CN102037683A - Ip network performance measurement method, apparatus and system - Google Patents

Ip network performance measurement method, apparatus and system Download PDF

Info

Publication number
CN102037683A
CN102037683A CN2009801165812A CN200980116581A CN102037683A CN 102037683 A CN102037683 A CN 102037683A CN 2009801165812 A CN2009801165812 A CN 2009801165812A CN 200980116581 A CN200980116581 A CN 200980116581A CN 102037683 A CN102037683 A CN 102037683A
Authority
CN
China
Prior art keywords
measurement
frames
opposite end
gtpu
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2009801165812A
Other languages
Chinese (zh)
Inventor
杨义成
赖志昌
王江胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Publication of CN102037683A publication Critical patent/CN102037683A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks

Abstract

An IP network performance measurement method, apparatus and system are disclosed in present invention. The method comprises sending FM frame carried in GTPU message to a measurement opposite terminal, the FM frame contains a flow identifier of measured service flow; receiving BR frame carried in GTPU message sent by the measurement opposite terminal, the BR frame contains measurement information of measured service flow corresponding to the flow identifier; and obtaining IP network performance based on the measurement information. By the embodiment of present invention, the IP network performance measurement based on GTPU protocol can be achieved.

Description

Ip network performance measurement method, apparatus and system
The methods, devices and systems technical field of IP network performance measurement
The present invention relates to wireless communication technology, more particularly to a kind of methods, devices and systems of IP Wang Network performance measurements.Background technology
Based on Internet Protocol(Internet Protocol, IP) Fen group Jiao Huan Wang Network obtain vigorous growth in recent decades, as Tong Xin Wang Network covering the whole world.Because IP Wang Network have the advantages such as low cost, with the development of communication, the conventional telecommunications business including speech business is also more and more using IP Wang Network carryings.But, traditional IP Wang Network, which are only provided, does not ensure reachable service, does not provide service quality
The service that (Quality of Service, QoS) ensures.With being used more and more widely in IP Wang Network electricity Xin Wang Network, the various QoS guarantee mechanism of IP Wang Network performances, such as DiffServ are improved
(Differentiated Service, DiffServ) mechanism is introduced into.Lack the specific implementation to IP Wang Network performance measurements.The content of the invention
The present invention is to provide the methods, devices and systems that a kind of IP nets Network performance measurements, it is possible to achieve based on GPRS (General Packet Radio Service, GPRS) Tunneling Protocol-User face part(User plane of GPRS Tunneling Protocol, GTPU) IP Wang Network performance measurements.
The embodiments of the invention provide a kind of method of IP Wang Network performance measurements, including:
The forward direction carried in the GTPU message of GPRS Tunneling Protocol-User face part is sent to measurement opposite end and monitors FM frames, and the FM frames include the traffic identifier of tested Business Stream;
Back Report BR frame of the carrying of measurement opposite end transmission in GTPU message is received, the BR frames include the metrical information of the corresponding tested Business Stream of the traffic identifier; It is just blunt according to the metrical information, obtain IP Wang Network performances.
The embodiments of the invention provide a kind of device of IP Wang Network performance measurements, including:
First module, monitors FM frames, the FM frames include the traffic identifier of tested Business Stream for sending the forward direction carried in the GTPU message of GPRS Tunneling Protocol-User face part to measurement opposite end;
Second module, for receiving Back Report BR frame of the carrying of measurement opposite end transmission in GTPU message, the BR frames include the metrical information of the corresponding tested Business Stream of the traffic identifier;
3rd module, for according to the metrical information, obtaining IP Wang Network performances.
The embodiments of the invention provide a kind of system of IP Wang Network performance measurements, including:Above-mentioned device, the device is as measurement originating end, and the measurement opposite end communicated with the measurement originating end.
As shown from the above technical solution, the embodiment of the present invention is by measuring FM frame of the originating end to the transmission carrying of measurement opposite end in GTPU message, receive BR frame of the carrying of measurement opposite end feedback in GTPU message, and BR frames include metrical information, IP Wang Network performances are obtained according to the metrical information, it is possible to achieve the IP Wang Network performance measurements based on GTPU agreements.Brief description of the drawings
Fig. 1 is the method flow schematic diagram of first embodiment of the invention;
Fig. 2 is the method flow schematic diagram of second embodiment of the invention;
Fig. 3 is the method flow schematic diagram of the situation of activation process first in the embodiment of the present invention;
Fig. 4 is the method flow schematic diagram of the situation of activation process second in the embodiment of the present invention;
Fig. 5 is the method flow schematic diagram of the deactivation situation of flow first in the embodiment of the present invention;Fig. 6 is the method flow schematic diagram of the deactivation situation of flow second in the embodiment of the present invention;The system structure diagram for the first scene that Fig. 7 applies for the method for the embodiment of the present invention;Fig. 8 is the structural representation of the protocol stack used in the embodiment of the present invention;
The system structure diagram for the second scene that Fig. 9 applies for the method for the embodiment of the present invention;The system structure diagram for the 3rd scene that Figure 10 applies for the method for the embodiment of the present invention; Figure 11 is the structural representation of the device of third embodiment of the invention;
Figure 12 is the structural representation of the device of fourth embodiment of the invention;
Figure 13 is the structural representation of the system of fifth embodiment of the invention.Embodiment
Below by drawings and examples, technical scheme is described in further detail.First, to the present embodiments relate to several concepts explain.
GTPU:GPRS(General Packet Radio Service, GPRS) Tunneling Protocol-User face part(User plane of GPRS Tunneling Protocol, GTPU), user data can be completed and seal up dress or decapsulate.
UDP:User Datagram Protocol, User Data Protocol.A kind of transport layer protocol, is generally used for a Zu Wang Network, and the data of user are based on single UDP and are grouped transmission.Refer in particular to the udp protocol that Wang Network layer protocols are IP herein.
DSCP:DiffServ Code Point, differentiated service code point.One marks the IP for having value to be grouped in net Network when transmitting, and DiffServ services can be used to carry out QoS management to business.
QCI:QoS Class Indicator, QoS classification is indicated.
TEID:Tunnel End Point Identifier, Tunnel End Point Identifier.Identify the endpoint of a tunnel in end-to-end GTPU entities.
Fig. 1 is the method flow schematic diagram of first embodiment of the invention, including:
Step 11:Measure originating end and forward direction monitoring (Forward Monitoring, the FM) frame carried in GTPU message is sent to measurement opposite end, the FM frames include the traffic identifier of tested Business Stream.
Step 12:Measure originating end and receive Back Report of the carrying of measurement opposite end transmission in GTPU message(Backward Report, BR) frame, the BR frames include the metrical information of the corresponding tested Business Stream of the traffic identifier.
Step 13:Originating end is measured according to the metrical information, IP Wang Network performances are obtained.
Wherein, FM frames can also include first send information, first send information can include the transmission time, Send bag number, send byte number etc. and the performance-relevant transmission information of IP Wang Network for needing to measure.
