CN102012486B - Voltage measuring tool special for storage battery - Google Patents

Voltage measuring tool special for storage battery Download PDF

Info

Publication number
CN102012486B
CN102012486B CN2010105459909A CN201010545990A CN102012486B CN 102012486 B CN102012486 B CN 102012486B CN 2010105459909 A CN2010105459909 A CN 2010105459909A CN 201010545990 A CN201010545990 A CN 201010545990A CN 102012486 B CN102012486 B CN 102012486B
Authority
CN
China
Prior art keywords
lead
contact
right test
test pencil
handed watch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010105459909A
Other languages
Chinese (zh)
Other versions
CN102012486A (en
Inventor
苏建军
刘洪正
郭顺生
刘矞
张军
郭百艳
任光
李臣仁
崔贺贺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maintenance Branch of State Grid Shandong Electric Power Co Ltd
State Grid Corp of China
Original Assignee
ULTRA-HV Co OF SHANDONG ELECTRIC POWER Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ULTRA-HV Co OF SHANDONG ELECTRIC POWER Corp filed Critical ULTRA-HV Co OF SHANDONG ELECTRIC POWER Corp
Priority to CN2010105459909A priority Critical patent/CN102012486B/en
Publication of CN102012486A publication Critical patent/CN102012486A/en
Application granted granted Critical
Publication of CN102012486B publication Critical patent/CN102012486B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electromechanical Clocks (AREA)

Abstract

本发明公开了一种蓄电池组专用测压工具,包括手柄,手柄上安装连接壳,连接壳上安装左表笔和右表笔,左表笔和右表笔的前端各设一个接触头,左表笔和右表笔分别通过两根导线与万用表连接。它的两测试表笔的宽度可根据蓄电池两极的宽度而自由调整,可适合准确检测不同型号尺寸的蓄电池;它的两表笔共同固定于一个手柄上,可以达到两极同时接触的目的,并可在两表笔上分别标出正负极,以便对准蓄电池组的正负极,可避免接反影响读数。使用专用测量工具进行测量工作,单人便可完成测量读数工作,可有效节省人力资源的投入,而且,根据统计,使用所述的专用工具进行测量电压的工作,耗时降至现在的0.18分钟,可有效地提高工作效率。

The invention discloses a special pressure measuring tool for battery packs, which comprises a handle, on which a connecting shell is installed, on which a left test lead and a right test lead are installed, a contact head is respectively arranged at the front ends of the left test lead and the right test lead, and the left test lead and the right test lead Connect to the multimeter through two wires respectively. The width of its two test leads can be freely adjusted according to the width of the two poles of the battery, which is suitable for accurate detection of batteries of different sizes; its two test leads are fixed on a handle together, which can achieve the purpose of simultaneous contact between the two poles, and can be used at both ends The positive and negative poles are marked on the test leads, so as to align with the positive and negative poles of the battery pack, and avoid reverse connection from affecting the reading. Using special measuring tools for measuring work, a single person can complete the work of measuring readings, which can effectively save the investment of human resources, and, according to statistics, using the special tools mentioned above to measure voltage takes time down to 0.18 minutes now , can effectively improve work efficiency.

Description

蓄电池组专用测压工具Special pressure measuring tool for battery pack

技术领域 technical field

 本发明涉及一种蓄电池组专用测压工具。 The invention relates to a special pressure measuring tool for battery packs.

