CN102031752B - All-welded integral node - Google Patents

All-welded integral node Download PDF

Info

Publication number
CN102031752B
CN102031752B CN2010106180419A CN201010618041A CN102031752B CN 102031752 B CN102031752 B CN 102031752B CN 2010106180419 A CN2010106180419 A CN 2010106180419A CN 201010618041 A CN201010618041 A CN 201010618041A CN 102031752 B CN102031752 B CN 102031752B
Authority
CN
China
Prior art keywords
plate
internal partition
node
upper flat
section point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010106180419A
Other languages
Chinese (zh)
Other versions
CN102031752A (en
Inventor
闫兴非
周良
彭俊
朱敏
邓玮琳
宋杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Design Research Institute Group Co Ltd
Original Assignee
Shanghai Urban Construction Design Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Design Research Institute Co ltd filed Critical Shanghai Urban Construction Design Research Institute Co ltd
Priority to CN2010106180419A priority Critical patent/CN102031752B/en
Publication of CN102031752A publication Critical patent/CN102031752A/en
Application granted granted Critical
Publication of CN102031752B publication Critical patent/CN102031752B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses an all-welded integral node, comprising a first node board (1) and a second node board (1'). The first node board (1) and the second node board (1') are welded into an integral structure through flat boards (2,3). The all-welded integral node provided by the invention has the advantages of simple and clear structural members, good integrity, large bearing capacity, improved construction quality and compact appearance, and is simple in corrosion prevention and convenient for industrialized production.

