CN102039385B - Method for determining thicknesses of solid-liquid slag lubricating films on basis of temperature measuring continuous-casting mold of thermoelectric couple - Google Patents

Method for determining thicknesses of solid-liquid slag lubricating films on basis of temperature measuring continuous-casting mold of thermoelectric couple Download PDF

Info

Publication number
CN102039385B
CN102039385B CN201010563750A CN201010563750A CN102039385B CN 102039385 B CN102039385 B CN 102039385B CN 201010563750 A CN201010563750 A CN 201010563750A CN 201010563750 A CN201010563750 A CN 201010563750A CN 102039385 B CN102039385 B CN 102039385B
Authority
CN
China
Prior art keywords
slag
film thickness
equation
crystallizer
melt cinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201010563750A
Other languages
Chinese (zh)
Other versions
CN102039385A (en
Inventor
孟祥宁
朱苗勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northeastern University China
Original Assignee
Northeastern University China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northeastern University China filed Critical Northeastern University China
Priority to CN201010563750A priority Critical patent/CN102039385B/en
Publication of CN102039385A publication Critical patent/CN102039385A/en
Application granted granted Critical
Publication of CN102039385B publication Critical patent/CN102039385B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a method for determining the thicknesses of solid-liquid slag lubricating films on the basis of a temperature measuring continuous-casting mold of a thermoelectric couple, belonging to the field of mathematical model application of ferrous metallurgical continuous casting process, comprising the following steps: step 1, acquiring initial data; step 2, determining the thickness of the solid slag lubricating film and the thickness of the liquid slag lubricating film at a meniscus area of the mold; and step 3, displaying a result of the thickness of the solid slag lubricating film and the thickness of the liquid slag lubricating film in an online manner. The method has the advantages that on the basis of mass balance and heat flow balance, an equation for calculating the thicknesses of the lubricating films at the meniscus of the continuous casting mold is deduced, and under the premise of installing the thermoelectric couple at the meniscus area, temperature data detected in real time is imported to a mathematical model so as to realize real-time calculation of the thicknesses of the lubricating films.

