CN102035747A - Method and device for forwarding message - Google Patents
Method and device for forwarding message Download PDFInfo
- Publication number
- CN102035747A CN102035747A CN201010607402XA CN201010607402A CN102035747A CN 102035747 A CN102035747 A CN 102035747A CN 201010607402X A CN201010607402X A CN 201010607402XA CN 201010607402 A CN201010607402 A CN 201010607402A CN 102035747 A CN102035747 A CN 102035747A
- Authority
- CN
- China
- Prior art keywords
- message
- aggregated links
- route priority
- link
- priority
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention discloses a method and a device for forwarding a message. The method comprises the steps of: counting a packet loss rate of the message forwarded by the surplus polymerizing link with high routing priority by the message forwarding device when a member link of a polymerizing link used as an equivalent routing has a fault; counting the occupied bandwidth of the received message by the message forwarding device when the packet loss rate satisfies the preset condition; marking the received message by the message forwarding device according to the preset strategy when the bandwidth obtained through counting does not exceed the bandwidth of the surplus polymerizing link with high routing priority; and respectively sending the message by the message forwarding device through the surplus polymerizing link with high routing priority and the links besides the surplus polymerizing link with high routing priority according to the mark of the message. In the invention, the problems of congestion and package loss as all the flow is forwarded through the polymerizing link with high routing priority are solved.
Description
Technical field
The present invention relates to the communications field, relate in particular to the method and apparatus that a kind of message is transmitted.
Background technology
Cloud computing has intimate unlimited calculating, storage, its communication ability, and is corresponding, and it is the data center that has assembled the large-scale basis resource that the IT architecture of cloud computing service is provided.Data center has a large amount of servers usually, but the visit of a large amount of servers brings white elephant can for the network of data center.Along with number of servers and density constantly increase, the network of data center becomes and sinks beneath one's burden.Support the large-scale application of full the Internet level, server cluster may reach thousands of, tens thousand of, and all can there be a lot of problems in professional deployment, expansion, operation, support.
Fig. 1 is a kind of non-blocking network model.Access-layer switch descending has 40 gigabit ports, and clog-free up 4 10,000,000,000 ports are to n platform (n=2 among Fig. 1) convergence switch (or other core network devices).Use equal-cost route (Equal-Cost Multipath Routing in the network planning, ECMP) uplink bandwidth with access switch carries out load balancing, thereby can realize the clog-free exchange of whole network, can have the ability of gigabit wire speed arbitrarily between the Service-Port, eliminate the bandwidth constraints factor of cloud computing cluster inside fully.Wherein, equal-cost route is meant concerning same Routing Protocol, allows many routes that the destination is identical and expense is also identical of configuration.When in the route of same destination, when not having the route of higher priority, these several routes are all adopted, when the message of this destination is gone in forwarding, send by each paths successively, thus the load balancing of realization network.For same destination, specific Routing Protocol also may be found the route of several equivalences, if this Routing Protocol is the highest at all active Routing Protocol medium priorities, these several different routes all are counted as the current effective route so.Like this, on the Routing Protocol aspect, guaranteed the load balancing of IP flow.
As shown in Figure 2, in the prior art, the aggregated links that connects convergence switch when access switch occurs when unusual, and for example: the link failure of port P2, at this moment aggregated links P1/P2 does not interrupt.But, the bandwidth of aggregated links changes because reducing the expense that causes this link.Access switch judges that the priority of this aggregated links is lower than the route priority of aggregated links P3/P4, so the route of P1/P2 is deleted from equal-cost route, though cause the P1/P2 aggregated links to also have bandwidth resources to utilize, be set in idle state.All flows are transmitted from aggregated links P3/P4, cause this link flow pressure excessive, the congested packet loss that causes occurs, thereby make the business of data center occur influencing user's normal visit unusually.
Summary of the invention
The invention provides the method and apparatus that a kind of message is transmitted, avoid because flow is all transmitted the congestion packet loss problem that causes by the aggregated links of high route priority.
