Embodiment
In order to make RN in the LTE-A system can correctly receive the data on the R-PDCCH, the embodiment of the invention provides transmission and the channel demodulation method of public guide frequency on a kind of LTE-A system back haul link, in this method, pre-configured for the Resource Unit that sends common pilot signal on the back haul link in the shared Physical Resource Block of R-PDCCH (PRB), the base station utilizes the Resource Unit of configuration to send common pilot signal to RN, RN utilizes the common pilot signal that receives to carry out channel estimating, and then according to the data on the channel estimation results demodulation R-PDCCH.
Referring to Fig. 2, transmission and the channel demodulation method of public guide frequency on the LTE-A system back haul link that the embodiment of the invention provides specifically may further comprise the steps:
Step 20: in the shared Physical Resource Block PRB of the Physical Downlink Control Channel R-PDCCH of base station on back haul link, choose the pre-configured Resource Unit that is used for sending common pilot signal on the back haul link;
Step 21: the base station utilizes the Resource Unit of choosing to send common pilot signal to the via node equipment under this base station;
Step 22:RN receives common pilot signal at described Resource Unit;
Step 23:RN carries out channel estimating according to the common pilot signal that receives, and utilizes the Physical Downlink Control Channel R-PDCCH on the channel estimation results demodulation back haul link.
In the step 20, configuration can be as follows for the concrete grammar that sends the Resource Unit of common pilot signal on the back haul link in the shared PRB of R-PDCCH:
At first, in the shared PRB of R-PDCCH, search the Resource Unit that the base station utilizes by antenna port transmission common pilot signal in the LTE system, as shown in Figure 3, be the Resource Unit position view that is used for sending common pilot signal that in the LTE system antenna port 0~3 is disposed, wherein, first classifies configuring ports as No. 0, second classifies configuring ports as No. 1, the 3rd classifies configuring ports as No. 2, the 4th classifies configuring ports as No. 3, and being coated with black box is the Resource Unit that the port is used to send common pilot signal, and being coated with the fork square is that the port is not used in the Resource Unit that sends common pilot signal;
Then, the Resource Unit that finds is configured to for the Resource Unit that sends common pilot signal on the back haul link.Concrete, if the physical down link sharing channel (R-PDSCH) on R-PDCCH and the back haul link carries out Time Division Multiplexing, then base station Resource Unit that will find, that be positioned at R-PDCCH zone and R-PDSCH zone is configured to for the Resource Unit that sends common pilot signal on the back haul link, be the base station in R-PDCCH zone and the R-PDSCH zone of the shared PRB of R-PDCCH, choose the pre-configured Resource Unit that is used for common pilot signal on the transmission back haul link; If R-PDCCH and R-PDSCH carry out frequency division multiplexing (FDM), Resource Unit that the base station will find, that be positioned at the R-PDCCH zone is configured to for the Resource Unit that sends common pilot signal on the back haul link, be the base station in the R-PDCCH zone of the shared PRB of R-PDCCH, choose the pre-configured Resource Unit that is used for sending common pilot signal on the back haul link.
When R-PDCCH and R-PDSCH carry out TDM, if the PRB that R-PDSCH and R-PDCCH are shared is also incomplete same, then at first determine the PRB that R-PDSCH and R-PDCCH are taken jointly, and the zone of the R-PDCCH in this PRB and R-PDSCH zone, choose the pre-configured Resource Unit that is used for sending common pilot signal on the back haul link.
The R-PDCCH zone refers to the resource area that R-PDCCH is shared, the resource area that the R-PDSCH zone refers to or R-PDSCH is shared.
At present, the R-PDCCH on the back haul link has time division duplex (TDM) and Frequency Division Duplexing (FDD) (FDM) dual mode, and the FDM mode can be referring to Fig. 4, and the TDM mode can be referring to Fig. 5.Among two figure, PDSCH is the Physical Downlink Shared Channel in the LTE system, and R-PDSCH is the Physical Downlink Shared Channel to the via node equipment sending data of being used on the LTE-A system repeated link.As can be seen from the figure, in order to reduce the influence to present LTE system, R-PDCCH is positioned at the PDSCH intra-zone.
