CN102065478B - Automatic optimization method and device of network load regulation target - Google Patents

Automatic optimization method and device of network load regulation target Download PDF

Info

Publication number
CN102065478B
CN102065478B CN 200910238010 CN200910238010A CN102065478B CN 102065478 B CN102065478 B CN 102065478B CN 200910238010 CN200910238010 CN 200910238010 CN 200910238010 A CN200910238010 A CN 200910238010A CN 102065478 B CN102065478 B CN 102065478B
Authority
CN
China
Prior art keywords
cell
target
origin
load
switching
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 200910238010
Other languages
Chinese (zh)
Other versions
CN102065478A (en
Inventor
王彦
许森
杨晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Telecommunications Technology CATT
Datang Mobile Communications Equipment Co Ltd
Original Assignee
China Academy of Telecommunications Technology CATT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Academy of Telecommunications Technology CATT filed Critical China Academy of Telecommunications Technology CATT
Priority to CN 200910238010 priority Critical patent/CN102065478B/en
Publication of CN102065478A publication Critical patent/CN102065478A/en
Application granted granted Critical
Publication of CN102065478B publication Critical patent/CN102065478B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention provides an automatic optimization method and device of a network load regulation target. The automatic optimization method comprises the following steps: a target cell selected by a source cell counts related switch performance data caused by load regulation; and when partial or all related switch performance statistics do not meet a predetermined index, a base station at which thetarget cell is arranged sends a notice message to the base station at which the source cell is arranged so that the source cell stops to carry out load regulation operation on the target cell, wherein the notice message comprises the related switch performance statistics and related load regulation target indicates. The invention also provides an information count and feedback device and a load regulation device. Through using the technique in the invention, when the effect of the load regulation dose not achieve the determined indexes, the source cell can obtain the related performance statistics and automatically optimize the regulated target, thereby avoiding the lasting deterioration of the system performance.