The invention provides the method that a kind of message is transmitted, be applied to clog-free access network, message forwarding equipment by many each other the aggregated links of equal-cost route, identical high route priority carry out message and transmit, this method comprises:
As the Member Link fault of the aggregated links of equal-cost route the time, described message forwarding equipment is transmitted the message that receives by the aggregated links that remains high route priority;
Described message forwarding equipment is added up the packet loss that the aggregated links of the high route priority of described residue E-Packets;
When described packet loss satisfies when pre-conditioned, described message forwarding equipment is the message marking that receives according to preset strategy;
Described message forwarding equipment according to the mark of message with message respectively the link outside the aggregated links of aggregated links by the high route priority of described residue and the high route priority of described residue send.
Described message forwarding equipment is that the message marking that receives comprises according to preset strategy: the shared bandwidth of message that described message forwarding equipment statistics receives, and when the bandwidth that obtains of statistics surpassed the bandwidth of aggregated links of the high route priority of described residue, described message forwarding equipment was that the message that receives is stamped first mark;
Described message forwarding equipment according to the mark of message with message respectively the link outside the aggregated links of aggregated links by the high route priority of described residue and the high route priority of described residue send and comprise: described message forwarding equipment will carry the aggregated links transmission of the message of described first mark by the high route priority of described residue, and the message that will not carry described first mark sends by the link outside the aggregated links of the high route priority of described residue.
As the Member Link fault of the aggregated links of equal-cost route the time, described message forwarding equipment is transmitted the message receive by the aggregated links that remains high route priority and is comprised: as the Member Link fault of the aggregated links of equal-cost route the time, the state of the aggregated links of described message forwarding equipment fault is set to static standby by enlivening active, the aggregated links that stops by this fault is transmitted the message that receives, and the aggregated links by the high route priority outside the aggregated links of this fault E-Packets;
When the Member Link that breaks down recovers just often, described message forwarding equipment is updated to active with the state of the aggregated links of described fault, recovers to E-Packet by this aggregated links.
The shared bandwidth of message that described message forwarding equipment statistics receives, and when the bandwidth that obtains of statistics surpasses the bandwidth of aggregated links of the high route priority of described residue, described message forwarding equipment is that the message that receives is stamped first mark and comprised: described message forwarding equipment issues polymerization CAR configuration speed limit on downlink port, stamps first mark for the message in the bandwidth range of the aggregated links of the high route priority of described residue that receives.
When the link outside the aggregated links of the high route priority of described residue has different route priority, also comprise:
When the bandwidth that obtains when statistics surpasses the bandwidth of aggregated links of the high route priority of described residue, described message forwarding equipment is that the message that receives is stamped different marks according to the route priority of the link outside the aggregated links of the high route priority of described residue, carries out message according to the mark of message by link corresponding and transmits.
The invention provides a kind of message forwarding equipment, be applied to clog-free access network, comprising:
Transmitting element, be used for by many each other the aggregated links of equal-cost route, identical high route priority carry out message and transmit, as as the Member Link fault of the aggregated links of equal-cost route the time, transmit the message that receives by the aggregated links that remains high route priority; When the packet loss of the aggregated links of the high route priority of described residue satisfies when pre-conditioned, according to the mark of message with message respectively the link outside the aggregated links of aggregated links by the high route priority of described residue and the high route priority of described residue send;
Statistic unit is used for as the Member Link fault of the aggregated links of equal-cost route the time, adds up the packet loss that the aggregated links of the high route priority of described residue E-Packets;
Indexing unit is used for satisfying when pre-conditioned when packet loss that described statistic unit statistics obtains, is the message marking that receives according to preset strategy.
Described indexing unit also is used for: the shared bandwidth of message that statistics receives; When the bandwidth that obtains when statistics surpasses the bandwidth of aggregated links of the high route priority of described residue, for the message that receives is stamped first mark;
Described transmitting element also is used for: will carry the aggregated links transmission of the message of described first mark by the high route priority of described residue, the message that will not carry described first mark sends by the link outside the aggregated links of the high route priority of described residue.
Also comprise state set unit, be used for as the time that the state of the aggregated links of fault is set to static standby by enlivening active as the Member Link fault of the aggregated links of equal-cost route; When the Member Link that breaks down recovers just often, the state of the aggregated links of described fault is updated to active.
Described indexing unit also is used for: issue polymerization CAR configuration speed limit on downlink port, stamp first mark for the message in the bandwidth range of the aggregated links of the high route priority of described residue that receives.
