CN102034157A - Priority analysis and selecting method of different energy-saving loss-reduction technologies for urban and rural distribution network - Google Patents

Priority analysis and selecting method of different energy-saving loss-reduction technologies for urban and rural distribution network Download PDF

Info

Publication number
CN102034157A
CN102034157A CN2010105962372A CN201010596237A CN102034157A CN 102034157 A CN102034157 A CN 102034157A CN 2010105962372 A CN2010105962372 A CN 2010105962372A CN 201010596237 A CN201010596237 A CN 201010596237A CN 102034157 A CN102034157 A CN 102034157A
Authority
CN
China
Prior art keywords
transformation
priority
reactive
technology
load compensation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010105962372A
Other languages
Chinese (zh)
Inventor
刘华勇
侯兴哲
李志勇
于跃
尹呼和
王靖韬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Electric Power Scientific Research Institute
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
Chongqing Electric Power Scientific Research Institute
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Electric Power Scientific Research Institute, China Electric Power Research Institute Co Ltd CEPRI filed Critical Chongqing Electric Power Scientific Research Institute
Priority to CN2010105962372A priority Critical patent/CN102034157A/en
Publication of CN102034157A publication Critical patent/CN102034157A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • Y02E40/76
    • Y04S10/545

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention provides a priority analysis and selecting method of different energy-saving loss-reduction technologies for urban and rural distribution network. According to the technical characteristics, the energy-saving loss-reduction technologies are classified into the following five categories: (1) reforming metering device and treating harmonic wave; (2) performing reactive power compensation for a distribution transformer, circuits and applying reactive power optimization configuration software; (3) applying an economical operation system of the distribution transformer; (4) reforming the distribution transformer, the distribution circuits and low-voltage circuits, and applying a single-phase distribution transformer and a circuits voltage regulator; (5) reforming the boosting of the distribution network and leading high voltage into a load center. According to technical characteristics of each category, including realization ways, the five categories are subject o the analysis of mutual influence and ranks the priorities, thus corresponding reforming technology can be selected according to the priority of each reforming technology during the reforming of different kinds of equipment, thereby reducing the energy-saving loss-reduction cost.