Description

Network load is adjusted target self-organization method and device
Technical field
The present invention relates to the communications field, relate in particular to a kind of network load and adjust target self-organization method and device and Information Statistics and feedback device and load adjusting device.
Background technology
In the LTE system, in order to improve overall system capacity, wish between different districts, to realize the even distribution of load.By the load balancing of minizone, can also reduce owing to the single subdistrict overload causes user's quality of service and seriously descend.On the other hand, too high when the load that the residential quarter is arranged in the system, when surpassing the level that the network equipment can bear, the users of specific area that causes for fear of the base station equipment collapse can't obtain the network service, and the high load capacity residential quarter need be transferred to other residential quarter (base station) to the load of overload.
At present, (mutual load condition is separately wanted in the minizone to the mobile load balancing of discussing in the 3GPP normal structure for Mobility LoadBalancing, method MLB), comprises no specific electric load, hardware load and transport layer load, and the situation of available resources.Which residential quarter the base station of heavy load can only determine can be used as balanced target based on these information on loads, and base station, place, high load capacity residential quarter forwards certain customers in the Target cell to by switching then.Traffic overload is handled and is belonged to manufacturer's specific implementation, does not have the required standard operating process in agreement, but similar with load balance method usually.Because the complex situations of real network are not necessarily only based on the Target cell that load condition is selected, the result that load is adjusted operation also depends on two wireless signal situations between the residential quarter.Such consequence might occur, when carrying out load adjustment action, some UE are switched in the selected Target cell by network, cause call drop but failure takes place behind the target approach residential quarter; Perhaps only the very short time of stop just switches to other residential quarter, causes the unnecessary consumption of Internet resources.
In present 3GPP agreement, want mutual information on load to comprise between the neighbor cell,
◆ Radio Resource utilization rate (being the Physical Resource Block utilization rate)
◆ hardware load indication (basic, normal, high, overload)
◆ transmission network load indication (basic, normal, high, overload)
◆ the cell capacity classification
◆ available load value (can be used for load balancing on/downlink capacity accounts for the percentage of residential quarter total capacity)
The load controlling function body of base station, place, cell-of-origin (i.e. the heavy residential quarter of load) is according to above information on load, determine the Target cell that load is adjusted, after consulting with Target cell, to load to the Target cell adjustment by change action in the cell-of-origin, namely the user is switched to selected Target cell from the cell-of-origin.
Use prior art, base station, place, cell-of-origin can only determine the target of selecting which residential quarter to adjust as load according to the load condition of each adjacent area.But, the wireless signal situation of adjacent area intersection is not understood in the cell-of-origin, therefore possible result is, though the Target cell load level of selecting is lower, but wireless environment may be improper, make that UE switches to target from the cell-of-origin after, very fast generation Radio Link Failure (Radio Link Failure, RLF), cause call drop; Perhaps the very short time of stop just switches to other residential quarter behind the UE target approach residential quarter.These problems can cause the performance of system to descend (cutting off rate rising), cause the discontented of user, and the resource of waste system, are that operator does not wish to see.
As seen, in the prior art, the selection of load adjustment target can only be based on the information on load of each residential quarter, the wireless environment with each adjacent area intersection is not understood in the cell-of-origin, might make load adjust the performance of handoffs variation that operation causes, cause systematic function to descend, cutting off rate rises, and the resource of waste system.Owing to the result who adjusts operation is not understood in the cell-of-origin, therefore can not make timely and optimizing, cause systematic function constantly to worsen, cause being discontented with of user.
Summary of the invention
At the one or more problems that exist in the correlation technique, the object of the present invention is to provide a kind of network load to adjust target self-organization method and device and Information Statistics and feedback device and load adjusting device, with in addressing the above problem one of at least.