When measurement opposite end can be with normal response, metrical information includes at least one in following two:One is measurement result, another is that receive information and second send information, the receive information for the tested Business Stream that the receive information obtains for measurement opposite end according to the traffic identifier, the second transmission information is the first transmission information or is the part in the first transmission information, and the measurement result calculates obtained measurement result for measurement opposite end according to receive information and the first transmission information.
Measurement originating end obtains IP Wang Network performances and is specially:When metrical information includes measurement result, then measure originating end and the measurement result is directly obtained from metrical information;When metrical information includes receive information and second sends information, then measure originating end and calculate according to the receive information and the second transmission information and obtain measurement result.
The present embodiment is by measuring FM frame of the originating end to the transmission carrying of measurement opposite end in GTPU message, receive BR frame of the carrying of measurement opposite end feedback in GTPU message, and BR frames include metrical information, measurement originating end obtains IP Wang Network performances according to the metrical information, it is possible to achieve the IP Wang Network performance measurements based on GTPU agreements.
FM frames can include following cell:Traffic identifier, and characterize the cell for sending information.For example, characterizing the cell of transmission information can include:Send bag number, send byte number, delivery time.
Certainly, in order to which the need for upgrading and extend etc., the FM frames of the present embodiment can further include following cell:Version, frame type, sequence number, reserved field.
Specifically, FM frames include but is not limited to the form shown in table 1:
Table 1 Wherein,
Version (version):Version number;
Frame type(FM ):It is FM frames to show the frame; Traffic identifier( FlowID ):The mark of tested Business Stream, different traffic identifier can distinguish different Business Streams;
Sequence number(SN ):The sequence number of the frame of transmission, originating end often sends a FM frames and plus one;Send bag number(TxPacket ):Originating end sends the accumulated value of the corresponding message number of the traffic identifier;Send byte number(TxByte ):Originating end sends the accumulated value of the corresponding byte number of the traffic identifier;Delivery time(TxTime ):At the time of originating end sends the FM frames.
BR frames can include following cell:The cell of metrical information is characterized, for example, information and receive information are sent, and/or, measurement result.
Certainly, similar with FM frames, the BR frames of the present embodiment can further include following cell:Version, frame type, sequence number, reserved field.
Specifically, it is to send information and during receive information when what is carried in BR frames, BR frames can include but is not limited to the form shown in table 2:
Table 2
Wherein,
Version (version):Version number;
Frame type(BR ):It is BR frames to show the frame;
Traffic identifier( FlowID ):Traffic identifier in FM frames corresponding with the BR frames is identical.
Sequence number( SN ):Sequence number in FM frames corresponding with the BR frames is identical;
Send bag number( TxPacket ):Transmission bag number in FM frames corresponding with the BR frames is identical;Send byte number(TxByte ):Transmission byte number in FM frames corresponding with the BR frames is identical; FM delivery times (TxTime):Delivery time in FM frames corresponding with the BR frames is identical;The time of reception( RxTime ):At the time of recipient receives FM frames;
Receiver packet number (RxPacket):Receiving terminal receives the accumulated value of the corresponding blunt literary number of the traffic identifier;Receive byte number(RxByte ):Receiving terminal receives the accumulated value of the corresponding byte number of the traffic identifier;BR delivery times( TxTime 1 ):Receiving terminal sends the delivery time of BR frames.
When Xie Dai Lost bags this measurement result of rate in BR frames, BR frames can include but is not limited to the form shown in table 3:
Table 3
Wherein, Lost bags rate measurement opposite end, which is calculated, obtains, and calculation formula is:
Lost bags rate=(Send bag number-receiver packet number %.
Send bag number
Remaining explanation of field is with table 2.
When Xie Dai Lost bags rate, this two measurement results of One Way Delay in BR frames, BR frames can include but is not limited to the form shown in table 4:
Table 4
Wherein, One Way Delay is calculated for measurement opposite end and obtained, and calculation formula is:
One Way Delay=the time of reception-FM delivery time.
Remaining explanation of field is with table 3.
When Xie Dai Lost bags rate, One Way Delay He this three measurement results of Lost byte numbers in BR frames, BR frames can include but is not limited to the form shown in table 5:
Table 5
Wherein, byte number difference(Lost byte numbers)Calculate and obtain for measurement opposite end, calculation formula is:Lost byte numbers=transmission byte number-reception byte number.
Remaining explanation of field is with table 4.
First embodiment Ke Yi Shi Xian Lost bags rate, One Way Delay are He the measurement of Lost byte numbers, it is appreciated that, when needs measure other information, such as loopback delay, delay variation, other information need respectively transmission information, receive information, measurement result can be carried in FM frames and BR frames.
In the technical scheme of second embodiment of the invention, when measurement opposite end does not have normal response FM frames, it can regularly repeat to send FM frames, its flow is as follows:
Fig. 2 is the method flow schematic diagram of second embodiment of the invention, including:
Step 21:Measure originating end and the FM frames for carrying transmission information are sent to measurement opposite end, the FM frames are carried in GTPU message, also, measurement originating end starts timer while FM frames are sent.
Step 22:Within the time that timer is set, when measurement originating end does not receive the BR frames of measurement opposite end feedback, when the time set in timer reaches, measurement originating end sends FM frames to measurement opposite end again. Step 23:The flow of repeat step 22 reaches transmission times set in advance until the number of times that measurement originating end sends FM frames.
Step 24:Within the time that timer is set, when measurement originating end does not receive the BR frames of measurement opposite end feedback still, measurement originating end, which is terminated, sends FM frames, discharges PM resources.
It is, of course, understood that when measurement originating end sends FM frames several times, and measurement opposite end can respond BR frames, just can be handled using the follow-up process after the measurement opposite end normal response BR frames of first embodiment.
The present embodiment can save resource by repeating to send FM frames to ensure the reliability of measurement procedure, and terminate after certain number of times is attempted to send FM frames.
First embodiment and second embodiment are the flows in measurement process, activation is generally needed to measure before measuring, also include activation process before the measurement originating end of first embodiment or second embodiment sends FM frames, specific activation process can be as follows:
Fig. 3 is the method flow schematic diagram of the situation of activation process first in the embodiment of the present invention, and the present embodiment has the situation of feedback information for measurement opposite end.Referring to Fig. 3, including:
Step 31:After starting the order measured of survey crew's transmission is received when measuring originating end, measurement originating end is sent to activate and asked to measurement opposite end, and activation request is carried in GTPU message.
Step 32:Opposite end is measured to measurement originating end feedback activation response, activation response is carried in GTPU message.
