CN102061770A - Construction method for imitated frame structure of long-span prestressed concrete beam slab - Google Patents
Construction method for imitated frame structure of long-span prestressed concrete beam slab Download PDFInfo
- Publication number
- CN102061770A CN102061770A CN 201010566841 CN201010566841A CN102061770A CN 102061770 A CN102061770 A CN 102061770A CN 201010566841 CN201010566841 CN 201010566841 CN 201010566841 A CN201010566841 A CN 201010566841A CN 102061770 A CN102061770 A CN 102061770A
- Authority
- CN
- China
- Prior art keywords
- frame
- prestressed concrete
- slab
- beam slab
- steel bars
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
The invention relates to a construction method for an imitated frame structure of a long-span prestressed concrete beam slab, belonging to the technical field of constructional engineering structures. The method comprises the following steps of: installing single T-shaped slabs consisting of prestressed hollow single T-shape beam slabs with no flanges or flanges removed, or a plurality of T-shaped box-shaped beams, or trough slabs or rectangular beams at two sides close to a frame column after the frame column and a frame longitudinal beam are installed; arranging transverse constructed erected reinforcing steel bars on the frame column; suspending a bottom template on the deck or erected reinforcing steel bars along a beam slab arris or a side direction; leveling the bottom template with the bottom of the prestressed concrete beam slab; arranging reinforcing steel bars of the beam in a space formed by the template; connecting the reinforcing steel bars with the reinforcing steel bars of the frame column; then connecting the reinforcing steel bars again by hooping; and finally, pouring and tamping concrete as required to form a frame beam, i.e. an imitated frame beam. The method disclosed by the invention has the advantages of reducing the section of the imitated frame beam, not needing to cut off the flanges of the T-shaped slab, lowering the cost and improving construction and precasting benefits.
Description
Technical field
The invention belongs to the building engineering structure technical field, be specifically related to a kind of job practices of large-span prestressed concrete beam slab draft frame structure.
Background technology
Large-span prestressed concrete beam slab is many T box-girder, groove type plate and contain single T beam slab etc. (hereinafter to be referred as the T template) of hollow single T beam slab and rectangular beam is external uses early wherein.Its maximum advantage is: span is big, can build huge pillar apart from longspan structure; Rise low (0.45~1.085m is about roof truss structure height<roof truss height and adds the roofing plate hight〉1/3~1/4) can significantly reduce depth of building, reaches saving metal material and energy; Good stability does not need additional lateral support; The member wide coverage has then been finished the Structural Engineering amount of whole building roof system after installation effectiveness height, plate are installed, become one of building roof structure form that replaces the tool advantage of traditional roof system just gradually.
It is big from the anharmonic ratio steel work, and outside the span that is difficult to reach bigger, its durability, fire resistance and high class of loading but are that steel work hardly matches.
But it must be noted that, present this beam slab overwhelming majority is used for the floor plate structural element of roof panel and non-frame construction, and be obstructed for the application of the DESIGN TREND OF MODERN INDUSTRIAL ARCHITECTURE that has a large capacity and a wide range, public building, commercial building middle frame structure, thereby the large-scale popularization that has limited this large span sheet material is to a great extent used.It is used the reason of being obstructed and mainly contained two: one in frame construction, do not find the structural calculation model and the corresponding design structure method that are complementary with it as yet.It is investigated and prefabricated leading to scheme all contents of not mentioned this respect, and also do not have this related content at " Code for design of concrete structures " and " seismic design provision in building code " of China with the local mark of prestressed concrete handbook and China in the U.S..But document has a clause regulation: do not allow to adopt the hinged frame structure in the earthquake protection area.The 2nd, design the frame construction crossbeam (this be unique can satisfy engineering drawing examine necessary a kind of selection) of this large span member by the design code of code requirement as principle by the conventional frame structure, yet its consequence not only cruciform bracing cross section is big, heavy, not only attractive in appearance, the usage space of influence building, recruitment materials increase considerably, and difficulty of construction is big.Because this crossbeam must site operation, this just is difficult to reasonable coupling with the sequence of construction of this beam slab, thereby spins out the construction period.This has just fundamentally offset this large span member characteristics of high efficiency has been installed.Existing several engineering example has obtained proof.Adopting this method to be designed to frame construction person as this does not almost have, and is a kind of theoretic hypothesis.