The FDM mode, namely R-PDCCH and R-PDSCH, PDSCH are mutual FDM's in the back haul link.In Fig. 4, R-PDCCH takies a plurality of Physical Resource Block (PRB).
The TDM mode, namely R-PDCCH and R-PDSCH are TDM in the back haul link, and R-PDCCH and R-PDSCH and PDSCH are FDM.For the R-PDCCH demodulation, can be by a plurality of relayings whiles, correct detecting in order to guarantee it, its pilot tone must be public guide frequency.
Need to prove, Fig. 4 and Fig. 5 are a kind of TDM and FDM mode schematic diagram, and each channel also can adopt other TDM, FDM mode, for example, PDSCH zone among Fig. 5 also can be configured to the R-PDSCH zone, namely R-PDSCH can take different PRB with R-PDCCH.
With specific embodiment the Resource Unit configuration mode that is used for common pilot signal on the transmission back haul link is described below:
Embodiment one:
In the present embodiment, the Resource Unit that is used for the transmission common pilot signal at No. 0 port arrangement of base station, R-PDCCH and R-PDSCH adopt the TDM pattern, the R-PDCCH zone takies 4 OFDM symbols, be used for the Resource Unit of common pilot signal on the transmission back haul link in R-PDCCH zone and R-PDSCH area configurations, the concrete configuration process is as follows:
Step S01: determine in the shared PRB of R-PDCCH, the base station sends the Resource Unit position that common pilot signal utilizes by No. 0 port and is in the LTE system: the Resource Unit that No. 4 OFDM symbols of No. 1 time slot constitute with No. 3 frequency domain unit of described PRB, No. 9 frequency domain unit respectively, the Resource Unit that No. 0 OFDM symbol of No. 2 time slots constitutes with No. 0 frequency domain unit of the shared PRB of described PRB, No. 6 frequency domain unit respectively, and the Resource Unit that constitutes with No. 3 frequency domain unit of the shared PRB of described PRB, No. 9 frequency domain unit respectively of No. 4 OFDM symbols of No. 2 time slots;
Step S02: will be positioned at the R-PDCCH zone, the Resource Unit that No. 4 OFDM symbols of No. 1 time slot constitute with No. 3 frequency domain unit of described PRB, No. 9 frequency domain unit respectively is configured to for the Resource Unit that sends common pilot signal on the back haul link; To be positioned at the R-PDSCH zone, the Resource Unit that No. 0 OFDM symbol of No. 2 time slots constitutes with No. 0 frequency domain unit of the shared PRB of described PRB, No. 6 frequency domain unit respectively, and the Resource Unit that constitutes with No. 3 frequency domain unit of the shared PRB of described PRB, No. 9 frequency domain unit respectively of No. 4 OFDM symbols of No. 2 time slots, be configured to for the Resource Unit that sends common pilot signal on the back haul link, as the black box that is coated with among Fig. 6 A.
Embodiment two:
In the present embodiment, the Resource Unit that is used for the transmission common pilot signal at No. 0 port arrangement of base station, R-PDCCH and R-PDSCH adopt the TDM pattern, the R-PDCCH zone takies 5 OFDM symbols, in R-PDCCH zone and R-PDSCH zone, configuration is used for sending the Resource Unit of common pilot signal on the back haul link, and the concrete configuration process is as follows:
Step S11: determine that in the shared PRB of R-PDCCH the base station sends the Resource Unit position that common pilot signal utilizes by No. 0 port in the LTE system, determines that the result is with step S01;
Step S12: will be positioned at the R-PDCCH zone, the Resource Unit that No. 4 OFDM symbols of No. 1 time slot constitute with No. 3 frequency domain unit of described PRB, No. 9 frequency domain unit respectively, the Resource Unit that No. 0 OFDM symbol of No. 2 time slots constitutes with No. 0 frequency domain unit of the shared PRB of described PRB, No. 6 frequency domain unit respectively is configured to for the Resource Unit that sends common pilot signal on the back haul link; To be positioned at the R-PDSCH zone, the Resource Unit that No. 4 OFDM symbols of No. 2 time slots constitute with No. 3 frequency domain unit of described PRB, No. 9 frequency domain unit respectively, be configured to for the Resource Unit that sends common pilot signal on the back haul link, as the black box that is coated with among Fig. 6 B.
