin is twined in mould, and moulding is heating and curing by (or mould is outer) in the mould simultaneously.Draw the demoulding under external force, finalize the design through behind the regelate again.
With sharp perching knife unnecessary burr are scalped, again machined surface is polished.
Stainless steel wire or stainless steel band along the horizontal uniform winding of fiber muscle, are coated sheath until all twining full formation.
The lid groove surface is coated with full resin adhesive liquid, and (lubricate during installation is installed the back and is played cementation.) and the fiber muscle is sleeved on the expander, expander and lid are installed the position of fiber muscle and alignd, under external force the fiber muscle is pushed into the lid corresponding site.
Thus obtained well lid for the round panel of band shirt rim and along round panel radially be provided with 7 stiffening ribs, it is monochromatic that panel is, bearing capacity is not less than 240KN, deadweight is not more than 65KG.
Embodiment three:The cement-base composite material well lid, its lid is by the 47.46wt% limestone portland cement; 11.39wt% water; The 2.1wt% hdpe fiber; The 35.95wt% haydite; The 3.1wt% furane resins are made.
Its method for making is with reference to embodiment one.
Thus obtained well lid for the round panel of band shirt rim and along round panel radially be provided with 8 stiffening ribs, panel is multiple color pattern, bearing capacity is not less than 240KN, deadweight is not more than 65KG.
Embodiment four:The cement-base composite material well lid, its lid is by the 35.55wt% coloured cement; 10.67wt% water; 2.1wt% polyphenyl Bing dioxazole fibre dimension; 45.68wt% sand, stone; The 6wt% styrene resin is made.
Its method for making is with reference to embodiment two.
Thus obtained well lid for the round panel of band shirt rim and along round panel radially be provided with 9 stiffening ribs, it is monochromatic that panel is, bearing capacity is not less than 240KN, deadweight is not more than 65KG.
Embodiment five:The cement-base composite material well lid, its lid is by the 38.69wt% low alkalinity cement; 10.06wt% water; The 3wt% alkali-resistant glass fibre; 40.05wt% sand, stone; The 8.2wt% unsaturated polyester resin is made.
Its method for making is with reference to embodiment one.
Thus obtained well lid for the round panel of band shirt rim and along round panel radially be provided with 10 stiffening ribs, panel is multiple color pattern, bearing capacity is not less than 240KN, deadweight is not more than 65KG.
Embodiment six:The cement-base composite material well lid, its lid is by the 45.5wt% Portland cement; 14.56wt% water; The 2.1wt% modified polyvinyl alcohol fabric; The 34.94wt% haydite; 2.9wt% phenolic resins is made.
Its method for making is with reference to embodiment one.
Thus obtained well lid for the round panel of band shirt rim and along round panel radially be provided with 11 stiffening ribs, panel is multiple color pattern, bearing capacity is not less than 240KN, deadweight is not more than 65KG.
Embodiment seven:The cement-base composite material well lid, its lid is by the 41.32wt% aluminate cement; 12.4wt% water; The 0.8wt% asphalt base carbon fiber; 39.48wt% sand, stone; 6wt% epoxy resin is made.
Its method for making is with reference to embodiment one.
Thus obtained well lid for the round panel of band shirt rim and along round panel radially be provided with 12 stiffening ribs, panel is multiple color pattern, bearing capacity is not less than 240KN, deadweight is not more than 65KG.
Embodiment eight:The cement-base composite material well lid, its lid is by the 42.67wt% ferrous aluminate cement; 11.95wt% water; The 2.9wt% basalt fibre; 37.48wt% sand, stone; The 5wt% acrylic acid epoxy resin is made.
Its method for making is with reference to embodiment one.
Thus obtained well lid for the round panel of band shirt rim and along round panel radially be provided with 13 stiffening ribs, panel is multiple color pattern, bearing capacity is not less than 240KN, deadweight is not more than 65KG.
Embodiment nine:The cement-base composite material well lid, its lid is by the 39.7wt% Composite portland cement; 11.12wt% water; The 5wt% ceramic alumina fiber; The 40.98wt% haydite; 3.2wt% epoxy resin is made.