背景技术 Background technique

目前,电力部门的变电站中的直流系统常采用双电池组单母线分段,双组充电装置单一电压输出的接线方式。每段直流母线上接有阀控式密封铅酸蓄电池一组, 110v蓄电池108台,48v蓄电池46台,通讯蓄电池96台。由于《山东电力集团公司超高压公司企业标准》潍坊变电站运行规程3.14.4.4之规定:蓄电池浮充电运行时,每台电池电压保持在2.25V左右,变化范围:2.25±1%。故而,蓄电池检测是运行人员日常必不可少的一项重要工作。测量蓄电池组电压的传统方法是:借助于万用表的两相线直接接触蓄电池组的两极进行测量电压,由于万用表的两相线头接触端较细小,不易与蓄电池组的两极有效地贴合接触,经常出现某一个线头接触不良和易滑动的现象,影响测试结果,延长了测试时间。由于现有万用表的两相线头的检测笔是相互独立的两支,因此,当测试时必须由两人进行,一人双手持万用表的两相线进行测试,另一人持万用表进行读数,操作费时费力。具统计测试一台蓄电池就需耗时0.56分钟,全检一次共250台,需耗时140.6分钟。 At present, the DC system in the substation of the electric power sector often adopts the wiring method of double battery packs, single bus bar segmentation, and single voltage output of double pack charging devices. Each section of DC bus is connected with a group of valve-regulated sealed lead-acid batteries, 108 sets of 110v batteries, 46 sets of 48v batteries, and 96 sets of communication batteries. Due to the provisions of 3.14.4.4 of the Weifang Substation Operating Regulations of the "Shandong Electric Power Group Corporation Ultra-high Voltage Company Enterprise Standards", when the battery is floating charging, the voltage of each battery is kept at about 2.25V, and the variation range is 2.25±1%. Therefore, battery testing is an essential and important task for operators in daily life. The traditional method of measuring the voltage of the battery pack is: use the two-phase wire of the multimeter to directly contact the two poles of the battery pack to measure the voltage. Since the contact end of the two-phase wire of the multimeter is relatively small, it is difficult to effectively fit and contact with the two poles of the battery pack. There is a phenomenon of poor contact and easy sliding of a certain wire end, which affects the test result and prolongs the test time. Since the detection pens of the two-phase line ends of the existing multimeter are two independent of each other, two people must carry out the test. One person holds the two-phase line of the multimeter for testing, and the other person holds the multimeter for reading. The operation is time-consuming and laborious. . It takes 0.56 minutes to test one battery with statistics, and 140.6 minutes to fully check a total of 250 batteries.

发明内容 Contents of the invention

本发明的目的,是提供一种蓄电池组专用测压工具,它可解决现有技术存在的问题。它可实现测压的单人操作,操作省时省力。而且,由于它的两个检测笔共同固定于同一个手柄上,因此,可防止因单个检测线头接触不良或滑移而影响检测精度的情况发生。 The object of the present invention is to provide a special pressure measuring tool for battery packs, which can solve the problems in the prior art. It can realize the single-person operation of pressure measurement, and the operation saves time and effort. Moreover, since its two detection pens are jointly fixed on the same handle, it is possible to prevent the detection accuracy from being affected due to poor contact or slippage of a single detection wire head.

本发明的目的是通过以下技术方案实现的:蓄电池组专用测压工具,包括手柄,手柄上安装连接壳,连接壳上安装左表笔和右表笔,左表笔和右表笔的前端各设一个接触头,左表笔和右表笔分别通过两根导线与万用表连接。 The purpose of the present invention is achieved through the following technical proposals: the special pressure measuring tool for battery packs includes a handle, a connection case is installed on the handle, a left test lead and a right test lead are installed on the connection case, and a contact head is respectively arranged at the front ends of the left test lead and the right test lead , the left test lead and the right test lead are respectively connected to the multimeter through two wires.

