CN102029346A - Post-forging heat-insulating protective guard of 2000T high-speed forging press - Google Patents

Post-forging heat-insulating protective guard of 2000T high-speed forging press Download PDF

Info

Publication number
CN102029346A
CN102029346A CN2009101451318A CN200910145131A CN102029346A CN 102029346 A CN102029346 A CN 102029346A CN 2009101451318 A CN2009101451318 A CN 2009101451318A CN 200910145131 A CN200910145131 A CN 200910145131A CN 102029346 A CN102029346 A CN 102029346A
Authority
CN
China
Prior art keywords
protective guard
forging
guard shield
heat
guard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2009101451318A
Other languages
Chinese (zh)
Inventor
韩国忠
叶福平
高欣
高森林
韩兴华
徐岳强
邱海东
林澄清
郭振龙
徐庆丰
张肈弋
徐伟强
张耀良
徐建良
韩工不
韩丁财
雷振钢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGYIN NANGONG FORGING CO Ltd
Original Assignee
JIANGYIN NANGONG FORGING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGYIN NANGONG FORGING CO Ltd filed Critical JIANGYIN NANGONG FORGING CO Ltd
Priority to CN2009101451318A priority Critical patent/CN102029346A/en
Publication of CN102029346A publication Critical patent/CN102029346A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Heat Treatments In General, Especially Conveying And Cooling (AREA)

Abstract

The invention relates to a post-forging heat-insulating protective guard of a 2000T high-speed forging press. The guard is mainly used for performing post-forging heat treatment on forge pieces produced by the 2000T high-speed forging press. The heat-insulating protective guard comprises a sandpit (1), a protective guard (2) and a chain (3) with a lifting hook. The protective guard (2) is in a transverse semi-cylindrical shape. Fireproof heat-insulating materials (2.1) are paved on the inner wall of the protective guard (2). The protective guard (2) is buckled above the sandpit (1). The chain (3) with the lifting hook is arranged on the top of the protective guard (2). During moving, the protective guard is hung at the specified position by a travelling crane. The forge pieces are kept at a certain temperature in a tempering furnace and then pushed into the sandpit and covered by the protective guard, so a closed space is formed in the protective guard to achieve the similar effect of slow cooling in the tempering furnace. Therefore, the tempering furnace is used reasonably and the production efficiency is improved.

Description

2000T forging machine soon forges back insulation guard shield
(1) technical field
The present invention relates to a kind of fast forging machine, be specifically related to a kind of 2000T forging machine forging back insulation guard shield soon.Be mainly used in to 2000T soon the forging of forging machine production forge after-baking.Belong to forging equipment attachment technique field.
(2) background technology
The 2000T forging of forging machine production soon generally needs in time to forge after-baking after forging is finished.Because of the forging after-baking time cycle of forging all long, regular meeting causes the forging produced and postpones to arrange production because can can't in time advance tempering furnace.
(3) summary of the invention
The objective of the invention is to overcome above-mentioned deficiency, a kind of 2000T that can rationally use tempering furnace, enhance productivity is provided forging machine forging back insulation guard shield soon.
The object of the present invention is achieved like this: a kind of 2000T forging machine soon forges back insulation guard shield, the chain that comprises sand pit, guard shield and band suspension hook, described guard shield is horizontal semicircle tubular, be equipped with flame-proof thermal insulation material on the guard shield internal face, guard shield is buckled in the top, sand pit, and the chain of band suspension hook is arranged at the guard shield top.By driving guard shield is placed in given place when mobile.Forging is incubated in tempering furnace to uniform temperature to be piled in the sand pit, on the guard shield cover, makes the inner confined space that forms of guard shield, reaches the effect of similar slow cooling in tempering furnace, can rationally use tempering furnace like this, enhances productivity.
(4) description of drawings
Fig. 1 is incubated the shield structure schematic diagram in forging machine forging back soon for 2000T of the present invention.
Fig. 2 is the side view of Fig. 1.
Fig. 3 is the inwall cut-away view of guard shield among Fig. 1.
Among the figure: chain 3, forging 4, the flame-proof thermal insulation material 2.1 of sand pit 1, guard shield 2, band suspension hook.
(5) specific embodiment
Referring to Fig. 1~2, the 2000T that the present invention relates to forging machine soon forges back insulation guard shield, mainly is made up of chain 3 three parts of sand pit 1, guard shield 2 and band suspension hook.Described guard shield 2 is horizontal semicircle tubular, is equipped with flame-proof thermal insulation material 2.1 on guard shield 2 internal faces, as Fig. 3.Guard shield 2 is buckled in 1 top, sand pit, and the chain 3 of band suspension hook is arranged at guard shield 2 tops.