Embodiment three:
In the present embodiment, the Resource Unit that is used for the transmission common pilot signal at No. 0 port arrangement of base station, R-PDCCH and R-PDSCH adopt the TDM pattern, the R-PDCCH zone takies 1 OFDM symbol, be used for the Resource Unit of common pilot signal on the transmission back haul link in R-PDCCH zone and R-PDSCH area configurations, the concrete configuration process is as follows:
Step S21: determine that in the shared PRB of R-PDCCH the base station sends the Resource Unit position that common pilot signal utilizes by No. 0 port in the LTE system, determines that the result is with step S01;
Step S22: will be positioned at the R-PDSCH zone, the Resource Unit that No. 4 OFDM symbols of No. 1 time slot constitute with No. 3 frequency domain unit of described PRB, No. 9 frequency domain unit respectively, the Resource Unit that No. 0 OFDM symbol of No. 2 time slots constitutes with No. 0 frequency domain unit of the shared PRB of described PRB, No. 6 frequency domain unit respectively, and the Resource Unit that constitutes with No. 3 frequency domain unit of the shared PRB of described PRB, No. 9 frequency domain unit respectively of No. 4 OFDM symbols of No. 2 time slots, be configured to for the Resource Unit that sends common pilot signal on the back haul link, as the black box that is coated with among Fig. 6 C.
Embodiment four:
In the present embodiment, the Resource Unit that is used for the transmission common pilot signal at No. 0 port arrangement of base station, R-PDCCH and R-PDSCH adopt the FDM pattern, and for the Resource Unit that sends common pilot signal on the back haul link, the concrete configuration process is as follows in the R-PDCCH area configurations:
Step S31: determine that in the shared PRB of R-PDCCH the base station sends the Resource Unit position that common pilot signal utilizes by No. 0 port in the LTE system, determines that the result is with step S01;
Step S32: will be positioned at the R-PDCCH zone, the Resource Unit that No. 4 OFDM symbols of No. 1 time slot constitute with No. 3 frequency domain unit of described PRB, No. 9 frequency domain unit respectively, the Resource Unit that No. 0 OFDM symbol of No. 2 time slots constitutes with No. 0 frequency domain unit of the shared PRB of described PRB, No. 6 frequency domain unit respectively, and the Resource Unit that constitutes with No. 3 frequency domain unit of the shared PRB of described PRB, No. 9 frequency domain unit respectively of No. 4 OFDM symbols of No. 2 time slots, be configured to for the Resource Unit that sends common pilot signal on the back haul link, as the black box that is coated with among Fig. 6 D.
Embodiment five:
In the present embodiment, the Resource Unit that is used for the transmission common pilot signal at No. 1 port arrangement of base station, R-PDCCH and R-PDSCH adopt the TDM pattern, the R-PDCCH zone takies 4 OFDM symbols, be used for the Resource Unit of common pilot signal on the transmission back haul link in R-PDCCH zone and R-PDSCH area configurations, the concrete configuration process is as follows:
Step T01: determine among the shared PRB of R-PDCCH, the base station sends the Resource Unit position that common pilot signal utilizes by No. 1 port and is in the LTE system: the Resource Unit that No. 4 OFDM symbols of No. 1 time slot constitute with No. 0 frequency domain unit of described PRB, No. 6 frequency domain unit respectively, the Resource Unit that the Resource Unit that No. 2 time slots No. 0 OFDM symbol constitutes with No. 3 frequency domain unit of described PRB, No. 9 frequency domain unit respectively among the described PRB, No. 4 OFDM symbols of described No. 2 time slots constitute with No. 0 frequency domain unit of described PRB, No. 6 frequency domain unit respectively;
Step T02: will be positioned at the R-PDCCH zone, the Resource Unit that No. 4 OFDM symbols of No. 1 time slot constitute with No. 0 frequency domain unit of described PRB, No. 6 frequency domain unit respectively is configured to for the Resource Unit that sends common pilot signal on the back haul link; To be positioned at the R-PDSCH zone, the Resource Unit that No. 0 OFDM symbol of No. 2 time slots constitutes with No. 3 frequency domain unit of described PRB, No. 9 frequency domain unit respectively, and the Resource Unit that constitutes with No. 0 frequency domain unit of described PRB, No. 6 frequency domain unit respectively of No. 4 OFDM symbols of No. 2 time slots, be configured to for the Resource Unit that sends common pilot signal on the back haul link, as the black box that is coated with among Fig. 7 A.