Description

Definite method based on thermocouple temperature measurement continuous cast mold solid-liquid slag lubrication film thickness
Technical field
The invention belongs to Ferrous Metallurgy casting process Mathematical Modeling application, particularly a kind of definite method based on thermocouple temperature measurement continuous cast mold solid-liquid slag lubrication film thickness.
Background technology
During continuous casting steel machine; The covering slag of sprawling on the molten steel in mold liquid level absorbs the heat that high-temperature molten steel provides; On liquid steel level, form liquid slag layer rapidly, do not reach melt temperature yet, then form the sinter layer of interim form near the covering slag of liquid slag layer; Then be the slag layer that maintains the original state on the sinter layer, be the three-decker of covering slag on the molten steel in mold liquid level; On the other hand; Liquid slag constantly penetrates into air gap and the lubricated slag film of formation between crystallizer wall and initial solidification base shell with crystallizer periodicity double vibrations in the liquid slag layer; The liquid slag of wherein pressing close to crystallizer wall forms the solid lubricant film of the nature of glass and crystalline coexistence under cooling effect, the liquid slag of pressing close to base shell surface then forms the hydrodynamic lubrication film.Fig. 1 is a casting situation in the continuous cast mold; Theoretical based on received mixed film friction in the metallurgical continuous casting field, the frictional force that produces between vibrating crystallizer wall and solidified shell surface is divided into two types: (1) is consolidated between slag film and solidified shell and is contacted the static friction that causes with solid because of solid; (2) fluid friction that causes by the stickiness Newtonian fluid in the melt cinder film.Although the contact condition between crystallizer wall and solidified shell receives the influence of two types of frictional force simultaneously, and total frictional force is sum of the two, and the effect that two types of frictional force is brought into play at the crystallizer diverse location is also inequality.Research shows, occupies absolute leading position in crystallizer upper liquid frictional force, and the crystallizer bottom is main with solid friction power mainly then.In addition; Crystallizer upper meniscus district solidified shell is torn easily under the effect of fluid friction power and is formed slab surface crack; Even cause the bleed-out accident, and causing heavy losses, bottom crystallizer wall and the solid intermembranous friction of slag have then caused the wearing and tearing of copper plate of crystallizer; Make cost of equipment maintenance promote, and increased the possibility on strand generation surface.Therefore, no matter be fluid friction, or solid friction, all be should be in the continuous casting steel machine by the significant process parameter of close monitoring and control, especially fluid friction power is directly being controlled the casting data that continuous casting direct motion and product quality are paid close attention to especially because of it.At present; To the monitoring of frictional force except that coming the Indirect evaluation through covering slag slag consumption; The means that adopted are through the detection to resistance of billet withdrawal mostly, and the frictional force detection method that people such as Sahoo have developed based on multisensor is used for controlling frictional force to improve slab quality and casting stability, and people such as Yao Man have developed the friction calculation model based on power method; Difference power during through detection crystallizer vibration platform load and zero load is estimated frictional force; All built-in frictional force detection module in the crystallizer system of international iron and steel technical research such as VAI and Da Nieli giant design, although solved the problem of the online detection of frictional force to a certain extent, its detected value and calculated value difference are bigger; And detecting mechanism is " black box ", still waits to further investigate and crack.The macroscopic view that these researchs all lay particular emphasis on frictional force detects; And be primarily aimed at the fluid friction power in meniscus district; And according to the Newtonian fluid theory of mechanics; Fluid friction power is viscous fluid " internal friction ", can calculate by equation (1), and then should be the most direct and accurate means of its variation of monitoring in line computation fluid friction power.Can know based on equation (1); Fluid friction power depends on relative motion, covering slag viscosity and melt cinder film (lubricating film) thickness between crystallizer and solidified shell; The above two can be provided by conticaster setting value or covering slag supplier at the numerical value of stablizing under the casting condition; The melt cinder film thickness is very difficult to then confirm that research up to now only can prove its order of magnitude in the 10-5-10-4m scope, thereby becomes the bottleneck of the online computation model of exploitation fluid friction power.
