CN102043085A - 超高压电网和电流带负荷检测装置 - Google Patents

超高压电网和电流带负荷检测装置 Download PDF

Info

Publication number
CN102043085A
CN102043085A CN2010105034190A CN201010503419A CN102043085A CN 102043085 A CN102043085 A CN 102043085A CN 2010105034190 A CN2010105034190 A CN 2010105034190A CN 201010503419 A CN201010503419 A CN 201010503419A CN 102043085 A CN102043085 A CN 102043085A
Authority
CN
China
Prior art keywords
current
phase
voltage
amplitude
electric current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010105034190A
Other languages
English (en)
Other versions
CN102043085B (zh
Inventor
曲欣
余晓东
王超
宋国涛
李成彦
曹锐
井子恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Feng Lin
State Grid Corp of China SGCC
Zaozhuang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Nanyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanyang Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical Nanyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority to CN201010503419.0A priority Critical patent/CN102043085B/zh
Priority to CN201510060234.XA priority patent/CN104635015B/zh
Publication of CN102043085A publication Critical patent/CN102043085A/zh
Application granted granted Critical
Publication of CN102043085B publication Critical patent/CN102043085B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Measurement Of Current Or Voltage (AREA)

Abstract

本发明涉及一种超高压电网和电流带负荷检测装置,具有一个SY3001智能三相相位伏安表,该伏安表中设有三路电压输入通道和6路电流输入通道,电流输入通道的一端均连接有钳形电流互感器,在该伏安表内设置的电压、电流信号处理模块中设有六相电流信号接收、处理及存储单元,和电流信号接收、处理及存储单元,电压电流显示界面以及和电流显示界面。该装置能够有效地解决现场带负荷检测中不能检查和电流的问题,并能准确地测量、计算、显示出和电流的有功功率和无功功率值,直观、清晰地判断出六相电流幅值、相位,以及合成后的和电流的幅值、相位是否正确,缩短现场带负荷检测时间,提高工作效率,具有结构设计简单合理,使用方便,性能可靠等优点。