Specifically, when measurement opposite end can meet the requirement in activation request, then the successful activation response of activation is fed back, when measurement opposite end can not meet the requirement during activation is asked, then the activation response that feedback activation fails.When the activation response of feedback activation failure, failure cause can be carried in activation response, afterwards, the activation that measurement originating end can adjust transmission according to failure cause is asked, and activation process is initiated again.
Fig. 4 is the method flow schematic diagram of the situation of activation process second in the embodiment of the present invention, and the present embodiment does not have the situation of feedback information for measurement opposite end.Referring to Fig. 4, including:
Step 41:Measure originating end and send activation request to measurement opposite end, while starting timer.
Step 42:Within the time that timer is set, measurement originating end does not receive the feedback of measurement opposite end During information, when the time set in timer reaches, measurement originating end sends activation request to measurement opposite end again.
Step 43:The flow of repeat step 42 reaches transmission times set in advance until the number of times that measurement originating end sends activation request.
Step 44:Within the time that timer is set, when measurement originating end does not receive the feedback information of measurement opposite end still, measurement originating end, which is terminated, sends activation request, terminates and consults, activation failure.
It is, of course, understood that when measurement originating end sends activation request several times, and measurement opposite end can respond activation request, just can be handled using the follow-up process after the measurement opposite end Normal Feedback activation response shown in Fig. 3.
The above-mentioned flow for giving measurement process and activation measurement, generally needs to deactivate to measure, i.e., it is necessary to when terminating measurement, can also include in first embodiment or second embodiment or the embodiment including activation after the measurement:Measurement is deactivated, specific deactivation flow can be as follows:
Fig. 5 is the method flow schematic diagram of the deactivation situation of flow first in the embodiment of the present invention, and the present embodiment has the situation of feedback information for measurement opposite end.Referring to Fig. 5, including:
Step 51:After stopping the order measuring of survey crew's transmission is received when measuring originating end, measurement originating end sends deactivation to measurement opposite end and asked, and deactivation request is carried in GTPU message.
Step 52:Measurement opposite end is received after deactivation request, stops sending BR frames, while deactivating response to measurement originating end feedback.
Fig. 6 is the method flow schematic diagram of the deactivation situation of flow second in the embodiment of the present invention, and the present embodiment does not have the situation of feedback information for measurement opposite end.Referring to Fig. 6, including:
Step 61:Measure originating end and send deactivation request to measurement opposite end, while starting timer.Step 62:Within the time that timer is set, when measurement originating end does not receive the feedback information of measurement opposite end, when the time set in timer reaches, measurement originating end sends to measurement opposite end deactivate request again.
Step 63:The flow of repeat step 62 reaches transmission times set in advance until the number of times that measurement originating end sends deactivation request. Step 64:Within the time that timer is set, when measurement originating end does not receive the feedback information of measurement opposite end still, measurement originating end, which is terminated, sends FM frames, discharges resource, terminates measurement.
It is, of course, understood that deactivating request several times when measurement originating end is sent, when measurement opposite end can respond deactivation request, the follow-up process that just can be deactivated using the measurement opposite end Normal Feedback shown in Fig. 5 after response is handled.
Activation/deactivation frame can be used in activation or deactivation process, the form of the activation/deactivation frame can be as shown in table 6:
Table 6
Wherein,
Version (Version):Version number;
Message number(Message ID ):Definition activation or various orders or response in deactivation process, the corresponding relation between the coding of message number and specific implication may refer to table:
Table 7
Direction(Directions of action ):Direction for distinguishing order or response, the corresponding relation between the coding in direction and specific implication may refer to table 8: Table 8
Sequence number( Sequence Number ):The sequence number of the frame of transmission, originating end often sends an activation/deactivation frame and plus one;
The transmission cycle(Tx Interval ):The cycle of FM frames and BR frames is sent, can be timing information
(for example, sending a FM frame per N seconds)Or determine bag number information(For example, sending a FM frame after often sending M bag);
Traffic identifier:The mark of measured data stream, different traffic identifier can distinguish different Business Streams;In measurement procedure after the activation, the traffic identifier of FM frames and BR frames is identical with sequence number herein;
Traffic identifier is indexed:Show the classification foundation used.
Business Stream can be classified using different classification foundations in the embodiment of the present invention, to obtain different business stream Wang Network performances.Classification foundation includes source IP address, purpose IP address, can also further use the mark of application layer, such as service quality(Quality of Service, QoS) classification instruction(QoS Class Indicator, QCI), Tunnel End Point Identifier(Tunnel End Point Identifier, TEID), the mark of transport layer can also be further used, for example, source user data protocol(User Datagram Protocol, UDP) port numbers and Differentiated Services(Differentiated Service, Diffserv) encoded point (DiffServ Code Point, DSCP) value, or the mark further combined using both application layer and transport layer.Classification foundation includes but is not limited to the item shown in table 9:
Table 9
Index classification foundation
1 (source IP address, purpose IP address) 2 (source IP address, purpose IP address, QCI)
3 (source IP address, purpose IP address, TEID)
4 (source IP address, purpose IP address, source port numbers)
5 (source IP address, purpose IP address, source port number, QCI)
6 (source IP address, purpose IP address, source port number, TEID)
7 (source IP address, purpose IP address, DSCP values) after any classification foundation of the Business Stream in table 9 classified, different Business Streams can be obtained, different class indications can be added in different Business Streams, class indication shows the classification belonging to corresponding Business Stream.And carried in above-mentioned FM frames, BR frames, activation/deactivation frame is traffic identifier, shows tested Business Stream to be measured.For example, Business Stream can be divided into classification as shown in table 10 using the 7th kind of classification foundation (source IP address, purpose IP addresses, DSCP values):
Table 10
On the basis of the classification of table 10, traffic identifier, class indication and the corresponding relation of classification can be as shown in table 11:
Table 11
Traffic identifier class indication is classified(Data flow)
Classification 6 in 60 XXX XXXX XXXX XXXX tables 10
Classification 5 in 5 1011 lllx xxxx xxxx tables 10 Classification 4 in 4 1010 OOlx xxxx xxxx tables 10
Classification 3 in 3 1,000 1111 Olxx xxxx tables 10
Classification 2 in 2 1,000 1111 lOxx xxxx tables 10
The class indication of the table 11 of classification 1 in 1 1,000 1,111 11 xx xxxx tables 10 is exemplified by carrying in IPv4 heads ID domains, instead, class indication can also be carried in the IPv6 of IP traffic stream label domain;Or, carry in the IPsec SA domains of IP traffic;Or, carry the generic route encapsulation in IP data flows(Generic Routing Encapsulation, GRE) Key domains;Or, carry in the UDP port number domain of IP traffic.