Embodiment six:
In the present embodiment, the Resource Unit that is used for the transmission common pilot signal at No. 1 port arrangement of base station, R-PDCCH and R-PDSCH adopt the TDM pattern, the R-PDCCH zone takies 5 OFDM symbols, in R-PDCCH zone and R-PDSCH zone, configuration is used for sending the Resource Unit of common pilot signal on the back haul link, and the concrete configuration process is as follows:
Step T11: determine among the shared PRB of R-PDCCH that the base station sends the Resource Unit position that common pilot signal utilizes by No. 1 port in the LTE system, determines that the result is with step T01;
Step T12: will be positioned at the R-PDCCH zone, the Resource Unit that No. 4 OFDM symbols of No. 1 time slot constitute with No. 0 frequency domain unit of described PRB, No. 6 frequency domain unit respectively, and the Resource Unit that constitutes with No. 3 frequency domain unit of described PRB, No. 9 frequency domain unit respectively of No. 0 OFDM symbol of No. 2 time slots, be configured to for the Resource Unit that sends common pilot signal on the back haul link; To be positioned at the R-PDSCH zone, the Resource Unit that No. 4 OFDM symbols of No. 2 time slots constitute with No. 0 frequency domain unit of described PRB, No. 6 frequency domain unit respectively, be configured to for the Resource Unit that sends common pilot signal on the back haul link, as the black box that is coated with among Fig. 7 B.
Embodiment seven:
In the present embodiment, the Resource Unit that is used for the transmission common pilot signal at No. 1 port arrangement of base station, R-PDCCH and R-PDSCH adopt the TDM pattern, the R-PDCCH zone takies 1 OFDM symbol, be used for the Resource Unit of common pilot signal on the transmission back haul link in R-PDCCH zone and R-PDSCH area configurations, the concrete configuration process is as follows:
Step T21: determine among the shared PRB of R-PDCCH that the base station sends the Resource Unit position that common pilot signal utilizes by No. 1 port in the LTE system, determines that the result is with step T01;
Step T22: will be positioned at the R-PDSCH zone, the Resource Unit that No. 4 OFDM symbols of No. 1 time slot constitute with No. 0 frequency domain unit of described PRB, No. 6 frequency domain unit respectively, the Resource Unit that No. 0 OFDM symbol of No. 2 time slots constitutes with No. 3 frequency domain unit of described PRB, No. 9 frequency domain unit respectively, and the Resource Unit that constitutes with No. 0 frequency domain unit of described PRB, No. 6 frequency domain unit respectively of No. 4 OFDM symbols of No. 2 time slots, be configured to for the Resource Unit that sends common pilot signal on the back haul link, as the black box that is coated with among Fig. 7 C.
Embodiment eight:
In the present embodiment, the Resource Unit that is used for the transmission common pilot signal at No. 1 port arrangement of base station, R-PDCCH and R-PDSCH adopt the FDM pattern, be used for the Resource Unit of common pilot signal on the transmission back haul link in R-PDCCH zone and R-PDSCH area configurations, the concrete configuration process is as follows:
Step T31: determine among the shared PRB of R-PDCCH that the base station sends the Resource Unit position that common pilot signal utilizes by No. 1 port in the LTE system, determines that the result is with step T01;
Step T32: will be positioned at the R-PDCCH zone, the Resource Unit that No. 4 OFDM symbols of No. 1 time slot constitute with No. 0 frequency domain unit of described PRB, No. 6 frequency domain unit respectively, the Resource Unit that No. 0 OFDM symbol of No. 2 time slots constitutes with No. 3 frequency domain unit of described PRB, No. 9 frequency domain unit respectively, and the Resource Unit that constitutes with No. 0 frequency domain unit of described PRB, No. 6 frequency domain unit respectively of No. 4 OFDM symbols of No. 2 time slots, be configured to for the Resource Unit that sends common pilot signal on the back haul link, as the black box that is coated with among Fig. 7 D.