Description

Full welding integral node
Technical field
The present invention relates to the large span steel truss bridge node structure of highway bridge and Construction of Urban Rail Traffic, particularly relate to a kind of full welding integral node.
Background technology
At present, in highway bridge and the track traffic, the node of steel structure truss bridge adopts bolt weldering type of attachment more.This node connected mode is at the construction field (site), and the gusset plate of node area and chord member, web member couple together with the hybrid mode of bolt and weld seam.This connected mode has more shortcoming: (1) high-strength bolt large usage quantity; (2) structural element is too much; (3) industrialized level is lower, and each member need be installed on bridge, and inconvenient installation; (4) stress corrosion at generation bolt place and bolt corrosion, poor durability.
Therefore, those skilled in the art be devoted to develop simple clear and definite, the good integrity of a kind of member, bearing capacity big, improve construction quality, simple appearance, anticorrosion simple, the node of being convenient to suitability for industrialized production.
Summary of the invention
Because the above-mentioned defective of prior art, technical problem to be solved by this invention provide simple clear and definite, the good integrity of a kind of member, bearing capacity big, improve construction quality, simple appearance, anticorrosion simple, the node of being convenient to suitability for industrialized production.
For realizing above-mentioned purpose, the invention provides a kind of full welding integral node, comprise first node plate and Section Point plate; Said first node plate and Section Point plate are through the flat board structure that is welded into a whole.
Preferable, said flat board comprises that the upper flat plate that laterally arranges up and down is dull and stereotyped with down.
Preferable, be welded with internal partition between said upper flat plate and the following flat board; Said internal partition is dull and stereotyped vertical with down with said upper flat plate.
Preferable, said internal partition comprises first internal partition, second internal partition and the 3rd internal partition of parallel setting; Said upper flat plate is welded with external partition over against the said second internal partition place.
Preferable, said upper flat plate is provided with the first upper flat plate through hole between first internal partition and second internal partition, between second internal partition and the 3rd internal partition, be provided with the second upper flat plate through hole; Be respectively arranged with the first internal partition through hole, the second internal partition through hole and the 3rd internal partition through hole on said first internal partition, second internal partition and the 3rd internal partition; The position of the said second internal partition through hole is higher than said first internal partition through hole and the 3rd internal partition through hole.
Preferable, the one or both sides of said first node plate and Section Point plate are provided with the chord member attachment weld; Said first node plate and Section Point plate are welded with chord member at said chord member attachment weld place.
Preferable, said first node plate Section Point plate and the chord member middle part between said upper flat plate and following flat board is provided with first ribs; Said dull and stereotyped down middle part and chord member are provided with second ribs at the said dull and stereotyped down place, middle part of correspondence; The both sides of said first internal partition and the 3rd internal partition, and the middle part that is positioned at said upper flat plate and chord member is provided with the 3rd ribs; Said the 3rd ribs both sides equidistant parallel is provided with the 4th ribs, and said the 4th ribs passes said internal partition, and length is less than the length of said first node plate.
Preferable, said first node backboard is connected to cross-beam connecting plate from said Section Point plate one face down bonding; Said cross-beam connecting plate is provided with the web member attachment weld.
Preferable, said first node backboard is connected to the flat gusset plate that joins from said Section Point plate one face down bonding; Said first node plate, cross-beam connecting plate peace join gusset plate and are perpendicular to one another.
Preferable, said first node plate and Section Point plate join gusset plate with said upper flat plate, following flat board, chord member, cross-beam connecting plate peace and adopt the steel plate of wide not uniform thickness to dock welded construction.
The present invention has that structural element is simple clear and definite, good integrity, bearing capacity are big, improve construction quality, simple appearance, anticorrosion simple, the advantage of being convenient to suitability for industrialized production, has represented the steel truss bridge to high-strength, lightweight, integral body, large span, new construction Development Trend.
Below will combine accompanying drawing that the technique effect of design of the present invention, concrete structure and generation is described further, to understand the object of the invention, characteristic and effect fully.
Description of drawings
Fig. 1 is the structural representation of the embodiment of the invention 1;
Fig. 2 is the A-A sectional view of Fig. 1;
The structural representation of Fig. 3 embodiment of the invention 2;
Fig. 4 is the B-B sectional view of Fig. 3;
Fig. 5 is the structural representation of the embodiment of the invention 3;
Fig. 6 is the C-C sectional view of Fig. 5;