f l = μ f v m - v c d l - - - ( 1 )
In the formula, fl is a fluid friction power, Pa; μ f is the covering slag viscosity, Pas; Vm is a mold oscillation speed, mms-1; Vc is the strand pulling rate, mms-1; Dl is the melt cinder film thickness, mm.
Summary of the invention
Lubrication film thickness can comparatively intuitively reflect in the casting cycle lubricated in the crystallizer, friction and heat transfer conditions between vibrating crystallizer and solidified shell; Lubrication film thickness should maintain in the stability range helping and keep the continuous casting direct motion and guarantee slab quality in the actual pouring operation, otherwise can cause a series of negative consequences.1. solid slag and melt cinder are lubricated lepthymenia, show that then the covering slag consumption reduces, and not only reduce lubricant effect, and make vibrating crystallizer inwall and solidified shell inter-surface friction to aggravate, thereby produce slab surface crack, even cause the bleed-out accident to take place; Gu slag and melt cinder 2. lubricating films are blocked up; Make that heat transfer resistance increases between crystallizer inwall and solidified shell surface; Be unfavorable for release and the transmission of latent heat of solidification and the sensible heat of liquid metal to water mold; Cause the attenuation of base shell, be prone under vibrating machine external force and thermal stress effect, produce distortion, produce the strand underbead crack; 3. solid slag and melt cinder lubrication film thickness are unstable (promptly can't to be maintained in the fixing scope; Frequent blocked up or thin excessively); Be prone to cause the instability of heat flux, it is inhomogeneous both to have made the base shell solidify growth, again the stable row that transmits of influence heat; Can cause surface or underbead crack in vibrating machine external force or thermal stress effect row equally, even the bleed-out accident.
For solving the problem that continuous cast mold meniscus district's melt cinder film thickness calculating means lack; The present invention proposes a kind of definite method based on thermocouple temperature measurement continuous cast mold solid-liquid slag lubrication film thickness; Reaching in line computation meniscus district solid slag and melt cinder lubrication film thickness, and process data is provided for the calculating of fluid friction power.Wherein thermocouple is installed in meniscus surface area.The present invention is based on two angles and consider the calculating of lubrication film thickness: the continuity of (1) slag consumption, i.e. mass balance; (2) continuity of the vertical throwing direction heat transfer of molten steel, the instant heating mobile equilibrium.
A kind of continuous crystallizer protecting slag lubrication film thickness based on the meniscus thermocouple temperature measurement is confirmed method, carries out as follows:
Step 1, obtain primary data
1. confirm meniscus level H
Meniscus level is slag road length, is obtained by capillary constant equation (15);
H = 2 σ s - f ( ρ s - ρ f ) g - - - ( 15 )
In the formula, g is an acceleration of gravity, g=9.8ms-2; ρ s is a molten steel density, kgm-3; σ s-f is an interfacial tension between initial set base shell and covering slag, and Nm-1 is calculated by Girifalco-Good equation (16).
σ s - f = σ s + σ f - 2 φ σ s σ f - - - ( 16 )
In the formula, σ s, σ f are respectively initial set base shell and covering slag surface tension, and Nm-1, covering slag comprise melt cinder and solid slag; Φ is the contact interface characteristic value.
2. pouring operation parameter
(1) confirms wide of continuous cast mold and leptoprosopy length L and W by design drawing;
(2) stablize under the casting state statistics by the scene and confirm unit plane accumulated slag consumption Q;
(3) by design drawing confirm thermocouple imbed the position apart from the crystallizer hot side apart from d;
(4) The real time measure electric thermo-couple temperature T c
(5) calculate initial set base shell surface temperature T in real time by casting process simulation system in-circuit emulation model s
3. covering slag physical parameter
(1) confirms melt cinder lubricating film density p f by the covering slag technical manual;
(2) confirm covering slag fusing point T by the covering slag technical manual f
4. material thermal conductivity
(1) sets melt cinder film and solid slag film thermal conductivity factor λ s and λ l;
(2), set the copper thermal conductivity factor according to meniscus copper coin hot-face temperature;
Step 2, confirm solid slag lubrication film thickness in crystallizer meniscus district and melt cinder lubrication film thickness
Set up solid slag lubrication film thickness model (13) in crystallizer meniscus district and melt cinder lubrication film thickness model (14) based on mass balance and hot-fluid equilibrium principle, confirm the solid slag lubrication film thickness d in crystallizer meniscus district sWith melt cinder lubrication film thickness d l