Description

The different saving energy and decreasing loss technology priority of a kind of town and country power distribution network level is analyzed and selecting method
Technical field
The present invention relates to electric system, different saving energy and decreasing loss technology priority level analyses of particularly a kind of town and country power distribution network and selecting method.
Background technology
Along with the propelling of intelligent grid construction and the primary energy that reduces day by day, the matter of utmost importance that the power distribution network saving energy and decreasing loss has become electric system to face.Saving energy and decreasing loss has become electric system to need the problem of solution badly.A lot of scholars are devoted to the saving energy and decreasing loss Study on Technology.Find that under study for action different saving energy and decreasing loss renovation techniques exists to intersect and conflicts in actual implementation process.For example, when a heavily loaded transformer being carried out the saving energy and decreasing loss transformation, owing to the reason that causes the transformer heavy duty may be because overload, also may be because transformer reactive-load compensation deficiency, if adopt reactive-load compensation to make transformer no longer heavily loaded, then do not need transformer is done transformation again, thereby saved substantial contribution, a kind of method of the optimization of capital that Here it is.Use substation transformer economical operation system simultaneously, also can solve the heavily loaded problem of transformer, but therefore its economic effect for the solution of transformation heavy duty problem, should at first consider reactive power compensation technology not as the reactive-load compensation transformation.
In this external real work, Utilities Electric Co. is when carrying out the power distribution network technological transformation, often lay particular stress on a certain local link, can't plan as a whole the optimization of comprehensive realization power distribution network technological transformation, and each technological transformation mode is lacked the research that becomes more meticulous, the selection of each modification measures is not had the planning of comprehensive pool.
Summary of the invention
Defective at above-mentioned art methods and existence thereof, purpose of the present invention aims to provide a kind of when being used for town and country power distribution network saving energy and decreasing losses and transforming, the interactional analytical approach of different saving energy and decreasing loss technology, and the prioritization method of selecting the saving energy and decreasing loss technology for distinct device for use.Based on the thought of prioritization, to different classes of element and scrap build the time, realize each technology improvement method is formulated its corresponding priority level order.Transform element select work the time at first consider the technological transformation model that priority is higher, descend successively, thereby solved the conflicting problem of technological transformation, realized the analysis that becomes more meticulous of modification measures, for the optimization of fund for technical innovation provides the foundation.Simultaneously, this also is the mode that each technology model is realized by software.
The foundation of this invention is at first energy-conservation impairment technology to be classified according to its technical characterstic, mainly comprises 5 classes: (1) measuring apparatus transformation, harmonic wave control; (2) substation transformer reactive-load compensation, circuit reactive-load compensation, application idle work optimization configuration software; (3) use substation transformer economical operation system; (4) improving distribution transformer, distribution line transformation, low-voltage circuit transformation, application single phase distribution transformer, application circuit pressure regulator; (5) electrical network boosting and transformation, high voltage are introduced load center.According to the technical characterstic of each classification, comprise its realization approach then, analyze its mutual influence, and it is carried out prioritization, thereby when different equipment is transformed, according to the priority of various renovation techniques, the corresponding transformation technology of selecting reduces the saving energy and decreasing loss cost.
For realizing that the technical scheme that the different saving energy and decreasing loss technology of above-mentioned town and country power distribution network adopt may further comprise the steps:
1) with the classification of modification measures
In order to realize the prioritization of modification measures, at first each renovation technique is sorted out, will adopt different processing modes to different technology models.Actual research work according to various places is summed up, and analyzes the enforcement of each renovation technique and relation each other thereof, and all technical modification measures are classified.
The first kind: measuring apparatus transformation, harmonic wave control.
Second class: substation transformer reactive-load compensation, circuit reactive-load compensation, application idle work optimization configuration software.
The 3rd class: use substation transformer economical operation system.