为进一步实现本发明的目的,还可以采用以下技术方案实现:连接壳内设有绝缘隔板,绝缘隔板位于左表笔和右表笔之间;连接壳内平行安装上导杆、下导杆和螺杆,上导杆、下导杆和螺杆分别与绝缘隔板垂直连接;螺杆的一端穿出连接壳外安装手轮,螺杆的左半段和右半段各设有一段螺纹,两段螺纹分别位于绝缘隔板的两侧,且旋转方向相反;左表笔和右表笔的固定端分别与上导杆、螺杆和下导杆连接,左表笔与螺杆的左半段螺纹连接,右表笔与螺杆的右半段螺纹连接。所述的两根导线分别是左表笔导线和右表笔导线,左表笔导线由左表笔第一导线和左表笔第二导线构成,右表笔导线由右表笔第一导线和右表笔第二导线构成;手柄内安装铁芯,铁芯的外周安装线圈,线圈分别与右表笔第一导线和右表笔第二导线的一端连接,右表笔第一导线的另一端与右表笔连接,右表笔第二导线的另一端与万用表连接;手柄内安装触片室,触片室位于铁芯上方,触片室内安装动金属触片和定金属触片,动金属触片上安装绝缘杆,定金属触片上开设通孔,绝缘杆经通孔穿出触片室外安装限位凸台,绝缘杆的外周安装第一弹簧,第一弹簧位于限位凸台与触片室之间;左表笔与左表笔第一导线的一端连接,左表笔第一导线的另一端与动金属触片连接,定金属触片与左表笔第二导线的一端连接,左表笔第二导线的另一端与万用表连接。触片室的一侧安装导套,导套内安装绝缘片,绝缘片的一端穿入触片室内,绝缘片的另一端设有复位柄,复位柄穿出触片室及手柄外,复位柄的外周安装第二弹簧,第二弹簧位于导套内,绝缘片上开设槽。所述的接触头由基座、第一半轴、第三弹簧、第二半轴和弧形板状触头连接构成,基座与左表笔铰接,基座内开设内腔,内腔内安装第一半轴、第三弹簧和第二半轴,第三弹簧位于第一半轴和第二半轴之间,第二半轴的一端设有弧形板状触头。 In order to further realize the object of the present invention, the following technical schemes can also be adopted to realize: the connecting shell is provided with an insulating partition, and the insulating partition is positioned between the left meter pen and the right meter pen; the upper guide rod, the lower guide rod and the The screw, the upper guide rod, the lower guide rod and the screw rod are vertically connected with the insulating partition; one end of the screw rod passes through the connecting shell to install the hand wheel, and the left half and the right half of the screw rod are respectively provided with a thread, and the two threads are respectively Located on both sides of the insulating partition, and the direction of rotation is opposite; the fixed ends of the left test lead and the right test lead are respectively connected with the upper guide rod, the screw rod and the lower guide rod, the left test lead is threaded with the left half of the screw rod, and the right test lead is connected with the screw rod. Right half threaded connection. The two wires are the left wire and the right wire respectively, the left wire is composed of the first wire of the left and the second wire of the left, and the wire of the right is composed of the first wire of the right and the second wire of the right; An iron core is installed in the handle, and a coil is installed on the outer circumference of the iron core. The coil is respectively connected to one end of the first lead wire of the right test pen and one end of the second lead wire of the right test lead, and the other end of the first lead wire of the right test lead is connected to the right test lead, and the second lead wire of the right test lead is connected to the right test lead. The other end is connected with the multimeter; a contact chamber is installed in the handle, and the contact chamber is located above the iron core. The movable metal contact and the fixed metal contact are installed in the contact chamber. An insulating rod is installed on the movable metal contact, and a through hole is opened on the fixed metal contact. , the insulating rod passes through the through hole to install the limit boss outside the contact piece, and the first spring is installed on the outer periphery of the insulating rod, and the first spring is located between the limit boss and the contact piece chamber; One end is connected, the other end of the first wire of the left test pen is connected with the moving metal contact piece, the fixed metal contact piece is connected with one end of the second wire of the left test pen, and the other end of the second wire of the left test pen is connected with the multimeter. A guide sleeve is installed on one side of the contact chamber, and an insulating sheet is installed inside the guide sleeve. One end of the insulating sheet penetrates into the contact chamber, and the other end of the insulating sheet is provided with a reset handle. The reset handle passes through the contact chamber and the outside of the handle. The outer periphery of the second spring is installed, the second spring is located in the guide sleeve, and a groove is opened on the insulating sheet. The contact head is composed of a base, a first semi-axis, a third spring, a second semi-axis and an arc-shaped plate-shaped contact. The first half shaft, the third spring and the second half shaft, the third spring is located between the first half shaft and the second half shaft, and one end of the second half shaft is provided with an arc-shaped plate-shaped contact.