d s = ( A - A 2 - 4 B ) D - 2 E 2 ( C + D ) - - - ( 13 )
d l = ( A - A 2 - 4 B ) C + 2 E 2 ( C + D ) - - - ( 14 )
In the formula
Figure BSA00000364176500034
Figure BSA00000364176500036
D=λ sλ m
Figure BSA00000364176500037
L and W are respectively wide of crystallizer and leptoprosopy length; Q is a unit plane accumulated slag consumption; ρ f is a melt cinder lubricating film density; λ lThermal conductivity factor for the melt cinder lubricating film; λ sThermal conductivity factor for solid slag lubricating film; λ mThermal conductivity factor for copper plate of crystallizer; T sTemperature for the solidified shell surface; T fTemperature for the covering slag melting point; T mTemperature for the copper plate of crystallizer hot side; T cTemperature for thermocouple location; D is that thermocouple is imbedded the position apart from crystallizer hot side distance;
The result of step 3, the solid slag lubrication film thickness of online demonstration and melt cinder lubrication film thickness;
It is following wherein to set up the method for solid slag lubrication film thickness model (13) in crystallizer meniscus district and melt cinder lubrication film thickness model (14) based on mass balance and hot-fluid equilibrium principle:
1. mass balance
Usually estimate the slag consumption according to the covering slag that consumes on the unit are in the produced on-site, i.e. the slag consumption rate of covering slag, covering slag comprises melt cinder and solid slag, its unit is kgm -2, then meniscus district slag consumption can be expressed as equation (2).In addition, (commerical test and Theoretical Calculation prove that all its order of magnitude is 10 as thin as a wafer owing to meniscus district lubricating film -5-10 -4The m scope), then can be thought of as normal value with stablizing solid slag lubricating film in when casting meniscus district and melt cinder lubricating film, the another kind that then obtains meniscus district slag consumption is represented mode, equation (3).
M=2H(L+W)Q (2)
Figure BSA00000364176500041
In the formula, M is a meniscus district slag consumption, kg; L and W are respectively wide of crystallizer and leptoprosopy length, m; H is a meniscus district height; Q is unit plane accumulated slag consumption (is slag consumption rate, can provides by produced on-site is actual), kgm -2d sAnd d lBe respectively solid slag lubricating film and melt cinder lubrication film thickness, m; ρ f is melt cinder lubricating film density (can be provided by the continuous casting covering slag technical data), kgm -3, then obtain comprising solid slag lubrication film thickness d by equation (2) and equation (3) sWith melt cinder lubrication film thickness d lEquation (4); Because of the present invention is directed to solid slag lubrication film thickness in meniscus district and melt cinder lubrication film thickness; And solid slag lubrication film thickness is minimum with the melt cinder lubrication film thickness order of magnitude in should the zone, considers to consolidate the slag lubrication film thickness and the melt cinder lubrication film thickness is a definite value along the throwing direction, obtains
(d s+d l) 2-A(d s+d l)+B=0 (4)
Wherein,
A = L + W 2 - - - ( 5 )
B = L + W 2 Q ρ f - - - ( 6 )
2. hot-fluid balance
Characteristics of the present invention rely on its detected temperature data that solid slag lubrication film thickness and melt cinder lubrication film thickness are calculated just.Can know that based on the numerical heat transfer theory heat flow density is identical on the vertical throwing direction, promptly synchronization is consistent by the heat flow that molten steel transfers to the crystallizer cooling water, therefore can set up the thermocouple location equation of heat balance.
The melt cinder lubricating film equates with the solid slag lubricating film hot-fluid of correspondence position:
λ l T s - T f d l = λ s T f - T m d s - - - ( 7 )
The melt cinder lubricating film equates with correspondence position copper plate of crystallizer hot-fluid:
λ 1 = T s - T f d 1 = λ m T m - T c d - - - ( 8 )
In the formula, T is a temperature, ℃, T s, T f, T mAnd T cTemperature, the temperature of covering slag melting point, the temperature of copper plate of crystallizer hot side and the temperature of thermocouple location of representing the solidified shell surface respectively; λ is a material thermal conductivity, Wm -1-1, λ l, λ sAnd λ mRepresent the thermal conductivity factor of melt cinder lubricating film, the thermal conductivity factor of solid slag lubricating film and the thermal conductivity factor of copper plate of crystallizer respectively; D is that thermocouple is imbedded the position apart from crystallizer hot side distance, m.Then release following two equations respectively by equation (7) and equation (8):
( T s - T f ) λ 1 d 1 d s λ s = T f - T m
( T s - T f ) λ 1 d 1 d λ m = T m - T c
Here since copper plate of crystallizer hot-face temperature Tm be difficult to confirm, then with equation (7) and equation (8) addition, put in order equation (9) to equation (12).