Described indexing unit also is used for: when the link outside the aggregated links of the high route priority of described residue has different route priority, if the bandwidth that statistics obtains surpasses the bandwidth of the aggregated links of the high route priority of described residue, then the route priority according to the link outside the aggregated links of the high route priority of described residue is that the message that receives is stamped different marks;
Described transmitting element also is used for: the mark according to message is transmitted by carrying out message with the mark respective links.
Compared with prior art, the present invention has the following advantages at least:
Among the present invention, when the aggregated links packet loss of high route priority satisfies when pre-conditioned, message forwarding equipment E-Packets by the link outside the aggregated links of high route priority, thereby avoid making data center professional normal because the aggregated links of all flows by high route priority sends the congestion packet loss problem that causes.
Description of drawings
Fig. 1 is a non-blocking network model schematic diagram in the prior art;
Fig. 2 is that the message that access switch connects convergence switch in the prior art aggregated links occurs when unusual sends schematic diagram;
Fig. 3 is that the message that aggregated links that access switch provided by the invention connects convergence switch occurs when unusual sends schematic diagram;
Fig. 4 is the schematic flow sheet of the method for message forwarding provided by the invention;
Fig. 5 is that another message that aggregated links that access switch provided by the invention connects convergence switch occurs when unusual sends schematic diagram;
Fig. 6 is the structural representation of message forwarding equipment provided by the invention.
Embodiment
Core concept of the present invention is: message forwarding equipment comprises multilink at up direction, and the up link that the message that message forwarding equipment receives from down direction passes through high priority sends, and the up link of low priority is by idle.When causing up packet loss owing to the flow of down direction is excessive, message forwarding equipment carries out the priority division to the flow of down direction, up link by high priority sends the message of high priority, sends the message of low priority by the up link of low priority.
For the clear method of introducing message forwarding provided by the invention, illustrate this method below by concrete application scenarios.As shown in Figure 3, being applied to non-blocking network with this method is example, and wherein message forwarding equipment is access-layer switch S1.As shown in Figure 4, this method may further comprise the steps:
Wherein, S1 calculates link priority and mainly considers factors such as link bandwidth, link overhead, and among the present invention, the P1/P2 link is identical with the P3/P4 link bandwidth, and priority is identical, constitutes equal-cost route, and S1 uses P1/P2 link and P3/P4 link to carry out load balancing.
The P1/P2 aggregated links is as logical links, after its state be set be Standby, still can carry out transfer of data by physical link P1 link wherein, but because the P1 link bandwidth is lower than the P3/P4 link, priority is lower, at the P3/P4 link just often, S1 only uses P3/P4 link transmission message.
S1 is provided with port packet loss statistical function, detects the message packet loss of uplink port P3 and P4.When definite P3 and P4 packet loss, when perhaps detecting the message packet loss greater than threshold value, S1 determines the uplink bandwidth deficiency.S1 issues polymerization CAR (Committed Access Rate, agreement access rate) configuration speed limit on downlink port, stamp the flow mark of different stage for the flow that enters S1.Concrete, the message that the S1 downlink port receives enters the message process chip, and the message process chip disposes according to polymerization CAR the flow that enters in the particular port scope is added up, and is that flow is stamped the flow mark according to statistics.In the embodiment of the invention, polymerization CAR configuration requirement carries out the bandwidth speed limit to the flow that all downlink ports enter, be that the message process chip is added up the flow that all downlink ports receive, flow in the limiting bandwidth scope is stamped high priority flag, the extraneous flow of limiting bandwidth is stamped low-priority flags.
S1 is provided with the message forwarding strategy, and the message of the high priority up link by high priority is sent, and the message of the low priority up link by low priority is sent.In the embodiment of the invention, the P3/P4 link transmission DSCP by high priority is 7 message, and the P1 link transmission DSCP by low priority is 6 message.
If the P2 link-recovery is normal, then this method can also comprise:
Need explanation, method provided by the invention is not only applicable to scene shown in Figure 3, and is suitable equally for the situation of 3 above link aggregations and 3 above aggregated links.As shown in Figure 5, Access Layer comprises A1 and A2 switch, and convergence-level comprises C1, C2, C3 and C4 switch.A1 forms aggregated links P1 with link P11, P12, P13 and P14 polymerization, link P21-P24, P31-P34, the polymerization of P41-P44 difference are formed aggregated links P2, P3 and P4, and the bandwidth of every aggregated links is 4*n, and total uplink traffic is m, when m≤16*n, uplink traffic normally sends.If the link P11 between A1 and the C1 is unusual, the link P21/P22 between A1 and the C2 is unusual, and then the aggregated links between A1 and the C1/C2 is deleted from equal-cost route, causes the bandwidth resources waste of 8*n.At this moment, congestion packet loss can appear in flow when m>8*n.