The 4th class: improving distribution transformer, distribution line transformation, low-voltage circuit transformation, application single phase distribution transformer, application circuit pressure regulator.
The 5th class: electrical network boosting and transformation, high voltage are introduced load center.
2) all kinds of modification measures are carried out prioritization
1. priority one: measuring apparatus transformation, harmonic wave control
The priority of measuring apparatus transformation and harmonic wave control is come most significant digit, be not these two Measures of technical to the damage work of falling of Utilities Electric Co. is most important, but because the decision of the singularity of its implementation.
There are different separately characteristics in these two Measures of technical, measuring apparatus is transformed multi-point and wide-ranging, harmonic wave control is primarily aimed at the user that some harmonic waves do not satisfy national standard, the technology model of these two modification measures carries out accurate analog computation and all has difficulties on software, therefore, can carry out manual intervention to it, earlier these two required inputs of modification measures be calculated, and in total transformation funds, deduct.The fund that surplus capital is used as other modification measures.
Manual intervention judgement (user decides in its sole discretion) is reserved a part of special fund and is carried out Measuring Reformation (pressing measuring apparatus and low-temperature measurement device in comprising) specially.The suggestion which measuring apparatus technology model provides should transform, how to transform, how guides user carries out this transformation.
According to GB GB/T14549-93 " quality of power supply utility network harmonic wave ", do not satisfy the power consumer of national standard for harmonic wave, Utilities Electric Co. must force it to carry out harmonic wave control.So this falls the damage measure is to fall to decrease one that modification scheme must comprise.Prioritization scheme is a target with the economy under the prerequisite that satisfies reliability and security, and therefore, the realization of harmonic wave control can judge whether this area needs to carry out harmonic wave control by user's manual intervention.
2. priority two: substation transformer reactive-load compensation, circuit reactive-load compensation, application idle work optimization configuration software.
In electric system, the defective and heavily loaded problem of a lot of voltages all causes owing to idle a large amount of transmission, if carried out rational reactive-load compensation, has transformed with regard to not needing to carry out element again.So the priority of the correlation model that reactive-load compensation is transformed should be higher than other element renovation techniques.
Substation transformer reactive-load compensation simultaneously, circuit reactive-load compensation, these three kinds of technology of application idle work optimization configuration software also are conflicting, if adopted the idle work optimization configuration software, then can directly use the analog result of software; If do not adopt the idle work optimization configuration software, then can realize idle optimization by substation transformer reactive-load compensation and circuit reactive-load compensation.
Because substation transformer reactive-load compensation, circuit reactive-load compensation, these three kinds of technology of application idle work optimization configuration software are conflicted mutually, therefore need carry out prioritization to these three kinds of technology, and are specific as follows:
Local priority one: use the reasonable disposition that the idle work optimization configuration software carries out reactive-load compensation.
Local priority two: substation transformer reactive power compensation technology
Local priority three: circuit reactive power compensation technology
The prioritization foundation:
Use the reasonable disposition that the idle work optimization configuration software carries out reactive-load compensation.Invest and fall the damage benefit and all can obtain by the Technological Economy model.If without the idle work optimization configuration software, idle configuration is optimized to network by substation transformer reactive-load compensation and circuit reactive-load compensation model Expert Rules in suggestion.According to relevant rules and guide rule, the reactive power source of electric system and load or burden without work, all should adopt branch (voltage) floor on the peak or during low ebb and divide () district principle in a basic balance to be configured and to move, and should have var regulating power and overhaul reserve flexibly.Simultaneously, principle according to idle in-situ balancing, should be in the configuration of reactive power compensator in the power distribution network based on the reactive-load compensation of substation transformer, also exist the built on stilts basic routing line of 10kV of power factor problem can take into account the reactive-load compensation of line road after the substation transformer reactive-load compensation.
3. priority level three: use substation transformer economical operation system
By the substation transformer economical operation, may solve the heavily loaded problem of part substation transformer, therefore, use substation transformer economical operation system priority and be higher than improving distribution transformer, and for the solution of heavily loaded problem, at first consider it is reactive-load compensation, the priority of therefore using substation transformer economical operation system is the 3rd.