Cd s-Dd 1+E=0 (9)
C = λ 1 λ m T s - T f T f - T c - - - ( 10 )
D=λ sλ m (11)
E = λ 1 λ s d T s - T f T f - T c - - - ( 12 )
3, confirm solid slag lubrication film thickness in crystallizer meniscus district and melt cinder lubrication film thickness
Simultaneous solution equation (4) and equation (9), and cast out unnecessary separating based on the actual slag film thickness order of magnitude, promptly obtain solid slag lubrication film thickness and melt cinder lubrication film thickness such as equation (13) and equation (14) respectively.
d s = ( A - A 2 - 4 B ) D - 2 E 2 ( C + D ) - - - ( 13 )
d 1 = ( A - A 2 - 4 B ) C + 2 E 2 ( C + D ) - - - ( 14 )
Advantage of the present invention: be to derive continuous cast mold meniscus lubrication film thickness accounting equation based on mass balance and hot-fluid balance; And be equipped with under the prerequisite of thermocouple in the meniscus district; Detected temperature data imports Mathematical Modeling in the time of in fact, realizes the real-time calculating of lubrication film thickness.
Description of drawings
Casting situation signal in Fig. 1 continuous cast mold;
The signal of Fig. 2 continuous cast mold physical model size;
Fig. 3 continuous cast mold meniscus district physical model;
Fig. 4 meniscus lubrication film thickness calculation flow chart;
The real-time result of calculation of Fig. 5 crystallizer meniscus slag film thickness.
The specific embodiment
The present invention is based on above-mentioned derivation equation, set up Mathematical Modeling, and combine meniscus district thermocouple detection gained temperature to be implemented in line computation meniscus district covering slag lubrication film thickness, specify embodiment to cast-in-place mild steel situation at present.
A kind of continuous crystallizer protecting slag lubrication film thickness based on the meniscus thermocouple temperature measurement is confirmed method, carries out as follows: as shown in Figure 4:
Step 1, obtain primary data
1. confirm meniscus level H
Meniscus level is slag road length, is obtained by capillary constant equation (15);
H = 2 σ s - f ( ρ s - ρ f ) g - - - ( 15 )
In the formula, g is an acceleration of gravity, g=9.8ms-2; ρ s is a molten steel density, kgm-3; σ s-f is an interfacial tension between initial set base shell and covering slag, and Nm-1 is calculated by Girifalco-Good equation (16).
σ s - f = σ s + σ f - 2 φ σ s σ f - - - ( 16 )
In the formula, σ s, σ f are respectively initial set base shell and covering slag surface tension, Nm-1; Φ is the contact interface characteristic value.
2. pouring operation parameter
(1) confirms wide of continuous cast mold and leptoprosopy length L and W by design drawing;
(2) stablize under the casting state statistics by the scene and confirm unit plane accumulated slag consumption Q;
(3) by design drawing confirm thermocouple imbed the position apart from the crystallizer hot side apart from d;
(4) The real time measure electric thermo-couple temperature Tc;
(5) calculate initial set base shell surface temperature Ts in real time by casting process simulation system in-circuit emulation model;
3. covering slag physical parameter
(1) melt cinder lubricating film density p f is taken as normal temperature (1300 ℃) measured value, can be confirmed by the covering slag technical manual;
(2) covering slag fusing point Tf is confirmed by the covering slag technical manual.
4. material thermal conductivity
(1) because of lubricating film as thin as a wafer, the melt cinder film all is taken as 1.5Wm-1 ℃-1 with solid slag film thermal conductivity factor λ s and λ l;
(2) because of meniscus copper coin hot-face temperature near 300 ℃, getting the copper thermal conductivity factor is 310Wm-1 ℃-1.
Step 2, confirm solid slag lubrication film thickness in crystallizer meniscus district and melt cinder lubrication film thickness
Set up solid slag lubrication film thickness model (13) in crystallizer meniscus district and melt cinder lubrication film thickness model (14) based on mass balance and hot-fluid equilibrium principle, confirm the solid slag lubrication film thickness d in crystallizer meniscus district sWith melt cinder lubrication film thickness d l
d s = ( A - A 2 - 4 B ) D - 2 E 2 ( C + D ) - - - ( 13 )
d l = ( A - A 2 - 4 B ) C + 2 E 2 ( C + D ) - - - ( 14 )
In the formula
Figure BSA00000364176500073
Figure BSA00000364176500074
Figure BSA00000364176500075
D=λ sλ m
Figure BSA00000364176500076
L and W are respectively wide of crystallizer and leptoprosopy length; Q is a unit plane accumulated slag consumption; ρ f is a melt cinder lubricating film density; λ lThermal conductivity factor for the melt cinder lubricating film; λ sThermal conductivity factor for solid slag lubricating film; λ mThermal conductivity factor for copper plate of crystallizer; T sTemperature for the solidified shell surface; T fTemperature for the covering slag melting point; T mTemperature for the copper plate of crystallizer hot side; T cTemperature for thermocouple location; D is that thermocouple is imbedded the position apart from crystallizer hot side distance;
