CN102055144A - 防止拉线折断及基础上拔的方法 - Google Patents
防止拉线折断及基础上拔的方法 Download PDFInfo
- Publication number
- CN102055144A CN102055144A CN2010105369368A CN201010536936A CN102055144A CN 102055144 A CN102055144 A CN 102055144A CN 2010105369368 A CN2010105369368 A CN 2010105369368A CN 201010536936 A CN201010536936 A CN 201010536936A CN 102055144 A CN102055144 A CN 102055144A
- Authority
- CN
- China
- Prior art keywords
- backguy
- guy wire
- distaff
- foundation
- cable quadrant
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Ropes Or Cables (AREA)
Abstract
本发明公开了一种防止拉线折断及基础上拔的方法,利用本发明,通过合理选择拉线及拉线棒的截面、采用镀锌钢绞线或镀锌铁线作为拉线、及时检查拉线地下部分的锈蚀情况、拉线尽量避开车辆等一系列措施,有效地防止了拉线折断,通过合理选择拉线盘的规格和埋深、使拉线棒与拉线盘垂直、将拉线安装在易受洪水冲刷的地点、禁止在拉线周围取土等一系列措施,有效防止了拉线基础上拔,本发明行之有效、科学合理、操作方便、设计周全、可有效防止拉线折断及基础上拔。
Description
技术领域
本发明属于输电线路养护技术领域,特别涉及一种防止拉线折断及基础上拔的方法。
背景技术
输电线路中设置在两个电线杆之间拉线是固定电线、保证线路正常运行的重要装置。电力运行中,一旦拉线折断或者基础上拔,电线杆就会发生倾倒,电线杆倾倒后电线下垂甚至电线直接落在地面上,这样,不但使线路的正常运行受到影响,而且过往人员及车辆等接触电线而触电。而目前,由于受到自然灾害、人为损坏、材料不合格、埋入地下部分腐蚀致使抗折断强度降低和汽车等大型施工设备撞击等诸多因素的影响,致使拉线折断和基础上拔时有存在,这些都给电网安全运行和供电可靠性造成极大隐患,切实可行的拿出办法解决,已是迫在眉睫、刻不容缓的大事。
发明内容
本发明的目的在于解决上述问题,而提供一种行之有效、科学合理、操作方便、设计周全、可有效防止拉线折断及基础上拔的防止拉线折断及基础上拔的方法
所述方法包括如下方案:
1、解决拉线折断问题的方法:根据拉线所承受的拉力大小,合理选择拉线及拉线棒的截面,拉线棒应选择热镀锌,直径不得小于16毫米,在腐蚀严重的地区应适当加大拉线棒直径,一般加大2到4毫米;采用镀锌钢绞线或镀锌铁线作为拉线,拉线的地下部分不宜采用镀锌钢绞线或镀锌铁线,一般应采用拉线棒;每五年应抽查一次拉线地下部分的锈蚀情况,锈蚀的拉线应立即更换;拉线不应装在路旁,以免被车辆撞断。如果受地形所限,需要设在路旁的,应在拉线靠道路侧埋设护杆;跨越道路的拉线至路面的垂直距离应符合规程要求。
2、预防拉线基础上拔的方法:根据拉线所承受的拉力和土质情况,合理选择拉线盘的规格并埋深;安装拉线盘时,使拉线棒与拉线盘垂直,以增大拉线盘上部的承压面积;不将拉线安装在易受洪水冲刷的地点,必要时采取防洪加固措施;禁止在拉线周围取土,拉线周围地基夯实并加大巡视次数。
利用本发明,通过合理选择拉线及拉线棒的截面、采用镀锌钢绞线或镀锌铁线作为拉线、及时检查拉线地下部分的锈蚀情况、拉线尽量避开车辆等一系列措施,有效地防止了拉线折断,通过合理选择拉线盘的规格和埋深、使拉线棒与拉线盘垂直、将拉线安装在易受洪水冲刷的地点、禁止在拉线周围取土等一系列措施,有效防止了拉线基础上拔,本发明行之有效、科学合理、操作方便、设计周全、可有效防止拉线折断及基础上拔。
具体实施方式
下面通过具体实施例,进一步说明本发明的优点:
利用本发明,解决拉线折断问题的方法主要有:根据拉线所承受的拉力大小,合理选择拉线及拉线棒的截面,拉线棒应选择热镀锌,直径不得小于16毫米,在腐蚀严重的地区应适当加大拉线棒直径,一般加大2到4毫米;采用镀锌钢绞线或镀锌铁线作为拉线,拉线的地下部分不宜采用镀锌钢绞线或镀锌铁线,一般应采用拉线棒;每五年应抽查一次拉线地下部分的锈蚀情况,锈蚀的拉线应立即更换;拉线不应装在路旁,以免被车辆撞断。如果受地形所限,需要设在路旁的,应在拉线靠道路侧埋设护杆;跨越道路的拉线至路面的垂直距离应符合规程要求。预防拉线基础上拔的方法主要有:根据拉线所承受的拉力和土质情况,合理选择拉线盘的规格并埋深;安装拉线盘时,使拉线棒与拉线盘垂直,以增大拉线盘上部的承压面积;不将拉线安装在易受洪水冲刷的地点,必要时采取防洪加固措施;禁止在拉线周围取土,拉线周围地基夯实并加大巡视次数。
利用本发明,通过合理选择拉线及拉线棒的截面、采用镀锌钢绞线或镀锌铁线作为拉线、及时检查拉线地下部分的锈蚀情况、拉线尽量避开车辆等一系列措施,有效地防止了拉线折断,通过合理选择拉线盘的规格和埋深、使拉线棒与拉线盘垂直、将拉线安装在易受洪水冲刷的地点、禁止在拉线周围取土等一系列措施,有效防止了拉线基础上拔,本发明行之有效、科学合理、操作方便、设计周全、可有效防止拉线折断及基础上拔。
Claims (1)
1.一种防止拉线折断及基础上拔的方法,其特征在于包括如下方法:
a、解决拉线折断问题的方法:根据拉线所承受的拉力大小,合理选择拉线及拉线棒的截面,拉线棒应选择热镀锌,直径不得小于16毫米,在腐蚀严重的地区应适当加大拉线棒直径,一般加大2到4毫米;采用镀锌钢绞线或镀锌铁线作为拉线,拉线的地下部分不宜采用镀锌钢绞线或镀锌铁线,一般应采用拉线棒;每五年应抽查一次拉线地下部分的锈蚀情况,锈蚀的拉线应立即更换;拉线不应装在路旁,以免被车辆撞断,如果受地形所限,需要设在路旁的,应在拉线靠道路侧埋设护杆;跨越道路的拉线至路面的垂直距离应符合规程要求;