Description

超高压电网和电流带负荷检测装置
技术领域
本发明属于电力系统继电保护检测技术领域,特别是一种超高压电网和电流带负荷检测装置。
背景技术
在500千伏及以上超高压电网系统中,常采用二分之三主接线方式,而继电保护是保护超高压电网设备的,因此作为保护装置它要根据所保护的对象、范围采用两组电流,而这两组电流在实际二次回路接线中是并接在一起的,然后接入保护装置,这样就形成了两路电流的和,即所谓的和电流。
带负荷检查是电力系统继电保护专业现场工作中经常采用的测试手段,主要适用于新安装或设备回路经较大改动的继电保护装置,在其投入运行以前,必须进行带负荷检查。该检查的主要目的是通过测量一条输电线路或一台主变压器实时二次电流的相序、幅值及与电压的相位关系,并与输电线路或主变压器的负荷潮流进行对比,从而判定继电保护二次回路的极性、相序是否正确,继电保护装置能否投运,因而它是检验继电保护装置能否正确投运最关键的一个环节。
传统的继电保护检查方法是通过单相钳形表测量电流与电压的相位关系,来确定继电保护二次回路的极性、相序是否正确。但这种检查方法只能测单一的电流与电压之间的相位关系,针对和电流的检查目前是将两组电流分别测量,然后再对测量的数据进行合成计算。由于500千伏及以上线路负荷潮流波动较大,不同时刻的潮流都是不一样的;同时无功功率(容性或感性)也占一定的比例,造成两组电流的角度偏差很大,这种情况下两组合成后的电流就不是简单的加减关系。如果分别测量则存在时间先后,造成测量误差,数据不准确;而且由于对数据进行合成计算量大,非常耗时,不能快速地得出结论,由此影响了设备的正常投运,也给系统运行带来安全隐患。
目前,出现的SY3001智能三相相位伏安表采用高精度ADC及DSP技术进行测量,三路电压输入通道相互绝缘隔离,三路电流采用钳形电流互感器输入,可在不断开被测电路的情况下同时测量1~3路、和1~3路交流电流的幅值及其各量间的相位、频率;测量单/三相功率和功率因数。同时,该伏安表利用基于Windows Mobile 5.0操作系统的嵌入式掌上电脑进行操作和数据处理,设有三相电压、电流相关参数的图形化界面,并同屏以向量图或表格显示,触摸屏操作,汉字手写输入,人机界面友好,被称为是划时代的智能化现场测量仪器。但是,该技术对和电流的检查仍然是将两组电流分别测量,然后再对测量的数据进行合成计算。由测量时间先后差异造成测量误差,数据不准,以及数据进行合成计算量大等问题仍未得到解决。
发明内容
本发明的目的是提供一种能够有效地解决现场带负荷检测中不能准确检测和电流的问题,能准确地测量、计算、显示出和电流的有功功率和无功功率值,直观、清晰地判断出六相电流幅值、相位,以及合成后的和电流的幅值、相位是否正确,缩短现场带负荷检测时间,提高工作效率的超高压电网和电流带负荷检测装置。
实现本发明的目的所采取的技术方案是:该检测装置具有一个SY3001智能三相相位伏安表,该伏安表中设有触摸式操作显示屏,伏安表内嵌入有Windows Mobile 5.0操作系统,Windows Mobile 5.0操作系统中设有三路电压信息输入通道和电压、电流信息处理模块,其中,在SY3001智能三相相位伏安表中设有6路电流信号输入通道,电流信号输入通道的一端均连接有钳形电流互感器,在电压、电流信息处理模块中设有:
一个六相电流信号接收、处理及存储单元,用于单相电流幅值、相位及功率的运算处理;
一个和电流信息处理及存储单元,用于和电流幅值、相位及功率的运算处理;
一个电压及六相电流信息显示界面,用于显示三相电压及六相电流的幅值、相位、有功功率、无功功率及相量图;
一个和电流信息显示界面,用于显示和电流的幅值、相位、有功功率、无功功率及电压和电流的相量图。
按照上述方案制成的超高压电网和电流带负荷检测装置,能够有效地解决现场带负荷检测中不能检查和电流的问题,并能准确地测量、计算、显示出和电流的有功功率和无功功率值,直观、清晰地判断出六相电流幅值、相位,以及合成后的和电流的幅值、相位是否正确,缩短现场带负荷检测时间,提高工作效率。同时该装置具有结构设计简单合理,使用方便,性能可靠等优点。
附图说明
图1是本发明的结构示意图;
图2是电压及六相电流显示界面示意图;
图3是和电流显示界面示意图。
具体实施方式
参看图1,本发明的超高压电网和电流带负荷检测装置具有一个SY3001智能三相相位伏安表1,该伏安表嵌入有Windows Mobile 5.0操作系统,设有触摸式操作显示屏2,并由此构成掌上电脑,可进行触摸操作和数据的运算处理,人机界面友好,软件升级方便,该SY3001智能三相相位伏安表1可在市场直接购置。在SY3001智能三相相位伏安表1中设有3路相互绝缘隔离的电压信息输入通道和6路电流信号输入通道。6路电流信号输入通道分别对应连接有钳形电流互感器3,可分别与继电保护二次回路5的接线连接,能在不断开被测电路的情况下同时检测二次电流回路的六相电流,图中标号4、6为超高压电网母线。在SY3001智能三相相位伏安表1中导入有电压、电流信息处理模块,该模块中设有一个六相电流信号接收、处理及存储单元,能进行二次回路中六相电流幅值、相位的运算处理,计算出单相或六相功率和功率因数;并由电压、电流信息处理模块以电压为基准,自动按下述算式计算出两组六相电流对应的有功功率和无功功率值;
Figure BSA00000298279400041
(式中P表示有功功率,Q表示无功功率,U表示被测线路电压的一次值,I表示被测线路电流的一次值一次值,Φ表示被测电流的相位角)。在电压、电流信息处理模块中还设有一个和电流信息处理及存储单元,用于三相和电流的计算,通过下述算式自动计算出和电流的幅值和相位:设两组相互并接的某相电流分别为i1,i2,和电流为ih,其中:
i1=I1sinωt A,i2=I2sin(ωt+ψ)A,
则和电流的幅值为 I h = I 1 2 + I 2 2 ,
和电流的角度为 ψ h = tg - 1 I 2 I 1 ,
则和电流为:ih=i1+i2=Ihsin((ωt+ψh)A
上述算式中,I1、I2分别表示被测线路电流的一次值,ω、ψ分别表示,t表示被测线路电流的相位角。
然后,再以电压为基准,计算出和电流的有功功率和无功功率值,
Figure BSA00000298279400051
(式中,Ph表示和电流的有功功率,Qh表示和电流的无功功率和电流的有功功率,U表示被测线路电压的一次值,I表示被测线路电流的一次值,Φ表示被测线路电流的相位角)。
在电压、电流信息处理模块中设有一个电压及六相电流信息显示界面(参见图2),能实时显示三相电压、两组六相电流的幅值和相位,同时设有“电压变比”和“电流变比”选项,能够分别显示三相电压和六相电流的一次值。
在电压、电流信息处理模块中还设有一个和电流信息显示界面(参见图3),用于显示和电流的幅值、相位及有功功率和无功功率,由此实现检测时刻一致的和电流幅值、相位的显示,同时在和电流信息显示界面中还设有“电流变比”选项,能够显示和电流的一次值。
在对继电保护装置进行检测时,只要将6把钳形电流互感器3的卡钳分别卡接在被测继电保护二次回路5的各相接线上,并通过操作显示屏2的触摸操作,即可分别或同屏显示三相电压及六相电流的幅值、相位、相量图、有功功率和无功功率、以及和电流的幅值、相位、有功功率和无功功率,并与监控中心测量表计的数据分别进行对比,即可准确地判断出六相电流幅值、相位,以及合成后的和电流的幅值、相位是否正确,从而判定被测继电保护装置是否能投入运行。由于对继电保护二次回路5中的两组六相电流同时进行检测,并由Windows Mobile 5.0操作系统自动快速运算处理,因而不仅能够保证判定结果的准确性,而且可以大大缩短现场带负荷检查的时间,提高检测工作效率。