For achieving the above object, according to an aspect of the present invention, provide a kind of network load to adjust the self-organization method of target, having comprised: by the Target cell that the cell-of-origin is chosen the switching correlated performance data that load adjustment causes are added up; When switching correlated performance statistic does not partly or entirely satisfy desired indicator, base station, Target cell place sends a notification message to base station, place, cell-of-origin, make the cell-of-origin stop to load to Target cell and adjust operation, wherein, notification message comprises that switching the correlated performance statistic adjusts the relevant indication of target with load.
For achieving the above object, according to another aspect of the present invention, provide a kind of network load to adjust target self-optimizing device, comprise: Information Statistics and feedback module, be positioned at the Target cell of being chosen by the cell-of-origin, be used for when loading the adjustment operation, the switching correlated performance data that load adjustment causes are added up, and when switching correlated performance statistic does not partly or entirely satisfy desired indicator, send a notification message to the cell-of-origin, notification message comprises that switching the correlated performance statistic adjusts the relevant indication of target with load; The load adjusting module is positioned at the cell-of-origin, is used for receiving notice message, stops to load to Target cell after receiving notification message adjusting operation and carrying out subsequent treatment.
For achieving the above object, according to a further aspect of the invention, a kind of Information Statistics and feedback device are provided, it is positioned at the base station of being chosen by the cell-of-origin, Target cell place, these Information Statistics and feedback device comprise: statistical module, be used for when loading the adjustment operation, the switching correlated performance data that load adjustment causes being added up; And feedback module, be used for when switching correlated performance statistic does not partly or entirely satisfy desired indicator, sending a notification message to the cell-of-origin, wherein, notification message comprises switching correlated performance statistic and the relevant indication of load adjustment target.
For achieving the above object, according to a further aspect of the invention, a kind of load adjusting device is provided, it is positioned at base station, place, cell-of-origin, this load adjusting device comprises: receiver module, be used for receiving the notification message from Target cell, wherein, notification message comprises that switching the correlated performance statistic adjusts the relevant indication of target with load; And the load adjusting module, be used for after receiving notification message, stop to load to Target cell and adjust operation.
The present invention is by in the process of carrying out the load adjustment, the performance statistics that Target cell is loaded and adjusted, and feed back to the cell-of-origin is so that under the relatively poor situation of the performance of handoffs that load adjustment causes, self-optimizing can be carried out to target in the cell-of-origin, to avoid the lasting deterioration of systematic function.
Description of drawings
Fig. 1 is that network load is adjusted the flow chart of target self-organization method according to an embodiment of the invention;
Fig. 2 is that network load is adjusted the block diagram of target self-optimizing device according to an embodiment of the invention;
Fig. 3 is the block diagram of Information Statistics according to an embodiment of the invention and feedback device;
Fig. 4 is the block diagram of adjusting device of loading according to an embodiment of the invention;
Fig. 5 is the scene of target mistake of switching in the network load adjustment process according to an embodiment of the invention;
The scene of switching too early takes place in Fig. 6 according to an embodiment of the invention in the network load adjustment process; And
The scene of switching continuously takes place in Fig. 7 according to an embodiment of the invention in the network load adjustment process.
Embodiment
In order to solve above-mentioned one or more problems, in the process of carrying out the load adjustment, the performance statistics that Target cell is loaded and adjusted, and feed back to the cell-of-origin, so that under the relatively poor situation of (load adjust cause) performance of handoffs, self-optimizing can be carried out to target in the cell-of-origin, to avoid the lasting deterioration of systematic function.
Fig. 1 is that network load is adjusted the flow chart of target self-organization method according to an embodiment of the invention.As shown in Figure 1, network load adjustment target self-organization method comprises according to an embodiment of the invention:
Step S102 when loading the adjustment operation, is added up the switching correlated performance data that load adjustment causes by the Target cell that the cell-of-origin is chosen;
Step S104, when switching correlated performance statistic does not partly or entirely satisfy desired indicator, base station, Target cell place (abbreviating target BS as) sends a notification message to base station, place, cell-of-origin (abbreviating source base station as), making the cell-of-origin stop to load to Target cell adjusts operation and carries out subsequent treatment, wherein, notification message comprises that switching the correlated performance statistic adjusts the relevant indication of target with load.