Among the present invention, when the A1 switch detects the packet loss generation, issue the configuration of bandwidth speed limit at downlink port, flow mark high priority in the limited speed belt wide region, the flow mark low priority that the limited speed belt wide region is outer, the flow of high priority sends by aggregated links P3 and P4, and the flow of low priority sends by aggregated links P1 and P2.Optionally, flow mark high priority in the limited speed belt wide region is set, the flow mark suboptimum of the 3*n bandwidth that the speed limit bandwidth is outer is level earlier, all the other flow mark low priorities, the flow of high priority sends by aggregated links P3 and P4, the flow of inferior priority sends by aggregated links P1, and the flow of low priority sends by aggregated links P2.
By adopting method provided by the invention, when the up link packet loss of high priority satisfies when pre-conditioned, message forwarding equipment sends message by the up link outside the high priority, thereby avoid making data center professional normal because the up link of all flows by high priority sends the congestion packet loss problem that causes.
Based on the same or analogous technical conceive of said method embodiment, the present invention also provides a kind of message forwarding equipment, comprises many up links that priority is different, as shown in Figure 6, this message forwarding equipment comprises:
Transmitting element 11, be used for by many each other the aggregated links of equal-cost route, identical high route priority carry out message and transmit, as as the Member Link fault of the aggregated links of equal-cost route the time, transmit the message that receives by the aggregated links that remains high route priority; When the packet loss of the aggregated links of the high route priority of described residue satisfies when pre-conditioned, according to the mark of message with message respectively the link outside the aggregated links of aggregated links by the high route priority of described residue and the high route priority of described residue send;
Indexing unit 13 is used for satisfying when pre-conditioned when packet loss that described statistic unit 12 statistics obtain, is the message marking that receives according to preset strategy.
Wherein, indexing unit 13 is that the message marking that receives specifically comprises according to preset strategy: the shared bandwidth of message that statistics receives; When the bandwidth that obtains when statistics surpasses the bandwidth of aggregated links of the high route priority of described residue, for the message that receives is stamped first mark.Accordingly, transmitting element 11 will carry the aggregated links transmission of the message of described first mark by the high route priority of described residue, and the message that will not carry described first mark sends by the link outside the aggregated links of the high route priority of described residue.Concrete, described indexing unit 13 also is used for: issue polymerization CAR configuration speed limit on downlink port, stamp first mark for the message in the bandwidth range of the aggregated links of the high route priority of described residue that receives.This equipment can also comprise configuration delete cells 15, is used for after the aggregated links that breaks down is recovered normally, the polymerization CAR configuration that deletion issues on downlink port.
This equipment also comprises state set unit 14, is used for as the Member Link fault of the aggregated links of equal-cost route the time, and the state of the aggregated links of fault is set to static standby by enlivening active; When the Member Link that breaks down recovers just often, the state of the aggregated links of described fault is updated to active.
This equipment can also comprise route priority determining unit 16, be used for determining the route priority of link according to Link State, for example determine the route priority of link according to link bandwidth, when the Member Link fault of aggregated links, the bandwidth of aggregated links reduces, route priority determining unit 16 determines that the route priority of this aggregated links reduces, after the fault Member Link of this aggregated links recovers normally, the bandwidth of aggregated links increases, and route priority determining unit 16 determines that the route priority of this aggregated links raises.There is the concrete of priority to determine that mode does not limit for the road in the embodiment of the invention.
Described indexing unit 13 also is used for: when the link outside the aggregated links of the high route priority of described residue has different route priority, if the bandwidth that statistics obtains surpasses the bandwidth of the aggregated links of the high route priority of described residue, then the route priority according to the link outside the aggregated links of the high route priority of described residue is that the message that receives is stamped different marks; Accordingly, described transmitting element 11 also is used for: according to the mark of message by transmitting with the mark respective links.
By adopting message forwarding equipment provided by the invention, when the aggregated links packet loss of high route priority satisfies when pre-conditioned, message forwarding equipment E-Packets by the link outside the aggregated links of high route priority, thereby avoid making data center professional normal because the aggregated links of all flows by high route priority sends the congestion packet loss problem that causes.