本发明的积极效果在于:它的两测试表笔的宽度可根据蓄电池两极的宽度而自由调整,可适合准确检测不同型号尺寸的蓄电池;它的两表笔共同固定于一个手柄上,可以达到两极同时接触的目的,并可在两表笔上分别标出正负极,以便对准蓄电池组的正负极,可避免接反影响读数。其表笔和接触头部分可采用不锈钢材质,易于导电,手柄采用绝缘材料,确保人身安全。使用专用测量工具进行测量工作,只需一名测量人员一手持握工具进行与蓄电池接触导通,另一手持握万用表进行读数,一人完成测量读数工作,可有效节省人力资源的投入,而且,根据统计,使用所述的专用工具进行测量电压的工作,耗时由原来的0.56分钟/台,降至现在的0.18分钟,可有效地提高工作效率。 The positive effect of the present invention is that: the width of its two test leads can be freely adjusted according to the width of the two poles of the battery, which can be suitable for accurately detecting batteries of different sizes; its two test leads are fixed on a handle together, and can reach two poles in contact at the same time The purpose, and the positive and negative poles can be marked on the two test leads, so as to align with the positive and negative poles of the battery pack, and avoid the influence of reverse connection on the reading. The test lead and contact head part can be made of stainless steel, which is easy to conduct electricity, and the handle is made of insulating material to ensure personal safety. Using a special measuring tool for measuring work, only one measuring person needs to hold the tool in one hand to make contact with the battery, and the other hand holds the multimeter to read, and one person completes the measurement and reading work, which can effectively save the investment of human resources. Moreover, according to According to statistics, using the special tool to measure voltage takes time from 0.56 minutes per unit to 0.18 minutes now, which can effectively improve work efficiency.

附图说明 Description of drawings

附图说明:图1是本发明的结构示意图;图2是图1的Ⅰ局部放大结构示意图;图3是图1的II局部放大结构示意图;图4是图2的III局部放大结构示意图;图5是图4的A向放大结构示意图。 Description of drawings: Fig. 1 is a structural schematic diagram of the present invention; Fig. 2 is a schematic diagram of a partially enlarged structure of Fig. 1; Fig. 3 is a schematic diagram of a partially enlarged structure of Fig. 1; Fig. 4 is a schematic diagram of a partially enlarged structure of Fig. 2; Fig. 5 is a schematic diagram of the enlarged structure along the direction A of FIG. 4 .

附图标记:1手柄 2连接壳 3左表笔 4基座 5右表笔 6手轮 7万用表 8线圈 9上导杆 10螺杆 11下导杆 12绝缘隔板 13第一弹簧 14铁芯 15复位柄 16第二弹簧 17导套 18绝缘片 19动金属触片 20触片室 21第一半轴 22弧形板状触头 23第二半轴 24第三弹簧 25限位凸台 26绝缘杆 27定金属触片 28通孔 29接触头 30槽 31左表笔第一导线 32左表笔第二导线 33右表笔第一导线 34右表笔第二导线 35内腔。 Reference signs: 1 handle 2 connecting shell 3 left pen 4 base 5 right pen 6 handwheel 7 multimeter 8 coil 9 upper guide rod 10 screw rod 11 lower guide rod 12 insulating partition 13 first spring 14 iron core 15 reset handle 16 Second spring 17 Guide sleeve 18 Insulation sheet 19 Moving metal contact piece 20 Contact piece chamber 21 First half shaft 22 Arc-shaped plate contact 23 Second half shaft 24 Third spring 25 Limiting boss 26 Insulation rod 27 Fixed metal Contact sheet 28 through hole 29 contact head 30 slot 31 first lead wire 32 second lead wire 33 first lead wire 34 second lead wire 35 cavity.