Wherein, switching the correlated performance statistic can comprise: user terminal switches to the ratio of very fast generation Radio Link Failure behind the current goal residential quarter from the cell-of-origin, wherein, user terminal enters the current goal residential quarter and arrives the time interval of generation Radio Link Failure less than the first network predetermined value; And/or the continuous ratio that switches of generation, wherein, after switching to user terminal continuously and switching to Target cell from the cell-of-origin, stop the very short time, switch to the event of the residential quarter except cell-of-origin and Target cell again, wherein, time of stopping in the current goal residential quarter of user terminal is less than the second network predetermined value.The cell-of-origin as long as one of above-mentioned performance statistics or all do not satisfy desired indicator, base station, Target cell place will send a notification message.
In addition, the network operation administrative staff need adjust the performance of handoffs index that operation will be satisfied, the just higher limit of the ratio of very fast generation Radio Link Failure and the first network predetermined value and the second network predetermined value for the base station arranges load.
The relevant indication of the adjustment target of loading can only comprise the indication of residential quarter uncomfortable cooperation load adjustment target or the candidate cell sign of Target cell recommendation, also can comprise the two simultaneously, and wherein, the candidate cell sign can be overall identification.
Comprise under the situation of the candidate cell sign that Target cell is recommended that in the relevant indication of load adjustment target base station, place, cell-of-origin determines whether candidate cell can be as the Target cell of loading and adjusting.Base station, place, cell-of-origin can be by holding consultation to determine with the candidate cell of recommending whether candidate cell can also can come to determine by other means as the Target cell of load adjustment.
Base station, Target cell place sends a notification message to base station, place, cell-of-origin by inter-base station interface.
Concrete process is: after load adjustment action begins to carry out, each selected Target cell is added up the performance of handoffs data that the adjustment operation causes, namely statistics UE switches to the ratio of very fast generation Radio Link Failure (RLF) behind this Target cell from the cell-of-origin in monitoring time, and the ratio that continuous switching takes place, after the one or more threshold values that set in advance above system in these ratios, the discontented pedal system requirement of the performance of handoffs that notification source cell load adjustment operation causes, indicate this residential quarter to be not suitable as the target that load is adjusted, can also recommend other residential quarter as the candidate simultaneously.After the cell-of-origin is notified, stop the adjustment action to this Target cell, if comprised candidate target in the message, then hold consultation with it in the cell-of-origin, whether can be used as the target that load is adjusted to determine this candidate cell.
Here UE switches to very fast generation Radio Link Failure behind the Target cell from the cell-of-origin, refers to be accomplished to the parameter that time interval that failure takes place sets in advance less than network from switching.
Here " switch continuously ", refer to that UE switches to selected Target cell (B) from cell-of-origin (A) after, stops the very short time, just switch to another residential quarter (C) again.This situation is called " switching continuously ", and wherein UE is the parameter that network sets in advance in the time span that residential quarter B stops.
May be caused by multiple reason owing to switching, wireless signal condition for example, it is acute to be pressed for time, and reason such as load adjustment.The cause value that carries in " handover request " message that Target cell can be sent by the cell-of-origin judges that this time switching is caused by load adjustment, or other factors causes.At LTE (Long Term Evolution, Long Term Evolution) in the system, the switch reasons that load adjustment causes comprises that " resource optimization switches (Resource Optimisation Handover) " reaches " reducing Serving cell load (Reduce Load in Serving Cell) ".
Fig. 2 is that network load is adjusted the block diagram of target self-optimizing device according to an embodiment of the invention.As shown in Figure 2, network load adjustment target self-optimizing device 200 comprises according to an embodiment of the invention: Information Statistics and feedback module 202, be positioned at the base station of being chosen by the cell-of-origin, Target cell place, be used for when loading the adjustment operation, the switching correlated performance data that load adjustment causes are added up, and when switching correlated performance statistic does not partly or entirely satisfy desired indicator, send a notification message to the cell-of-origin, notification message comprises that switching the correlated performance statistic adjusts the relevant indication of target with load; Load adjusting module 204 is positioned at base station, place, cell-of-origin, is used for receiving notice message, stops to load to Target cell after receiving notification message adjusting operation.
