CN102033197A - Direct current (DC) converter valve non-periodic triggering test method using improved time delay method - Google Patents

Direct current (DC) converter valve non-periodic triggering test method using improved time delay method Download PDF

Info

Publication number
CN102033197A
CN102033197A CN2010105172985A CN201010517298A CN102033197A CN 102033197 A CN102033197 A CN 102033197A CN 2010105172985 A CN2010105172985 A CN 2010105172985A CN 201010517298 A CN201010517298 A CN 201010517298A CN 102033197 A CN102033197 A CN 102033197A
Authority
CN
China
Prior art keywords
test
independent delay
delay device
time
independent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010105172985A
Other languages
Chinese (zh)
Other versions
CN102033197B (en
Inventor
李跃
王秀环
周军川
孙立波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Electric Power Research Institute Co Ltd CEPRI filed Critical China Electric Power Research Institute Co Ltd CEPRI
Priority to CN201010517298.5A priority Critical patent/CN102033197B/en
Publication of CN102033197A publication Critical patent/CN102033197A/en
Application granted granted Critical
Publication of CN102033197B publication Critical patent/CN102033197B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Relating To Insulation (AREA)
  • Testing Of Individual Semiconductor Devices (AREA)

Abstract

The invention relates to a direct current (DC) converter valve non-periodic triggering test method using an improved time delay method. The method comprises the following steps: selecting an independent delay timer, and placing the independent delay timer in a shielding device; adjusting parameters of a surge generator; supplementing energy to a pole plate of a converter valve, and simultaneously charging the surge generator; surging to trigger ignition, connecting the triggered electric signals of the surge generator to the independent delay timer by an electric/optic conversion-optical fiber-optic/electric conversion device, and using the signals as input signals of the independent delay timer; and when the surge voltage reaches a peak value, triggering a valve to be tested to be switched on. By placing the independent delay timer in the shielding chamber, the technical scheme provided by the invention can ensure the safety of personnel and decrease the number of times for going into/out of the test area, improves the working efficiency and effectively solves the problems of poor on-site time delay interference rejection and inaccurate time delay.