Its method for making is with reference to embodiment two.
Thus obtained well lid for the round panel of band shirt rim and along round panel radially be provided with 14 stiffening ribs, it is monochromatic that panel is, bearing capacity is not less than 240KN, deadweight is not more than 65KG.
Embodiment ten:The cement-base composite material well lid, its lid is by the 41.1wt% Portland pozzolana cement; 11.49wt% water; The 4.38wt% basalt fibre; The 34.33wt% haydite; The 8.7wt% acrylonitrile resin is made.
Its method for making is with reference to embodiment two.
Thus obtained well lid for the round panel of band shirt rim and along round panel radially be provided with 8 stiffening ribs, it is monochromatic that panel is, bearing capacity is not less than 240KN, deadweight is not more than 65KG.
Embodiment 11:The cement-base composite material well lid, its lid is by the 36.9wt% sulphate aluminium cement; 8.49wt% water; The 2.1wt% chrysotile asbestos fibre; 50.41wt% sand, stone; 2.1wt% phenolic resins is made.
Its method for making is with reference to embodiment one.
Thus obtained well lid for the round panel of band shirt rim and along round panel radially be provided with 8 stiffening ribs, panel is multiple color pattern, bearing capacity is not less than 240KN, deadweight is not more than 65KG.
Embodiment 12:The cement-base composite material well lid, its lid is by the 24.36wt% portland cement; 5.85wt% water; 66.49wt% sand, stone; The 1.8wt% modified polyvinyl alcohol fabric; The 1.5wt% polymethyl methacrylate resin is made.
Its method for making is with reference to embodiment two.
Thus obtained well lid for the round panel of band shirt rim and along round panel radially be provided with 8 stiffening ribs, it is monochromatic that panel is, bearing capacity is not less than 240KN, deadweight is not more than 65KG.
Embodiment 13:The cement-base composite material well lid, its lid is by 42wt% alunite self-stressing cement; 8.41wt% water; 41.28wt% sand, stone; The 4.11wt% ceramic alumina fiber is made.
Its method for making is with reference to embodiment one.
Thus obtained well lid for the round panel of band shirt rim and along round panel radially be provided with 10 stiffening ribs, panel is multiple color pattern, bearing capacity is not less than 240KN, deadweight is not more than 65KG.
Embodiment 14:The cement-base composite material well lid, its lid is by the 39.4wt% low alkalinity cement; 11.82wt% water; The 3.8wt% alkali-resistant glass fibre; The 40wt% haydite; 4.98wt% methyl acrylate resin is made.
Its method for making is with reference to embodiment one.
Thus obtained well lid for the round panel of band shirt rim and along round panel radially be provided with 10 stiffening ribs, panel is multiple color pattern, bearing capacity is not less than 240KN, deadweight is not more than 65KG.
Embodiment 15:The cement-base composite material well lid, its lid is by the 38.3wt% portland slag cement; 9.19wt% water; The 2.2wt% hdpe fiber; The 40.35wt% haydite; The 9.96wt% furane resins are made.
Its method for making is with reference to embodiment two.
Thus obtained well lid for the round panel of band shirt rim and along round panel radially be provided with 10 stiffening ribs, it is monochromatic that panel is, bearing capacity is not less than 240KN, deadweight is not more than 65KG.
Claims (12)
1. a well lid comprises lid, it is characterized in that: lid constitutes by the round panel of band shirt rim with along the stiffening rib that radially is provided with of round panel, and the panel and the stiffening rib of band shirt rim are one-time formed integral body.
2. well lid according to claim 1 is characterized in that: lateral surface bottom, lid shirt rim is provided with the fiber muscle.
3. well lid according to claim 1 and 2 is characterized in that: lid shirt rim lateral surface is a taper seat; Lateral surface bottom, lid shirt rim is provided with the groove that the fiber muscle is installed, and shirt rim lateral surface and groove surface are the concentric circles conical surface; The fiber muscle is located in the groove.
5. well lid according to claim 4 is characterized in that: the quantity of stiffening rib is 6~14.