Wherein, switching the correlated performance statistic comprises: user terminal switches to the ratio of very fast generation Radio Link Failure behind the current goal residential quarter and/or takes place to switch continuously from the cell-of-origin ratio.
Wherein, the relevant indication of load adjustment target comprises the indication of residential quarter uncomfortable cooperation load adjustment target and/or the candidate cell sign that Target cell is recommended.
Fig. 3 is the schematic diagram of Information Statistics according to an embodiment of the invention and feedback device.As shown in Figure 3, this device is positioned at the base station of being chosen by the cell-of-origin, Target cell place, and Information Statistics and feedback device 300 comprise: statistical module 302 is used for when loading the adjustment operation switching correlated performance data that load adjustment causes being added up; And feedback module 304, be used for when switching correlated performance statistic does not partly or entirely satisfy desired indicator, sending a notification message to the cell-of-origin, wherein, notification message comprises switching correlated performance statistic and the relevant indication of load adjustment target.
Switching the correlated performance statistic can comprise: user terminal switches to the ratio of very fast generation Radio Link Failure behind the current goal residential quarter from the cell-of-origin, wherein, user terminal enters the current goal residential quarter and arrives the time interval of generation Radio Link Failure less than the first network predetermined value; And/or the continuous ratio that switches of generation, wherein, after switching to user terminal continuously and switching to Target cell from the cell-of-origin, stop the very short time, switch to the event of the residential quarter except cell-of-origin and Target cell again, wherein, time of stopping in the current goal residential quarter of user terminal is less than the second network predetermined value.
The relevant indication of the adjustment target of loading can comprise the indication of residential quarter uncomfortable cooperation load adjustment target and/or the candidate cell sign of Target cell recommendation.Adjust under the situation that the relevant indication of target comprises the candidate cell sign that Target cell is recommended at load, the load adjusting module is determined the Target cell whether candidate cell can be adjusted as load.
Fig. 4 is the schematic diagram of adjusting device of loading according to an embodiment of the invention.As shown in Figure 4, this device is positioned at base station, place, cell-of-origin, and load adjusting device 400 comprises: receiver module 402 is used for receiving the notification message from Target cell, wherein, notification message comprises that switching the correlated performance statistic adjusts the relevant indication of target with load; And load adjusting module 404, be used for after receiving notification message, stop to load to Target cell and adjust operation.
Describe below with several typical specific embodiments the present invention is described.
Embodiment 1
The scene of the target that in the network load adjustment process, switches mistake, as shown in Figure 5.Very fast generation Radio Link Failure (RLF) after user terminal switches, select subsequently one neither the cell-of-origin neither Target cell the residential quarter carry out connection reconstruction, load is in this case adjusted target self-optimizing process and is comprised:
Step 1, A place, cell-of-origin is base station selected adjacent residential quarter B carries out load adjustment operation, to reduce the load among the A of residential quarter as target.
Step 2, some UE at two cell boarder places switch to B from A, and carrying cause value in the handover request message is " Resource Optimisation Handover " or " Reduce Load in ServingCell ".
Step 3, have some UE to switch to residential quarter B after, Radio Link Failure just takes place in very fast (time interval that sets in advance less than network).These UE attempt recovering wireless connections, have chosen another residential quarter C to carry out wireless connections by the residential quarter selection course and have rebuild.Residential quarter C sends Radio Link Failure report (RLF report) after receiving that request is rebuild in the wireless connections of UE to base station, B place, residential quarter.
Step 4 after residential quarter B receives report, is upgraded the relevant RLF statistic of corresponding load adjustment.