Description

A kind of DC converter valve of application enhancements time-delay method triggers test method non-periodic
Technical field
Trigger test method the non-periodic that the present invention relates to a kind of field of power electronics, and the DC converter valve that specifically relates to a kind of application enhancements time-delay method triggers test method non-periodic.
Background technology
Along with the fast development of UHV (ultra-high voltage) and extra-high voltage direct-current transmission engineering construction, the development requirement of high voltage direct current converter valve Study on testing method and test unit strengthens day by day.The ability of thyristor and auxiliary circuit withstand voltage current stress when the fundamental purpose that triggers single valve non-periodic test is checking thyristor is opened under maximum working voltage and non-periodic stress condition.The critical problem of this test is that thyristor valve is conducting when surge voltage reaches maximal value, could carry out the harshest test to valve, if ON time mistake, then test failure.So delay time is vital with stablizing for test accurately, and in test, because the voltage height, electric current is very big, electromagnetic interference (EMI) is very serious in the test loop, and the problem that solves the chronotron poor anti jamming capability has become the key point and the difficult point of test.
Existing chronotron using method is that chronotron is placed in the impact body control box, and control box has function of shielding and ground connection, with the input as chronotron of the trigger pip of impact body.All kinds of corrupt practices creep in to use this kind time-delay method, as when time-delay being set or searching problem, need enter the test block, need safety practice and enter the test block, frequently entering the test block has increased the unnecessary time, and needs sometimes to cooperate surge voltage to search problem, and danger is bigger; When surge voltage raises, time-delay mechanism antijamming capability variation, time-delay is unstable, and voltage is high more, and stability is poor more, causes test failure, and test can't be proceeded.
Summary of the invention
The object of the present invention is to provide a kind of DC converter valve of application enhancements time-delay method to trigger test method non-periodic, use this method can guarantee personnel's the safety and the time of minimizing discrepancy test block, increase work efficiency, and effectively solved delay time on the spot poor anti jamming capability and the coarse problem of time-delay.
The DC converter valve of application enhancements time-delay method provided by the invention triggers test method non-periodic, and its improvements are, said method comprising the steps of:
A, select the independent delay device for use, the independent delay device is positioned in the shielding device;
B, adjustment surge generator parameter;
C, give converter valve gate pole plate complementary energy, charge to surge generator in the time of complementary energy;
D, impact trigger igniting, and surge generator is triggered electric signal by electric light conversion-optical fiber-photoelectric conversion device, are connected to the independent delay device, as the input signal of independent delay device;
The conducting that when surge voltage reaches peak value, is triggered of E, test product valve.
In a kind of optimal technical scheme provided by the invention: before on-test, independent delay device 1 is positioned in the screened room 2, it is 250us that independent delay device 1 delay value is set, and need not enter the test block;
Among the described step B, adjust surge generator D parameter and comprise wave front resistance R2, wave rear resistance R 1 and the harmonic inductance L of regulating impulse voltage generator D, make test product valve Vt 250us (± 5us) two ends reach voltage peak;
Among the described step C, during on-test, give converter valve gate pole plate complementary energy, killer switch one S1 and killer switch two S2 disconnect during complementary energy, at this moment protective resistance R3 branch road ground connection, test product valve Vt and complementary energy power supply T1 serial connection are given surge generator D charging in the time of complementary energy;
Among the described step D, impact and trigger igniting, and surge generator D triggered electric signal by electric light conversion-optical fiber-photoelectric conversion device, at this moment electrical signal conversion is a light signal, utilize optical fiber 3 transmission, convert light signal to electric signal again, be connected to independent delay device 1, as the input signal of independent delay device 1;
In the described step e, through 250us, surge voltage reaches voltage peak, simultaneously independent delay device 1 output signal to VBE, VBE sends trigger pip for test product valve Vt, the test product valve Vt conducting that is triggered.
In the another kind of optimal technical scheme provided by the invention: described independent delay device 1 delay value was determined by the operating impulse voltage wave head time, the blasting operation ripple reference waveform wave head time is 250us (± 20%), by adjusting surge generator D parameter, the fixing operation wave-wave head time be 250us (± 5us), independent delay device 1 delay time is 250us.
Compared with prior art, the beneficial effect of technical scheme provided by the invention is:
The DC converter valve of application enhancements time-delay method provided by the invention triggers test method non-periodic, and the independent delay device is put in the screened room, and control is convenient, saves time, and is safe and reliable; Technical scheme provided by the invention is a light signal with electrical signal conversion, utilizes Optical Fiber Transmission, sends in the screened room, convert light signal to electric signal again,, effectively shielded the electromagnetic interference (EMI) in the test as the input signal of chronotron, antijamming capability is strengthened, and increases the reliability of test; Chronotron can carry out the time-delay of delicate level accurately, makes the success of the test rate reach 100%.