4. priority level four: improving distribution transformer, distribution line transformation, low-voltage circuit transformation, application single phase distribution transformer, application circuit pressure regulator
Because such Technology Need transforms element, comprehensively its economic benefit and improvement cost, it is the 4th that damage measure priority falls in such technology, need enter the optimization flow process, satisfies the optimization that realizes economy under the prerequisite of security and reliability.
5. priority level five: electrical network boosting and transformation, high voltage are introduced load center
Adopt high voltage power transmission can reduce line loss, but need carry out boosting and transformation to existing line, its improvement cost height.Therefore the priority level of such technology is minimum.
When the power distribution network element being carried out the saving energy and decreasing loss transformation, need select the element of needs transformation according to expert's principle.Below be detailed introduction:
Expert's principle can be divided into mandatory criterion and non-imposed criterion two big classes by its character.The element that mandatory criterion is picked out requires mandatory the transformation, the optional transformation of the element that non-imposed criterion is picked out.
In criterion was implemented, mandatory criterion and non-imposed criterion will judge to the element in the electrical network simultaneously that element gathers element after selecting and finishing, and sorts out division by the character of its transformation.Specific to expert's principle of each model,, then implement according to the sequencing of model defined if the sequencing that criterion is implemented is stipulated.(annotate: these sequencings are not the orderings of carrying out according to mandatory or non-imposed character, but formulate according to the logicality that decision element is selected)
According to the difference of select element transformation character, select corresponding optimization flow process for use.
According to the research to the electrical network boosting and transformation, its transformation is on a grand scale, and transformation funds is huge, so the user need be in conjunction with local conditions, and fully feasibility study, and then make a strategic decision and whether adopt this modification scheme.The electrical network boosting and transformation model that the present invention sets up only provides the suggestion what situation is fit to carry out the electrical network boosting and transformation, and investment, benefit are provided some empirical datas, and is only for reference.
Simultaneously, it mainly is because newly-built transformer station of needs can not satisfy situation such as burden requirement time of transformer station that high voltage is introduced load center, its transformation scale is also very big, the fund of transforming is also huger, the user should fully prove according to the actual conditions of locality, and whether decision-making needs to adopt this measure then.The high voltage that the present invention sets up is introduced the load center model and is only provided this measure of suggestion employing under certain conditions, and its investment, benefit are provided empirical data.
Therefore, these two kinds of technology reforming schemes of electrical network boosting and transformation and high voltage introducing load center will not enter and fall the transformation and optimization scheme of decreasing.Can be used as an independent functional module uses for the user.The method that provides according to model, and in conjunction with local conditions, provide the user and whether be fit to carry out the electrical network boosting and transformation, high voltage is introduced the suggestion of load center.
The different saving energy and decreasing loss technology priority of town and country of the present invention power distribution network level is analyzed and selecting method, in the engineered process of the town and country of reality power distribution network saving energy and decreasing loss, the one, can avoid falling the repeated use of damage technology, the 2nd, can realize adopting minimum cost to realize the saving energy and decreasing loss transformation.For example, when to one because OL heavily loaded transformer carries out saving energy and decreasing loss when transforming, if adopt reactive-load compensation can make transformer no longer heavily loaded, then can avoid adopting mode that it is transformed to the transformer transformation, the former cost is greatly about several thousand yuan to several ten thousand yuan, and the latter's cost often surpasses 50,000 yuan, therefore as can be seen, adopt priority analysis, and select for use the saving energy and decreasing loss technology effectively to reduce cost.
Description of drawings
Fig. 1 is that the different saving energy and decreasing loss technology priority of town and country of the present invention power distribution network level is analyzed and the selecting method process flow diagram;
The present invention is further described below in conjunction with accompanying drawing.
Embodiment