Embodiment nine:
In the present embodiment, the Resource Unit that is used for the transmission common pilot signal at No. 2 port arrangement of base station, R-PDCCH and R-PDSCH adopt the TDM pattern, the R-PDCCH zone takies 4 OFDM symbols, be used for the Resource Unit of common pilot signal on the transmission back haul link in R-PDCCH zone and R-PDSCH area configurations, the concrete configuration process is as follows:
Step U01: determine among the shared PRB of R-PDCCH that the base station sends the Resource Unit position that common pilot signal utilizes by No. 2 ports and is in the LTE system: the Resource Unit that No. 1 OFDM symbol of No. 2 time slots constitutes with No. 3 frequency domain unit of described PRB, No. 9 frequency domain unit respectively;
Step U02: will be positioned at the R-PDSCH zone, the Resource Unit that No. 1 OFDM symbol of No. 2 time slots constitutes with No. 3 frequency domain unit of described PRB, No. 9 frequency domain unit respectively, be configured to for the Resource Unit that sends common pilot signal on the back haul link, as the black box that is coated with among Fig. 8 A.
Embodiment ten:
In the present embodiment, the Resource Unit that is used for the transmission common pilot signal at No. 2 port arrangement of base station, R-PDCCH and R-PDSCH adopt the TDM pattern, the R-PDCCH zone takies 5 OFDM symbols, be used for the Resource Unit of common pilot signal on the transmission back haul link in R-PDCCH zone and R-PDSCH area configurations, the concrete configuration process is as follows:
Step U11: determine among the shared PRB of R-PDCCH that the base station sends the Resource Unit position that common pilot signal utilizes by No. 2 ports in the LTE system, determines that the result is with step U01;
Step U12: will be positioned at the R-PDSCH zone, the Resource Unit that No. 1 OFDM symbol of No. 2 time slots constitutes with No. 3 frequency domain unit of described PRB, No. 9 frequency domain unit respectively, be configured to for the Resource Unit that sends common pilot signal on the back haul link, as the black box that is coated with among Fig. 8 B.
Embodiment 11:
In the present embodiment, the Resource Unit that is used for the transmission common pilot signal at No. 2 port arrangement of base station, R-PDCCH and R-PDSCH adopt the TDM pattern, the R-PDCCH zone takies 1 OFDM symbol, be used for the Resource Unit of common pilot signal on the transmission back haul link in R-PDSCH zone and R-PDSCH area configurations, the concrete configuration process is as follows:
Step U21: determine among the shared PRB of R-PDCCH that the base station sends the Resource Unit position that common pilot signal utilizes by No. 2 ports in the LTE system, determines that the result is with step U01;
Step U22: will be positioned at the R-PDSCH zone, the Resource Unit that No. 1 OFDM symbol of No. 2 time slots constitutes with No. 3 frequency domain unit of described PRB, No. 9 frequency domain unit respectively, be configured to for the Resource Unit that sends common pilot signal on the back haul link, as the black box that is coated with among Fig. 8 C.
Embodiment 12:
In the present embodiment, the Resource Unit that is used for the transmission common pilot signal at No. 2 port arrangement of base station, R-PDCCH and R-PDSCH adopt the FDM pattern, be used for the Resource Unit of common pilot signal on the transmission back haul link in R-PDCCH zone and R-PDCCH area configurations, the concrete configuration process is as follows:
Step U31: determine among the shared PRB of R-PDCCH that the base station sends the Resource Unit position that common pilot signal utilizes by No. 2 ports in the LTE system, determines that the result is with step U01;
Step U32: will be positioned at the R-PDCCH zone, the Resource Unit that No. 1 OFDM symbol of No. 2 time slots constitutes with No. 3 frequency domain unit of described PRB, No. 9 frequency domain unit respectively, be configured to for the Resource Unit that sends common pilot signal on the back haul link, as the black box that is coated with among Fig. 8 D.