Fig. 7 is the D-D sectional view of Fig. 5;
Fig. 8 is the E-E sectional view of Fig. 5.
The specific embodiment
Embodiment 1: as depicted in figs. 1 and 2, a kind of full welding integral node comprises first node plate 1 and Section Point plate 1 ', and first node plate 1 and Section Point plate 1 ' are through the upper flat plate 3 that laterally arranges up and down and dull and stereotyped 2 structures that are welded into a whole down.The right side of first node plate 1 and Section Point plate 1 ' is provided with chord member attachment weld 7, and first node plate 1 is welded with chord member 10 with Section Point plate 1 ' at chord member attachment weld 7 places.Chord member 10 is welded to after the gusset plate, and directly dispatching from the factory gets final product.
Because first node plate 1, Section Point plate 1 ', upper flat plate 3, following flat board 2 and chord member 10 are that integrally welded structure is dispatched from the factory, so this node overall performance is good, bearing capacity is big, and easy construction, uses high-strength bolt few.
Embodiment 2: of Fig. 3 and Fig. 4; The structure of present embodiment and embodiment 1 are basic identical; Different is: upper flat plate 3 and be welded with down first internal partition 5, second internal partition 4 and the 3rd internal partition 5 ' of parallel setting between dull and stereotyped 2; Upper flat plate 2 is welded with external partition 11 over against second internal partition, 4 places, and each internal partition is vertical with following dull and stereotyped 2 with upper flat plate 3 with external partition; The left side of first node plate 1 and Section Point plate 1 ' also is provided with chord member attachment weld 7, and this chord member attachment weld place is welded with chord member 10.
Other structures of present embodiment are identical with embodiment 1 with operating principle, but owing to weld together with the chord member one in internal partition, external partition and left side, so performance is better than embodiment 1.
Embodiment 3: like Fig. 5, Fig. 6, Fig. 7 and triangular truss node structure shown in Figure 8; The structure of present embodiment and embodiment 2 are basic identical; Different is; Upper flat plate 3 is provided with the first upper flat plate through hole 31 between first internal partition 5 and second internal partition 4; Be higher than the first internal partition through hole 51 and the 3rd internal partition through hole 51 ' being provided with the position that is respectively arranged with the first internal partition through hole 51, the second internal partition through hole 41 and the 3rd internal partition through hole 51 ', the second internal partition through hole 41 on the second upper flat plate through hole, 32, the first internal partitions 5, second internal partition 4 and the 3rd internal partition 5 ' between second internal partition 4 and the 3rd internal partition 5 '.
First node plate 1, Section Point plate 1 ' and chord member 10 middle part between upper flat plate 3 and following dull and stereotyped 2 is provided with first ribs 61; The place, middle part of following dull and stereotyped 2 middle part and chord member 10 flat board 2 under correspondence is provided with second ribs 62; The both sides of first internal partition 5 and the 3rd internal partition 5 ', and the middle part that is positioned at upper flat plate 3 and chord member 10 is provided with the 3rd ribs 63; The 3rd ribs 63 both sides equidistant parallels are provided with the 4th ribs 64, the four ribs 64 and pass first internal partition 5, second internal partition 4 and the 3rd internal partition 5 ', and length is less than the length of first node plate 1.
First node plate 1 deviates from Section Point plate 1 ' one face down bonding and is connected to cross-beam connecting plate 8 peace couplet gusset plates 9, and cross-beam connecting plate 8 is provided with web member attachment weld 12.First node plate 1, cross-beam connecting plate 8 peace join gusset plate 9 and are perpendicular to one another.
First node plate 1 is identical with Section Point plate 1 ', adopts the steel plate of wide not uniform thickness to dock welded construction but join gusset plates 9 with upper flat plate 3, following flat board 2, chord member 10, cross-beam connecting plate 8 peace.
In the present embodiment, having welded two chord members on the node, in other specific embodiment, also can be two nodes of welding on the chord member, to reach essentially identical technique effect.
Other structures of present embodiment are identical with embodiment 1 with operating principle, but because the setting of bulkhead through-hole, ribs, and together with the welding of cross-beam connecting plate 8 peace couplet gusset plates 9 one, so performance is better than embodiment 2.
Embodiment 4: the structure of present embodiment is identical with embodiment 3; Different is; On the maximum circular arc of the first node plate of full welding integral node and Section Point plate radius, be provided with the montant attachment weld, this attachment weld place can weld with montant, so can be made into N type panel point.Other structures of present embodiment are identical with embodiment 3.
More than describe preferred embodiment of the present invention in detail.Should be appreciated that those of ordinary skill in the art need not creative work and just can design according to the present invention make many modifications and variation.Therefore, all technician in the art all should be in the determined protection domain by claims under this invention's idea on the basis of existing technology through the available technical scheme of logical analysis, reasoning, or a limited experiment.