6. well lid according to claim 2 is characterized in that: the fiber muscle comprises muscle body and sheath, and the muscle body is the circular ring-type of sealing, and sheath is coated on the muscle surface, fiber muscle cross section parallelogram.
7. well lid according to claim 1 and 2 is characterized in that: lid is by 23.63~47.46wt% cement; 5.56~14.56wt% water; 0.8~5wt% chopped strand; 34.33~66.49wt% gathers materials; 0~9.96wt% resin mix vibrates and forms.
8. well lid according to claim 7 is characterized in that: following steps are adopted in the lid moulding:
(1), fabrication and installation mould:
The mould of preparation lid comprises: be the face mould of panel top dough model shape, be the moulding side form of the lateral surface of shirt rim, be the bottom surface of panel, the medial surface and the moulding bed die of stiffening rib of shirt rim, the vibration source of power and vibration frequency 50-200Hz is provided for the lid moulding; The side form horizontal is connected on support and with stand spring, and vibration source is installed on the side form base plate between two parties, and the rotating shaft of vibration source is vertical with the bed die plane; The bed die horizontal is on the side form base plate; The face mould horizontal is on side form top;
(2), batching:
Select the double speed high-shear impeller of 900-1200 rev/mins of high speeds, 45-60 rev/mins of low speed for use, earlier cement, water and resin are put into and stirred into cement slurry in the mixer, chopped strand being dropped in the cement slurry then makes it sneak into cement paste equably with high-speed stirred, drop into again and gather materials, make cement-base composite material with stirring at low speed;
(3), moulding:
Cement-base composite material filled out be put in the mould, fill up face mould on the bonnet, obtain base substrate with frequency 50-200Hz 30 to 150 second time of vibration;
(4), maintenance:
Base substrate after the moulding placed maintenance obtains lid under the wet environment.
9. well lid according to claim 8 is characterized in that: when on the cover panel multiple color being set, the mould of preparation lid also comprises the filler frame, and filler frame horizontal is on side form top; The pigment of the distribution of (two) adding required color is prepared the cement-base composite material of corresponding color respectively set by step, and (two) prepare the cement-base composite material that does not add pigment set by step, the cement-base composite material that will not add pigment is then filled out and is put in the mould, load onto the filler frame, according to the cover panel design cement-base composite material of required color is filled out respectively in the respective regions that is put into the filler frame, fill up face mould on the bonnet, obtained base substrate in 30 to 150 seconds with frequency 50-200Hz vibration.
10. well lid according to claim 6 is characterized in that: the fiber muscle is to be made by 48~60v% fiber filament, 32~42v% resin and 5~14v% stainless steel.
11. well lid according to claim 10 is characterized in that: the fiber filament impregnated with resin twined in mould make the muscle body, form sheath with stainless steel wire or stainless steel band along the horizontal uniform winding of muscle body in the muscle surface then and obtain the fiber muscle.
12. according to claim 2 or 6 or 10 or 11 described well lids, it is characterized in that: fiber muscle mounting method is: the fiber muscle is sleeved on the expander, is alignd in the position that expander and lid are installed the fiber muscle, under external force the fiber muscle is pushed on the lid.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105919103A CN102071704B (en) | 2010-12-16 | 2010-12-16 | Well lid |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105919103A CN102071704B (en) | 2010-12-16 | 2010-12-16 | Well lid |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102071704A true CN102071704A (en) | 2011-05-25 |
CN102071704B CN102071704B (en) | 2012-07-25 |
Family
ID=44030444
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010105919103A Expired - Fee Related CN102071704B (en) | 2010-12-16 | 2010-12-16 | Well lid |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102071704B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102363967A (en) * | 2011-11-07 | 2012-02-29 | 朱明龙 | Damage control device for road inspection well cover |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1401860A (en) * | 2002-09-06 | 2003-03-12 | 蒋元海 | Method for making fibre reinforced concrete manhole cover |
