CN102042019B - 浅埋大跨软塑粘土隧道两台阶五步开挖的施工方法 - Google Patents

浅埋大跨软塑粘土隧道两台阶五步开挖的施工方法 Download PDF

Info

Publication number
CN102042019B
CN102042019B CN 201010540923 CN201010540923A CN102042019B CN 102042019 B CN102042019 B CN 102042019B CN 201010540923 CN201010540923 CN 201010540923 CN 201010540923 A CN201010540923 A CN 201010540923A CN 102042019 B CN102042019 B CN 102042019B
Authority
CN
China
Prior art keywords
excavation
soft plastic
arch
excavating
plastic clay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201010540923
Other languages
English (en)
Other versions
CN102042019A (zh
Inventor
胡利平
盖青山
白国艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
Fourth Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd filed Critical Fourth Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd
Priority to CN 201010540923 priority Critical patent/CN102042019B/zh
Publication of CN102042019A publication Critical patent/CN102042019A/zh
Application granted granted Critical
Publication of CN102042019B publication Critical patent/CN102042019B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

浅埋大跨软塑粘土隧道两台阶五步开挖的施工方法,它涉及一种浅埋大跨软塑粘土隧道开挖的施工方法。本发明解决了现有软弱地层隧道开挖技术存在的工序多、施工进度慢、成本高、对围岩扰动次数多、围岩变形大和仰拱封闭需要时间长的问题。本发明步骤上台阶开挖,预留核心土:在挖掘机开挖时沿轮廓线预留土体,开挖,在拱脚处设扩大拱脚;上台阶支护:初喷混凝土对开挖面进行封闭,设置拱脚支垫,架设型钢拱架,铺设钢筋网片,施作锁脚锚管,喷射混凝土至设计厚度;下台阶交错开挖支护:交错开挖左右部,边墙的型钢钢架与拱部钢架连接牢固,进行钢筋网、锁脚锚管和喷射混凝土;核心土开挖;仰拱开挖及支护。本发明适用于浅埋大跨软塑粘土隧道施工中。