具体实施方式 Detailed ways

本发明所述的蓄电池组专用测压工具,包括手柄1,手柄1上安装连接壳2,连接壳2上安装左表笔3和右表笔5,左表笔3和右表笔5的前端各设一个接触头29,左表笔3和右表笔5分别通过两根导线与万用表7连接。将左表笔3和右表笔5固定于共同的连接壳2上,测量人员单手握住手柄1便可控制左表笔3和右表笔5与蓄电池的两个电极准确连接,另一支手操控万用表7,从而实现单人测压,节省人力,提高检测效率。 The special pressure measuring tool for battery packs according to the present invention includes a handle 1, on which a connecting case 2 is installed, on which a left test lead 3 and a right test lead 5 are installed, and a contact is provided at the front ends of the left test lead 3 and the right test lead 5 respectively. Head 29, left test lead 3 and right test lead 5 are respectively connected with multimeter 7 by two wires. Fix the left test lead 3 and the right test lead 5 on the common connection shell 2, and the measuring personnel can control the accurate connection between the left test lead 3 and the right test lead 5 and the two electrodes of the battery by holding the handle 1 with one hand, and control the multimeter with the other hand 7. So as to realize the pressure measurement by one person, save manpower and improve the detection efficiency.

为使所述的蓄电池组专用测压工具能够对各类不同型号尺寸的蓄电池进行测压,如图2所示,连接壳2内设有绝缘隔板12,绝缘隔板12位于左表笔3和右表笔5之间,可防止左表笔3和右表笔5接触造成短路;连接壳2内平行安装上导杆9、下导杆11和螺杆10,上导杆9、下导杆11和螺杆10分别与绝缘隔板12垂直连接,即上导杆9、下导杆11和螺杆10分别垂直穿过绝缘隔板12;螺杆10的一端穿出连接壳2外安装手轮6;螺杆10的左半段和右半段各设有一段螺纹,两段螺纹分别位于绝缘隔板12的两侧,且旋转方向相反;左表笔3和右表笔5的固定端分别与上导杆9、螺杆10和下导杆11连接,左表笔3与螺杆10的左半段螺纹连接,右表笔5与螺杆10的右半段螺纹连接,上导杆9和下导杆11共同对左表笔3和右表笔5起导向作用。当测量不同型号尺寸的蓄电池时,由于蓄电池两电极间的距离不同,因此可通过手轮6转动螺杆10,螺杆10带动左表笔3和右表笔5直线移动,或缩短两者间的距离,或增大两者的距离,以便准确测量。 In order to enable the above-mentioned special pressure measuring tool for battery packs to measure the pressure of batteries of various types and sizes, as shown in FIG. Between the right test leads 5, it can prevent the short circuit caused by the contact between the left test lead 3 and the right test lead 5; the upper guide rod 9, the lower guide rod 11 and the screw rod 10 are installed in parallel in the connection shell 2, and the upper guide rod 9, the lower guide rod 11 and the screw rod 10 Connect vertically with the insulation partition 12 respectively, that is, the upper guide rod 9, the lower guide rod 11 and the screw rod 10 pass through the insulation partition 12 vertically respectively; one end of the screw rod 10 passes through the connecting shell 2 and installs the handwheel 6; The half section and the right half section are each provided with a section of thread, and the two sections of thread are respectively located on both sides of the insulating partition 12, and the direction of rotation is opposite; The lower guide rod 11 is connected, the left test lead 3 is threaded to the left half of the screw rod 10, the right test lead 5 is threaded to the right half of the screw rod 10, the upper guide rod 9 and the lower guide rod 11 are connected to the left test lead 3 and the right test lead 5 Play a guiding role. When measuring batteries of different sizes, since the distance between the two electrodes of the battery is different, the screw 10 can be turned by the hand wheel 6, and the screw 10 drives the left test lead 3 and the right test lead 5 to move in a straight line, or shorten the distance between them, or Increase the distance between the two for accurate measurement.