Claims (2)

1. a full welding integral node is characterized in that: comprise first node plate (1) and Section Point plate (1 '); Said first node plate (1) and Section Point plate (1 ') are through dull and stereotyped (2, the 3) structure that is welded into a whole; Said flat board comprises upper flat plate (3) and down dull and stereotyped (2) that laterally arrange up and down; Be welded with internal partition (4,5,5 ') between said upper flat plate (3) and down dull and stereotyped (2); Said internal partition (4,5,5 ') is vertical with down dull and stereotyped (2) with said upper flat plate (3); Said internal partition comprises first internal partition (5), second internal partition (4) and the 3rd internal partition (5 ') of parallel setting; Said upper flat plate (3) locates to be welded with external partition (11) over against said second internal partition (4); Said upper flat plate (3) is provided with the first upper flat plate through hole (31) between first internal partition (5) and second internal partition (4), between second internal partition (4) and the 3rd internal partition (5 '), be provided with the second upper flat plate through hole (32); Be respectively arranged with the first internal partition through hole (51), the second internal partition through hole (41) and the 3rd internal partition through hole (51 ') on said first internal partition (5), second internal partition (4) and the 3rd internal partition (5 '); The position of the said second internal partition through hole (41) is higher than said first internal partition through hole (51) and the 3rd internal partition through hole (51 '), and the one or both sides of said first node plate (1) and Section Point plate (1 ') are provided with chord member attachment weld (7); Said first node plate (1) and Section Point plate (1 ') locate to be welded with chord member (10) at said chord member attachment weld (7), and the middle part that said first node plate (1) Section Point plate (1 ') and chord member (10) are positioned between said upper flat plate (3) and down dull and stereotyped (2) is provided with first ribs (61); The middle part of said down dull and stereotyped (2) and chord member (10) are provided with second ribs (62) at the place, middle part of correspondence said dull and stereotyped (2) down; The both sides of said first internal partition (5) and the 3rd internal partition (5 '), and the middle part that is positioned at said upper flat plate (3) and chord member (10) is provided with the 3rd ribs (63); Said the 3rd ribs (63) both sides equidistant parallel is provided with the 4th ribs (64), and said the 4th ribs (64) passes said internal partition, and length is less than the length of said first node plate (1); And on the maximum circular arc of the radius of said first node plate and said Section Point plate, be provided with the montant attachment weld.
2. full welding integral node as claimed in claim 1 is characterized in that: said first node plate (1) deviates from said Section Point plate (1 ') face down bonding and is connected to cross-beam connecting plate (8); Said cross-beam connecting plate (8) is provided with web member attachment weld (12), and said first node plate (1) deviates from said Section Point plate (1 ') face down bonding and is connected to the flat gusset plate (9) that joins; Said first node plate (1), cross-beam connecting plate (8) peace join gusset plate (9) and are perpendicular to one another, and said first node plate (1) and Section Point plate (1 ') join gusset plate (9) and adopt the steel plate of wide not uniform thickness to dock welded construction with said upper flat plate (3), down dull and stereotyped (2), chord member (10), cross-beam connecting plate (8) peace.
CN2010106180419A 2010-12-30 2010-12-30 All-welded integral node Active CN102031752B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010106180419A CN102031752B (en) 2010-12-30 2010-12-30 All-welded integral node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010106180419A CN102031752B (en) 2010-12-30 2010-12-30 All-welded integral node

Publications (2)

Publication Number Publication Date
CN102031752A CN102031752A (en) 2011-04-27
CN102031752B true CN102031752B (en) 2012-07-25

Family

ID=43885155

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010106180419A Active CN102031752B (en) 2010-12-30 2010-12-30 All-welded integral node

Country Status (1)

Country Link
CN (1) CN102031752B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102979033A (en) * 2012-11-16 2013-03-20 中铁大桥勘测设计院集团有限公司 Steel truss girder all-welded joist slice and construction method thereof
CN102966033B (en) * 2012-12-12 2014-12-03 中铁山桥集团有限公司 Multi-joint chord member of all-welded railway continuous steel truss girder, and manufacturing method of multi-joint chord member
CN105113382B (en) * 2015-05-21 2017-03-01 中铁大桥勘测设计院集团有限公司 The double web attachment structure of steel truss diagonal brace with secondary purlin
CN106835950A (en) * 2017-03-27 2017-06-13 中铁二院工程集团有限责任公司 Concrete-filled steel tube arch arch rib truss H type web member all welded type coupling configurations
CN111136424B (en) * 2019-12-24 2021-04-27 江苏中铁山桥重工有限公司 Manufacturing method of large-scale multi-closed-structure support chord member
CN111364362A (en) * 2020-03-16 2020-07-03 长安大学 Bridge construction process adopting all-welded integral node steel pipe truss chord member prefabricated unit
CN111980295A (en) * 2020-08-26 2020-11-24 长安大学 Truss structure adopting rectangular steel pipe concrete chord member with batten plate openings

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2546201A2 (en) * 1983-04-25 1984-11-23 Deminiere Marie Agnes Bridges with a latticed load-bearing structure made up of steel sections assembled by means of assembly nodes
CN101608424A (en) * 2009-07-07 2009-12-23 中铁大桥勘测设计院有限公司 A kind of octahedral tank type steel purlin arc bridge boom
CN201546171U (en) * 2009-10-30 2010-08-11 中铁二院工程集团有限责任公司 Multipoint combined top beam structure of railway ultra large-span steel truss beam
CN201634994U (en) * 2010-02-01 2010-11-17 中铁大桥勘测设计院有限公司 Bolting-welding combined member
CN201924271U (en) * 2010-12-30 2011-08-10 上海市城市建设设计研究院 Fully-welded integral node