Description

浅埋大跨软塑粘土隧道两台阶五步开挖的施工方法
技术领域
本发明涉及一种浅埋大跨软塑粘土隧道开挖的施工方法,具体涉及一种浅埋大跨软塑粘土隧道两台阶五步开挖的施工方法,属于土木工程技术领域。
背景技术
软塑粘土围岩具有地基承载力低、含水量大、粘结力差和易塌方等特点,我国修建软弱地层隧道时,V、VI级围岩主要采用CD法、CRD法和双侧壁导坑法等工法,这类工法可以很好地控制地表沉降和变形收敛,但工序较多,且全部为人工或小型机械作业,大型机械无法展开,施工进度慢,同时增加临时仰拱及中隔墙,成本增加大。而环形开挖预留核心土法和三台阶七步开挖法存在开挖对土体扰动次数多、围岩变形大和仰拱封闭需要时间长等缺点。
发明内容
本发明的目的是为了解决现有软弱地层隧道开挖技术存在的工序多、施工进度慢、成本高、对围岩扰动次数多、围岩变形大和仰拱封闭需要时间长的问题,进而提供一种浅埋大跨软塑粘土隧道两台阶五步开挖的施工方法。
本发明的技术方案是:浅埋大跨软塑粘土隧道两台阶五步开挖的施工方法的步骤为:
步骤一、上台阶开挖,预留核心土:
开挖时采用挖掘机配合人工风镐或电镐开挖,在挖掘机开挖时沿轮廓线预留50cm土体,然后采用人工风镐或电镐进行开挖,人工开挖时在拱脚处设扩大拱脚,并在拱脚底部至少留深20cm土用人工开挖;
步骤二、上台阶支护:
当有渗水现象时,初喷混凝土对开挖面进行封闭,然后设置拱脚支垫,架设型钢拱架,相邻两榀工字钢之间纵向采用连接钢筋在工字钢内外缘交错连接,随初喷射混凝土表面布设钢筋网,钢筋网片之间相互搭接,施作锁脚锚管,继续喷射混凝土至设计厚度;
步骤三、下台阶交错开挖支护:
在上台阶初期支护稳定的条件下,开始交错开挖左右部,开挖长度为0.5-0.75m,边墙的型钢钢架与拱部钢架上下对正,并螺栓连接牢固,钢架支立完成后进行钢筋网、锁脚锚管和喷射混凝土;
步骤四、核心土开挖:
挖除核心土;
步骤五、仰拱开挖及支护:
仰拱开挖采用全幅施工,上面铺设仰拱栈桥;当仰拱有渗水现象时,立即初喷射混凝土封闭围岩,然后安装仰拱拱架并喷射混凝土达到设计厚度,使初期支护成环。
本发明与现有技术相比具有以下效果:
(1)施工空间大,可以引入大型施工机械,多作业面平行作业,工效高,很大程度上加快了施工进度;
(2)在地质结构复杂多变的隧道施工中,便于灵活、及时地调整施工方法,进度稳定,工期保障性强;
(3)适应不同跨度和多种断面形式,没有需要拆除的临时施工支护,避免了因拆除临时支护造成初期支护突然卸载而危及隧道安全;初期支护断面圆顺,无应力集中点,安全性强,同时节省投资;
(4)仰拱初支及时封闭成环,仰拱衬砌混凝土超前施作,确保施工安全,改善隧道运输环境,便于隧道文明施工的开展;
(5)解决了软塑粘土地层地基承载力低的问题,确保了施工安全;
(6)仰拱初支和仰拱混凝土全幅施作,确保了防排水系统、仰拱保温层和混凝土的施工质量,减少了营运病害;
(7)无需投入特种设备,投入小,操作性强,易推广。
具体实施方式
具体实施方式一:本实施方式的浅埋大跨软塑粘土隧道两台阶五步开挖的施工方法的步骤为:
步骤一、上台阶开挖,预留核心土:
开挖时采用挖掘机配合人工风镐或电镐开挖,在挖掘机开挖时沿轮廓线预留50cm土体,然后采用人工风镐或电镐进行开挖,人工开挖时在拱脚处设扩大拱脚,并在拱脚底部至少留深20cm土用人工开挖;
步骤二、上台阶支护:
当有渗水现象时,初喷混凝土对开挖面进行封闭,然后设置拱脚支垫,架设型钢拱架,相邻两榀工字钢之间纵向采用连接钢筋在工字钢内外缘交错焊接,随初喷射混凝土表面布设钢筋网,钢筋网片之间相互搭接,施作锁脚锚管,继续喷射混凝土至设计厚度;
步骤三、下台阶交错开挖支护:
在上台阶初期支护稳定的条件下,开始交错开挖左右部,开挖长度为0.5-0.75m,边墙的型钢钢架与拱部钢架上下对正,并螺栓连接牢固,钢架支立完成后进行钢筋网、锁脚锚管和喷射混凝土;
步骤四、核心土开挖:
挖除核心土;
步骤五、仰拱开挖及支护:
仰拱开挖采用全幅施工,上面铺设仰拱栈桥;当仰拱有渗水现象时,立即喷射混凝土封闭围岩,然后安装仰拱拱架并喷射混凝土达到设计厚度,使初期支护成环。
本实施方式中采用人工风镐或电镐进行开挖,避免挖掘机破坏既有初支,防止挖掘机开挖对土体的振动太大,造成土体塌方,并可以控制超挖。在拱脚底部至少留深20cm土用人工开挖,避免了拱脚超挖,便于拱脚使用型钢或方木垫实,防止因拱脚承载力不足而造成支护下沉。当有渗水现象时,初喷混凝土对开挖面进行封闭,避免了孔隙水从断面处渗出,而使土体失稳。
具体实施方式二:本实施方式的步骤二中相邻两榀工字钢之间纵向连接钢筋采用双向直钩形在工字钢内外缘交错焊接。结构稳定。其它步骤与具体实施方式一相同。
具体实施方式三:本实施方式的步骤二中钢筋网片之间相互搭接的长度大于30倍的钢筋直径。结构稳定。其它步骤与具体实施方式一或二相同。
具体实施方式四:本实施方式的步骤二中锁脚锚管与型钢拱架采用螺纹钢双排焊接。以增强共同支护作用。其它步骤与具体实施方式一、二或三相同。
具体实施方式五:本实施方式的步骤二中相邻两榀工字钢之间纵向采用连接钢筋在工字钢内外缘交错连接的间距为60-100cm。结构稳定。其它步骤与具体实施方式一、二、三或四相同。
具体实施方式六:本实施方式的步骤三中开挖左右部的交错距离为1-2m。结构稳定。其它步骤与具体实施方式一、二、三、四或五相同。
具体实施方式七:本实施方式的步骤三中的开挖长度为0.5-0.75m,该长度为相邻一榀拱架间距。施工更安全。其它步骤与具体实施方式一、二、三、四、五或六相同。