Description of drawings
Fig. 1 is that the independent delay device triggers using method schematic diagram in the test in non-periodic.
Embodiment
The present invention is described in further detail with concrete technical scheme below in conjunction with accompanying drawing.
Be that the independent delay device triggers using method schematic diagram in the test in non-periodic as shown in Figure 1, comprise independent delay device 1, screened room 2, optical fiber 3, VBE, impulse voltage generator D, harmonic inductance L, complementary energy capacitor C 2, protective resistance R3, current-limiting resistance R4, RC divider 4, killer switch one S1 and killer switch two S2, complementary energy power supply T1 and test product valve Vt.Surge generator D comprises wave rear resistance R 1, wave front resistance R2, body capacitor C 1 and ignition pill crack 5, body capacitor C 1 and the output of wave rear resistance R 1 one end ground connection, body capacitor C 1 is connected with wave front resistance by ignition pill crack 5, wave rear resistance R 1 is exported at wave front resistance R2 one end with after wave front resistance R2 is connected.RC divider 4 comprises resistance R 5, capacitor C 3 and the C4 of series connection successively; Current-limiting resistance R4 and 2 series connection of complementary energy capacitor C; Surge generator D, RC divider 4, current-limiting resistance R4-complementary energy capacitor C 2 branch roads back in parallel successively ground connection; When killer switch S1 and S2 disconnect, complementary energy power supply T1, test product valve Vt and protective resistance R3 series connection ground connection; When killer switch S1 and S2 are closed; complementary energy power supply T1 is by killer switch S2 ground connection; test product valve Vt, protective resistance R3 is by killer switch S1 and current-limiting resistance R4-complementary energy capacitor C 2 branch roads and RC divider 4 backs in parallel and harmonic inductance L series connection impulse voltage generator D.
Before on-test, independent delay device 1 is positioned in the screened room 2, it is 250us that independent delay device 1 delay value is set, and need not enter the test block; Adjust surge generator D parameter and comprise wave front resistance R2, wave rear resistance R 1 and the harmonic inductance L of regulating impulse voltage generator D, make test product valve Vt 250us (± 5us) two ends reach voltage peak.
During on-test, give converter valve gate pole plate complementary energy, killer switch one S1 and killer switch two S2 disconnect during complementary energy, protective resistance R3 branch road ground connection at this moment, and test product valve Vt and complementary energy power supply T1 serial connection are given surge generator D charging in the time of complementary energy; After complementary energy is finished, close circuit breaker switch one S1 and killer switch two S2, impact and trigger igniting, and surge generator D triggered electric signal by electric light conversion-optical fiber-photoelectric conversion device, at this moment electrical signal conversion is a light signal, utilizes optical fiber 3 transmission, converts light signal to electric signal again, be connected to independent delay device 1, as the input signal of independent delay device 1; Through 250us, surge voltage reaches voltage peak, simultaneously independent delay device 1 output signal to VBE, VBE sends trigger pip for test product valve Vt, the test product valve Vt conducting that is triggered.
Independent delay device 1 delay value was determined by the operating impulse voltage wave head time, because the blasting operation ripple reference waveform wave head time is 250us (± 20%), by adjusting surge generator D parameter, the fixing operation wave-wave head time be 250us (± 5us), so independent delay device 1 delay time is 250us, reach test objective, finished test, made the success of the test rate reach 100%.
Surge generator D produces the blasting operation voltage waveform, to 2 chargings of complementary energy capacitor C, when surge voltage reaches maximal value, complementary energy capacitor C 2 charging voltages are the highest, trigger test product valve Vt conducting this moment, complementary energy capacitor C 2 discharges big electric current and flows through test product valve Vt, thereby the ability of test test product valve Vt withstand voltage electric current, and the moment of triggering the valve conducting in this process is most important, triggering ignition signal with surge generator D is independent delay device 1 input signal, and independent delay device 1 delay time is by the wave head time decision of operating impulse voltage.
The advantage that the DC converter valve of application enhancements time-delay method provided by the invention triggers test method non-periodic is:
1, the independent delay device is put in the screened room, and control is convenient, saves time, and is safe and reliable.
2, antijamming capability is strong, and technical scheme provided by the invention is a light signal with electrical signal conversion, utilizes Optical Fiber Transmission, convert light signal to electric signal again, send into the independent delay device time-delay in the screened room then, effectively shielded the electromagnetic interference (EMI) in the test, increased the reliability of test.
3, the time-delay of independent delay device is precisely tested time-delay in delicate level, and chronotron can be delayed time accurately, makes the success of the test rate reach 100%.
Should be noted that at last: illustrate that in conjunction with the foregoing description technical scheme of the present invention is not intended to limit.Those of ordinary skill in the field are to be understood that: those skilled in the art can make amendment or are equal to replacement the specific embodiment of the present invention, but these modifications or change are all among the claim protection domain that application is awaited the reply.