Step 5, when the occurrence rate of failure problem surpassed system's pre-set threshold, the effect that this explanation load is adjusted was bad, though because load migrates out from A, be not to be moved into B at last, but among the C of residential quarter, mean that C may be a more suitably target.Base station, B place, residential quarter sends a notification message to base station, A place, cell-of-origin, comprise the RLF ratio that load adjustment causes, indicates self to be not suitable for doing the target that load is adjusted, and can comprise the overall identification of residential quarter C.
Step 6 after residential quarter A is notified, stops to do load adjustment to residential quarter B.If residential quarter C also is the adjacent area of A, then hold consultation in two residential quarters, determines whether C is suitable as the target that load is adjusted.
Embodiment 2
The scene of switching too early takes place in the network load adjustment process, and as shown in Figure 6, very fast generation RLF after user terminal switches selects the cell-of-origin to carry out connection reconstruction subsequently, and load is in this case adjusted target self-optimizing process and comprised:
Step 1, A place, cell-of-origin is base station selected adjacent residential quarter B carries out load adjustment operation, to reduce the load among the A of residential quarter as target.
Step 2, some UE at two cell boarder places switch to B from A, and carrying cause value in the handover request message is " Resource Optimisation Handover " or " Reduce Load inServing Cell ".
Step 3, have some UE to switch to residential quarter B after, Radio Link Failure just takes place in very fast (time interval that sets in advance less than network).These UE attempt recovering wireless connections, get back to cell-of-origin A again by the residential quarter selection course and carry out connection reconstruction.Residential quarter A sends Radio Link Failure report (RLF report) after receiving that request is rebuild in the wireless connections of UE to base station, B place, residential quarter.
Step 4 after residential quarter B receives report, is upgraded the relevant RLF statistic of corresponding load adjustment.
Step 5, when the occurrence rate of failure problem surpasses system's pre-set threshold, base station, B place, residential quarter sends a notification message to base station, A place, cell-of-origin, comprise the RLF ratio that load adjustment causes, indicates self to be not suitable for doing the target that load is adjusted action.
Step 6 after residential quarter A is notified, stops to do load adjustment to residential quarter B.
Embodiment 3
The scene switched continuously takes place in the network load adjustment process, as shown in Figure 7, switch to residential quarter B from residential quarter A after, very fast generation switches to residential quarter C next time, load is in this case adjusted target self-optimizing process and is comprised:
Step 1, cell-of-origin A is base station selected adjacent residential quarter B carries out load adjustment operation, to reduce the load among the A of residential quarter as target.
Step 2, some UE at two cell boarder places switch to B from A, and carrying cause value in the handover request message is " Resource Optimisation Handover " or " Reduce Load in ServingCell ".
Step 3, have some UE to switch to residential quarter B after, stop very short time (time interval that sets in advance less than network) just switches next time, switches to another residential quarter C.
Step 4, residential quarter B judges that " switching continuously " problem has taken place these UE, upgrades load and adjusts relevant continuous switching statistic.
Step 5, when the occurrence rate of this class event surpasses system's pre-set threshold, base station, B place, residential quarter sends a notification message to base station, A place, cell-of-origin, comprise load adjustment and operate the ratio of " switching continuously " of causing, indicate self to be not suitable for doing the target that load is adjusted, and can comprise the overall identification of residential quarter C.
Step 6 after residential quarter A is notified, stops to do load adjustment to residential quarter B.If residential quarter C also is the adjacent area of A, then hold consultation in two residential quarters, determines whether residential quarter C is suitable as the target that load is adjusted.
More than several embodiment be not what separate, in real network, may take place simultaneously, therefore the target BS adjusted of load will be added up these problems simultaneously.
Statistics in the embodiments of the invention is only added up at the handover event that load adjustment causes, and the switching that other reason causes is not in the statistics category.
Compared with prior art, above-mentioned at least one technical scheme by the embodiment of the invention, by adopting the technology of the embodiment of the invention, when the performance statistics of load adjustment does not reach expectation index, the cell-of-origin can obtain relevant statistical information, and the target of adjusting carried out Automatic Optimal, can avoid the lasting deterioration of systematic function.
The above is the preferred embodiments of the present invention only, is not limited to the present invention, and for a person skilled in the art, the present invention can have various changes and variation.Within the spirit and principles in the present invention all, any modification of doing, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (14)

