CN102031555A - Construction method for clearing away waste soil nails and anchor rods in soil by utilizing electrolytic corrosion technology - Google Patents

Construction method for clearing away waste soil nails and anchor rods in soil by utilizing electrolytic corrosion technology Download PDF

Info

Publication number
CN102031555A
CN102031555A CN 201010507520 CN201010507520A CN102031555A CN 102031555 A CN102031555 A CN 102031555A CN 201010507520 CN201010507520 CN 201010507520 CN 201010507520 A CN201010507520 A CN 201010507520A CN 102031555 A CN102031555 A CN 102031555A
Authority
CN
China
Prior art keywords
soil
anchor pole
anchor rods
utilizing
electrolytic corrosion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010507520
Other languages
Chinese (zh)
Other versions
CN102031555B (en
Inventor
钟显奇
余剑锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foundation Design Group Co., Ltd of Guangdong Province
Original Assignee
GUANGDONG PROV FOUNDATION ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG PROV FOUNDATION ENGINEERING Co filed Critical GUANGDONG PROV FOUNDATION ENGINEERING Co
Priority to CN201010507520A priority Critical patent/CN102031555B/en
Publication of CN102031555A publication Critical patent/CN102031555A/en
Application granted granted Critical
Publication of CN102031555B publication Critical patent/CN102031555B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses a construction method for clearing away waste soil nails and anchor rods in soil by utilizing an electrolytic corrosion technology. The construction method adopts an electrolytic principle and comprises the steps of: connecting a direct-current power supply between two of the soil nails or the anchor rods which need to be cleared away; and energizing by utilizing the moisture or the ground water contained in the soil as an electrolyte solution to ensure that the metal atoms on the soil nails or the anchor rods which are connected with the positive pole of the direct-current power supply lose electrons and are oxidized and corroded till the soil nails or the anchor rods which need to be cleared away disappear. The method not only can be used for effectively and rapidly clearing away the waste soil nails and the anchor rods buried in the soil, but also has the advantages of fewer needed operating personnel, low construction cost, shorter construction period, and has greater dissemination and application value.

Description

A kind of constructional method of utilizing the electrolytic corrosion technology to remove discarded soil nailing anchor pole in the soil
Technical field
The present invention relates to a kind of constructional method for building, particularly a kind of constructional method of utilizing the electrolytic corrosion technology to remove discarded soil nailing anchor pole in the soil.
Background technology
In the building foundation pit construction process, sometimes adopt and in the foundation ditch periphery soil body, squeeze into soil nailing or anchor pole is kept the stable of the soil body, it is main bearing member that these soil nailings or anchor pole generally adopt steel, finish, behind the foundation ditch periphery backfilling of earthwork, just no longer need soil nailing or anchor pole to keep the stable of the soil body Deng foundation ditch inside subject structure construction.At this moment, just ineffective at the native intravital soil nailing of periphery, anchor pole, but most of because of darker in the embedding soil, be difficult for to take out, take recyclable technology, often just abandon in soil, generally can not be corroded, become the underground obstacle in underground iron and steel rubbish and later adjacent architectural building site.
Summary of the invention
In order to overcome the deficiencies in the prior art, the invention provides a kind of can accelerate irony objects such as soil nailing, anchor pole in the underground corrosion process to reach the constructional method of removing purpose.
The technical solution used in the present invention can be described as:
A kind of constructional method of utilizing the electrolytic corrosion technology to remove discarded soil nailing anchor pole in the soil, it utilizes electrolysis principle, insert a direct supply between the soil nailing of two needs removings or the anchor pole therein, utilize the moisture or the underground water that contain in the soil to be electrolytic solution, atoms metal loses the oxidized corrosion of electronics on soil nailing that the energising back is connected with described dc power anode or the anchor pole, infiltrate in the soil with the ionic form, until disappearance, variation as negative pole is little, can the chap because of electrolytic action.
The invention has the beneficial effects as follows:
In the present invention, discarded soil nailing in the soil is applied a volts DS utilizes electrolysis principle to accelerate to be embedded in the metal soil nailing in the soil or the oxidation corrosion of anchor pole, to reach the purpose of removing, this electrolysis process can not only be removed discarded soil nailing or the anchor pole of imbedding in the soil effectively apace, and the action required personnel are few, construction cost is low, the duration is short, have bigger application value.
Description of drawings
Fig. 1 is an enforcement synoptic diagram of the present invention.
Embodiment
As shown in Figure 1, a kind of constructional method of utilizing the electrolytic corrosion technology to remove discarded soil nailing anchor pole in the soil, it at first removes the earthing at discarded soil nailing or anchor pole 1 top, connect the top that 2 soil nailings or anchor pole 1 expose the soil body respectively with the anchor clamps 4 of tape insulation handle then, anchor clamps 4 are connected with the positive and negative electrode of external power source 2 respectively by cable 5, this outside power supply 2 adopts low-voltage dc power supply, generally can adopt DC welder or the generator being convenient to move.If adopt AC power, then should be equipped with rectifier, low-voltage transformer, change alternating-current into low-voltage DC output.
The workmen should determine electrical current intensity according to clean-up time, two soil nailings or 1 distance of anchor pole, soil nailing or anchor pole 1 depth of burying.Generally get adjacent two soil nailings or anchor pole 1 as positive and negative electrode, spacing is 1.0~3.0m, and strength of current is controlled at 0~500A; Voltage is unsuitable too high, generally is controlled in the 100V.
After connecting power supply, the intermittence energising.Under the effect of dc voltage and current, by the moisture 3 that contains in the soil as electrolytic solution, atoms metal on anode soil nailing or the anchor pole 1 loses electronics and oxidized corrosion, metal ion infiltrates soil, along with voltage raises, electric current reduces, and anode anchor pole or soil nailing 1 variation in diameter are until disappearance, and electric current is zero.After treating that an anode soil nailing or anchor pole 1 are eliminated, change another root soil nailing or anchor pole 1, be eliminated until all soil nailings that need remove or anchor pole 1 as anode.