Claims (3)

1. the DC converter valve of an application enhancements time-delay method triggers test method non-periodic, it is characterized in that said method comprising the steps of:
A, select the independent delay device for use, the independent delay device is positioned in the shielding device;
B, adjustment surge generator parameter;
C, give converter valve gate pole plate complementary energy, charge to surge generator in the time of complementary energy;
D, impact trigger igniting, and surge generator is triggered electric signal by electric light conversion-optical fiber-photoelectric conversion device, are connected to the independent delay device, as the input signal of independent delay device;
The conducting that when surge voltage reaches peak value, is triggered of E, test product valve.
2. the DC converter valve of a kind of application enhancements time-delay method as claimed in claim 1 triggers test method non-periodic, it is characterized in that: before on-test, independent delay device (1) is positioned in the screened room (2), and it is 250us that independent delay device (1) delay value is set, and need not enter the test block;
Among the described step B, adjust surge generator (D) parameter and comprise wave front resistance (R2), wave rear resistance (R1) and the harmonic inductance (L) of regulating impulse voltage generator (D), make test product valve (Vt) 250us (± 5us) two ends reach voltage peak;
Among the described step C, during on-test, give converter valve gate pole plate complementary energy, killer switch one (S1) and killer switch two (S2) all disconnect during complementary energy, at this moment protective resistance (R3) branch road ground connection, test product valve (Vt) and complementary energy power supply (T1) serial connection are given surge generator (D) charging in the time of complementary energy;
Among the described step D, impact and trigger igniting, and surge generator (D) triggered electric signal by electric light conversion-optical fiber-photoelectric conversion device, at this moment electrical signal conversion is a light signal, utilize optical fiber (3) transmission, convert light signal to electric signal again, be connected to independent delay device (1), as the input signal of independent delay device (1);
In the described step e, through 250us, surge voltage reaches voltage peak, simultaneously independent delay device (1) output signal to VBE, VBE sends trigger pip for test product valve (Vt), test product valve (Vt) conducting that is triggered.
3. the DC converter valve of a kind of application enhancements time-delay method as claimed in claim 2 triggers test method non-periodic, it is characterized in that: described independent delay device (1) delay value was determined by the operating impulse voltage wave head time, the blasting operation ripple reference waveform wave head time is 250us (± 20%), by adjusting surge generator (D) parameter, the fixing operation wave-wave head time be 250us (± 5us), independent delay device (1) delay time is 250us.
CN201010517298.5A 2010-10-18 2010-10-18 Direct current (DC) converter valve non-periodic triggering test method using improved time delay method Active CN102033197B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010517298.5A CN102033197B (en) 2010-10-18 2010-10-18 Direct current (DC) converter valve non-periodic triggering test method using improved time delay method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010517298.5A CN102033197B (en) 2010-10-18 2010-10-18 Direct current (DC) converter valve non-periodic triggering test method using improved time delay method

Publications (2)

Publication Number Publication Date
CN102033197A true CN102033197A (en) 2011-04-27
CN102033197B CN102033197B (en) 2014-04-23

Family

ID=43886348

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010517298.5A Active CN102033197B (en) 2010-10-18 2010-10-18 Direct current (DC) converter valve non-periodic triggering test method using improved time delay method

Country Status (1)

Country Link
CN (1) CN102033197B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102486516A (en) * 2010-12-01 2012-06-06 中国电力科学研究院 Nonperiodic trigger test method for direct current converter valve
CN103033725A (en) * 2012-12-04 2013-04-10 国网智能电网研究院 Impact voltage applying time control system and method thereof
CN103048601A (en) * 2012-12-13 2013-04-17 国网智能电网研究院 Testing method and device for non-periodically triggering parallel capacitors by thyristor
CN103048602A (en) * 2012-12-13 2013-04-17 国网智能电网研究院 Turn-on characteristic testing apparatus of large power semiconductor device
CN103675660A (en) * 2013-11-27 2014-03-26 中国西电电气股份有限公司 Extra-high-voltage converter valve recovery period transient forward voltage test loop and test method thereof
CN107294519A (en) * 2017-05-08 2017-10-24 南京南瑞继保电气有限公司 The method and device of signal distribution processor
CN107957536A (en) * 2017-10-16 2018-04-24 许继电气股份有限公司 Sychronisation and pilot system are tested in a kind of aperiodic triggering of direct-current transmission converter valve

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5432366A (en) * 1977-08-16 1979-03-09 Danfoss As Limit value monitor for ac signal
US5386542A (en) * 1991-10-31 1995-01-31 International Business Machines Corporation System for generating a time reference value in the MAC layer of an ISO/OSI communications model among a plurality of nodes
CN201096849Y (en) * 2007-09-18 2008-08-06 中国电力科学研究院 A high level voltage measuring system for high-voltage DC transmission conversion valve
CN101800482A (en) * 2010-02-11 2010-08-11 株洲南车时代电气股份有限公司 Dephasing superpower thyristor pulse trigger

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5432366A (en) * 1977-08-16 1979-03-09 Danfoss As Limit value monitor for ac signal
US5386542A (en) * 1991-10-31 1995-01-31 International Business Machines Corporation System for generating a time reference value in the MAC layer of an ISO/OSI communications model among a plurality of nodes
CN201096849Y (en) * 2007-09-18 2008-08-06 中国电力科学研究院 A high level voltage measuring system for high-voltage DC transmission conversion valve
CN101800482A (en) * 2010-02-11 2010-08-11 株洲南车时代电气股份有限公司 Dephasing superpower thyristor pulse trigger