Summary of the invention
The objective of the invention is to be used for frame construction and lack the structure design building method that is complementary or adapts with it at large-span prestressed concrete beam slab, and technology and the very poor drawback of economic feasibility by the existence of conventional frame structure design, a kind of job practices of large-span prestressed concrete beam slab draft frame structure is provided, thereby increase substantially efficiency of construction, reduce cost, in frame construction, embody the advantage of large span prestressed concrete plate.
Technical scheme of the present invention is as follows: a kind of job practices of large-span prestressed concrete beam slab draft frame structure comprises the steps:
(1) uses common process installing frame trestle and frame rails;
(2) remove the edge of a wing or remove many T of prestressing force box-girder on the part edge of a wing or contain hollow single T beam slab at interior large span prestressed concrete list T beam slab or contain the hollow rectangle beam in that a side is installed near the frame column both sides, form the crossbeam side form at interior no edge of a wing large span prestressed concrete rectangular beam or large span prestressed concrete trough slab;
(3) set up the crossbeam bed die of suspention along the crossbeam side form;
(4) reinforcing bar of crossbeam is set, comprises plate upper frame stud, the crossbeam longitudinal rib and the stirrup that are connected with the frame column reinforcing bar;
(5) with part beyond the reinforcing bar inner concrete topping in the EPS plate padding girder;
(6) disturbing concrete constitutes cruciform bracing in accordance with regulations---intend Vierendeel girder.
Further, the job practices of aforesaid large-span prestressed concrete beam slab draft frame structure, wherein, the reinforcing bar of described crossbeam is a nonprestressed reinforcement.
Beneficial effect of the present invention is as follows: intend Vierendeel girder and compare with the conventional frame beam, its ratio of performance to price advantage is outstanding, mainly be reflected in two aspects: the one, easy construction, efficiency of construction improves more than 3 times than conventional frame beam, and intends Vierendeel girder and can realize the assembled integral construction; The 2nd, material (concrete and reinforcing bar) consumption can reduce significantly.Material usage increases with span, and conventional frame beam growth trend is more obvious, and especially its amplification is bigger when plate is striden greater than 18m, highlights the infeasibility of its technical-economic index.According to the impact analysis of Vierendeel girder coupled columns, conventional frame beam section analogy Vierendeel girder is big, and its material usage to frame column that causes also increases thereupon, increases 20% at least as post concrete consumption, and amount of reinforcement also can increase, but does not count this increment.And the cross section is too greatly very not attractive in appearance, is the one of the main reasons that can't realize yet.
This shows the design structure method problem that adopts draft frame structure not only to solve this class sheet material, and improve more than 3 times than conventional frame efficiency of construction, material usage reduces half at least, and the beam slab span reduces about 5 times during greater than 18m, and attractive in appearance, Here it is value of the present invention place.
Description of drawings
Fig. 1 is a structural representation of intending Vierendeel girder when adopting trough slab;
Fig. 2 intends the structural representation of Vierendeel girder for adopting hollow single T beam;
Fig. 3 is a structural representation of intending Vierendeel girder when adopting many T box-shaped;
Fig. 4 is a structural representation of intending Vierendeel girder when adopting the hollow rectangle beam;
Fig. 5 is the job practices flow chart of large-span prestressed concrete beam slab draft frame structure.
The specific embodiment
Below in conjunction with drawings and Examples the present invention is described in detail.