Because the embodiment of the present invention is based on GTPU agreements, each performance management frame(Performance Management, PM) frame be carry in GTPU message, PM frames include activation/deactivation frame, FM frames, BR frames.Specific carrying mode includes:Carry in the payload of GTPU message, or carry in the heading of GTPU message.
Mode one, carrying are in the payload of GTPU message
The GTPU message used at present includes 5 kinds, as shown in table 12:
Table 12
The embodiment of the present invention can be carried activation/deactivation frame, FM frames or BR frames in the payload of these GTPU being not used by message using the GTPU message being not used by.For example, using message Types value is 52 GTPU message, and corresponding form is as shown in table 13:
Table 13
Wherein, in UDP headings 2152 the reason for be:The UDP destination slogans of current GTPU message are 2152.
Mode two, carrying are in the heading of GTPU message
The form of GTP headings may refer to table 14:
Table 14
Byte (Octets) 87654321
1 version number's protocol type (*) E S PN
2 type of messages
Length (1st Octet)
4 length(2nd Octet)
5 tunnel endpoint identifier TEID (lst Octet)
6 tunnel endpoint identifier TEID (2nd Octet)
7 tunnel endpoint identifier TEID (3rd Octet)
8 tunnel endpoint identifier TEID (4th Octet)
9 sequence numbers(1st Octet)
10 sequence numbers (2nd Octet)
11 N-PDU are numbered
12 next extension header types Wherein,
Extension header mark (E):This mark is put, and Γ indicates next extension header field.Put, 0' is represented without next extension header field, or is had but need not be explained.
Type of message:This field points out the type of GTP message.
Next extension header type:This field definition is in GTP protocol Data Units(GTP Protocol Data Unit, G-PDU) in and then this field prolate-headed type.
The GTPU headings that GTPU agreements are used are variable-lengths, including mandatory field(Take 1-8 byte)And Optional Field.There are three to indicate for indicating whether three Optional Fields use in GTPU headings:PN marks, S marks and E marks.PN marks are used to indicate whether to use next protocol Data Unit(Next Protocol Data Unit, N-PDU) Optional Field;S marks are used to indicate whether to use GTP sequence numbers;E marks are used to indicate whether, using extension header Optional Field, other version number need not be used when can be made using E marks and in the future be extended this specification.Provided according to existing protocol, when any one being provided with three marks, it is accomplished by including the field of the 9-12 byte of occupancy in table 12 in GTPU headings part, therefore, when three traffic sign placements at least one when, the length of GTPU headings is at least 12 bytes.
It can be seen from the above, when field E is effective(When putting 1), the extension header part of GTPU headings just can be used.The PM frames in the embodiment of the present invention can be carried with extension header(FM frames, BR frames or activation/deactivation frame), prolate-headed form is as shown in Table 15:
Table 15
The I extension header length of Octets 1
2-m extension header contents
Next extension header type (*) the present embodiment of m+1 can identify extension header content for PM frames in " the next extension header type " field of the GTPU headings shown in table 14 using specific extension header types value (such as 255), PM frames are encapsulated in extension header as shown in Table 15.Specific encapsulation format can be as shown in table 16: IP header UDP header GTPU headers
The next extension header Extended-type head activation/deactivation frames of IP SPort DPort are next
The certain kinds offset length of Header 2152 or FM frames or extension header
[0 length BR frame types
0868] ( 255 )
The PM frames of the present embodiment can use single GTPU tunnels to carry, or be carried on tested Business Stream in identical GTPU tunnels.Assuming that individually the TEID in the GTPU tunnels of carrying PM frames is 00780522, then can use the tunnel carrying of TEID values mark is PM frames.
It is above-mentioned to be described using measuring originating end as executive agent, then perform following steps for measurement opposite end:
S02:Opposite end is measured to receive the traffic identifier of tested Business Stream of the carrying of measurement originating end transmission in GTPU message and send information;
S03:Opposite end is measured at least one measured in following two of originating end transmission carrying in GTPU message:One is measurement result, another is receive information and sends information, the receive information is measures the receive information for the tested Business Stream that opposite end is obtained according to the traffic identifier, and the measurement result obtains measurement result according to receive information for measurement opposite end with information calculating is sent.
It can further include the step in activation process:
S00:Measure opposite end and receive the activation request that measurement originating end is sent, the activation request is carried in the payload of GTPU message, or is carried in the heading of GTPU message;
S01 :Opposite end is measured to measurement originating end feedback activation response, the activation response is carried in the payload of GTPU message, or carry in the heading of GTPU message, when measuring opposite end satisfaction activation request, the activation response representation is activated successfully, when measurement opposite end can not meet activation request message, the activation response representation activation failure.
It can further include the step deactivated in flow:
S04:Measure opposite end and receive the deactivation request for measuring originating end transmission, it is described to deactivate request carrying In the payload of GTPU message, or carry in the heading of GTPU message;
S05:Measurement opposite end deactivates response to measurement originating end feedback, and the deactivation response, which is carried, to exist
In the payload of GTPU message, or carry in the heading of GTPU message.
Above-mentioned that measuring method is described, the method for the embodiment of the present invention can apply to following scene:
The system structure diagram for the first scene that Fig. 7 applies for the method for the embodiment of the present invention, the present embodiment is WCDMA(Wideband Code Division Multiple Access, WCDMA) system, no Xian Wang Network controllers(Radio Network Controller, RNC) 71 and gateway general grouping service wireless(General Packet Radio Service, GPRS) supporting node(Gateway GPRS Supporting Node, GGSN)/Serving GPRS Support Node( Serving GPRS Supporting Node:SGSN) between 72 IP PM implement scene, for RNC, RNC → GGSN/SGSN is to be preceding to GGSN/SGSN → RNC is backward.Two-way simultaneous includes above-mentioned two direction.
So that RNC is PM measurement originating ends as an example, using the method for the embodiment of the present invention, RNC can initiate forward, backward and two-way IP PM.Time delay, shake, Lost bag rates being respectively completed in RNC → GGSN/SGSN, GGSN/SGSN → RNC and both direction etc. is measured, and input parameter is provided for RNC stream control and access control.
During forward direction PM, RNC can periodically send FM frames, inform bag number, byte number and the FM delivery time that GGSN/SGSN local terminals are sent etc..GGSN/SGSN is received after FM, at the time of minute book end receives FM frames, the bag number that local terminal can be received, byte number, at the time of receive FM frames and at the time of sending BR frames informs RNC by BR frames.In local terminal Wan Cheng Lost bags rate, One Way Delay He the calculating of Lost byte numbers RNC can also be informed result of calculation and at the time of sending BR frames.:RNC is received after BR frames, according to the information of BR frame ins, finally gives the IP Wang Network performances such as time delay, shake, Lost bag rates, is used as the input parameter of stream control and access control.
Fig. 8 is the structural representation of the protocol stack used in the embodiment of the present invention.Fig. 7 and following Fig. 9,10 can use the protocol stack shown in Fig. 8.