The result of step 3, the solid slag lubrication film thickness of online demonstration and melt cinder lubrication film thickness.Solid slag lubrication film thickness and melt cinder lubrication film thickness result such as Fig. 5 in the casting cycle of confirming.
It is following wherein to set up the method for solid slag lubrication film thickness model (13) in crystallizer meniscus district and melt cinder lubrication film thickness model (14) based on mass balance and hot-fluid equilibrium principle:
1. mass balance
Usually estimate the slag consumption according to the covering slag that consumes on the unit are in the produced on-site, i.e. the slag consumption rate of covering slag, its unit is kgm -2, then meniscus district slag consumption can be expressed as equation (2).In addition, (commerical test and Theoretical Calculation prove that all its order of magnitude is 10 as thin as a wafer owing to meniscus district lubricating film -5-10 -4The m scope), then can be thought of as normal value with stablizing solid slag lubricating film in when casting meniscus district and melt cinder lubricating film, the another kind that then obtains meniscus district slag consumption is represented mode, equation (3).
M=2H(L+W)Q (2)
In the formula, M is a meniscus district slag consumption, kg; L and W are respectively wide of crystallizer and leptoprosopy length, m; H is a meniscus district height; Q is unit plane accumulated slag consumption (is slag consumption rate, can provides by produced on-site is actual), kgm -2d sAnd d lBe respectively solid slag lubricating film and melt cinder lubrication film thickness, m; ρ f is melt cinder lubricating film density (can be provided by the continuous casting covering slag technical data), kgm -3, continuous cast mold size such as Fig. 2.Then obtain comprising solid slag lubrication film thickness d by equation (2) and equation (3) sWith melt cinder lubrication film thickness d lEquation (4); Because of the present invention is directed to solid slag lubrication film thickness in meniscus district and melt cinder lubrication film thickness; And solid slag lubrication film thickness is minimum with the melt cinder lubrication film thickness order of magnitude in should the zone, considers to consolidate the slag lubrication film thickness and the melt cinder lubrication film thickness is a definite value along the throwing direction, obtains
(d s+d 1) 2-A(d s+d 1)+B=0 (4)
Wherein,
A = L + W 2 - - - ( 5 )
B = L + W 2 Q ρ f - - - ( 6 )
2. hot-fluid balance
Fig. 3 provides thermograde signal between solidified shell and crystallizer; The thermocouple of wherein monitoring cast temperature in the crystallizer is placed in the meniscus district, and characteristics of the present invention rely on its detected temperature data that solid slag lubrication film thickness and melt cinder lubrication film thickness are calculated just.Can know that based on the numerical heat transfer theory heat flow density is identical on the vertical throwing direction, promptly synchronization is consistent by the heat flow that molten steel transfers to the crystallizer cooling water, therefore can set up the thermocouple location equation of heat balance.
The melt cinder lubricating film equates with the solid slag lubricating film hot-fluid of correspondence position:
λ 1 T s - T f d 1 = λ s T f - T m d s - - - ( 7 )
The melt cinder lubricating film equates with correspondence position copper plate of crystallizer hot-fluid:
λ 1 T s - T f d 1 = λ m T m - T c d - - - ( 8 )
In the formula, T is a temperature, ℃, T s, T f, T mAnd T cTemperature, the temperature of covering slag melting point, the temperature of copper plate of crystallizer hot side and the temperature of thermocouple location of representing the solidified shell surface respectively; λ is a material thermal conductivity, Wm -1-1, λ l, λ sAnd λ mRepresent the thermal conductivity factor of melt cinder lubricating film, the thermal conductivity factor of solid slag lubricating film and the thermal conductivity factor of copper plate of crystallizer respectively; D is that thermocouple is imbedded the position apart from crystallizer hot side distance, m.Then release following two equations respectively by equation (7) and equation (8):
( T s - T f ) λ 1 d 1 d s λ s = T f - T m
( T s - T f ) λ 1 d 1 d λ m = T m - T c
Here because copper plate of crystallizer hot-face temperature T mBe difficult to confirm, then with equation (7) and equation (8) addition, put in order equation (9) to equation (12).
Cd s-Dd l+E=0 (9)
C = λ l λ m T s - T f T f - T c - - - ( 10 )
D=λ sλ m (11)
E = λ l λ s d T s - T f T f - T c - - - ( 12 )
3, confirm the solid slag lubrication film thickness in crystallizer meniscus district and melt cinder lubrication film thickness simultaneous solution equation (4) and equation (9); And cast out unnecessary separating based on the actual slag film thickness order of magnitude, promptly obtain solid slag lubrication film thickness and melt cinder lubrication film thickness such as equation (13) and equation (14) respectively.
d s = ( A - A 2 - 4 B ) D - 2 E 2 ( C + D ) - - - ( 13 )
d l = ( A - A 2 - 4 B ) C + 2 E 2 ( C + D ) - - - ( 14 ) .