Shown in the flow process of Fig. 5, at first use common process installing frame trestle and frame rails, after treating that frame column and frame rails are installed, the large-span prestressed concrete beam slab formation crossbeam side form that one side does not have the edge of a wing or do not have the part edge of a wing is being installed near the frame column both sides, set up the beam bottom board of suspention along side form, the reinforcing bar (nonprestressed reinforcement) of beam slightly upwards is set in the space that soffit formwork forms, comprises longitudinal rib and stirrup that the upright reinforcing bar of plate upper frame is connected with the frame column reinforcing bar.With part beyond the reinforcing bar inner concrete topping in the EPS plate padding girder, disturbing concrete has promptly constituted the plan cruciform bracing in accordance with regulations then.Intend Vierendeel girder and form " draft frame structure " with large-span prestressed concrete beam slab, frame column, longeron etc.
Because intending Vierendeel girder is non-prestressed member, the prestressing force beam slab of its its both sides of deformation ratio etc. are much bigger, and whole vertical force loads of therefore intending Vierendeel girder are delivered on the plate of its both sides by concrete bonding or the cementation of tenon key therebetween.In the structure design, also considered the most reliable power transmission safeguard measure simultaneously especially: even the crack appears in the concrete of intending between Vierendeel girder and this beam slab, be that concrete adhesion strength is when entirely ineffective (although this probability is very little), then there is the reliable stirrup that is connected 6. (to see accompanying drawing), the load of this beam can be passed on the plate by transverse structure reinforcing bar with the Liang Neibanding setting.And the pulling force that this stirrup provided is at least more than 7 times of the whole loads of plan Vierendeel girder.Therefore this plan Vierendeel girder has become no load or zero load rod member under the gravity load effect; Under horizontal loading or geological process, it constitutes horizontal effect or the distortion that the cruciform bracing strengthened and frame column are resisted structure jointly with the beam slab of its both sides again.
As shown in Figure 1, treat that 1. frame column is installed with the frame column longeron after, 1. one page trough slab respectively is being installed 3. in both sides near frame column, form beam side, set up the beam bottom board of suspention along side form, on the beam slab of both sides, horizontal handling reinforcement is set 4..6. 5. the beam longitudinal rib that setting is connected with the frame column reinforcing bar thereon connect with stirrup again, and disturbing concrete has promptly constituted cruciform bracing in accordance with regulations---intend Vierendeel girder.In beam, fill the EPS plate.
As shown in Figure 2, after treating that 1. frame column is installed with the frame column longeron, 1. hollow single T beam slab that one page do not have the edge of a wing or do not have a part edge of a wing respectively is being installed 3. in both sides near frame column, also can a side be installed by hollow single T beam slab that no edge of a wing opposite side is installed the no part edge of a wing, form beam side, set up the beam bottom board of suspention along side form, on the beam slab of both sides, horizontal handling reinforcement is set 4..6. 5. the beam longitudinal rib that setting is connected with the frame column reinforcing bar thereon connect with stirrup again, and disturbing concrete has promptly constituted cruciform bracing in accordance with regulations---intend Vierendeel girder.In beam, fill the EPS plate.
As shown in Figure 3, after treating that 1. frame column is installed with the frame column longeron, 1. many T box-girder that one page do not have the edge of a wing or do not have a part edge of a wing respectively is being installed 3. in both sides near frame column, also can a side be installed by many T box-girder that no edge of a wing opposite side is installed the no part edge of a wing, form beam side, set up the beam bottom board of suspention along side form, on the beam slab of both sides, horizontal handling reinforcement is set 4..6. 5. the beam longitudinal rib that setting is connected with the frame column reinforcing bar thereon connect with stirrup again, and disturbing concrete has promptly constituted cruciform bracing in accordance with regulations---intend Vierendeel girder.In beam, fill the EPS plate.