Embodiment 13:
In the present embodiment, the Resource Unit that is used for the transmission common pilot signal at No. 3 port arrangement of base station, R-PDCCH and R-PDSCH adopt the TDM pattern, the R-PDCCH zone takies 4 OFDM symbols, be used for the Resource Unit of common pilot signal on the transmission back haul link in R-PDCCH zone and R-PDCCH area configurations, the concrete configuration process is as follows:
Step V01: determine among the shared PRB of R-PDCCH that the base station sends the Resource Unit position that common pilot signal utilizes by No. 3 ports and is in the LTE system: the Resource Unit that No. 1 OFDM symbol of No. 2 time slots constitutes with No. 0 frequency domain unit of described PRB, No. 6 frequency domain unit respectively;
Step V02: will be positioned at the R-PDSCH zone, the Resource Unit that No. 1 OFDM symbol of No. 2 time slots constitutes with No. 0 frequency domain unit of described PRB, No. 6 frequency domain unit respectively, be configured to for the Resource Unit that sends common pilot signal on the back haul link, as the black box that is coated with among Fig. 9 A.
Embodiment 14:
In the present embodiment, the Resource Unit that is used for the transmission common pilot signal at No. 3 port arrangement of base station, R-PDCCH and R-PDSCH adopt the TDM pattern, the R-PDCCH zone takies 5 OFDM symbols, be used for the Resource Unit of common pilot signal on the transmission back haul link in R-PDCCH zone and R-PDCCH area configurations, the concrete configuration process is as follows:
Step V11: determine among the shared PRB of R-PDCCH that the base station sends the Resource Unit position that common pilot signal utilizes by No. 3 ports in the LTE system, determines that the result is with step V01;
Step V12: will be positioned at the R-PDSCH zone, the Resource Unit that No. 1 OFDM symbol of No. 2 time slots constitutes with No. 0 frequency domain unit of described PRB, No. 6 frequency domain unit respectively, be configured to for the Resource Unit that sends common pilot signal on the back haul link, as the black box that is coated with among Fig. 9 B.
Embodiment 15:
In the present embodiment, the Resource Unit that is used for the transmission common pilot signal at No. 3 port arrangement of base station, R-PDCCH and R-PDSCH adopt the TDM pattern, the R-PDCCH zone takies 1 OFDM symbol, be used for the Resource Unit of common pilot signal on the transmission back haul link in R-PDCCH zone and R-PDSCH area configurations, the concrete configuration process is as follows:
Step V21: determine among the shared PRB of R-PDCCH that the base station sends the Resource Unit position that common pilot signal utilizes by No. 3 ports in the LTE system, determines that the result is with step V01;
Step V22: will be positioned at the R-PDSCH zone, the Resource Unit that No. 1 OFDM symbol of No. 2 time slots constitutes with No. 0 frequency domain unit of described PRB, No. 6 frequency domain unit respectively, be configured to for the Resource Unit that sends common pilot signal on the back haul link, as the black box that is coated with among Fig. 9 C.
Embodiment 16:
In the present embodiment, the Resource Unit that is used for the transmission common pilot signal at No. 3 port arrangement of base station, R-PDCCH and R-PDSCH adopt the FDM pattern, be used for the Resource Unit of common pilot signal on the transmission back haul link in R-PDCCH zone and R-PDCCH area configurations, the concrete configuration process is as follows:
Step V31: determine among the shared PRB of R-PDCCH that the base station sends the Resource Unit position that common pilot signal utilizes by No. 3 ports in the LTE system, determines that the result is with step V01;
Step V32: will be positioned at the R-PDCCH zone, the Resource Unit that No. 1 OFDM symbol of No. 2 time slots constitutes with No. 0 frequency domain unit of described PRB, No. 6 frequency domain unit respectively, be configured to for the Resource Unit that sends common pilot signal on the back haul link, as the black box that is coated with among Fig. 9 D.