Claims (3)

1. one kind is utilized the electrolytic corrosion technology to remove the constructional method of discarding the soil nailing anchor pole in the soil, it is characterized in that: utilize electrolysis principle, insert a direct supply (2) between the soil nailing of two needs removings or the anchor pole (1) therein, utilizing the moisture or the underground water (3) that contain in the soil is electrolytic solution, the energising back is gone up atoms metal with anodal soil nailing that is connected of described direct supply (2) or anchor pole (1) and is lost the oxidized corrosion of electronics, form with metal ion is infiltrated in the soil, and negative electrode can not be corroded.
2. a kind of constructional method of utilizing the electrolytic corrosion technology to remove discarded soil nailing anchor pole in the soil according to claim 1, it is characterized in that: the soil nailing of two needs removings or the end of anchor pole (1) are provided with the anchor clamps (4) that have the handle that insulate therein, and described anchor clamps (4) are connected with the positive and negative electrode of direct supply (2) respectively by cable (5).
3. a kind of constructional method of utilizing the electrolytic corrosion technology to remove discarded soil nailing anchor pole in the soil according to claim 1, it is characterized in that: described electrolysis working current intensity control is at 0~500A, and operating voltage is controlled at 0~100V.
CN201010507520A 2010-10-13 2010-10-13 Construction method for clearing away waste soil nails and anchor rods in soil by utilizing electrolytic corrosion technology Expired - Fee Related CN102031555B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010507520A CN102031555B (en) 2010-10-13 2010-10-13 Construction method for clearing away waste soil nails and anchor rods in soil by utilizing electrolytic corrosion technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010507520A CN102031555B (en) 2010-10-13 2010-10-13 Construction method for clearing away waste soil nails and anchor rods in soil by utilizing electrolytic corrosion technology

Publications (2)

Publication Number Publication Date
CN102031555A true CN102031555A (en) 2011-04-27
CN102031555B CN102031555B (en) 2012-10-03

Family

ID=43884981

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010507520A Expired - Fee Related CN102031555B (en) 2010-10-13 2010-10-13 Construction method for clearing away waste soil nails and anchor rods in soil by utilizing electrolytic corrosion technology

Country Status (1)

Country Link
CN (1) CN102031555B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103806084A (en) * 2014-01-28 2014-05-21 周锡武 Construction method for eliminating metal objects in soil in fixed area
CN103953358A (en) * 2014-04-21 2014-07-30 江苏鼎达建筑新技术有限公司 Clearing construction method for underground obstacle
CN110792104A (en) * 2019-11-19 2020-02-14 上海建工二建集团有限公司 Method and device for removing obstacles by oxidizing corrosion of existing in-situ metal tube well

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1163335A (en) * 1996-12-06 1997-10-29 广东省水利水电第二工程局 Technological method for strengthening roof bolt recovery
JPH10184296A (en) * 1996-12-27 1998-07-14 Ohbayashi Corp Execution method of bolt for reinforcing bedrock
JPH11172472A (en) * 1997-12-04 1999-06-29 Suido Gijutsu Kaihatsu Kiko:Kk Corrosion preventive fitting
CN1904226A (en) * 2006-08-03 2007-01-31 张继红 Construction method of recoverable brad wall base pit enclosure
CN101260560A (en) * 2007-12-08 2008-09-10 徐灿清 Method for manufacturing pattern and character on stainless steel plate