The system structure diagram for the second scene that Fig. 9 applies for the method for the embodiment of the present invention, this implementation Example be Long Term Evolution (Long Term Evolution, LTE) system in, evolution base station (eNodeB) 91 and gateway(Serving Gateway, SGW) IP PM between 92 implement scene, be the interfaces of S 1 between eNodeB and SGW, for eNodeB, eNodeB → SGW is to be preceding to SGW → eNodeB is backward.Two-way simultaneous includes above-mentioned two direction.
The system structure diagram for the 3rd scene that Figure 10 applies for the method for the embodiment of the present invention, the present embodiment is in LTE system, the implement scene of IP PM between first eNodeB 101 and the 2nd eNodeB 102, it is X2 interface between first eNodeB and the 2nd eNodeB, for the first eNodeB, the eNodeB of first eNodeB → the 2nd for it is preceding to the eNodeB of, the 2nd eNodeB → the first be backward.Two-way simultaneous includes above-mentioned two direction.
In the above-described embodiments, by the way that FM frames, BR frames, the carrying of activation/deactivation frame can be realized into the IP Wang Network performance measurements based on GTPU in GTPU message.What deserves to be explained is, the overall plan of the embodiment of the present invention is:The FM frames carried in GTPU message are sent from measurement originating end to measurement opposite end, BR frame of the carrying sent by reception measurement opposite end in GTPU message afterwards, according to the metrical information, obtains IP Wang Network performances.It can be seen that, it is possible to achieve IPPM Wang Network performance measurements are carried out in measurement originating end and measurement opposite end, intermediate node is not related to measurement>Text carries out the processing such as understanding, and is also indifferent to the type of intermediate node, it is achieved thereby that IPPM nets Network performance measurements end to end.
The metrical information returned by measuring opposite end can be specific measurement result, or send information and receive information, measurement originating end is directly obtained measurement result or need calculating to obtain measurement result, realize the flexibility for obtaining measurement result mode.
By the way that FM frames, BR frames, activation/deactivation frame and tested Business Stream are transmitted in same GTPU tunnels, or, individually transmitted in a GTPU tunnel, realize the variation of transmission means.
By to traffic packets classify obtaining Business Stream, different measurements can be carried out for different business traffic category, the diversified demand of measurement is met.
By activating and deactivating flow and repeat to send the flows such as FM frames, BR frames, activation/deactivation frame, application scenarios different during measurement are adapted to.
Figure 11 is the structural representation of the device of third embodiment of the invention, and the device is applied to measurement initiation End, including the first module 111, the second module 112 and the 3rd module 113.First module 111 is used to send the FM frames carried in GTPU message to measurement opposite end, and the FM frames include the traffic identifier of tested Business Stream;Second module 112 is used to receive BR frame of the carrying for measuring opposite end transmission in GTPU message, and the BR frames include the metrical information of the corresponding tested Business Stream of the traffic identifier;3rd module 113 obtains IP Wang Network performances for just blunt according to the metrical information.
Further, first can also be included in the FM frames that first module is sent and sends information, the 3rd module includes first module and second unit;The first module be used for when second module receive metrical information include measurement result when, directly using the measurement result as IP Wang Network performances measurement result;The second unit is used for when the metrical information includes receive information and second sends information, calculates according to the receive information and the second transmission information and obtains the measurement result that IP nets Network performances.
The present embodiment can also include the 4th module, for setting up GTPU tunnels, and the FM frames or BR frames are transmitted with the tested Business Stream in same GTPU tunnels, or, the FM frames or BR frames are transmitted in a single GTPU tunnel.
The present embodiment can also include the 5th module, for to traffic packets classify according to classification foundation obtaining Business Stream, the classification foundation includes source IP address and purpose IP address, or, source IP address and purpose IP address and following any or its combination:QCI, TEID, UDP port number and DSCP.
The present embodiment can also include the 6th module, for adding class indication in Business Stream, and the class indication is used to show the classification belonging to Business Stream, and the class indication is carried in the IPv4 heads ID domains of Business Stream;Or, carry in the IPv6 of Business Stream stream label domain;Or, carry in the IPsec SA domains of Business Stream;Or, carry in GRE Key domains;Or, carry in the UDP port number domain of Business Stream.
The present embodiment can also just include the 7th module, and for sending activation request to measurement opposite end, the activation request is carried in GTPU message;8th module, it is described to activate response carrying in GTPU message for when measurement opposite end can be with normal response, receiving the activation response for measuring opposite end feedback.
The present embodiment can also just include the 9th module, described to deactivate request carrying in GTPU message for deactivating request to the transmission of measurement opposite end;And the tenth module, for when measure opposite end can be with normal response when, receive the deactivation response of measurement opposite end feedback, it is described to deactivate response and carry in GTPU In message.
Further, the first module in the present embodiment can be also used for, when sending FM frames, starting timer;When measurement opposite end is unable to normal response, when the timing of setting is reached, repeat to send the traffic identifier and transmission information that carry the tested Business Stream in GTPU message to measurement opposite end, until reaching number of times set in advance, stop sending the traffic identifier for carrying the tested Business Stream in GTPU message afterwards and send information, terminate measurement.
7th module can be also used for, when sending activation request, starting timer;When measurement opposite end is unable to normal response, when reaching the time that timer is set, repeats transmission and activate request until reaching number of times set in advance, afterwards, stop sending activating and ask, terminate activation.
9th module can be also used for, when sending deactivation request, starting timer;When measurement opposite end is unable to normal response, when the time set in timer reaches, repeat to send to deactivate and ask until reaching number of times set in advance, afterwards, stop sending the traffic identifier for carrying the tested Business Stream in GTPU message and send information, terminate measurement.
Specifically, FM frames can include following cell:Traffic identifier, and characterize the cell for sending information.For example, characterizing the cell of transmission information can include:Send bag number, send byte number, delivery time.Certainly, in order to which the need for upgrading and extend etc., the FM frames of the present embodiment can further include following cell:Version, frame type, sequence number, reserved field.
When carrying transmission information and receive information in BR frames, the BR frames include following cell:Traffic identifier, transmission bag number, transmission byte number, FM frames delivery time, the time of reception, receiver packet number, reception byte number, BR frame delivery times;When Xie Dai Lost bag rate measurement results in BR frames, the BR frames include following cell:Traffic identifier, Lost bags rate, transmission byte number, FM frames delivery time, the time of reception, reception byte number, BR frame delivery times;When Xie Dai Lost bags rates in BR frames and one-way delay measurement result, the BR frames include following cell:Traffic identifier, Lost bags rate, transmission byte number, One Way Delay, reception byte number, BR frame delivery times;When Xie Dai Lost bags rates and One Way Delay in BR frames Ji during Lost byte number measurement results, the BR frames include following cell:Traffic identifier, Lost bags rate, byte number difference, One Way Delay, BR frame delivery times.Certainly, in order to the need for upgrading and extend etc., the BR frames of the present embodiment can be with Further comprise following cell:Version, frame type, sequence number, reserved field.