As shown in Figure 4, treat that 1. frame column is installed with the frame column longeron after, near frame column 1. both sides each install contain the hollow rectangle beam rectangular beam 3., form beam side, set up the beam bottom board of suspention along side form, on the beam slab of both sides, horizontal handling reinforcement is set 4..6. 5. the beam longitudinal rib that setting is connected with the frame column reinforcing bar thereon connect with stirrup again, and disturbing concrete has promptly constituted cruciform bracing in accordance with regulations---intend Vierendeel girder.In beam, fill the EPS plate.
Above-mentioned many T box-girder, hollow single T plate or hollow rectangle beam or trough slab etc. play the template of intending Vierendeel girder, the supporting of suspention soffit formwork and the effect of construction operation platform in work progress.Intend Vierendeel girder and form " draft frame structure " with large-span prestressed plate, frame column, longeron etc.
In sum, the essence and the core technology of draft frame structure are: intending Vierendeel girder and be no load rod member under the gravity load effect, is mainly to bear to draw or the rod member of pressure under horizontal loading or geological process.Therefore intend the force mode that is subjected to that framework (beam) has exceeded the conventional frame structure, and become the rod member that mainly bears pressure, on the structural mechanics angle, this is the optimal stress of structure, and this also is the reason place that is called " plan framework ".Therefore intend Vierendeel girder joint construction uniqueness, simple, can design by MIN structure requirement arrangement of reinforcement (minimum steel ratio μ=0.2% of regulation and stipulation), but the degree of safety of structure or reliability are more much higher than conventional frame beam.
Obviously, those skilled in the art can carry out change on the various forms and modification to the present invention and not break away from the spirit and scope of the present invention.Like this, if of the present invention these are revised and modification belongs within the scope of claim of the present invention and equivalent technologies thereof, then the present invention also is intended to comprise these changes and modification interior.
Claims (2)
1. the job practices of a large-span prestressed concrete beam slab draft frame structure comprises the steps:
(1) uses common process installing frame trestle and frame rails;
(2) remove the edge of a wing or remove many T of prestressing force box-girder on the part edge of a wing or contain hollow single T beam slab at interior large span prestressed concrete list T beam slab or contain the hollow rectangle beam in that a side is installed near the frame column both sides, form the crossbeam side form at interior no edge of a wing large span prestressed concrete rectangular beam or large span prestressed concrete trough slab;
(3) set up the crossbeam bed die of suspention along the crossbeam side form;
(4) reinforcing bar of crossbeam is set, comprises plate upper frame stud, the crossbeam longitudinal rib and the stirrup that are connected with the frame column reinforcing bar;
(5) with part beyond the reinforcing bar inner concrete topping in the EPS plate padding girder;
(6) disturbing concrete constitutes cruciform bracing in accordance with regulations---intend Vierendeel girder.
2. the job practices of large-span prestressed concrete beam slab draft frame structure as claimed in claim 1 is characterized in that: the reinforcing bar of the crossbeam described in the step (4) is a nonprestressed reinforcement.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010566841 CN102061770A (en) | 2010-03-03 | 2010-11-20 | Construction method for imitated frame structure of long-span prestressed concrete beam slab |
Applications Claiming Priority (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010131587.1 | 2010-03-03 | ||
CN201010131587 | 2010-03-03 | ||
CN201020147951 | 2010-03-03 | ||