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1163335A (en) * 1996-12-06 1997-10-29 广东省水利水电第二工程局 Technological method for strengthening roof bolt recovery
JPH10184296A (en) * 1996-12-27 1998-07-14 Ohbayashi Corp Execution method of bolt for reinforcing bedrock
JPH11172472A (en) * 1997-12-04 1999-06-29 Suido Gijutsu Kaihatsu Kiko:Kk Corrosion preventive fitting
CN1904226A (en) * 2006-08-03 2007-01-31 张继红 Construction method of recoverable brad wall base pit enclosure
CN101260560A (en) * 2007-12-08 2008-09-10 徐灿清 Method for manufacturing pattern and character on stainless steel plate

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《电力建设》 20041031 魏其巍 埋地金属设施腐蚀情况的分析 第22-24、27页 1-3 第25卷, 第10期 2 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103806084A (en) * 2014-01-28 2014-05-21 周锡武 Construction method for eliminating metal objects in soil in fixed area
CN103806084B (en) * 2014-01-28 2016-08-17 周锡武 A kind of determine region and remove the construction method of metal object in soil
CN103953358A (en) * 2014-04-21 2014-07-30 江苏鼎达建筑新技术有限公司 Clearing construction method for underground obstacle
CN110792104A (en) * 2019-11-19 2020-02-14 上海建工二建集团有限公司 Method and device for removing obstacles by oxidizing corrosion of existing in-situ metal tube well
CN110792104B (en) * 2019-11-19 2024-07-26 上海建工二建集团有限公司 Method and device for clearing obstacles through oxidation corrosion of existing in-situ metal pipe well

Also Published As

Publication number Publication date
CN102031555B (en) 2012-10-03

Similar Documents

Publication Publication Date Title
EP3558497B1 (en) Foundation for a structure
AU2018102179A4 (en) Electro-osmosis treatment method for reducing moisture content of roadbed, and road structure
CN102031555B (en) Construction method for clearing away waste soil nails and anchor rods in soil by utilizing electrolytic corrosion technology
CN206083404U (en) Do you be used for prosthetic horizontal EK of on --spot combined pollution soil PRB device
CN104846711B (en) The electroosmosis method reinforced for soil-slope
CN104368596A (en) In-situ treatment method for electrically repairing heavy metal contaminated soil based on plastic electrode
CN101457521B (en) Electroosmosis method and apparatus for dehydration for large area high moisture percentage earth body
CN104131549B (en) A kind of method of electrode tube electric drainage consolidation
CN107905211A (en) A kind of barged-in fill recently quickly crusts electroosmosis electrode and its application method
CN101832143A (en) Method for treating tunnel water leakage
CN104532263A (en) Oil casing pipe cathode protecting system based on pulse current power supply and building method thereof
CN105603964B (en) Central Symmetry electroosmosis electrode device and its electric osmose reduce pulls out resistance method on Large-diameter Steel cylinder
CN206316141U (en) A kind of processing unit of electro reclamation heavy-metal contaminated soil
CN208527690U (en) Electric reparation formula remediation contaminated soil device
CN204780952U (en) Side slope is oozed drainage fast and is reached from reinforcing apparatus
CN202577276U (en) Electric plastic drain board
CN103232096B (en) In-situ repairing system and repairing method capable of continuously removing Cr in underground water
CN101660312B (en) Reinforced cement mixing pile composite foundation treatment and construction method
CN103806084B (en) A kind of determine region and remove the construction method of metal object in soil
CN211773888U (en) Existing normal position tubular metal resonator well oxidation corrosion barrier removal device
CN206204927U (en) A kind of strong tamping combined method reinforcing soft ground device of solar energy electric osmose
CN105870650A (en) Method for reducing grounding resistance by ground anchor for reducing grounding resistance and ground anchor for reducing grounding resistance
CN201010693Y (en) Oil well anti-corrosion device
CN105239079B (en) A kind of down conductor cathodic protection anti-corrosion method
CN110792104B (en) Method and device for clearing obstacles through oxidation corrosion of existing in-situ metal pipe well

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: GUANGDONG FOUNDATION ENGINEERING GROUP CO., LTD.

Free format text: FORMER NAME: GUANGDONG PROV. FOUNDATION ENGINEERING CO.

CP01 Change in the name or title of a patent holder

Address after: 19-20, No. 510620, Tianhe Road, 99 Tianhe Road, Guangdong, Guangzhou

Patentee after: Foundation Design Group Co., Ltd of Guangdong Province

Address before: 19-20, No. 510620, Tianhe Road, 99 Tianhe Road, Guangdong, Guangzhou

Patentee before: Guangdong Prov. Foundation Engineering Co.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121003

Termination date: 20201013