Claims (1)

1.一种超高压电网和电流带负荷检测装置,具有一个SY3001智能三相相位伏安表,该伏安表中设有触摸式操作显示屏,伏安表内嵌入有Windows Mobile5.0操作系统,Windows Mobile 5.0操作系统中设有三路电压信息输入通道和电压、电流信息处理模块,其特征在于:在SY3001智能三相相位伏安表中设有6路电流信号输入通道,电流信号输入通道的一端均连接有钳形电流互感器,在电压、电流信息处理模块中设有:
一个六相电流信号接收、处理及存储单元,用于单相电流幅值、相位及功率的运算处理;
一个和电流信息处理及存储单元,用于和电流幅值、相位及功率的运算处理;
一个电压及六相电流信息显示界面,用于显示三相电压及六相电流的幅值、相位、有功功率、无功功率及相量图;
一个和电流信息显示界面,用于显示和电流的幅值、相位、有功功率、无功功率及电压和电流的相量图。
CN201010503419.0A 2010-10-12 2010-10-12 超高压电网和电流带负荷检测装置 Expired - Fee Related CN102043085B (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201010503419.0A CN102043085B (zh) 2010-10-12 2010-10-12 超高压电网和电流带负荷检测装置
CN201510060234.XA CN104635015B (zh) 2010-10-12 2010-10-12 超高压电网和电流带负荷检测装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010503419.0A CN102043085B (zh) 2010-10-12 2010-10-12 超高压电网和电流带负荷检测装置

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201510060234.XA Division CN104635015B (zh) 2010-10-12 2010-10-12 超高压电网和电流带负荷检测装置

Publications (2)

Publication Number Publication Date
CN102043085A true CN102043085A (zh) 2011-05-04
CN102043085B CN102043085B (zh) 2015-04-22

Family

ID=43909422

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010503419.0A Expired - Fee Related CN102043085B (zh) 2010-10-12 2010-10-12 超高压电网和电流带负荷检测装置

Country Status (1)

Country Link
CN (1) CN102043085B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102360036A (zh) * 2011-08-10 2012-02-22 上海华艾软件有限公司 一种多路电流采集及叠加处理装置
CN110749834A (zh) * 2019-11-26 2020-02-04 广东电网有限责任公司 带负荷测试分析方法
CN111756021A (zh) * 2020-06-29 2020-10-09 深圳供电局有限公司 一种用于二分之三接线的线路保护电流二次回路

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101533053A (zh) * 2009-04-24 2009-09-16 东北大学 静态无功补偿试验平台负载模拟及检测装置
CN201365142Y (zh) * 2009-01-24 2009-12-16 北京清电华力电气自动化科技有限公司 一种高可靠性的配电变压器监测终端
CN101813736A (zh) * 2009-04-15 2010-08-25 河南省电力公司 同杆并架双回线的距离保护测量方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201365142Y (zh) * 2009-01-24 2009-12-16 北京清电华力电气自动化科技有限公司 一种高可靠性的配电变压器监测终端
CN101813736A (zh) * 2009-04-15 2010-08-25 河南省电力公司 同杆并架双回线的距离保护测量方法
CN101533053A (zh) * 2009-04-24 2009-09-16 东北大学 静态无功补偿试验平台负载模拟及检测装置

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
无: "GY6000B 六路钳形差动保护接线测试仪", 《HTTP://WWW.AFZHAN.COM/PRODUCT/DETAIL/287555.HTML》 *
无: "SY3001 智能三相相位伏安表", 《HTTP://WWW.SY1718.COM/OLD/PRODUCTS/SY30001.HTML》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102360036A (zh) * 2011-08-10 2012-02-22 上海华艾软件有限公司 一种多路电流采集及叠加处理装置
CN110749834A (zh) * 2019-11-26 2020-02-04 广东电网有限责任公司 带负荷测试分析方法
CN111756021A (zh) * 2020-06-29 2020-10-09 深圳供电局有限公司 一种用于二分之三接线的线路保护电流二次回路