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2546201A2 (en) * 1983-04-25 1984-11-23 Deminiere Marie Agnes Bridges with a latticed load-bearing structure made up of steel sections assembled by means of assembly nodes
CN101608424A (en) * 2009-07-07 2009-12-23 中铁大桥勘测设计院有限公司 A kind of octahedral tank type steel purlin arc bridge boom
CN201546171U (en) * 2009-10-30 2010-08-11 中铁二院工程集团有限责任公司 Multipoint combined top beam structure of railway ultra large-span steel truss beam
CN201634994U (en) * 2010-02-01 2010-11-17 中铁大桥勘测设计院有限公司 Bolting-welding combined member
CN201924271U (en) * 2010-12-30 2011-08-10 上海市城市建设设计研究院 Fully-welded integral node

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
周良等.闵浦二桥主桥设计及技术创新.《城市道桥与防洪》.2010,(第9期),24-29,34. *
陈向东.轻轨车辆与斜拉桥动态耦合系统的数值模拟方法及应用.《中国博士学位论文全文数据库》.2009,30-37. *

Also Published As

Publication number Publication date
CN102031752A (en) 2011-04-27

Similar Documents

Publication Publication Date Title
CN102031752B (en) All-welded integral node
CN112160420A (en) Assembled beam column connected node based on anti special-shaped post of side of buckled plate
CN201924271U (en) Fully-welded integral node
CN202010648U (en) Double I shaped installing beam of vibrator of vibration sieve
CN205295918U (en) Purlin piece is assembled to multipurpose standard
CN213038987U (en) Through node for welding lower bolt partition plate on square steel tube concrete column-steel beam
CN105464221A (en) Partition plate penetrating node for connecting rectangular steel tube concrete column with box-shaped steel beam
CN106677062B (en) A kind of close crossbeam orthotropic deck architecture of double girders
CN204238119U (en) Opening concrete pin shear connector structure with elliptic holes
CN201433509Y (en) Prestressed steel girder
CN103485483A (en) Assembly type honeycombed web composite beam
CN201915509U (en) T-shaped connecting node for H-shaped steel beams
CN103243636B (en) Spatial panel point structure of steel truss and web PC (poly carbonate) combined bridge and construction method of spatial panel point
CN202688856U (en) Externally connected type node structure formed by connecting steel members and concrete
CN215670516U (en) Novel weakening type steel connecting beam
CN203559338U (en) Node connecting structure for upper chord of steel truss and web members
CN205296412U (en) A baffle link up node that is used for rectangle steel core concrete column and box girder steel to be connected
CN212426678U (en) Assembled light steel sheet composite beam bridge structure
CN203613652U (en) Side plate strengthening honeycomb type H-shaped steel beam frame joint component
CN206457723U (en) The close crossbeam orthotropic deck architecture of a kind of pair of girder
CN207331456U (en) A kind of Orthotropic Steel Bridge Deck structure with horizontal binder
CN212405511U (en) Node connection mechanism suitable for H shaped steel
CN211947875U (en) Cross beam connecting structure between corrugated web steel box and concrete composite beam box
CN216765553U (en) Steel arch steel beam consolidation structure
CN211775087U (en) H-shaped honeycomb component with double rows of holes in web plate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI URBAN CONSTRUCTION DESIGN + RESEARCH INST

Free format text: FORMER NAME: SHANGHAI MUNICIPAL URBAN CONSTRUCTION DESIGN AND RESEARCH INST.

CP03 Change of name, title or address

Address after: 200011 Tibet South Road, Shanghai, No. 1170, No.

Patentee after: Shanghai Urban Construction Design & Research Institute

Address before: 200125 Dongfang Road, Shanghai, Pudong New Area, No. 3447

Patentee before: Shanghai Urban Construction Design and Research Institute

CP01 Change in the name or title of a patent holder

Address after: 200011 Tibet South Road, Shanghai, No. 1170, No.

Patentee after: Shanghai urban construction design & Research Institute (Group) Co., Ltd.

Address before: 200011 Tibet South Road, Shanghai, No. 1170, No.

Patentee before: Shanghai Urban Construction Design & Research Institute

CP01 Change in the name or title of a patent holder