所述的两根导线分别是左表笔导线和右表笔导线,左表笔导线由左表笔第一导线31和左表笔第二导线32构成,右表笔导线由右表笔第一导线33和右表笔第二导线34构成;手柄1内安装铁芯14,铁芯14的外周安装线圈8,铁芯14和线圈8连接构成电磁铁,线圈8分别与右表笔第一导线33和右表笔第二导线34的一端连接,右表笔第一导线33的另一端与右表笔5连接,右表笔第二导线34的另一端与万用表7连接;手柄1内安装触片室20,触片室20位于铁芯14上方,触片室20内安装动金属触片19和定金属触片27,动金属触片19上安装绝缘杆26,定金属触片27上开设通孔28,绝缘杆26经通孔28穿出触片室20外安装限位凸台25,绝缘杆26的外周安装第一弹簧13,第一弹簧13位于限位凸台25与触片室20之间,第一弹簧13可通过限位凸台25和绝缘杆26对动金属触片19提供预紧力,确保常态下动金属触片19与定金属触片27紧密接触;左表笔3与左表笔第一导线31的一端连接,左表笔第一导线31的另一端与动金属触片19连接,定金属触片27与左表笔第二导线32的一端连接,左表笔第二导线32的另一端与万用表7连接。当被测蓄电池的电压或电流过大时,线圈8和铁芯14构成的电磁铁可产生足够大的磁力,克服第一弹簧13的弹力,使动金属触片19与铁芯14吸合,从而使动金属触片19与定金属触片27分离,此时所述测压装置断电,防止万用表7受损。 The two wires described are the left test pen lead and the right test lead lead, the left test lead is composed of the left test lead first lead 31 and the left test lead second lead 32, and the right test lead is composed of the right test lead first lead 33 and the right second lead. Conductive wire 34 is formed; Iron core 14 is installed in the handle 1, and coil 8 is installed on the periphery of iron core 14, and iron core 14 and coil 8 are connected to form electromagnet, and coil 8 is connected with the first lead wire 33 of right meter pen and the second lead wire 34 of right meter pen respectively. One end is connected, the other end of the first lead 33 of the right test lead is connected with the right test lead 5, the other end of the second lead 34 of the right test lead is connected with the multimeter 7; the contact chamber 20 is installed in the handle 1, and the contact chamber 20 is located above the iron core 14 , a movable metal contact piece 19 and a fixed metal contact piece 27 are installed in the contact piece chamber 20, an insulating rod 26 is installed on the movable metal contact piece 19, a through hole 28 is opened on the fixed metal contact piece 27, and the insulating rod 26 passes through the through hole 28 The limit boss 25 is installed outside the contact chamber 20, and the first spring 13 is installed on the outer periphery of the insulating rod 26. The first spring 13 is located between the limit boss 25 and the contact chamber 20. The first spring 13 can pass through the limit boss. The table 25 and the insulating rod 26 provide a pre-tightening force to the movable metal contact piece 19 to ensure that the movable metal contact piece 19 is in close contact with the fixed metal contact piece 27 under normal conditions; The other end of the first wire 31 is connected with the movable metal contact piece 19, and the fixed metal contact piece 27 is connected with one end of the second wire 32 of the left meter pen, and the other end of the second wire 32 of the left meter pen is connected with the multimeter 7. When the voltage or current of the storage battery under test is too large, the electromagnet composed of the coil 8 and the iron core 14 can generate a large enough magnetic force to overcome the elastic force of the first spring 13, so that the movable metal contact piece 19 is attracted to the iron core 14, Thereby, the movable metal contact piece 19 is separated from the fixed metal contact piece 27, and at this time, the pressure measuring device is powered off to prevent the multimeter 7 from being damaged.