1. a network load is adjusted the target self-organization method, it is characterized in that,
By the Target cell that the cell-of-origin is chosen the switching correlated performance data that load adjustment causes are added up;
When switching correlated performance statistic does not partly or entirely satisfy desired indicator, base station, described Target cell place sends a notification message to base station, place, described cell-of-origin, make described cell-of-origin stop to load to described Target cell and adjust operation, wherein, described notification message comprises described switching correlated performance statistic and the relevant indication of load adjustment target
Wherein, described switching correlated performance statistic comprises: user terminal switches to the ratio of very fast generation Radio Link Failure behind the current goal residential quarter and/or takes place to switch continuously from the cell-of-origin ratio.
2. method according to claim 1, it is characterized in that, when described switching correlated performance statistic was the ratio of very fast generation Radio Link Failure after user terminal switches to the current goal residential quarter from the cell-of-origin, described user terminal entered described current goal residential quarter and arrives the time interval of generation Radio Link Failure less than the first network predetermined value;
When described switching correlated performance statistic is when the ratio of switching continuously takes place, after switching to user terminal continuously and switching to Target cell from the cell-of-origin, stop the very short time, switch to the event of the residential quarter except cell-of-origin and Target cell again, wherein, time of stopping in the current goal residential quarter of user terminal is less than the second network predetermined value.
3. method according to claim 1 is characterized in that, the relevant indication of described load adjustment target comprises the indication of residential quarter uncomfortable cooperation load adjustment target and/or the candidate cell sign that Target cell is recommended.
4. method according to claim 3, it is characterized in that, comprise under the situation of the candidate cell sign that described Target cell is recommended that in the relevant indication of described load adjustment target base station, place, described cell-of-origin determines whether described candidate cell can be as the Target cell of loading and adjusting.
5. method according to claim 4 is characterized in that, the base station, candidate cell place of base station, place, described cell-of-origin and recommendation comes through consultation to determine whether described candidate cell can be as the Target cell of load adjustment.
6. method according to claim 1 is characterized in that, base station, described Target cell place sends described notification message by inter-base station interface to base station, place, described cell-of-origin.
7. a network load is adjusted target self-optimizing device, it is characterized in that, comprising:
Information Statistics and feedback module, be positioned at the base station of being chosen by the cell-of-origin, Target cell place, be used for when loading the adjustment operation, the switching correlated performance data that load adjustment causes are added up, and when switching correlated performance statistic does not partly or entirely satisfy desired indicator, send a notification message to described cell-of-origin, described notification message comprises described switching correlated performance statistic and the relevant indication of load adjustment target;
The load adjusting module is positioned at base station, place, described cell-of-origin, be used for to receive described notification message, after receiving described notification message, stop to load to described Target cell adjusting operation,
Wherein, described switching correlated performance statistic comprises: user terminal switches to the ratio of very fast generation Radio Link Failure behind the current goal residential quarter and/or takes place to switch continuously from the cell-of-origin ratio.
8. device according to claim 7, it is characterized in that, when described switching correlated performance statistic was the ratio of very fast generation Radio Link Failure after user terminal switches to the current goal residential quarter from the cell-of-origin, described user terminal entered described current goal residential quarter and arrives the time interval of generation Radio Link Failure less than the first network predetermined value;
When described switching correlated performance statistic is when the ratio of switching continuously takes place, after switching to user terminal continuously and switching to Target cell from the cell-of-origin, stop the very short time, switch to the event of the residential quarter except cell-of-origin and Target cell again, wherein, time of stopping in the current goal residential quarter of user terminal is less than the second network predetermined value.
9. device according to claim 7 is characterized in that, the relevant indication of described load adjustment target comprises the indication of residential quarter uncomfortable cooperation load adjustment target and/or the candidate cell sign that Target cell is recommended.
10. device according to claim 9, it is characterized in that, comprise under the situation of the candidate cell sign that described Target cell is recommended that in the relevant indication of described load adjustment target described load adjusting module determines whether described candidate cell can be as the Target cell of loading and adjusting.
11. Information Statistics and feedback device is characterized in that be positioned at the base station of being chosen by the cell-of-origin, Target cell place, described Information Statistics and feedback device comprise:
Statistical module is used for when loading the adjustment operation switching correlated performance data that load adjustment causes being added up; And
Feedback module is used for sending a notification message to described cell-of-origin when switching correlated performance statistic does not partly or entirely satisfy desired indicator, and wherein, described notification message comprises described switching correlated performance statistic and the relevant indication of load adjustment target,
Wherein, described switching correlated performance statistic comprises: user terminal switches to the ratio of very fast generation Radio Link Failure behind the current goal residential quarter and/or takes place to switch continuously from the cell-of-origin ratio.
12. device according to claim 11, it is characterized in that, when described switching correlated performance statistic was the ratio of very fast generation Radio Link Failure after user terminal switches to the current goal residential quarter from the cell-of-origin, described user terminal entered described current goal residential quarter and arrives the time interval of generation Radio Link Failure less than the first network predetermined value;
When described switching correlated performance statistic is when the ratio of switching continuously takes place, after switching to user terminal continuously and switching to Target cell from the cell-of-origin, stop the very short time, switch to the event of the residential quarter except cell-of-origin and Target cell again, wherein, time of stopping in the current goal residential quarter of user terminal is less than the second network predetermined value.
13. device according to claim 11 is characterized in that, the relevant indication of described load adjustment target comprises the indication of residential quarter uncomfortable cooperation load adjustment target and/or the candidate cell sign that Target cell is recommended.
14. a load adjusting device is characterized in that, is positioned at base station, place, cell-of-origin, described load adjusting device comprises:
Receiver module is used for receiving the notification message from Target cell, and wherein, notification message comprises that switching the correlated performance statistic adjusts the relevant indication of target with load; And
The load adjusting module is used for after receiving described notification message, stops to load to described Target cell adjusting operation,
Wherein, described switching correlated performance statistic comprises: user terminal switches to the ratio of very fast generation Radio Link Failure behind the current goal residential quarter and/or takes place to switch continuously from the cell-of-origin ratio.
CN 200910238010 2009-11-13 2009-11-13 Automatic optimization method and device of network load regulation target Active CN102065478B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200910238010 CN102065478B (en) 2009-11-13 2009-11-13 Automatic optimization method and device of network load regulation target