Claims (3)

1. definite method based on thermocouple temperature measurement continuous cast mold solid-liquid slag lubrication film thickness is characterized in that: carry out as follows:
Step 1, obtain primary data
1), confirms meniscus level H
Meniscus level is slag road length, is obtained by capillary constant equation (15);
H = 2 σ s - f ( ρ s - ρ f ) g - - - ( 15 )
In the formula, g is an acceleration of gravity, g=9.8ms-2; ρ s is a molten steel density, kgm-3; σ s-f is an interfacial tension between initial set base shell and covering slag, and Nm-1 is calculated by Girifalco-Good equation (16);
σ s - f = σ s + σ f - 2 φ σ s σ f - - - ( 16 )
In the formula, σ s, σ f are respectively initial set base shell and covering slag surface tension, and Nm-1, covering slag comprise melt cinder and solid slag; Φ is the contact interface characteristic value;
2), pouring operation parameter
(1) confirms wide of continuous cast mold and leptoprosopy length L and W by design drawing;
(2) stablize under the casting state statistics by the scene and confirm unit plane accumulated slag consumption Q;
(3) by design drawing confirm thermocouple imbed the position apart from the crystallizer hot side apart from d;
(4) The real time measure electric thermo-couple temperature T c
(5) calculate initial set base shell surface temperature T in real time by casting process simulation system in-circuit emulation model s
3), covering slag physical parameter
(1) confirms melt cinder lubricating film density p f by the covering slag technical manual;
(2) confirm covering slag fusing point T by the covering slag technical manual f
4), material thermal conductivity
(1) sets melt cinder film and solid slag film thermal conductivity factor λ s and λ l;
(2), set the copper thermal conductivity factor according to meniscus copper coin hot-face temperature;
Step 2, confirm solid slag lubrication film thickness in crystallizer meniscus district and melt cinder lubrication film thickness
Set up solid slag lubrication film thickness model (13) in crystallizer meniscus district and melt cinder lubrication film thickness model (14) based on mass balance and hot-fluid equilibrium principle, confirm the solid slag lubrication film thickness d in crystallizer meniscus district sWith melt cinder lubrication film thickness d 1
d s = ( A - A 2 - 4 B ) D - 2 E 2 ( C + D ) - - - ( 13 )
d 1 = ( A - A 2 - 4 B ) C + 2 E 2 ( C + D ) - - - ( 14 )
In the formula A = L + W 2 B = L + W 2 Q ρ f C = λ 1 λ m T s - T s T f - T c D=λ sλ m E = λ 1 λ s d T s - T f T f - T c L and W are respectively wide of crystallizer and leptoprosopy length; Q is a unit plane accumulated slag consumption; ρ f is a melt cinder lubricating film density; λ l is the thermal conductivity factor of melt cinder lubricating film; λ sThermal conductivity factor for solid slag lubricating film; λ mThermal conductivity factor for copper plate of crystallizer; T sTemperature for the solidified shell surface; T fTemperature for the covering slag melting point; T mTemperature for the copper plate of crystallizer hot side; T cTemperature for thermocouple location; D is that thermocouple is imbedded the position apart from crystallizer hot side distance;
The result of step 3, the solid slag lubrication film thickness of online demonstration and melt cinder lubrication film thickness.
2. by the described definite method based on thermocouple temperature measurement continuous cast mold solid-liquid slag lubrication film thickness of claim 1, it is characterized in that: setting up crystallizer meniscus district based on mass balance and hot-fluid equilibrium principle in the described step 2, to consolidate the method for slag lubrication film thickness model (13) and melt cinder lubrication film thickness model (14) following:
1. mass balance
Meniscus district slag consumption can be expressed as equation (2), because meniscus district lubricating film is as thin as a wafer, then can be thought of as normal value with stablizing solid slag lubricating film in when casting meniscus district and melt cinder lubricating film, and the another kind that then obtains meniscus district slag consumption is represented mode, equation (3),
M=2H(L+W)Q (2)
Figure FSB00000774877000025
In the formula, M is a meniscus district slag consumption, kg; L and W are respectively wide of crystallizer and leptoprosopy length, m; H is a meniscus district height; Q is a unit plane accumulated slag consumption, kgm -2d sAnd d 1Be respectively solid slag lubricating film and melt cinder lubrication film thickness, m; ρ f is a melt cinder lubricating film density, kgm -3, then obtain comprising solid slag lubrication film thickness d by equation (2) and equation (3) sWith melt cinder lubrication film thickness d 1Equation (4), consider that along solid slag lubrication film thickness of throwing direction and melt cinder lubrication film thickness be definite value, obtain
(d s+d 1) 2-A(d s+d 1)+B=0 (4)
Wherein,
A = L + W 2 - - - ( 5 )
B = L + W 2 Q ρ f - - - ( 6 ) ;
2. hot-fluid balance
Can know that based on the numerical heat transfer theory heat flow density is identical on the vertical throwing direction, promptly synchronization is consistent by the heat flow that molten steel transfers to the crystallizer cooling water, therefore can set up the thermocouple location equation of heat balance;
The melt cinder lubricating film equates with the solid slag lubricating film hot-fluid of correspondence position:
λ 1 = T s - T f d 1 = λ s T f - T m d s - - - ( 7 )
The melt cinder lubricating film equates with correspondence position copper plate of crystallizer hot-fluid:
λ 1 T s - T f d 1 = λ m T m - T c d - - - ( 8 )
In the formula, T is a temperature, ℃, T s, T f, T mAnd T cTemperature, the temperature of covering slag melting point, the temperature of copper plate of crystallizer hot side and the temperature of thermocouple location of representing the solidified shell surface respectively; λ is a material thermal conductivity, Wm -1-1, λ l, λ sAnd λ mRepresent the thermal conductivity factor of melt cinder lubricating film, the thermal conductivity factor of solid slag lubricating film and the thermal conductivity factor of copper plate of crystallizer respectively; D is that thermocouple is imbedded the position apart from crystallizer hot side distance, m; Then release following two equations respectively by equation (7) and equation (8):
( T s - T f ) λ 1 d 1 d s λ s = T f - T m
( T s - T f ) λ 1 d 1 d λ m = T m - T c
Here because copper plate of crystallizer hot-face temperature T mBe difficult to confirm, then with equation (7) and equation (8) addition, put in order equation (9) to equation (12);
Cd s-Dd 1+E=0?(9)
C = λ 1 λ m T s - T f T f - T c - - - ( 10 )
D=λ sλ m (11)
E = λ 1 λ s d T s - T f T f - T c - - - ( 12 )
3. confirm solid slag lubrication film thickness in crystallizer meniscus district and melt cinder lubrication film thickness
Simultaneous solution equation (4) and equation (9), and cast out unnecessary separating based on the actual slag film thickness order of magnitude, promptly obtain solid slag lubrication film thickness and melt cinder lubrication film thickness such as equation (13) and equation (14) respectively;
d s = ( A - A 2 - 4 B ) D - 2 E 2 ( C + D ) - - - ( 13 )
d 1 = ( A - A 2 - 4 B ) C + 2 E 2 ( C + D ) - - - ( 14 ) .
CN201010563750A 2010-11-29 2010-11-29 Method for determining thicknesses of solid-liquid slag lubricating films on basis of temperature measuring continuous-casting mold of thermoelectric couple Expired - Fee Related CN102039385B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010563750A CN102039385B (en) 2010-11-29 2010-11-29 Method for determining thicknesses of solid-liquid slag lubricating films on basis of temperature measuring continuous-casting mold of thermoelectric couple