为了使动金属触片19和定金属触片27分离时,进一步提高两者间绝缘效果,如图4和图5所示,触片室20的一侧安装导套17,导套17内安装绝缘片18,绝缘片18的一端穿入触片室20内,绝缘片18的另一端设有复位柄15,复位柄15穿出触片室20及手柄1外,复位柄15的外周安装第二弹簧16,第二弹簧16位于导套17内,绝缘片18上开设槽30。当动金属触片19与定金属触片27分开后,绝缘片18会在第二弹簧16的作用下插入动金属触片19和定金属触片27之间,绝缘杆26位于槽30内。 In order to further improve the insulating effect between the movable metal contact piece 19 and the fixed metal contact piece 27, as shown in Figure 4 and Figure 5, a guide sleeve 17 is installed on one side of the contact piece chamber 20, and a Insulating sheet 18, one end of insulating sheet 18 penetrates in the contact piece chamber 20, and the other end of insulating sheet 18 is provided with reset handle 15, and reset handle 15 passes outside contact sheet chamber 20 and handle 1, and the outer periphery of reset handle 15 installs the first Two springs 16, the second spring 16 is located in the guide sleeve 17, and the insulating sheet 18 is provided with a groove 30. When the movable metal contact piece 19 is separated from the fixed metal contact piece 27 , the insulating sheet 18 will be inserted between the movable metal contact piece 19 and the fixed metal contact piece 27 under the action of the second spring 16 , and the insulating rod 26 is located in the groove 30 .

所述的接触头29由基座4、第一半轴21、第三弹簧24、第二半轴23和弧形板状触头22连接构成,基座4与左表笔3铰接,基座4内开设内腔35,内腔35内安装第一半轴21、第三弹簧24和第二半轴23,第三弹簧24位于第一半轴21和第二半轴23之间,第二半轴23的一端设有弧形板状触头22。由于基座4与左表笔3铰接,接触头29可相对左表笔3转动调整角度,便于根据检测需要调整弧形板状触头22的位置,增大接触面积,另外,第一半轴21、第三弹簧24和第二半轴23配合,既可使弧形板状触头22压紧蓄电池的电极,又可防止弧形板状触头22与蓄电池发生硬碰撞使弧形板状触头22损坏。 The contact head 29 is composed of the base 4, the first half shaft 21, the third spring 24, the second half shaft 23 and the arc-shaped plate contact 22. The base 4 is hinged with the left test lead 3, and the base 4 A cavity 35 is provided inside, and the first half shaft 21, the third spring 24 and the second half shaft 23 are installed in the inner cavity 35, the third spring 24 is located between the first half shaft 21 and the second half shaft 23, and the second half shaft One end of the shaft 23 is provided with an arc-shaped plate-shaped contact 22 . Because the base 4 is hinged with the left test lead 3, the contact head 29 can rotate and adjust the angle relative to the left test lead 3, which is convenient to adjust the position of the arc-shaped plate-shaped contact 22 according to the detection needs and increase the contact area. In addition, the first semi-axis 21, The third spring 24 cooperates with the second semi-axis 23, which can not only make the arc-shaped plate-shaped contact 22 press the electrode of the storage battery, but also prevent the arc-shaped plate-shaped contact 22 from colliding with the battery so that the arc-shaped plate-shaped contact 22 damaged.

本发明所述的技术方案并不限制于本发明所述的实施例的范围内。本发明未详尽描述的技术内容均为公知技术。 The technical solutions described in the present invention are not limited within the scope of the embodiments described in the present invention. The technical contents not described in detail in the present invention are all known technologies.

Claims (4)