CN201020147951.9 | 2010-03-03 | ||
CN 201010566841 CN102061770A (en) | 2010-03-03 | 2010-11-20 | Construction method for imitated frame structure of long-span prestressed concrete beam slab |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102061770A true CN102061770A (en) | 2011-05-18 |
Family
ID=43997249
Family Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010206287337U Expired - Fee Related CN201962792U (en) | 2010-03-03 | 2010-11-20 | Longspan prestressed concrete beam slab simulation framework structure |
CN 201010561002 Pending CN102094458A (en) | 2010-03-03 | 2010-11-20 | Simulated frame structure of long-span prestressed concrete slab |
CN 201010566841 Pending CN102061770A (en) | 2010-03-03 | 2010-11-20 | Construction method for imitated frame structure of long-span prestressed concrete beam slab |
Family Applications Before (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010206287337U Expired - Fee Related CN201962792U (en) | 2010-03-03 | 2010-11-20 | Longspan prestressed concrete beam slab simulation framework structure |
CN 201010561002 Pending CN102094458A (en) | 2010-03-03 | 2010-11-20 | Simulated frame structure of long-span prestressed concrete slab |
Country Status (1)
Country | Link |
---|---|
CN (3) | CN201962792U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102337784A (en) * | 2011-07-13 | 2012-02-01 | 葛加君 | Method for constructing reinforced concrete frame of tall curved tower |
CN102587554A (en) * | 2012-02-29 | 2012-07-18 | 黑龙江宇辉新型建筑材料有限公司 | Laminated concrete slab connected by bending reinforcing steel bars by 180 degrees within span and connection method |
CN102653968A (en) * | 2012-03-15 | 2012-09-05 | 中国建筑科学研究院 | Inner tensioning pre-stressed concrete single-layer I-shaped framework box-type structure |
CN104499715A (en) * | 2014-12-08 | 2015-04-08 | 江苏中南建筑产业集团有限责任公司 | Template overhanging construction method for floor system with composite structure by utilizing profiled steel beams |
CN104775620A (en) * | 2013-08-20 | 2015-07-15 | 南通鑫金建设集团有限公司 | Different-strength-level concrete classification replacement whole-set rapid construction method for high-rise frame joints |
CN108755948A (en) * | 2018-07-10 | 2018-11-06 | 福州大学 | The assembled beam-column node structure and its construction method of tenon formula connection |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201962792U (en) * | 2010-03-03 | 2011-09-07 | 柳忠林 | Longspan prestressed concrete beam slab simulation framework structure |
CN102864839A (en) * | 2012-10-13 | 2013-01-09 | 柳忠林 | Virtual beam used in large-span prestressed concrete beam plate frame structure |
CN105888064A (en) * | 2015-01-07 | 2016-08-24 | 北京中企卓创科技发展有限公司 | Reinforced concrete frame |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1371794A1 (en) * | 2002-06-14 | 2003-12-17 | Tecnostudi SRL | Improvements in a self-supporting lattice to provide steel-concrete composite beams for housing and industrial building |
CN1524149A (en) * | 2001-06-05 | 2004-08-25 | 邦那契梁柱(国际)控股有限公司 | Building structural element |
CN101363260A (en) * | 2007-11-19 | 2009-02-11 | 青岛市金潮特种混凝土制品有限责任公司 | Special technology of frame structure of wide span prestressed concrete plate |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201962792U (en) * | 2010-03-03 | 2011-09-07 | 柳忠林 | Longspan prestressed concrete beam slab simulation framework structure |
-
2010
- 2010-11-20 CN CN2010206287337U patent/CN201962792U/en not_active Expired - Fee Related
- 2010-11-20 CN CN 201010561002 patent/CN102094458A/en active Pending
- 2010-11-20 CN CN 201010566841 patent/CN102061770A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1524149A (en) * | 2001-06-05 | 2004-08-25 | 邦那契梁柱(国际)控股有限公司 | Building structural element |
EP1371794A1 (en) * | 2002-06-14 | 2003-12-17 | Tecnostudi SRL | Improvements in a self-supporting lattice to provide steel-concrete composite beams for housing and industrial building |
CN101363260A (en) * | 2007-11-19 | 2009-02-11 | 青岛市金潮特种混凝土制品有限责任公司 | Special technology of frame structure of wide span prestressed concrete plate |
Non-Patent Citations (1)
Title |
---|