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102486516A (en) * 2010-12-01 2012-06-06 中国电力科学研究院 Nonperiodic trigger test method for direct current converter valve
CN103033725A (en) * 2012-12-04 2013-04-10 国网智能电网研究院 Impact voltage applying time control system and method thereof
CN103033725B (en) * 2012-12-04 2015-04-29 国网智能电网研究院 Impact voltage applying time control system and method thereof
CN103048601A (en) * 2012-12-13 2013-04-17 国网智能电网研究院 Testing method and device for non-periodically triggering parallel capacitors by thyristor
CN103048602A (en) * 2012-12-13 2013-04-17 国网智能电网研究院 Turn-on characteristic testing apparatus of large power semiconductor device
CN103048601B (en) * 2012-12-13 2015-06-10 国网智能电网研究院 Testing method and device for non-periodically triggering parallel capacitors by thyristor
CN103675660A (en) * 2013-11-27 2014-03-26 中国西电电气股份有限公司 Extra-high-voltage converter valve recovery period transient forward voltage test loop and test method thereof
CN103675660B (en) * 2013-11-27 2016-04-06 中国西电电气股份有限公司 Extra-high-voltage converter valve recovery period transient forward voltage test loop and test method thereof
CN107294519A (en) * 2017-05-08 2017-10-24 南京南瑞继保电气有限公司 The method and device of signal distribution processor
CN107294519B (en) * 2017-05-08 2020-12-18 南京南瑞继保电气有限公司 Signal distribution processing method and device
CN107957536A (en) * 2017-10-16 2018-04-24 许继电气股份有限公司 Sychronisation and pilot system are tested in a kind of aperiodic triggering of direct-current transmission converter valve
CN107957536B (en) * 2017-10-16 2019-12-10 许继电气股份有限公司 Non-periodic trigger test synchronization device and non-periodic trigger test system for direct-current transmission converter valve

Also Published As

Publication number Publication date
CN102033197B (en) 2014-04-23

Similar Documents

Publication Publication Date Title
CN102033197B (en) Direct current (DC) converter valve non-periodic triggering test method using improved time delay method
CN103944355B (en) A kind of constant-current switch power source based on CS short-circuit protection circuit
CN110161405B (en) Three-power-supply direct-current on-off synthesis test loop and test method thereof
CN106526476B (en) Synchronous control device and method for power frequency follow current interruption capability test synthesis loop
Dong et al. The 100-kJ modular pulsed power units for railgun
CN105911463A (en) DC current-limiting breaker high-voltage heavy-current pulse impact test platform
CN109031106B (en) Hybrid direct current breaker breaking test device
CN107271866B (en) Test device and method for direct effect of quadruple continuous time sequence lightning stroke
CN109254182A (en) The current limiting protecting method of power device dynamic test
CN104772209A (en) Light-operated monopulse triggering system used for polysilicon crushing device
CN105891563A (en) High-altitude nuclear explosion electromagnetic pulse standard signal analog device
CN206460145U (en) A kind of power frequency continued flow breaking capacity test synthesis loop sync control device
CN103595289A (en) Multi-pulse high-voltage triggering device of rotary switch
CN106877469B (en) The LC resonance charging circuit of base feedback control when a kind of
CN103346567A (en) Shunt active power filter
CN107271846B (en) Device and method for testing lightning stroke effect of optical fiber composite overhead ground wire under initiation of square wave current wave
CN107271865B (en) Triple continuous time sequence lightning stroke effect test device and method for optical fiber composite overhead ground wire
CN104374962A (en) 10/1,000-microsecond lightning surge generator
CN203164242U (en) Current waveform generation device
CN101478259B (en) Square wave CROWBAR pulse current system
CN207460120U (en) Two-stage discharge fast pulse generator
CN203813428U (en) Detonation device of 110kV voltage-class short circuit current limiter
CN107179501B (en) Single-phase breaker break-brake heavy-duty breakdown simulation experiment device
CN109655744A (en) A kind of dc circuit breaker test voltage generative circuit and generation method
CN208623563U (en) A kind of square-wave voltage source being isolated using high-voltage relay

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20130716

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20130716

Address after: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15

Applicant after: China Electric Power Research Institute

Applicant after: State Grid Corporation of China

Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15

Applicant before: China Electric Power Research Institute

C14 Grant of patent or utility model
GR01 Patent grant