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200910238010 CN102065478B (en) 2009-11-13 2009-11-13 Automatic optimization method and device of network load regulation target

Publications (2)

Publication Number Publication Date
CN102065478A CN102065478A (en) 2011-05-18
CN102065478B true CN102065478B (en) 2013-10-02

Family

ID=44000521

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200910238010 Active CN102065478B (en) 2009-11-13 2009-11-13 Automatic optimization method and device of network load regulation target

Country Status (1)

Country Link
CN (1) CN102065478B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103067972B (en) * 2011-10-18 2018-06-12 中兴通讯股份有限公司 Parameter processing method and device based on load-balancing mechanism
CN104427554A (en) * 2013-08-29 2015-03-18 中兴通讯股份有限公司 Method for cooperative multi-flow data transmission and base station
CN112203361B (en) * 2020-10-12 2023-02-28 Oppo(重庆)智能科技有限公司 Method and device for processing radio link failure, terminal and storage medium
CN112910731B (en) * 2021-01-28 2022-11-11 三维通信股份有限公司 Counter determination method and device
CN116980917A (en) * 2022-04-13 2023-10-31 中兴通讯股份有限公司 Wireless network user perception optimization method and device, electronic equipment and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1681349A (en) * 2004-04-08 2005-10-12 华为技术有限公司 Loading balancing method in layering zone structure
CN101026857A (en) * 2006-02-17 2007-08-29 中兴通讯股份有限公司 Method for preparing resource in advance for hard switching process
CN101052208A (en) * 2006-04-06 2007-10-10 华为技术有限公司 Switching method and switching network
CN101478739A (en) * 2008-01-04 2009-07-08 上海华为技术有限公司 Method, system and related device for optimizing cell neighboring relation list

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1681349A (en) * 2004-04-08 2005-10-12 华为技术有限公司 Loading balancing method in layering zone structure
CN101026857A (en) * 2006-02-17 2007-08-29 中兴通讯股份有限公司 Method for preparing resource in advance for hard switching process
CN101052208A (en) * 2006-04-06 2007-10-10 华为技术有限公司 Switching method and switching network
CN101478739A (en) * 2008-01-04 2009-07-08 上海华为技术有限公司 Method, system and related device for optimizing cell neighboring relation list

Also Published As

Publication number Publication date
CN102065478A (en) 2011-05-18

Similar Documents

Publication Publication Date Title
US10506575B2 (en) Resource allocation method and system, device having base station functionality, and terminal
CN101273556B (en) Method and device for arranging and changing schedule of packet data service
CN101873620B (en) Method and device for judging inter-cell reselection parameter and handover parameter matching
CN102448112B (en) Process the method based on the congestion control of APN and communication device thereof
CN101873657B (en) Method for estimating quality of uplink signal in neighboring area and switching and optimizing method
JP4609125B2 (en) Data transfer system and method
CN104540159A (en) Reporting method, reporting system, and resource configuration method and system
CN104080133A (en) Mobility optimization method, user device and access network device
CN102065478B (en) Automatic optimization method and device of network load regulation target
CN101272588A (en) Alien system switching or re-selection
CN102595529B (en) Switching method and switching system based on multipoint coordination
CN103444230A (en) Computing cloud in a wireless telecommunication system
CN104954994A (en) Group communication service interruption processing method and group communication service interruption processing device
US20140057623A1 (en) Capacity station activation method, radio communication apparatus, and system
JP2012253622A (en) Radio communication system and method for changing accommodation of device constituting the same system
CN102469517A (en) Method of residence load balance between cells and apparatus thereof
CN101931966B (en) Method, device and system for detecting switching problem
CN109587744B (en) Switching method, switching system and mobile management entity
CN101179858A (en) Method for obtaining capability information of user facility
CN102264084B (en) A kind of multiple base stations united method and device carrying out coverage optimization
CN101540987B (en) Method, device and system for updating neighbor cell list
CN102695218A (en) Mode identification-based switching self-optimizing method
CN101562850A (en) Method for admitting judgment during switching process as well as system and device thereof
RU2013146947A (en) METHOD, NETWORK ACCESS CONTROL UNIT AND SYSTEM FOR RECEIVING AND SENDING LOAD INFORMATION
CN103874131A (en) Inter-cell load balance method based on quality of service, device and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee after: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

Address before: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee before: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20210611

Address after: 100085 1st floor, building 1, yard 5, Shangdi East Road, Haidian District, Beijing

Patentee after: DATANG MOBILE COMMUNICATIONS EQUIPMENT Co.,Ltd.

Address before: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee before: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

TR01 Transfer of patent right