Activation/deactivation frame can include following cell:Version, message number, direction, sequence number, traffic identifier, traffic identifier index, transmission cycle and reserved field.
The carrying mode and content of specific frame may refer to embodiment of the method, will not be repeated here.
The present embodiment is carried in GTPU message by that will send information and receive information or measurement result, it is possible to achieve the IP Wang Network performance measurements based on GTPU agreements.
Figure 12 is the structural representation of the device of fourth embodiment of the invention, and the device is applied to measurement opposite end, including the 11st module 121 and the 12nd module 122.11st module 121 is used to receive FM frame of the carrying for measuring originating end transmission in GTPU message, and the FM frames include the traffic identifier of tested Business Stream;12nd module 122, which is used to send to measurement originating end, carries the BR frames in GTPU message, and the BR frames include the metrical information of the corresponding tested Business Stream of the traffic identifier, measurement originating end is obtained IP Wang Network performances according to the metrical information.
Wherein, FM frames can also carry the first transmission information, and metrical information can include at least one in following two:One is measurement result, another is that receive information and second send information, the receive information for the tested Business Stream that the receive information obtains for measurement opposite end according to the traffic identifier, described second sends the part that information is the first transmission information or the first transmission information, and the measurement result obtains measurement result for measurement opposite end according to receive information and the first transmission information calculating.
The present embodiment can also include:13rd module, for receiving the activation request that measurement originating end is sent, the activation request is carried in GTPU message;14th module, for being responded to measurement originating end feedback activation, the activation response is carried in GTPU message, when measuring opposite end satisfaction activation request, the activation response representation is activated successfully, when measurement opposite end can not meet activation request message, the activation response representation activation failure.
The present embodiment can also include:15th module, for receiving the deactivation request that measurement originating end is sent, the deactivation request is carried in GTPU message;16th module, for deactivating response to measurement originating end feedback, the deactivation response is carried in GTPU message.
Wherein, it is real that the carrying mode and content for the specific information being related in the present embodiment may refer to method Example is applied, be will not be repeated here.
The present embodiment is carried in GTPU message by that will send information and receive information or measurement result, it is possible to achieve the IP Wang Network performance measurements based on GTPU agreements.
Figure 13 is the structural representation of the system of fifth embodiment of the invention, including the device shown in 3rd embodiment, and the device is as measurement originating end, and the measurement opposite end communicated with the measurement originating end.
Specifically, the present embodiment includes measurement originating end 131 and measurement opposite end 132.Measuring originating end 131 is used to send the FM frames for carrying the traffic identifier for including tested Business Stream in GTPU message to measurement opposite end;Measuring opposite end 132 is used to send the BR frames for carrying the metrical information including the corresponding tested Business Stream of the traffic identifier in GTPU message to measurement originating end.Originating end 131 is blunt obtains IP Wang Network performances according to the metrical information for measurement.
Wherein, FM frames can also carry the first transmission information, and metrical information can include at least one in following two:One is measurement result, another is that receive information and second send information, the receive information for the tested Business Stream that the receive information obtains for measurement opposite end according to the traffic identifier, described second sends the part that information is the first transmission information or the first transmission information, and the measurement result obtains measurement result for measurement opposite end according to receive information and the first transmission information calculating;The measurement originating end 131 is specifically for when metrical information includes measurement result, directly using the measurement result as IP Wang Network performances measurement result, or when metrical information includes receive information and second sends information, calculate according to the receive information and the second transmission information and obtain the measurement result that IP nets Network performances.
The measurement originating end be can be also used for sending activation request to measurement opposite end, and the activation request is carried in GTPU message;The measurement opposite end can be also used for measurement originating end feedback activation response, the activation response is carried in GTPU message, when measuring opposite end satisfaction activation request, the activation response representation is activated successfully, when measurement opposite end can not meet activation request message, the activation response representation activation failure.
The measurement originating end can be also used for deactivating request to the transmission of measurement opposite end, described to deactivate request carrying in GTPU message;The measurement opposite end be can be also used for deactivating response to measurement originating end feedback, and the deactivation response is carried in GTPU message. The measurement originating end of the present embodiment is RNC, and the measurement opposite end is GGSN or SGSN;Or, the measurement transmitting terminal is eNodeB, and the measurement opposite end is SGW;Or, the measurement transmitting terminal is the first eNodeB, and the measurement opposite end is the 2nd eNodeB.Or, above-mentioned tactful originating end and measurement opposite end are exchanged, i.e., described measurement originating end is GGSN or SGSN, and the measurement opposite end is RNC;Or, the measurement transmitting terminal is SGW, and the measurement opposite end is eNodeB;Or, the measurement transmitting terminal is the 2nd eNodeB, and the measurement opposite end is the first eNodeB.
Wherein, the carrying mode and content for the specific information being related in the present embodiment may refer to embodiment of the method, will not be repeated here.
The present embodiment is carried in GTPU message by that will send information and receive information or measurement result, it is possible to achieve the IP Wang Network performance measurements based on GTPU agreements.
One of ordinary skill in the art will appreciate that:Realizing all or part of step of above method embodiment can be completed by the related hardware of programmed instruction, foregoing program can be stored in a computer read/write memory medium, the program upon execution, performs the step of including above method embodiment;And foregoing storage medium includes:ROM, RAM, magnetic disc or CD etc. are various can be with the medium of store program codes.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention rather than is limited, although the present invention is described in detail with reference to preferred embodiments, it will be understood by those within the art that:It can still modify or equivalent substitution to technical scheme, and these modifications or equivalent substitution can not also make strange god and the scope of amended technical scheme disengaging technical solution of the present invention.