Claims (6)

1.一种浅埋大跨软塑粘土隧道两台阶五步开挖的施工方法,其特征在于:施工方法的步骤为:
步骤一、上台阶开挖,预留核心土:
开挖时采用挖掘机配合人工风镐或电镐开挖,在挖掘机开挖时沿轮廓线预留50cm土体,然后采用人工风镐或电镐进行开挖,人工开挖时在拱脚处设扩大拱脚,并在拱脚底部至少留深20cm土用人工开挖;
步骤二、上台阶支护:
当有渗水现象时,初喷混凝土对开挖面进行封闭,然后设置拱脚支垫,架设型钢拱架,相邻两榀工字钢之间纵向采用连接钢筋在工字钢内外缘交错连接,布设钢筋网随初喷射混凝土表面起伏铺设,钢筋网片之间相互搭接,施作锁脚锚管,继续喷射混凝土至设计厚度;
步骤三、下台阶交错开挖支护:
在上台阶初期支护稳定的条件下,开始交错开挖左右部,开挖长度为0.5-0.75m,边墙的型钢钢架与拱部钢架上下对正,并螺栓连接牢固,钢架支立完成后进行钢筋网、锁脚锚管和喷射混凝土;
步骤四、核心土开挖:
挖除核心土;
步骤五、仰拱开挖及支护:
仰拱开挖采用全幅施工,上面铺设仰拱栈桥;当仰拱有渗水现象时,立即初喷射混凝土封闭围岩,然后安装仰拱拱架并喷射混凝土达到设计厚度,使初期支护成环。
2.根据权利要求1所述的浅埋大跨软塑粘土隧道两台阶五步开挖的施工方法,其特征在于:步骤二中相邻两榀工字钢之间纵向钢筋采用双向直钩形在工字钢内外缘交错焊接。
3.根据权利要求1所述的浅埋大跨软塑粘土隧道两台阶五步开挖的施工方法,其特征在于:步骤二中钢筋网片之间相互搭接的长度大于30倍的钢筋直径。
4.根据权利要求1所述的浅埋大跨软塑粘土隧道两台阶五步开挖的施工方法,其特征在于:步骤二中锁脚锚管与型钢拱架采用螺纹钢双排焊接。
5.根据权利要求1所述的浅埋大跨软塑粘土隧道两台阶五步开挖的施工方法,其特征在于:步骤二中相邻两榀工字钢之间纵向采用连接钢筋在工字钢内外缘交错连接的间距为60-100cm。
6.根据权利要求1所述的浅埋大跨软塑粘土隧道两台阶五步开挖的施工方法,其特征在于:步骤三中开挖左右部的交错距离为1-2m。
CN 201010540923 2010-11-11 2010-11-11 浅埋大跨软塑粘土隧道两台阶五步开挖的施工方法 Active CN102042019B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010540923 CN102042019B (zh) 2010-11-11 2010-11-11 浅埋大跨软塑粘土隧道两台阶五步开挖的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010540923 CN102042019B (zh) 2010-11-11 2010-11-11 浅埋大跨软塑粘土隧道两台阶五步开挖的施工方法

Publications (2)

Publication Number Publication Date
CN102042019A CN102042019A (zh) 2011-05-04
CN102042019B true CN102042019B (zh) 2012-12-19