b、预防拉线基础上拔的方法:根据拉线所承受的拉力和土质情况,合理选择拉线盘的规格并埋深;安装拉线盘时,使拉线棒与拉线盘垂直,以增大拉线盘上部的承压面积;不将拉线安装在易受洪水冲刷的地点,必要时采取防洪加固措施;禁止在拉线周围取土,拉线周围地基夯实并加大巡视次数。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105369368A CN102055144A (zh) | 2010-11-10 | 2010-11-10 | 防止拉线折断及基础上拔的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105369368A CN102055144A (zh) | 2010-11-10 | 2010-11-10 | 防止拉线折断及基础上拔的方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102055144A true CN102055144A (zh) | 2011-05-11 |
Family
ID=43959231
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010105369368A Pending CN102055144A (zh) | 2010-11-10 | 2010-11-10 | 防止拉线折断及基础上拔的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102055144A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103255724A (zh) * | 2013-06-04 | 2013-08-21 | 中交二航局第四工程有限公司安徽分公司 | 一种单轮式钢绞线限位工装 |
CN103255723A (zh) * | 2013-06-04 | 2013-08-21 | 中交二航局第四工程有限公司安徽分公司 | 一种滑轮式钢绞线限位工装 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201126951Y (zh) * | 2007-11-30 | 2008-10-01 | 柴文慧 | 一种与钢绞线直接配合的拉线盘 |
-
2010
- 2010-11-10 CN CN2010105369368A patent/CN102055144A/zh active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201126951Y (zh) * | 2007-11-30 | 2008-10-01 | 柴文慧 | 一种与钢绞线直接配合的拉线盘 |
Non-Patent Citations (3)
Title |
---|
左旭等: "《500kV输电线路拉线塔拉线棒防护措施》", 《吉林电力》 * |
张铁蛋: "《热线征答》", 《农村电工》 * |
王彦国: "《电力线路拉线的设计及安装》", 《黑龙江科技信息》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103255724A (zh) * | 2013-06-04 | 2013-08-21 | 中交二航局第四工程有限公司安徽分公司 | 一种单轮式钢绞线限位工装 |
CN103255723A (zh) * | 2013-06-04 | 2013-08-21 | 中交二航局第四工程有限公司安徽分公司 | 一种滑轮式钢绞线限位工装 |
CN103255723B (zh) * | 2013-06-04 | 2015-07-01 | 中交二航局第四工程有限公司安徽分公司 | 一种滑轮式钢绞线限位工装 |
CN103255724B (zh) * | 2013-06-04 | 2015-09-09 | 中交二航局第四工程有限公司安徽分公司 | 一种单轮式钢绞线限位工装 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201338725Y (zh) | 带雷电防护装置系留气球平台系统 | |
CN104141406A (zh) | 一种可安装4g天线的电力铁塔 | |
CN201084842Y (zh) | 一种合金接地装置 | |
CN102055144A (zh) | 防止拉线折断及基础上拔的方法 | |
CN102256478B (zh) | Emc保护系统和具有emc保护系统的塔 | |
CN212392644U (zh) | 一种架空输电线路覆冰舞动抑制装置 | |
CN206287856U (zh) | 一种新型接触网承力索悬挂结构 | |
CN203475926U (zh) | 扩展型杆塔绝缘横担组合体 | |
CN104505605B (zh) | 降低管道站场接地电阻及延长接地体寿命的装置及方法 | |
CN210985613U (zh) | 垃圾焚烧发电厂移动可升降式避雷针防雷系统 | |
CN203205552U (zh) | 降低输电线路铁塔接地电阻网 | |
CN107337099B (zh) | 一种针对水电站缆索起重机布设的防雷天网 | |
CN106025923B (zh) | 一种张力式电力线路保护网的施工方法 | |
CN207393107U (zh) | 一种带有防攀爬高安全性的通信铁塔 | |
CN105305106A (zh) | 防盗接地线用接地极和电线杆 | |
WO2011029312A1 (zh) | 一种复合材料杆塔中心竖直接地引下方法及其杆塔 | |
CN201303211Y (zh) | 可控放电避雷针 | |
CN203626367U (zh) | 单边延伸型杆塔绝缘横担组合体 | |
CN207646606U (zh) | 一种用于市政桥梁工程的桥梁电缆保护装置 | |
CN204875862U (zh) | 一种安全井盖装置 | |
CN205389010U (zh) | 一种电杆、表箱接地装置 | |
CN204401653U (zh) | 一种防触电路灯工作井 | |
CN204081040U (zh) | 地漏和沉砂池 | |
CN204597000U (zh) | 一种中低压供电系统用非金属接地装置 | |
CN104563554A (zh) | 用于500kV变电站集成式构架的组合式格构梁 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20110511 |