Adopt the manner, owing to be not used for sending the Resource Unit of common pilot signal on the back haul link according to the configuration of the rule in the LTE system, which Resource Unit RN can't be informed on receives common pilot signal, therefore, before RN receives common pilot signal, the base station need send to RN with the Resource Unit positional information that is used for common pilot signal on the transmission back haul link of configuration, then RN determines corresponding Resource Unit according to this Resource Unit positional information, and receives the common pilot signal that send the base station at this Resource Unit.
Among the present invention, the R-PDCCH zone can also only take a time frequency unit.
Among the present invention, the base station sends common pilot signal with the transmitted power of setting to the RN under this base station, and the transmitted power of this setting is equal to or greater than the base station sends common pilot signal to terminal in the PDCCH zone transmitted power.The transmitted power of setting can send the high PdB of transmitted power of common pilot signal than the base station to terminal in the PDCCH zone, wherein P be in the system under the situation of the data demodulates that does not influence other frequency bands, the power offset that the R-PDCCH public guide frequency is added.The base station uses the pilot frequency sequence of setting to send common pilot signal to the RN under the described base station, and the pilot frequency sequence of setting and base station send the employed pilot frequency sequence of common pilot signal to terminal in the PDCCH zone identical or different.
Among the present invention, the whole common pilot signals in the RN receiving system frequency band comprise the common pilot signal on PDCCH zone and the R-PDCCH zone, utilize all common pilot signals that receive to carry out channel estimating jointly.
Referring to Figure 10, the embodiment of the invention also provides a kind of long-term evolution upgrading LTE-A communication system, and this system comprises:
Base station 1001, be used in the shared Physical Resource Block PRB of Physical Downlink Control Channel R-PDCCH on back haul link, choose the pre-configured Resource Unit that is used for sending common pilot signal on the back haul link, utilize this Resource Unit to send common pilot signal to the via node equipment under this base station;
Via node equipment 1002 is used for receiving described common pilot signal at described Resource Unit, carries out channel estimating according to this common pilot signal, and utilizes the Physical Downlink Control Channel R-PDCCH on the channel estimation results demodulation back haul link.
Described base station 1001 is used for:
When the physical down link sharing channel R-PDSCH on described R-PDCCH and back haul link carries out time division multiplexing tdm, in R-PDCCH zone and the R-PDSCH zone of the shared PRB of R-PDCCH, choose the pre-configured Resource Unit that is used for sending common pilot signal on the back haul link;
When described R-PDCCH and R-PDSCH carry out frequency division multiplexing FDM, in the R-PDCCH zone of the shared PRB of R-PDCCH, choose the pre-configured Resource Unit that is used for sending common pilot signal on the back haul link.
Described base station 1001 also is used for:
The Resource Unit positional information that is used for common pilot signal on the transmission back haul link of configuration is sent to described RN;
Accordingly, described via node equipment 1002 is used for:
Determine the Resource Unit of described Resource Unit positional information correspondence, and receive described common pilot signal at this Resource Unit.
Described R-PDCCH and described R-PDSCH adopt Frequency Division Duplexing (FDD) or TDD mode; Perhaps, described R-PDCCH zone takies a time frequency unit.
Described base station 1001 is used for:
Send common pilot signal with the transmitted power of setting to the via node equipment under the described base station, the transmitted power of described setting is equal to or greater than described base station sends common pilot signal to terminal in the PDCCH zone transmitted power; Use the pilot frequency sequence of setting to send common pilot signal to the via node equipment under the described base station, the pilot frequency sequence of described setting and described base station send the employed pilot frequency sequence of common pilot signal to terminal in the PDCCH zone identical or different.
Described via node equipment 1002 also is used for:
Receive the common pilot signal on the PDCCH; Utilize the common pilot signal on the described PDCCH and carry out channel estimating at the common pilot signal that described Resource Unit receives.