Claims (1)

  1. Claim
    1st, a kind of method of IP Wang Network performance measurements, it is characterised in that including:
    The forward direction carried in the GTPU message of GPRS Tunneling Protocol-User face part is sent to measurement opposite end and monitors FM frames, and the FM frames include the traffic identifier of tested Business Stream;
    Back Report BR frame of the carrying of measurement opposite end transmission in GTPU message is received, the BR frames include the metrical information of the corresponding tested Business Stream of the traffic identifier;
    It is just blunt according to the metrical information, obtain IP Wang Network performances.
    2nd, according to the method described in claim 1, it is characterised in that also include first in the FM frames and send information;
    The metrical information includes at least one in following two:One is measurement result, another is that receive information and second send information, the receive information for the tested Business Stream that the receive information obtains for measurement opposite end according to the traffic identifier, the second transmission information is the first transmission information or is the part in the first transmission information, and the measurement result calculates according to receive information and the first transmission information for measurement opposite end and obtains measurement result;
    It is described according to the metrical information, obtaining IP Wang Network performances includes:When the metrical information include measurement result when, directly using the measurement result as IP Wang Network performances measurement result;When the metrical information includes receive information and second sends information, calculate according to the receive information and the second transmission information and obtain the measurement result that IP nets Network performances.
    3rd, according to the method described in claim 1, it is characterised in that also include:GTPU tunnels are set up, the FM frames or BR frames are transmitted with the tested Business Stream in same GTPU tunnels, or, the FM frames or BR frames are transmitted in a single GTPU tunnel.
    4th, according to the method described in claim 1, it is characterised in that also include:Traffic packets classify according to classification foundation to obtain Business Stream, the classification foundation includes source IP address and purpose IP address, or, source IP address and purpose IP address and following any or its combination:Quality of service classes indicates QCI, GTPU Tunnel End Point Identifier TEID, source user data protocol UDP port number and differentiated service code point DSCP. 5th, method according to claim 4, it is characterised in that also include:Class indication is added in Business Stream, the class indication is used to show the classification belonging to Business Stream, and the class indication is carried in the IPv4 heads ID domains of Business Stream;Or, carry in the IPv6 of Business Stream stream label domain;Or, carry in the IPsec SA domains of Business Stream;Or, carry in the generic route encapsulation GRE Key domains of Business Stream;Or, carry in the UDP port number domain of Business Stream.
    6th, according to the method described in claim 1, it is characterised in that:
    The FM frames are carried in the payload of GTPU message, or are carried in the heading of GTPU message;
    The BR frames are carried in the payload of GTPU message, or are carried in the heading of GTPU message.
    7th, method according to claim 6, it is characterised in that the FM frames include following cell:Traffic identifier, transmission bag number, transmission byte number, delivery time;
    When carrying transmission information and receive information in BR frames, the BR frames include following cell:Traffic identifier, transmission bag number, transmission byte number, FM frames delivery time, the time of reception, receiver packet number, reception byte number, BR frame delivery times;
    When Xie Dai Lost bag rate measurement results in BR frames, the BR frames include following cell:Traffic identifier, Lost bags rate, transmission byte number, FM frames delivery time, the time of reception, reception byte number, BR frame delivery times;
    When Xie Dai Lost bags rates in BR frames and one-way delay measurement result, the BR frames include following cell:Traffic identifier, Lost bags rate, transmission byte number, One Way Delay, reception byte number, BR frame delivery times;When Xie Dai Lost bags rates and One Way Delay in BR frames Ji during Lost byte number measurement results, the BR frames include following cell:Traffic identifier, Lost bags rate, byte number difference, One Way Delay, BR frame delivery times.
    8th, according to the method described in claim 1, it is characterised in that also include:
    Activation request is sent to measurement opposite end, the activation request is carried in GTPU message;When measurement opposite end can be with normal response, the activation response for measuring opposite end feedback is received, it is described to activate response carrying in GTPU message. 9th, method according to claim 8, it is characterised in that also include:
    Sent to measurement opposite end and deactivate request, the deactivation request is carried in GTPU message;When measurement opposite end can be with normal response, the deactivation response of measurement opposite end feedback is received, the deactivation response is carried in GTPU message.
    10th, a kind of device of IP Wang Network performance measurements, it is characterised in that including:
    First module, monitors FM frames, the FM frames include the traffic identifier of tested Business Stream for sending the forward direction carried in the GTPU message of GPRS Tunneling Protocol-User face part to measurement opposite end;
    Second module, for receiving Back Report BR frame of the carrying of measurement opposite end transmission in GTPU message, the BR frames include the metrical information of the corresponding tested Business Stream of the traffic identifier;
    3rd module, for according to the metrical information, obtaining IP Wang Network performances.
    11st, the device according to claim 10, it is characterised in that the FM frames that first module is sent include the first transmission information, the 3rd module includes first module and second unit;
    The first module be used for when second module receive metrical information include measurement result when, directly using the measurement result as IP Wang Network performances measurement result;The second unit is used for when the metrical information includes receive information and second sends information, calculate according to the receive information and the second transmission information and obtain the measurement result that IP nets Network performances, wherein, the second transmission information is the first transmission information or is the part in the first transmission information.
    12nd, device according to claim 10, it is characterised in that also include:
    4th module, for setting up GTPU tunnels, the FM frames or BR frames are transmitted with the tested Business Stream in same GTPU tunnels, or, the FM frames or BR frames are transmitted in a single GTPU tunnel.
    13rd, device according to claim 10, it is characterised in that also include:
    5th module, for traffic packets classify according to classification foundation obtaining Business Stream, the classification foundation includes source IP address and purpose IP address, or, source IP address and purpose IP address and following any or its combination:Quality of service classes indicates that QCI, GTPU Tunnel End Point Identifier TEID, source are used User data Protocol UDP port number and differentiated service code point DSCP.
    14th, device according to claim 13, it is characterised in that also include:
    6th module, for adding class indication in Business Stream, the class indication is used to show the classification belonging to Business Stream, and the class indication is carried in the IPv4 heads ID domains of Business Stream;Or, carry in the IPv6 of Business Stream stream label domain;Or, carry in the IPsec SA domains of Business Stream;Or, carry in the generic route encapsulation GRE Key domains of Business Stream;Or, carry in the UDP port number domain of Business Stream.
    15th, device according to claim 10, it is characterised in that also include:
    7th module, for sending activation request to measurement opposite end, the activation request is carried in GTPU message;
    8th module, it is described to activate response carrying in GTPU message for when measurement opposite end can be with normal response, receiving the activation response for measuring opposite end feedback.
    16th, device according to claim 15, it is characterised in that also include:
    9th module, request is deactivated for being sent to measurement opposite end, and the deactivation request is carried in GTPU message;
    Tenth module, for when measurement opposite end can be with normal response, receiving the deactivation response of measurement opposite end feedback, the deactivation response is carried in GTPU message.
    17th, a kind of system of IP Wang Network performance measurements, it is characterised in that including:Device as described in any one of claim 10 to 16, the device is as measurement originating end, and the measurement opposite end communicated with the measurement originating end.
    18th, system according to claim 17, it is characterised in that the measurement opposite end includes:11st module, for receiving FM frame of the carrying of measurement originating end transmission in GTPU message, the FM frames include the traffic identifier of tested Business Stream;
    12nd module, carries the BR frames in GTPU message, the BR frames include the metrical information of the corresponding tested Business Stream of the traffic identifier, measurement originating end is obtained IP Wang Network performances according to the metrical information for being sent to measurement originating end. 19th, system according to claim 18, it is characterised in that the measurement opposite end also includes:13rd module, for receiving the activation request that measurement originating end is sent, the activation request is carried in GTPU message;
    14th module, for measurement originating end feedback activation response, the activation response to be carried in GTPU message.
    20th, system according to claim 18, it is characterised in that the measurement opposite end also includes:15th module, for receiving the deactivation request that measurement originating end is sent, the deactivation request is carried in GTPU message;
    16th module, for deactivating response to measurement originating end feedback, the deactivation response is carried in GTPU message.
    21st, the system according to any one of claim 17 to 20, it is characterised in that:
    The measurement originating end is RNC, and the measurement opposite end is GGSN or SGSN;Or, the measurement transmitting terminal is eNodeB, and the measurement opposite end is SGW;Or,
    The measurement transmitting terminal is the first eNodeB, and the measurement opposite end is the 2nd eNodeB;Or, the measurement originating end is GGSN or SGSN, and the measurement opposite end is RNC;Or, the measurement transmitting terminal is SGW, and the measurement opposite end is eNodeB;Or,
    The measurement transmitting terminal is the 2nd eNodeB, and the measurement opposite end is the first eNodeB.
CN2009801165812A 2009-04-14 2009-04-14 Ip network performance measurement method, apparatus and system Pending CN102037683A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2009/071261 WO2010118569A1 (en) 2009-04-14 2009-04-14 Ip network performance measurement method, apparatus and system