US20040042849A1 (en) * | 2002-08-15 | 2004-03-04 | Bescal, Inc. | Utilities access closure |
CN1542051A (en) * | 2003-04-29 | 2004-11-03 | 叶炽凡 | Macromolecule composite for manhole cover |
CN1598170A (en) * | 2004-08-11 | 2005-03-23 | 周志亮 | Cover made by macromolecular composite material and its mfg. method |
CN1990961A (en) * | 2005-12-28 | 2007-07-04 | 曾建祥 | Composite material moulded well covers |
CN101289290A (en) * | 2007-04-20 | 2008-10-22 | 天津市奥立纤维水泥制品厂 | Complex fiber cement well lid and method for preparing same |
CN101818504A (en) * | 2009-11-06 | 2010-09-01 | 长江大学 | The manufacture method of a kind of manhole cover or water drain grid cover |
CN202007419U (en) * | 2010-12-16 | 2011-10-12 | 吕云南 | Manhole cover |
-
2010
- 2010-12-16 CN CN2010105919103A patent/CN102071704B/en not_active Expired - Fee Related
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040042849A1 (en) * | 2002-08-15 | 2004-03-04 | Bescal, Inc. | Utilities access closure |
CN1401860A (en) * | 2002-09-06 | 2003-03-12 | 蒋元海 | Method for making fibre reinforced concrete manhole cover |
CN1542051A (en) * | 2003-04-29 | 2004-11-03 | 叶炽凡 | Macromolecule composite for manhole cover |
CN1598170A (en) * | 2004-08-11 | 2005-03-23 | 周志亮 | Cover made by macromolecular composite material and its mfg. method |
CN1990961A (en) * | 2005-12-28 | 2007-07-04 | 曾建祥 | Composite material moulded well covers |
CN101289290A (en) * | 2007-04-20 | 2008-10-22 | 天津市奥立纤维水泥制品厂 | Complex fiber cement well lid and method for preparing same |
CN101818504A (en) * | 2009-11-06 | 2010-09-01 | 长江大学 | The manufacture method of a kind of manhole cover or water drain grid cover |
CN202007419U (en) * | 2010-12-16 | 2011-10-12 | 吕云南 | Manhole cover |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102363967A (en) * | 2011-11-07 | 2012-02-29 | 朱明龙 | Damage control device for road inspection well cover |
Also Published As
Publication number | Publication date |
---|---|
CN102071704B (en) | 2012-07-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106189980B (en) | A kind of enhanced rapid curing dry-hang glue | |
CN107023211B (en) | Ultra-high performance concrete pole containing composite fibers | |
CN107932700A (en) | Prefabricated high-strength concrete bridge pier and its molding die and manufacture method | |
CN102888066A (en) | Resin-based composite material for cable bracket or fixture and preparation method of resin-based composite material | |
CN111941584A (en) | 3D printing device and method suitable for fiber cement-based concrete material | |
CN102071704B (en) | Well lid | |
CN103482456A (en) | Elevator balancing weight and manufacturing method thereof | |
CN202007419U (en) | Manhole cover | |
CN210558914U (en) | Inspection shaft hoisting assembly | |
CN104329105A (en) | Color light storage type anchor rod plastic tray | |
CN100436362C (en) | Luminous GRP floor tile | |
CN102080412B (en) | Water grate | |
CN100374581C (en) | Full homogeneous barium-containing skimming ball for steel making in converter | |
GB1604405A (en) | Articles made from resin compositions containing aggregate materials eg glass | |
CN201952887U (en) | Water grate | |
CN110241861B (en) | Production process of cast iron copper-imitation well cover | |
CN205685527U (en) | A kind of research on steel fiber reinforced concrete poles production system | |
CN105544609B (en) | Glass fiber reinforced plastic composite integrated inspection well and preparation method thereof | |
CN101274836A (en) | Polymer reinforced light gypsum decorative material | |
CN1631656A (en) | Fiber-reinforced pultrusion rod and preparation method and application thereof | |
CN204532369U (en) | Tunnel lining combined column cored structure | |
CN208484260U (en) | A kind of FRP thin-walled electric pole | |
CN210233479U (en) | A automatic intelligent dispensing equipment for producing high strength concrete | |
CN109741938B (en) | Method for preparing epoxy PET insulating cylinder suitable for casting dry-type transformer | |
KR101388243B1 (en) | grating having various colors and patterns |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120725 Termination date: 20211216 |