Family

ID=43908523

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010540923 Active CN102042019B (zh) 2010-11-11 2010-11-11 浅埋大跨软塑粘土隧道两台阶五步开挖的施工方法

Country Status (1)

Country Link
CN (1) CN102042019B (zh)

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102182474B (zh) * 2011-05-10 2013-02-13 湖南省交通规划勘察设计院 处理隧道施工初期支护变形过大的加固方法
CN102220868B (zh) * 2011-05-23 2013-06-19 重庆中环建设有限公司 城市浅埋大断面隧道五部开挖工法
CN102226398A (zh) * 2011-06-02 2011-10-26 中铁二院工程集团有限责任公司 软岩四线大跨隧道复合双侧壁撑索转换开挖施工方法
CN102268993B (zh) * 2011-06-30 2013-10-23 广东省长大公路工程有限公司 一种高液限土中隧道开挖方法
CN102392651B (zh) * 2011-11-30 2014-10-22 中铁五局(集团)有限公司 全风化花岗岩隧道开挖施工方法
CN102926757B (zh) * 2012-09-07 2015-09-09 中铁五局(集团)有限公司 山岭软弱大跨隧道两台阶四步开挖支护的施工方法
CN103244133B (zh) * 2013-05-17 2016-01-20 贵州省公路工程集团有限公司 煤系地层隧道铣挖与爆破联合施工工法
CN103541739A (zh) * 2013-09-13 2014-01-29 北京交通大学 一种浅埋大跨小净距黄土隧道支护体系
CN104500114B (zh) * 2014-12-19 2016-11-30 中国建筑第四工程局有限公司 地铁暗挖隧道横通道临时支撑系统
CN104963689A (zh) * 2015-07-07 2015-10-07 中铁十九局集团第二工程有限公司 隧道三台阶七步开挖方法
CN106368720A (zh) * 2016-10-10 2017-02-01 三峡大学 胎式衬砌与泡沫混凝土联合使用的支护结构及施工方法
CN106837371A (zh) * 2017-03-23 2017-06-13 中铁五局集团成都工程有限责任公司 大变形隧道两台阶带仰拱施工方法
CN106988767A (zh) * 2017-04-06 2017-07-28 铁道第三勘察设计院集团有限公司 深埋中心水沟的软弱围岩隧道支护结构
CN107013222A (zh) * 2017-05-28 2017-08-04 中铁五局集团有限公司 一种紧邻既有铁路的滇中红层隧道铣挖施工方法
CN107191206B (zh) * 2017-06-23 2019-07-12 中铁十二局集团有限公司 一种浅埋大跨隧道两单元六步施工方法
CN107939415A (zh) * 2017-10-20 2018-04-20 长安大学 浅埋大跨软塑粘土隧道留核心土微二台阶施工方法
CN108708739B (zh) * 2018-04-12 2019-07-26 中铁四局集团有限公司 一种适用于超大断面硬岩隧道的浅埋外露施工方法
CN111502707B (zh) * 2020-05-11 2022-08-12 中铁十八局集团有限公司 一种隧道极软岩层收缩拱架初支方法
CN111852491B (zh) * 2020-07-17 2022-10-18 中国水利水电第六工程局有限公司 一种tbm通过长距离软弱泥化岩断层的方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101105131A (zh) * 2007-08-17 2008-01-16 中铁十二局集团有限公司 一种适用于铁路大断面ⅳ、ⅴ级围岩隧道的开挖方法
CN101614125A (zh) * 2009-07-23 2009-12-30 中铁九局集团有限公司 V级围岩隧道施工方法
CN101769154A (zh) * 2008-12-31 2010-07-07 中铁六局集团呼和浩特铁路建设有限公司 一种隧道施工的开挖支护方法
CN101858220A (zh) * 2010-05-28 2010-10-13 深圳市建设(集团)有限公司 一种隧道双上侧壁导坑施工方法
CN101864960A (zh) * 2010-05-17 2010-10-20 中铁二十局集团有限公司 岩溶地区双连拱公路隧道施工方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5287831A (en) * 1976-01-14 1977-07-22 Masaru Nagata Method of moving hanging rail and rail suspension body from supporting holding work in tunnel excavation construction work
JP2010116739A (ja) * 2008-11-13 2010-05-27 Shimizu Corp トンネル支保方法及びトンネル支保構造