As shown in Figure 1, be that the different saving energy and decreasing loss technology priority of town and country power distribution network level is analyzed and the selecting method process flow diagram.By to the enforcement of the different saving energy and decreasing loss technology of power distribution network and relation each other thereof, it is classified, different technology models is adopted different processing modes, simultaneously, importance or mandatory and non-imposed principle to each modification measures are analyzed, and realize the prioritization of modification measures.As follows in conjunction with the concrete implementation step of Fig. 1:
1) with the classification of modification measures
In order to realize the prioritization of modification measures, at first each renovation technique is sorted out, will adopt different processing modes to different technology models.Actual research work according to various places is summed up, and analyzes the enforcement of each renovation technique and relation each other thereof, and all technical modification measures are classified.
The first kind: measuring apparatus transformation, harmonic wave control.
Second class: substation transformer reactive-load compensation, circuit reactive-load compensation, application idle work optimization configuration software.
The 3rd class: use substation transformer economical operation system.
The 4th class: improving distribution transformer, distribution line transformation, low-voltage circuit transformation, application single phase distribution transformer, application circuit pressure regulator.
The 5th class: electrical network boosting and transformation, high voltage are introduced load center.
2) all kinds of modification measures are carried out prioritization
1. priority one: measuring apparatus transformation, harmonic wave control
The priority of measuring apparatus transformation and harmonic wave control is come most significant digit, be not these two Measures of technical to the damage work of falling of Utilities Electric Co. is most important, but because the decision of the singularity of its implementation.
There are different separately characteristics in these two Measures of technical, measuring apparatus is transformed multi-point and wide-ranging, harmonic wave control is primarily aimed at the user that some harmonic waves do not satisfy national standard, the technology model of these two modification measures carries out accurate analog computation and all has difficulties on software, therefore, can carry out manual intervention to it, earlier these two required inputs of modification measures be calculated, and in total transformation funds, deduct.The fund that surplus capital is used as other modification measures.
Manual intervention judgement (user decides in its sole discretion) is reserved a part of special fund and is carried out Measuring Reformation (pressing measuring apparatus and low-temperature measurement device in comprising) specially.The suggestion which measuring apparatus technology model provides should transform, how to transform, how guides user carries out this transformation.
According to GB GB/T14549-93 " quality of power supply utility network harmonic wave ", do not satisfy the power consumer of national standard for harmonic wave, Utilities Electric Co. must force it to carry out harmonic wave control.So this falls the damage measure is to fall to decrease one that modification scheme must comprise.Prioritization scheme is a target with the economy under the prerequisite that satisfies reliability and security, and therefore, the realization of harmonic wave control can judge whether this area needs to carry out harmonic wave control by user's manual intervention.
2. priority two: substation transformer reactive-load compensation, circuit reactive-load compensation, application idle work optimization configuration software.
In electric system, the defective and heavily loaded problem of a lot of voltages all causes owing to idle a large amount of transmission, if carried out rational reactive-load compensation, has transformed with regard to not needing to carry out element again.So the priority of the correlation model that reactive-load compensation is transformed should be higher than other element renovation techniques.
Substation transformer reactive-load compensation simultaneously, circuit reactive-load compensation, these three kinds of technology of application idle work optimization configuration software also are conflicting, if adopted the idle work optimization configuration software, then can directly use the analog result of software; If do not adopt the idle work optimization configuration software, then can realize idle optimization by substation transformer reactive-load compensation and circuit reactive-load compensation.
Because substation transformer reactive-load compensation, circuit reactive-load compensation, these three kinds of technology of application idle work optimization configuration software are conflicted mutually, therefore need carry out prioritization to these three kinds of technology, and are specific as follows:
Local priority one: use the reasonable disposition that the idle work optimization configuration software carries out reactive-load compensation.
Local priority two: substation transformer reactive power compensation technology
Local priority three: circuit reactive power compensation technology
The prioritization foundation:
Use the reasonable disposition that the idle work optimization configuration software carries out reactive-load compensation.Invest and fall the damage benefit and all can obtain by the Technological Economy model.If without the idle work optimization configuration software, idle configuration is optimized to network by substation transformer reactive-load compensation and circuit reactive-load compensation model Expert Rules in suggestion.According to relevant rules and guide rule, the reactive power source of electric system and load or burden without work, all should adopt branch (voltage) floor on the peak or during low ebb and divide () district principle in a basic balance to be configured and to move, and should have var regulating power and overhaul reserve flexibly.Simultaneously, principle according to idle in-situ balancing, should be in the configuration of reactive power compensator in the power distribution network based on the reactive-load compensation of substation transformer, also exist the built on stilts basic routing line of 10kV of power factor problem can take into account the reactive-load compensation of line road after the substation transformer reactive-load compensation.
3. priority level three: use substation transformer economical operation system
By the substation transformer economical operation, may solve the heavily loaded problem of part substation transformer, therefore, use substation transformer economical operation system priority and be higher than improving distribution transformer, and for the solution of heavily loaded problem, at first consider it is reactive-load compensation, the priority of therefore using substation transformer economical operation system is the 3rd.
4. priority level four: improving distribution transformer, distribution line transformation, low-voltage circuit transformation, application single phase distribution transformer, application circuit pressure regulator
Because such Technology Need transforms element, comprehensively its economic benefit and improvement cost, it is the 4th that damage measure priority falls in such technology, need enter the optimization flow process, satisfies the optimization that realizes economy under the prerequisite of security and reliability.
When the power distribution network element being carried out the saving energy and decreasing loss transformation, need select the element of needs transformation according to expert's principle.Below be detailed introduction:
Expert's principle can be divided into mandatory criterion and non-imposed criterion two big classes by its character.The element that mandatory criterion is picked out requires mandatory the transformation, the optional transformation of the element that non-imposed criterion is picked out.
In criterion was implemented, mandatory criterion and non-imposed criterion will judge to the element in the electrical network simultaneously that element gathers element after selecting and finishing, and sorts out division by the character of its transformation.Specific to expert's principle of each model,, then implement according to the sequencing of model defined if the sequencing that criterion is implemented is stipulated.(annotate: these sequencings are not the orderings of carrying out according to mandatory or non-imposed character, but formulate according to the logicality that decision element is selected)
According to the difference of select element transformation character, select corresponding optimization flow process for use.
5. priority level five: electrical network boosting and transformation, high voltage are introduced load center
Adopt high voltage power transmission can reduce line loss, but need carry out boosting and transformation to existing line, its improvement cost height.Therefore the priority level of such technology is minimum.
According to the research to the electrical network boosting and transformation, its transformation is on a grand scale, and transformation funds is huge, so the user need be in conjunction with local conditions, and fully feasibility study, and then make a strategic decision and whether adopt this modification scheme.The electrical network boosting and transformation model that the present invention sets up only provides the suggestion what situation is fit to carry out the electrical network boosting and transformation, and investment, benefit are provided some empirical datas, and is only for reference.
Simultaneously, it mainly is because newly-built transformer station of needs can not satisfy situation such as burden requirement time of transformer station that high voltage is introduced load center, its transformation scale is also very big, the fund of transforming is also huger, the user should fully prove according to the actual conditions of locality, and whether decision-making needs to adopt this measure then.The high voltage that the present invention sets up is introduced the load center model and is only provided this measure of suggestion employing under certain conditions, and its investment, benefit are provided empirical data.
Therefore, these two kinds of technology reforming schemes of electrical network boosting and transformation and high voltage introducing load center will not enter and fall the transformation and optimization scheme of decreasing.Can be used as an independent functional module uses for the user.The method that provides according to model, and in conjunction with local conditions, provide the user and whether be fit to carry out the electrical network boosting and transformation, high voltage is introduced the suggestion of load center.
Invention has been described according to specific exemplary embodiment herein.It will be conspicuous carrying out suitable replacement to one skilled in the art or revise under not departing from the scope of the present invention.Exemplary embodiment only is illustrative, rather than to the restriction of scope of the present invention, scope of the present invention is by appended claim definition.