Through the above description of the embodiments, those skilled in the art can be well understood to the present invention and can realize by the mode that software adds essential general hardware platform, can certainly pass through hardware, but the former is better execution mode under a lot of situation.Based on such understanding, the part that technical scheme of the present invention contributes to prior art in essence in other words can embody with the form of software product, this computer software product is stored in the storage medium, comprise that some instructions are with so that a computer equipment (can be a personal computer, server, the perhaps network equipment etc.) carry out the described method of each embodiment of the present invention.
It will be appreciated by those skilled in the art that accompanying drawing is the schematic diagram of a preferred embodiment, module in the accompanying drawing or flow process might not be that enforcement the present invention is necessary.
It will be appreciated by those skilled in the art that the module in the device among the embodiment can be distributed in the device of embodiment according to the embodiment description, also can carry out respective change and be arranged in the one or more devices that are different from present embodiment.The module of the foregoing description can be merged into a module, also can further split into a plurality of submodules.
More than disclosed only be several specific embodiment of the present invention, still, the present invention is not limited thereto, any those skilled in the art can think variation all should fall into protection scope of the present invention.
Claims (10)
1. the method transmitted of a message is applied to clog-free access network, message forwarding equipment by many each other the aggregated links of equal-cost route, identical high route priority carry out message and transmit, it is characterized in that this method comprises:
As the Member Link fault of the aggregated links of equal-cost route the time, described message forwarding equipment is transmitted the message that receives by the aggregated links that remains high route priority;
Described message forwarding equipment is added up the packet loss that the aggregated links of the high route priority of described residue E-Packets;
When described packet loss satisfies when pre-conditioned, described message forwarding equipment is the message marking that receives according to preset strategy;
Described message forwarding equipment according to the mark of message with message respectively the link outside the aggregated links of aggregated links by the high route priority of described residue and the high route priority of described residue send.
2. the method for claim 1 is characterized in that,
Described message forwarding equipment is that the message marking that receives comprises according to preset strategy: the shared bandwidth of message that described message forwarding equipment statistics receives, and when the bandwidth that obtains of statistics surpassed the bandwidth of aggregated links of the high route priority of described residue, described message forwarding equipment was that the message that receives is stamped first mark;
Described message forwarding equipment according to the mark of message with message respectively the link outside the aggregated links of aggregated links by the high route priority of described residue and the high route priority of described residue send and comprise: described message forwarding equipment will carry the aggregated links transmission of the message of described first mark by the high route priority of described residue, and the message that will not carry described first mark sends by the link outside the aggregated links of the high route priority of described residue.
3. method as claimed in claim 2 is characterized in that,
As the Member Link fault of the aggregated links of equal-cost route the time, described message forwarding equipment is transmitted the message receive by the aggregated links that remains high route priority and is comprised: as the Member Link fault of the aggregated links of equal-cost route the time, the state of the aggregated links of described message forwarding equipment fault is set to static standby by enlivening active, the aggregated links that stops by this fault is transmitted the message that receives, and the aggregated links by the high route priority outside the aggregated links of this fault E-Packets;
When the Member Link that breaks down recovers just often, described message forwarding equipment is updated to active with the state of the aggregated links of described fault, recovers to E-Packet by this aggregated links.
4. method as claimed in claim 2, it is characterized in that, the shared bandwidth of message that described message forwarding equipment statistics receives, and when the bandwidth that obtains of statistics surpasses the bandwidth of aggregated links of the high route priority of described residue, described message forwarding equipment is that the message that receives is stamped first mark and comprised: described message forwarding equipment issues polymerization CAR configuration speed limit on downlink port, stamps first mark for the message in the bandwidth range of the aggregated links of the high route priority of described residue that receives.
5. as claim 2 or 4 described methods, it is characterized in that, when the link outside the aggregated links of the high route priority of described residue has different route priority, also comprise:
When the bandwidth that obtains when statistics surpasses the bandwidth of aggregated links of the high route priority of described residue, described message forwarding equipment is that the message that receives is stamped different marks according to the route priority of the link outside the aggregated links of the high route priority of described residue, carries out message according to the mark of message by link corresponding and transmits.