Publications (1)

Publication Number Publication Date
CN102037683A true CN102037683A (en) 2011-04-27

Family

ID=42982114

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009801165812A Pending CN102037683A (en) 2009-04-14 2009-04-14 Ip network performance measurement method, apparatus and system

Country Status (2)

Country Link
CN (1) CN102037683A (en)
WO (1) WO2010118569A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014101187A1 (en) * 2012-12-31 2014-07-03 华为技术有限公司 Ip performance measurement method and device

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5450394A (en) * 1994-03-10 1995-09-12 Northern Telecom Limited Delay monitoring of telecommunication networks
US7924725B2 (en) * 2003-11-10 2011-04-12 Nortel Networks Limited Ethernet OAM performance management
CN100550786C (en) * 2005-06-17 2009-10-14 阿尔卡特公司 In data network operation and maintenance agreement to the method for performance monitoring of frame transmission
CN1992651B (en) * 2005-12-29 2010-12-01 华为技术有限公司 Implementation method for detecting multicast performance of Ethernet

Also Published As

Publication number Publication date
WO2010118569A1 (en) 2010-10-21

Similar Documents

Publication Publication Date Title
JP4008447B2 (en) Bi-directional packet data transmission system and method
AU2002353634B2 (en) Selectively transmitting full or compressed header packets
US9306818B2 (en) Method for calculating statistic data of traffic flows in data network and probe thereof
KR101792378B1 (en) Support of quality of service control in a mobile communication system
CN100486225C (en) Method for reducing data IP fragmentation quantity in PS network
EP1405472B1 (en) Transmission of compression identifier of headers on data packet connection
EP1329078B1 (en) Defining header field compression for data packet connection
CN101388825B (en) Method and apparatus for transmitting data package of GPRS tunnel protocol
US9313049B2 (en) Communication system, network apparatus, gateway apparatus, computer program, data transmission method and data transfer method
US20160072930A1 (en) Data transmission method and apparatus, communications device, and communications system
US9565588B2 (en) Enhanced multiplexing for single RLC entity
US9219537B2 (en) Method and system for transmitting information in relay communication network
CN101150497A (en) Multi-data packet transmission method, system and device in mobile communication
CN103119896A (en) Heartbeat message transmission method and heartbeat proxy server
CN103262606A (en) An improvement on ip fragmentation in gtp tunnel
CN105577501B (en) Standby incoming communication implementation method and device are hung under private network customer terminal equipment
WO2010091610A1 (en) Link detection method, apparatus and communications system thereof
JP5965061B2 (en) Data transmission method, network element device, and communication system
CN101924625A (en) Data packet retransmission control method and network side equipment
CN109120540B (en) Method for transmitting message, proxy server and computer readable storage medium
CN108617009B (en) Data transmission method, device and system and packet data network gateway
CN105532059A (en) Configuration indication method and communication device
CN101557386A (en) Method and device for sending data and method and device for receiving data
KR100425745B1 (en) Packet transmission method in communication system supporting header compression of packet
CN102037683A (en) Ip network performance measurement method, apparatus and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110427