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010563750A CN102039385B (en) 2010-11-29 2010-11-29 Method for determining thicknesses of solid-liquid slag lubricating films on basis of temperature measuring continuous-casting mold of thermoelectric couple

Publications (2)

Publication Number Publication Date
CN102039385A CN102039385A (en) 2011-05-04
CN102039385B true CN102039385B (en) 2012-08-29

Family

ID=43906101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010563750A Expired - Fee Related CN102039385B (en) 2010-11-29 2010-11-29 Method for determining thicknesses of solid-liquid slag lubricating films on basis of temperature measuring continuous-casting mold of thermoelectric couple

Country Status (1)

Country Link
CN (1) CN102039385B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102228969A (en) * 2011-06-30 2011-11-02 中冶南方工程技术有限公司 System for multi-point continuous measurement and simulation of solidification and heat transfer progress of molten steel in continuous casting crystallizer
CN102228973B (en) * 2011-06-30 2012-12-19 中冶南方工程技术有限公司 Multi-point continuous measurement and simulation method for solidification heat transfer process of molten steel in continuous casting crystallizer
CN102228970A (en) * 2011-06-30 2011-11-02 中冶南方工程技术有限公司 System for simulating molten steel solidification heat-transfer process inside continuous casting crystallizer
CN102527955B (en) * 2011-10-31 2014-01-01 中冶南方工程技术有限公司 Coordinate conjugate gradient computing method for roller rows of continuous bending and straightening segments of continuous casting machine for slabs
CN102974795B (en) * 2012-12-31 2014-05-28 无锡隆达金属材料有限公司 Method for producing Monel alloy ingot by using horizontal continuous casting
CN105945251B (en) * 2016-06-03 2018-03-27 中南大学 A kind of method of testing of continuous crystallizer protecting slag slag consumption
CN106670413B (en) * 2017-03-10 2018-07-03 东北大学 A kind of computational methods of determining continuous cast mold slag film thickness
CN108663005A (en) * 2018-04-09 2018-10-16 中国洛阳浮法玻璃集团有限责任公司 A kind of detection method of Industrial Stoves pool wall corroding thickness

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1940547A (en) * 2006-09-29 2007-04-04 重庆大学 Internal slag heat current inspector and inspection for continuously-casting crystallizer
CN101398371A (en) * 2008-10-29 2009-04-01 大连理工大学 Detection method for protection slag of continuous casting crystallizer in thermal state lubrication friction state
CN101844214A (en) * 2009-03-23 2010-09-29 高妮 Determination method of heat-flow density of plate blank continuous casting crystallizer

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63149058A (en) * 1986-12-10 1988-06-21 Sumitomo Metal Ind Ltd Control method for powder film thickness in mold

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1940547A (en) * 2006-09-29 2007-04-04 重庆大学 Internal slag heat current inspector and inspection for continuously-casting crystallizer
CN101398371A (en) * 2008-10-29 2009-04-01 大连理工大学 Detection method for protection slag of continuous casting crystallizer in thermal state lubrication friction state
CN101844214A (en) * 2009-03-23 2010-09-29 高妮 Determination method of heat-flow density of plate blank continuous casting crystallizer

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
JP昭63-149058A 1988.06.21
王文浩等.钨铼热电偶在连铸中间包钢水连续测温中的应用.《传感器技术》.1997,第16卷(第2期), *

Also Published As

Publication number Publication date
CN102039385A (en) 2011-05-04

Similar Documents

Publication Publication Date Title
CN102039385B (en) Method for determining thicknesses of solid-liquid slag lubricating films on basis of temperature measuring continuous-casting mold of thermoelectric couple
Meng et al. Heat-transfer and solidification model of continuous slab casting: CON1D
CN101984348B (en) Determination method of copperplate heat flux based on mass balance and heat balance continuous casting mould
Shepel et al. Numerical simulation of filling and solidification of permanent mold castings
CN101398371B (en) Detection method for protection slag of continuous casting crystallizer in thermal state lubrication friction state
Saraswat et al. The effect of mould flux properties on thermo-mechanical behaviour during billet continuous casting
Guthrie et al. Measurements, simulations, and analyses of instantaneous heat fluxes from solidifying steels to the surfaces of twin roll casters and of aluminum to plasma-coated metal substrates
CN104331629A (en) Uneven distributed calculating method of liquid, solid powder film and air gap thickness of continuous casting crystallizer casting powder
CN102879130A (en) Continuous-casting casting powder comprehensive heat transfer heat flow testing method
CN102661967A (en) Heat flow simulation test device of crystallizer meniscus horizontal heat transfer
CN102228973B (en) Multi-point continuous measurement and simulation method for solidification heat transfer process of molten steel in continuous casting crystallizer
Zhang et al. Study of the mechanism of liquid slag infiltration for lubrication in slab continuous casting
CN108446505B (en) Method for calculating solidification heat transfer of casting blank in funnel crystallizer
Song et al. Heat transfer and deformation behavior of shell solidification in wide and thick slab continuous casting mold
JP3230513B2 (en) Method of estimating molten steel flow velocity in continuous casting mold, quality control method in continuous casting of steel, and continuous casting method of steel
Wang et al. Prediction on lubrication and friction of mold flux based on inverse problem in a continuous slab casting process
Santillana et al. Heat transfer in funnel-mould casting: effect of plate thickness
Yin et al. Inverse problem-based analysis on non-uniform profiles of thermal resistance between strand and mould for continuous round billets casting
Mills et al. Some insights into mechanisms involved in continuous casting
Guthrie et al. Ab‐initio Predictions of Interfacial Heat Flows during the High Speed Casting of Liquid Metals in Near Net Shape Casting Operations
CN102228972A (en) Calculation method for solidification heat transfer process of continuous casting crystallizer
DiLellio et al. An asymptotic model of the mold region in a continuous steel caster
CN102218515B (en) Method for calculating molten steel solidification and heat transfer process in continuous casting crystallizer
CN105945251B (en) A kind of method of testing of continuous crystallizer protecting slag slag consumption
Akhtar Analysis of the nail board experiment to measure the liquid slag depth in steel continuous casting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120829

Termination date: 20131129