《建筑技术开发》 20010531 何淅淅等 框架结构预制预应力楼盖体系的发展与应用 第18-20,55页 1-2 第28卷, 第5期 2 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102337784A (en) * | 2011-07-13 | 2012-02-01 | 葛加君 | Method for constructing reinforced concrete frame of tall curved tower |
CN102337784B (en) * | 2011-07-13 | 2013-07-10 | 葛加君 | Method for constructing reinforced concrete frame of tall curved tower |
CN102587554A (en) * | 2012-02-29 | 2012-07-18 | 黑龙江宇辉新型建筑材料有限公司 | Laminated concrete slab connected by bending reinforcing steel bars by 180 degrees within span and connection method |
CN102587554B (en) * | 2012-02-29 | 2015-06-03 | 黑龙江宇辉新型建筑材料有限公司 | Laminated concrete slab connected by bending reinforcing steel bars by 180 degrees within span and connection method |
CN102653968A (en) * | 2012-03-15 | 2012-09-05 | 中国建筑科学研究院 | Inner tensioning pre-stressed concrete single-layer I-shaped framework box-type structure |
CN104775620A (en) * | 2013-08-20 | 2015-07-15 | 南通鑫金建设集团有限公司 | Different-strength-level concrete classification replacement whole-set rapid construction method for high-rise frame joints |
CN104775620B (en) * | 2013-08-20 | 2017-03-01 | 南通鑫金建设集团有限公司 | The complete fast construction method of high-rise frame node different intensity grades concrete sort permutation |
CN104499715A (en) * | 2014-12-08 | 2015-04-08 | 江苏中南建筑产业集团有限责任公司 | Template overhanging construction method for floor system with composite structure by utilizing profiled steel beams |
CN108755948A (en) * | 2018-07-10 | 2018-11-06 | 福州大学 | The assembled beam-column node structure and its construction method of tenon formula connection |
Also Published As
Publication number | Publication date |
---|---|
CN102094458A (en) | 2011-06-15 |
CN201962792U (en) | 2011-09-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201962792U (en) | Longspan prestressed concrete beam slab simulation framework structure | |
CN202925762U (en) | Novel reinforced concrete superposed beam | |
CN103046645B (en) | A kind of whole casting structure and construction method of Large-span Precast | |
CN206428968U (en) | A kind of steel bar girder formula is without supporting template system | |
CN103470040A (en) | Splicing method of composite floor slab and beam | |
CN108756061A (en) | A kind of partial precast assembly prestress steel reinforced concrete hybrid beam and construction method | |
CN105220792B (en) | A kind of prefabricated concealed bracings energy-consuming shear wall and its assemble method | |
CN102071740A (en) | Long-span prestressed concrete slab small pre-frame structure and construction method thereof | |
CN201908380U (en) | Small simulation framework structure of large-span prestressed concrete beam plate | |
CN101761241A (en) | Roof suspended type method for pulling out pillars | |
CN101363260B (en) | Frame structure of wide span prestressed concrete plate and construction method thereof | |
CN212956151U (en) | Cast-in-place beam flange plate template system | |
CN113216527A (en) | Cornice structure of antique building | |
CN108951982A (en) | Assembly concrete superposed floor plate and its construction method based on cement fibrolite plate composite reinforcing steel bar skeleton | |
CN203034799U (en) | Tower hoist standard knot bearing overhead support formwork steel platform structure | |
CN202831219U (en) | Large-span precast monolithic concrete structure | |
CN206267358U (en) | A kind of built-in girder steel shear wall | |
CN102864839A (en) | Virtual beam used in large-span prestressed concrete beam plate frame structure | |
CN205776898U (en) | Overall assembled reinforced concrete shear wall structure system | |
CN203639814U (en) | Assembled monolithic hollow slab bridge | |
CN208717939U (en) | A kind of efficiently molding building hoist foundation structure | |
CN201546455U (en) | Novel masonry structure transfer beam | |
CN216713527U (en) | Assembled plane superstructure | |
CN215888962U (en) | Thin-bottom groove type prestressed concrete superposed beam | |
Storozhenko et al. | New design decisions of prefabricated girderless floors of multi-storeyed buildings |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20110518 |