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101105131A (zh) * 2007-08-17 2008-01-16 中铁十二局集团有限公司 一种适用于铁路大断面ⅳ、ⅴ级围岩隧道的开挖方法
CN101769154A (zh) * 2008-12-31 2010-07-07 中铁六局集团呼和浩特铁路建设有限公司 一种隧道施工的开挖支护方法
CN101614125A (zh) * 2009-07-23 2009-12-30 中铁九局集团有限公司 V级围岩隧道施工方法
CN101864960A (zh) * 2010-05-17 2010-10-20 中铁二十局集团有限公司 岩溶地区双连拱公路隧道施工方法
CN101858220A (zh) * 2010-05-28 2010-10-13 深圳市建设(集团)有限公司 一种隧道双上侧壁导坑施工方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
JP昭52-87831A 1977.07.22
JP特开2010-116739A 2010.05.27

Also Published As

Publication number Publication date
CN102042019A (zh) 2011-05-04

Similar Documents

Publication Publication Date Title
CN102042019B (zh) 浅埋大跨软塑粘土隧道两台阶五步开挖的施工方法
CN102926757B (zh) 山岭软弱大跨隧道两台阶四步开挖支护的施工方法
CN101614125B (zh) V级围岩隧道施工方法
CN104963689A (zh) 隧道三台阶七步开挖方法
CN202690082U (zh) 一种预防隧道变形沉降的组合钢架结构
CN104533446A (zh) 一种大断面软弱围岩隧道双层初期支护预防地质灾害发生的施工方法及其结构
CN108412519A (zh) 高原地区软岩轻微大变形单线隧道支护装置及施工方法
CN102226399A (zh) 软岩四线大跨隧道三台阶以索代撑开挖施工方法
CN104405411B (zh) 超大变断面隧道支护结构
CN110541721A (zh) 一种富水流砂地层全风化围岩隧道的支护体系及施工方法
CN102650212B (zh) 一种利用中导洞临时支护保护连拱隧道中隔墙的施工方法
CN203879506U (zh) 一种岩质地层大断面深竖井的支护结构体系
CN111779510B (zh) 一种高液限红黏土围岩隧道初支侵限换拱方法
CN205503146U (zh) 一种适用于城市敏感区的浅埋隧道新型支护结构
CN104727318A (zh) 一种基坑复合土钉支护结构及方法
CN103982188A (zh) 岩质地层大断面深竖井的支护结构体系及其施工方法
CN111335915B (zh) 一种用于隧道仰拱隆起破坏修复的型钢支撑结构及方法
CN103088830A (zh) 超深地下室复合外墙结构的施工方法
CN104831733A (zh) 拱桥拱座隧洞式大角度斜桩施工方法
CN204626396U (zh) 一种基坑复合土钉支护结构
CN104141500A (zh) 一种板结砂砾石地层洞室施工方法
CN116044418A (zh) 一种软岩隧洞开挖加固变形控制施工方法
CN114165269B (zh) 基于钢混组合支架及喷碹的复合支护系统及其施工工艺
CN211395698U (zh) 一种劲芯帷幕桩与护壁桩锚联合支护结构
CN212272218U (zh) 一种锚支组合支护体系

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA RAILWAY BRIDGE BUREAU GROUP FOURTH ENGINEERI

Free format text: FORMER NAME: THE FOURTH ENGINEERING COMPANY OF CHINA RAILWAY NO.13 BUREAU GROUP

CP01 Change in the name or title of a patent holder

Address after: 150008 No. 459 Xianfeng Road, Daowai District, Heilongjiang, Harbin

Patentee after: Middle iron is built the 4th Engineering Co., Ltd of group of Bridge Project office

Address before: 150008 No. 459 Xianfeng Road, Daowai District, Heilongjiang, Harbin

Patentee before: The Fourth Engineering Co., Ltd. of China Railway 13 Civil