Claims (1)

1. a 2000T is incubated guard shield in forging machine forging back soon, it is characterized in that described insulation guard shield comprises the chain (3) of sand pit (1), guard shield (2) and band suspension hook, described guard shield (2) is horizontal semicircle tubular, be equipped with flame-proof thermal insulation material (2.1) on guard shield (2) internal face, guard shield (2) is buckled in top, sand pit (1), and the chain (3) of band suspension hook is arranged at guard shield (2) top.
CN2009101451318A 2009-09-30 2009-09-30 Post-forging heat-insulating protective guard of 2000T high-speed forging press Pending CN102029346A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101451318A CN102029346A (en) 2009-09-30 2009-09-30 Post-forging heat-insulating protective guard of 2000T high-speed forging press

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101451318A CN102029346A (en) 2009-09-30 2009-09-30 Post-forging heat-insulating protective guard of 2000T high-speed forging press

Publications (1)

Publication Number Publication Date
CN102029346A true CN102029346A (en) 2011-04-27

Family

ID=43883108

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101451318A Pending CN102029346A (en) 2009-09-30 2009-09-30 Post-forging heat-insulating protective guard of 2000T high-speed forging press

Country Status (1)

Country Link
CN (1) CN102029346A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102382959A (en) * 2011-11-05 2012-03-21 张家港海锅重型锻件有限公司 Heat insulating cover used for slow cooling of forgings

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102382959A (en) * 2011-11-05 2012-03-21 张家港海锅重型锻件有限公司 Heat insulating cover used for slow cooling of forgings

Similar Documents

Publication Publication Date Title
CN105127746B (en) The production technology of bearing ring
CN102000754A (en) Manufacturing process of half shaft with flange plate
CN104014703A (en) Forging process for C12MoV twisting rollers
UA109304C2 (en) MELTING OVEN TO OBTAIN METAL
CN102979641B (en) Integrated type cast steel piston and manufacturing method thereof
CN102029346A (en) Post-forging heat-insulating protective guard of 2000T high-speed forging press
CN202281510U (en) Refractory material inner liner
CN201362736Y (en) After-forging heat-preservation guard shield of 2000T quick-forging press
CN203360515U (en) Cemented steel cylindrical hole bearing ring quenching assembling die
CN202359159U (en) Rapid heat treatment quenching machine
CN102051463A (en) Hanger device for pit furnace
CN212757181U (en) Splicing type annealing device applied to go forming machine
CN107052213A (en) A kind of splined shaft forging die structure for closing forging
CN201201959Y (en) Stainless steel annealing protective hood with horizontal corrugation
ES2539404T3 (en) Steel production apparatus that saves energy and its method
CN201284364Y (en) Heat treatment equipment for alloy material
CN202007253U (en) Kiln structure of well annealing furnace
CN204094134U (en) A kind of magnesium alloy casting dolly
CN202270898U (en) Red-hot conveying insulating cylinder of wind-power main shaft forged piece
CN204369945U (en) A kind of high-temperature electric resistance furnace of improvement
CN203919899U (en) A kind of PU sebific duct
CN204359118U (en) Tower molten aluminium stove melting chamber hearth structure
CN204171262U (en) A kind of high strength forged shaft
CN201819556U (en) Pocket brick of eccentric-bottom type steel tapping hole of electric furnace
CN205803542U (en) A kind of mobile bell-type heat-treatment furnace

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110427