Also Published As

Publication number Publication date
CN102043085B (zh) 2015-04-22

Similar Documents

Publication Publication Date Title
CN101120259B (zh) 漏电流断路器及其方法
CN103438797B (zh) 变压器绕组变形在线检测方法与系统
CN203490313U (zh) Pt二次回路多点接地告警及定位系统
CN103782509A (zh) 用于检测同步发电机内部绕组故障的系统、计算机程序产品和方法
CN102540001A (zh) 500kV变电站模拟穿越式三相短路检验交流电流回路的方法
CN103983889A (zh) 基于模型参考分析的有源电力滤波器开关器件开路故障诊断方法
CN107942192A (zh) 一种配电设备ct自动测试方法及系统
CN103439682B (zh) 采用一种便携式电流互感器复合误差测试装置进行电流互感器复合误差测试的方法
CN102590695A (zh) 电力线路故障检测与定位装置
CN103645415A (zh) 一种带电检查电能计量装置接线的实用方法
CN102043085B (zh) 超高压电网和电流带负荷检测装置
CN207662990U (zh) 一种ct二次回路开路和虚接的检测系统
KR20100061431A (ko) 전류파형 유사도 측정에 의한 변류비 오차 측정장치 및 방법
CN106526305B (zh) 一种用于判断三相二次回路接线正确性的相量分析器
CN101968512A (zh) 交流短路非放电型绝缘子检测方法
CN103344937A (zh) 智能电能表功耗检测设备及检测方法
CN105182156A (zh) 基于波形可视化同期回路极性检测装置及检测方法
US10067167B2 (en) Method and apparatus for precision phasor measurements through a medium-voltage distribution transformer
CN206161833U (zh) 一种计量电度表在线漏电检测模块
CN202025043U (zh) 改进型变比测试仪
CN104122483A (zh) 母线专用电流互感器变比检测仪
CN111474512B (zh) 新装计量设备的验收检测方法、装置及可读存储介质
CN202563047U (zh) 电力线路故障检测与定位装置
CN202189089U (zh) 电压互感器二次回路电压损失量测试装置
CN203630207U (zh) 变压器夹件接地电流的双互感器在线监测装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: FENG LIN

Free format text: FORMER OWNER: HENAN ELECTRIC POWER COMPANY NANYANG POWER SUPPLY BRANCH

Effective date: 20150318

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: FENG LIN

Effective date: 20150319

Owner name: ZAOZHUANG POWER SUPPLY COMPANY OF STATE GRID SHAND

Effective date: 20150319

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhang Aixiang

Inventor after: Jianqingzhi

Inventor after: Chen Ning

Inventor after: Han Peng

Inventor after: Zhang Jian

Inventor before: Feng Lin

Inventor after: Feng Lin

Inventor before: Qu Xin

Inventor before: Yu Xiaodong

Inventor before: Wang Chao

Inventor before: Song Guotao

Inventor before: Li Chengyan

Inventor before: Cao Rui

Inventor before: Jing Ziheng

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: FENG LIN TO: ZHANG AIXIANG JIAN QINGZHI CHEN NING HAN PENG ZHANG JIAN

Free format text: CORRECT: ADDRESS; FROM: 473000 NANYANG, HENAN PROVINCE TO: 518000 SHENZHEN, GUANGDONG PROVINCE

Free format text: CORRECT: INVENTOR; FROM: QU XIN YU XIAODONG WANG CHAO SONG GUOTAO LI CHENGYAN CAO RUI JING ZIHENG TO: FENG LIN

Free format text: CORRECT: ADDRESS; FROM: 518000 SHENZHEN, GUANGDONG PROVINCE TO: 100031 XICHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20150319

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: ZAOZHUANG POWER SUPPLY COMPANY OF STATE GRID SHANDONG ELECTRIC POWER Co.

Address before: 518000 Baoan North Road, Guangdong, Shenzhen, No. 3039, No.

Applicant before: Feng Lin

Effective date of registration: 20150318

Address after: 518000 Baoan North Road, Guangdong, Shenzhen, No. 3039, No.

Applicant after: Feng Lin

Address before: 473000 Henan City, Nanyang province people's North Road, No. 268

Applicant before: Henan Nanyang Power Supply Co.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150422

Termination date: 20181012

CF01 Termination of patent right due to non-payment of annual fee