Claims (2)

1. the different saving energy and decreasing loss technology priority of a town and country power distribution network level is analyzed and selecting method, it is characterized in that may further comprise the steps:
1), sum up, analyze the enforcement of various renovation techniques and relation each other thereof, the technical modification measures of power distribution network saving energy and decreasing loss be classified as follows according to the actual research work of various places:
The first kind: measuring apparatus transformation, harmonic wave control;
Second class: substation transformer reactive-load compensation, circuit reactive-load compensation, application idle work optimization configuration software;
The 3rd class: use substation transformer economical operation system;
The 4th class: improving distribution transformer, distribution line transformation, low-voltage circuit transformation, application single phase distribution transformer, application circuit pressure regulator;
The 5th class: electrical network boosting and transformation, high voltage are introduced load center;
2), the characteristics according to various saving energy and decreasing loss technology, cost and economic benefit, various saving energy and decreasing loss technology are carried out prioritization, the power distribution network technology is being carried out saving energy and decreasing loss when transforming, select various technology for use according to the priority of various technology:
1. priority one: measuring apparatus transformation, harmonic wave control
The priority of measuring apparatus transformation and harmonic wave control is come most significant digit;
There are different separately characteristics in these two Measures of technical, measuring apparatus is transformed multi-point and wide-ranging, harmonic wave control does not satisfy the user of national standard at some harmonic waves, earlier these two required inputs of modification measures are calculated, and in total transformation funds, deduct the fund that surplus capital is used as other modification measures;
Manual intervention judges that reserving a part of special fund carries out Measuring Reformation specially, how the hints and tips user which measuring apparatus technology model provides should transform, how to transform carries out this transformation, presses measuring apparatus and low-temperature measurement device during described Measuring Reformation comprises;
According to GB GB/T14549-93 " quality of power supply utility network harmonic wave ", do not satisfy the power consumer of national standard for harmonic wave, Utilities Electric Co. must force it to carry out harmonic wave control, prioritization scheme is a target with the economy under the prerequisite that satisfies reliability and security, and the realization of harmonic wave control can judge whether this area needs to carry out harmonic wave control by user's manual intervention;
2. priority two: substation transformer reactive-load compensation, circuit reactive-load compensation, application idle work optimization configuration software;
In electric system, the priority of the correlation model that reactive-load compensation is transformed should be higher than other element renovation techniques;
Substation transformer reactive-load compensation simultaneously, circuit reactive-load compensation, these three kinds of technology of application idle work optimization configuration software are conflicting, if adopted the idle work optimization configuration software, then can directly use the analog result of software; If do not adopt the idle work optimization configuration software, then can realize idle optimization by substation transformer reactive-load compensation and circuit reactive-load compensation;
Because substation transformer reactive-load compensation, circuit reactive-load compensation, these three kinds of technology of application idle work optimization configuration software are conflicted mutually, therefore need carry out prioritization to these three kinds of technology, and are specific as follows:
Local priority one: use the reasonable disposition that the idle work optimization configuration software carries out reactive-load compensation;
Local priority two: substation transformer reactive power compensation technology;
Local priority three: circuit reactive power compensation technology;
3. priority level three: use substation transformer economical operation system
By the substation transformer economical operation, can solve the heavily loaded problem of part substation transformer, therefore, use substation transformer economical operation system priority and be higher than improving distribution transformer, and for the solution of heavily loaded problem, at first consider it is reactive-load compensation, the priority of therefore using substation transformer economical operation system is the 3rd;
4. priority level four: improving distribution transformer, distribution line transformation, low-voltage circuit transformation, application single phase distribution transformer, application circuit pressure regulator
Because such Technology Need transforms element, comprehensively its economic benefit and improvement cost, it is the 4th that damage measure priority falls in such technology, need enter the optimization flow process, satisfies the optimization that realizes economy under the prerequisite of security and reliability;
5. priority level five: electrical network boosting and transformation, high voltage are introduced load center
Adopt high voltage power transmission can reduce line loss, need carry out boosting and transformation existing line, its improvement cost height, so the priority level of such technology is minimum;
2. the method for claim 1 is characterized in that when the power distribution network element being carried out the saving energy and decreasing loss transformation, need select the element of needs transformation according to expert's principle, comprise following content:
Expert's principle can be divided into mandatory criterion and non-imposed criterion two big classes by its character, and the element that mandatory criterion is picked out requires mandatory the transformation, the optional transformation of the element that non-imposed criterion is picked out;
In criterion was implemented, mandatory criterion and non-imposed criterion will judge to the element in the electrical network simultaneously that element gathers element after selecting and finishing, and sorts out division by the character of its transformation; Specific to expert's principle of each model,, then implement according to the sequencing of model defined if the sequencing that criterion is implemented is stipulated;
According to the difference of select element transformation character, select corresponding optimization flow process for use.
CN2010105962372A 2010-12-20 2010-12-20 Priority analysis and selecting method of different energy-saving loss-reduction technologies for urban and rural distribution network Pending CN102034157A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105962372A CN102034157A (en) 2010-12-20 2010-12-20 Priority analysis and selecting method of different energy-saving loss-reduction technologies for urban and rural distribution network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105962372A CN102034157A (en) 2010-12-20 2010-12-20 Priority analysis and selecting method of different energy-saving loss-reduction technologies for urban and rural distribution network