6. a message forwarding equipment is applied to clog-free access network, it is characterized in that, comprising:
Transmitting element, be used for by many each other the aggregated links of equal-cost route, identical high route priority carry out message and transmit, as as the Member Link fault of the aggregated links of equal-cost route the time, transmit the message that receives by the aggregated links that remains high route priority; When the packet loss of the aggregated links of the high route priority of described residue satisfies when pre-conditioned, according to the mark of message with message respectively the link outside the aggregated links of aggregated links by the high route priority of described residue and the high route priority of described residue send;
Statistic unit is used for as the Member Link fault of the aggregated links of equal-cost route the time, adds up the packet loss that the aggregated links of the high route priority of described residue E-Packets;
Indexing unit is used for satisfying when pre-conditioned when packet loss that described statistic unit statistics obtains, is the message marking that receives according to preset strategy.
7. message forwarding equipment as claimed in claim 6 is characterized in that,
Described indexing unit also is used for: the shared bandwidth of message that statistics receives; When the bandwidth that obtains when statistics surpasses the bandwidth of aggregated links of the high route priority of described residue, for the message that receives is stamped first mark;
Described transmitting element also is used for: will carry the aggregated links transmission of the message of described first mark by the high route priority of described residue, the message that will not carry described first mark sends by the link outside the aggregated links of the high route priority of described residue.
8. message forwarding equipment as claimed in claim 7, it is characterized in that, also comprise state set unit, be used for as the time that the state of the aggregated links of fault is set to static standby by enlivening active as the Member Link fault of the aggregated links of equal-cost route; When the Member Link that breaks down recovers just often, the state of the aggregated links of described fault is updated to active.
9. message forwarding equipment as claimed in claim 6, it is characterized in that, described indexing unit also is used for: issue polymerization CAR configuration speed limit on downlink port, stamp first mark for the message in the bandwidth range of the aggregated links of the high route priority of described residue that receives.
10. as claim 6 or 8 described message forwarding equipments, it is characterized in that, described indexing unit also is used for: when the link outside the aggregated links of the high route priority of described residue has different route priority, if the bandwidth that statistics obtains surpasses the bandwidth of the aggregated links of the high route priority of described residue, then the route priority according to the link outside the aggregated links of the high route priority of described residue is that the message that receives is stamped different marks;
Described transmitting element also is used for: the mark according to message is transmitted by carrying out message with the mark respective links.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010607402XA CN102035747A (en) | 2010-12-27 | 2010-12-27 | Method and device for forwarding message |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010607402XA CN102035747A (en) | 2010-12-27 | 2010-12-27 | Method and device for forwarding message |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102035747A true CN102035747A (en) | 2011-04-27 |
Family
ID=43888102
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010607402XA Pending CN102035747A (en) | 2010-12-27 | 2010-12-27 | Method and device for forwarding message |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102035747A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102347876A (en) * | 2011-09-30 | 2012-02-08 | 鞠洪尧 | Multilink aggregation control device for cloud computing network |
CN102447639A (en) * | 2012-01-17 | 2012-05-09 | 华为技术有限公司 | Strategy routing method and device |
CN102739518A (en) * | 2012-05-30 | 2012-10-17 | 杭州华三通信技术有限公司 | Flow load sharing method and equipment |
CN109362085A (en) * | 2011-05-23 | 2019-02-19 | 瑞典爱立信有限公司 | EPC is realized in cloud computer by OPENFLOW data plane |
CN109379297A (en) * | 2018-11-26 | 2019-02-22 | 锐捷网络股份有限公司 | A kind of method and apparatus for realizing flow load balance |