Referring to Figure 11, the embodiment of the invention also provides a kind of base station, and this base station comprises:
Resource is chosen unit 1101, is used in the shared Physical Resource Block PRB of Physical Downlink Control Channel R-PDCCH on back haul link, chooses the pre-configured Resource Unit that is used for sending common pilot signal on the back haul link;
Pilot tone transmitting element 1102 is used for utilizing described Resource Unit to send common pilot signal to the via node equipment under this base station.
Described resource is chosen unit 1101 and is used for:
When the physical down link sharing channel R-PDSCH on described R-PDCCH and back haul link carries out time division multiplexing tdm, in R-PDCCH zone and the R-PDSCH zone of the shared PRB of R-PDCCH, choose the pre-configured Resource Unit that is used for sending common pilot signal on the back haul link;
When described R-PDCCH and R-PDSCH carry out frequency division multiplexing FDM, in the R-PDCCH zone of the shared PRB of R-PDCCH, choose the pre-configured Resource Unit that is used for sending common pilot signal on the back haul link.
This base station also comprises:
Configuration information transmitting element 1103, the Resource Unit positional information that is used for common pilot signal on the transmission back haul link that is used for disposing sends to described RN.
Described pilot tone transmitting element 1102 is used for:
Send common pilot signal with the transmitted power of setting to the via node equipment under this base station, the transmitted power of described setting is equal to or greater than described base station sends common pilot signal to terminal in the PDCCH zone transmitted power; Use the pilot frequency sequence of setting to send common pilot signal to the via node equipment under the described base station, the pilot frequency sequence of described setting and described base station send the employed pilot frequency sequence of common pilot signal to terminal in the PDCCH zone identical or different.
Referring to Figure 12, the embodiment of the invention also provides a kind of via node equipment, and this via node equipment comprises:
The first pilot reception unit 1201, be used for receiving the common pilot signal that the base station sends at the pre-configured Resource Unit that is used for common pilot signal on the transmission back haul link, described Resource Unit is positioned at the shared Physical Resource Block PRB of Physical Downlink Control Channel R-PDCCH on the back haul link;
Channel data demodulating unit 1202 is used for carrying out channel estimating according to described common pilot signal, and utilizes the Physical Downlink Control Channel R-PDCCH on the channel estimation results demodulation back haul link.
This via node equipment also comprises:
The second pilot reception unit 1203 is used for receiving the common pilot signal on the PDCCH;
Described channel data demodulating unit 1202 is used for:
Utilize the common pilot signal on the described PDCCH and carry out channel estimating at the common pilot signal that described Resource Unit receives.
To sum up, beneficial effect of the present invention comprises:
In the scheme that the embodiment of the invention provides, the base station is in the shared PRB of R-PDCCH, choose for the Resource Unit that sends common pilot signal on the back haul link, utilize this Resource Unit to send common pilot signal to the via node equipment under this base station, RN receives common pilot signal at this Resource Unit, and carry out channel estimating according to the common pilot signal that receives, and then utilize data on the channel estimation results demodulation R-PDCCH, thereby guaranteed the correctly data on the demodulation R-PDCCH of via node equipment under the base station, reached the purpose of correct reception R-PDCCH.
Simultaneously, send the Resource Unit position that common pilot signal utilizes according to base station in the LTE system by antenna port in the embodiment of the invention, dispose for the Resource Unit that sends common pilot signal on the back haul link, can be on the basis that does not influence existing LTE system specifications, guarantee the performance of its backhaul link of via node Equipment Inspection, simultaneously can also its pilot-frequency expense of better controlled.
And, be in the shared PRB of R-PDCCH among the present invention, choose for the Resource Unit that sends common pilot signal on the back haul link, and utilize this Resource Unit to send common pilot signal to RN, in other PRB, do not send common pilot signal, can in the demodulation performance that guarantees the R-PDCCH of RN, save system resource.
Obviously, those skilled in the art can carry out various changes and modification to the present invention and not break away from the spirit and scope of the present invention.Like this, if of the present invention these are revised and modification belongs within the scope of claim of the present invention and equivalent technologies thereof, then the present invention also is intended to comprise these changes and modification interior.