Publications (1)

Publication Number Publication Date
CN102034157A true CN102034157A (en) 2011-04-27

Family

ID=43887014

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105962372A Pending CN102034157A (en) 2010-12-20 2010-12-20 Priority analysis and selecting method of different energy-saving loss-reduction technologies for urban and rural distribution network

Country Status (1)

Country Link
CN (1) CN102034157A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103018584A (en) * 2012-11-05 2013-04-03 中国电力科学研究院 Measuring and verifying method for electric power and electric quantity conservation of electric power boost reconstruction
CN106709667A (en) * 2017-01-06 2017-05-24 国网节能服务有限公司 Distribution line energy saving reconstruction measurement selection method
CN107453369A (en) * 2017-07-05 2017-12-08 北京天泰怡和科技有限公司 Intelligent distribution network optimization economize on electricity drop damage system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
葛江北; 黄伟; 杨丽娟; 魏志莲; 李乐; 牛铭: "基于优先级排序的配电变压器改造措施分析", 《陕西电力》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103018584A (en) * 2012-11-05 2013-04-03 中国电力科学研究院 Measuring and verifying method for electric power and electric quantity conservation of electric power boost reconstruction
CN103018584B (en) * 2012-11-05 2015-04-01 中国电力科学研究院 Measuring and verifying method for electric power and electric quantity conservation of electric power boost reconstruction
CN106709667A (en) * 2017-01-06 2017-05-24 国网节能服务有限公司 Distribution line energy saving reconstruction measurement selection method
CN107453369A (en) * 2017-07-05 2017-12-08 北京天泰怡和科技有限公司 Intelligent distribution network optimization economize on electricity drop damage system
CN107453369B (en) * 2017-07-05 2020-09-01 北京天泰怡和科技有限公司 Intelligent power distribution network optimization power saving and loss reduction system

Similar Documents

Publication Publication Date Title
Yuan et al. Smart grids in China
CN107038530A (en) A kind of power distribution network overall planning method and system
CN109409770A (en) A kind of rural power grids level of intelligence evaluation method neural network based
CN108520362A (en) A kind of integrated evaluating method of rural area intelligent grid level
CN105426994A (en) Optimization selection method of power distribution network alternative construction projects
CN108280599B (en) Agricultural distribution network input-output evaluation method based on public service value model
CN110739706A (en) Industrial park power distribution network dispatching system and power quality compensation equipment coordination control method
CN103326348A (en) System for improving local electric network power supply ability analysis and providing entire process online monitoring
CN103390253A (en) Evaluation method for increment energy efficiency of power grid energy conservation and loss reduction
CN109390953A (en) Low-voltage network reactive voltage control method for coordinating and system containing distributed generation resource and electric car
CN101609989A (en) A kind of system for calculating power supply abundance of urban power network
CN106410817A (en) Negative sequence, reactive power and voltage fluctuation comprehensive optimization compensation method for tractive power supply system
CN105140933A (en) 110kV transformer-substation multi-dimension variable-parameter calculation reactive power compensation configuration method
CN104036074B (en) Low voltage discrimination method for distribution substation regions
CN106557992A (en) Operation control line loss analysis method based on multifactor impact
CN105678641A (en) Energy-saving data processing method and device for power distribution network
Liao et al. Local utilization of wind electricity in isolated power systems by employing coordinated control scheme of industrial energy-intensive load
CN108364238A (en) A kind of diversified powering mode selection method based on power supply area grade classification
CN102034157A (en) Priority analysis and selecting method of different energy-saving loss-reduction technologies for urban and rural distribution network
EP2545487A2 (en) Efficient security-constrained optimal power flow (sc opf) analysis using convexification of continuos variable constraints within a bi-level decomposition scheme
Keramati et al. Determining optimal location and size of PEV fast-charging stations in coupled transportation and power distribution networks considering power loss and traffic congestion
CN104992246A (en) Improved-least-square-method-based prediction method of load electric quantity for transformer substation
CN107491896A (en) A kind of computational methods of the effective energy-saving potential of wall scroll distribution line
Balijepalli et al. A holistic approach for transmission system expansion planning studies: An Indian experience
CN201417948Y (en) Distribution network status and operating mode optimizing system based on DSCADA system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110427