CN109792570A (en) * | 2017-02-11 | 2019-05-21 | 柏思科技有限公司 | Pass through the method and system of the tunnel group transport packet at network node |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050075232A (en) * | 2004-01-16 | 2005-07-20 | 삼성전자주식회사 | The apparatus for implementation of ecmp in network processor |
CN101110775A (en) * | 2007-07-06 | 2008-01-23 | 中兴通讯股份有限公司 | Method and system for dynamically regulating load distribution |
CN101610535A (en) * | 2009-07-30 | 2009-12-23 | 杭州华三通信技术有限公司 | Multilink direct continuous show scape guarantees the method, system and device of BFD conversation stability down |
-
2010
- 2010-12-27 CN CN201010607402XA patent/CN102035747A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050075232A (en) * | 2004-01-16 | 2005-07-20 | 삼성전자주식회사 | The apparatus for implementation of ecmp in network processor |
CN101110775A (en) * | 2007-07-06 | 2008-01-23 | 中兴通讯股份有限公司 | Method and system for dynamically regulating load distribution |
CN101610535A (en) * | 2009-07-30 | 2009-12-23 | 杭州华三通信技术有限公司 | Multilink direct continuous show scape guarantees the method, system and device of BFD conversation stability down |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109362085A (en) * | 2011-05-23 | 2019-02-19 | 瑞典爱立信有限公司 | EPC is realized in cloud computer by OPENFLOW data plane |
CN109362085B (en) * | 2011-05-23 | 2022-06-28 | 瑞典爱立信有限公司 | Implementing EPC in cloud computer through OPENFLOW data plane |
CN102347876A (en) * | 2011-09-30 | 2012-02-08 | 鞠洪尧 | Multilink aggregation control device for cloud computing network |
CN102347876B (en) * | 2011-09-30 | 2013-11-13 | 鞠洪尧 | Multilink aggregation control device for cloud computing network |
CN102447639A (en) * | 2012-01-17 | 2012-05-09 | 华为技术有限公司 | Strategy routing method and device |
CN102447639B (en) * | 2012-01-17 | 2016-03-09 | 华为技术有限公司 | A kind of policy routing method and device |
US9942138B2 (en) | 2012-01-17 | 2018-04-10 | Huawei Technologies Co., Ltd. | Method and device for policy based routing |
CN102739518A (en) * | 2012-05-30 | 2012-10-17 | 杭州华三通信技术有限公司 | Flow load sharing method and equipment |
CN102739518B (en) * | 2012-05-30 | 2015-12-09 | 杭州华三通信技术有限公司 | A kind of flow load sharing method and apparatus |
CN109792570A (en) * | 2017-02-11 | 2019-05-21 | 柏思科技有限公司 | Pass through the method and system of the tunnel group transport packet at network node |
US11799686B2 (en) | 2017-02-11 | 2023-10-24 | Pismo Labs Technology Limited | Methods and systems for transmitting information packets through tunnel groups at a network node |
CN109379297A (en) * | 2018-11-26 | 2019-02-22 | 锐捷网络股份有限公司 | A kind of method and apparatus for realizing flow load balance |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101019372B (en) | System and method for reporting out-of-resources (OOR) conditions in a data network | |
CN102263697B (en) | Method and device for sharing aggregated link traffic | |
US10135735B2 (en) | Method and system for managing flows in a network | |
CN103179046B (en) | Based on data center's flow control methods and the system of openflow | |
US9667570B2 (en) | Fabric extra traffic | |
US20070223372A1 (en) | Method and apparatus for preventing congestion in load-balancing networks | |
CN105897575A (en) | Path computing method based on multi-constrained path computing strategy under SDN | |
CN104836750B (en) | A kind of data center network stream scheduling method based on round-robin | |
CN102035747A (en) | Method and device for forwarding message | |
CN106533960A (en) | Data center network routing method based on Fat-Tree structure | |
CN101854284A (en) | The Loop Protection of dynamic assignment and the reservation of the bandwidth in the recovery technology re-use | |
CN102014075B (en) | Traffic policing method and device | |
CN103931145A (en) | Dynamic bandwidth adjustment in packet transport network | |
CN102185771A (en) | Dispatching method and system for data packet of sender in MPTCP (Multipath TCP (Transmission Control Protocol)) | |
WO2021244247A1 (en) | Data message forwarding method, network node, system, and storage medium | |
CN103716252A (en) | Flow-distribution link aggregation and device | |
US20110134830A1 (en) | Telecommunication network transmission divergence system and method | |
CN108337179A (en) | Link flow control method and device | |
CN102932268A (en) | Data packet transmitting method and device | |
CN101836196B (en) | Methods and systems for providing efficient provisioning of data flows | |
CN102082734A (en) | Service message transmission method and equipment | |
JP5083323B2 (en) | Communication device in label switching network | |
CN106921997A (en) | A kind of method and device for distributing transmission channel | |
CN107872385A (en) | A kind of SDN router-level topology and control method | |
CN104917677A (en) | Data stream forwarding control method and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20110427 |