1. the special-purpose pressure measurement instrument of battery pack; Comprise handle (1); It is characterized in that: handle (1) is gone up to install and is connected shell (2); Connect shell (2) and go up installation left-handed watch pen (3) and right test pencil (5), the front end of left-handed watch pen (3) and right test pencil (5) is respectively established a contact head (29), and left-handed watch pen (3) is connected with multimeter (7) through two leads respectively with right test pencil (5); Be provided with insulating barrier (12) in the connection shell (2), insulating barrier (12) is positioned between left-handed watch pen (3) and the right test pencil (5); Connect parallel guide rod (9), lower guide rod (11) and the screw rod (10) installed in the shell (2), top guide bar (9), lower guide rod (11) and screw rod (10) respectively with vertical connection of insulating barrier (12); One end of screw rod (10) passes and connects the outer handwheel (6) of installing of shell (2), and half section on the left side of screw rod (10) and the right side respectively are provided with one section screw thread for half section, and two sections screw threads lay respectively at the both sides of insulating barrier (12), and sense of rotation is opposite; The stiff end of left-handed watch pen (3) and right test pencil (5) is connected with top guide bar (9), screw rod (10) and lower guide rod (11) respectively; Left-handed watch pen (3) is threaded for half section with the left side of screw rod (10), and right test pencil (5) is threaded for half section with the right side of screw rod (10).
2. the special-purpose pressure measurement instrument of battery pack according to claim 1; It is characterized in that: described two leads are respectively a left-handed watch lead and right test pencil lead; A left-handed watch lead is made up of left-handed watch pen first lead (31) and left-handed watch pen second lead (32), and right test pencil lead is made up of right test pencil first lead (33) and right test pencil second lead (34); Iron core (14) is installed in the handle (1); The periphery of iron core (14) is installed coil (8); Coil (8) is connected with the end of right test pencil first lead (33) with right test pencil second lead (34) respectively; The other end of right test pencil first lead (33) is connected with right test pencil (5), and the other end of right test pencil second lead (34) is connected with multimeter (7); Contact chamber (20) is installed in the handle (1); Contact chamber (20) is positioned at iron core (14) top; Moving metal contact (19) and deposit are installed in the contact chamber (20) are belonged to contact (27); Moving metal contact (19) is gone up insulating bar (26) is installed, and deposit belongs to offers through hole (28) on the contact (27), and insulating bar (26) via through holes (28) passes the outer positive stop lug boss (25) of installing in contact chamber (20); The periphery of insulating bar (26) is installed first spring (13), and first spring (13) is positioned between positive stop lug boss (25) and contact chamber (20); Left-handed watch pen (3) is connected with an end of left-handed watch pen first lead (31); The other end of left-handed watch pen first lead (31) is connected with moving metal contact (19); Deposit belongs to contact (27) and is connected with an end of left-handed watch pen second lead (32), and the other end of left-handed watch pen second lead (32) is connected with multimeter (7).
3. the special-purpose pressure measurement instrument of battery pack according to claim 2; It is characterized in that: a side mounting guide sleeve (17) of contact chamber (20); Insulating trip (18) is installed in the guide pin bushing (17), and an end of insulating trip (18) penetrates in the contact chamber (20), and the other end of insulating trip (18) is provided with the handle that resets (15); The handle (15) that resets passes outside contact chamber (20) and the handle (1); The periphery of handle (15) of resetting is installed second spring (16), and second spring (16) is positioned at guide pin bushing (17), offers groove (30) on the insulating trip (18).
4. the special-purpose pressure measurement instrument of battery pack according to claim 1; It is characterized in that: described contact head (29) is connected and composed by pedestal (4), first semiaxis (21), the 3rd spring (24), second semiaxis (23) and the tabular contact of arc (22); Pedestal (4) is hinged with left-handed watch pen (3); Offer inner chamber (35) in the pedestal (4); First semiaxis (21), the 3rd spring (24) and second semiaxis (23) are installed in the inner chamber (35), and the 3rd spring (24) is positioned between first semiaxis (21) and second semiaxis (23), and an end of second semiaxis (23) is provided with the tabular contact of arc (22).
CN2010105459909A 2010-11-16 2010-11-16 Voltage measuring tool special for storage battery Expired - Fee Related CN102012486B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105459909A CN102012486B (en) 2010-11-16 2010-11-16 Voltage measuring tool special for storage battery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105459909A CN102012486B (en) 2010-11-16 2010-11-16 Voltage measuring tool special for storage battery

Publications (2)

Publication Number Publication Date
CN102012486A CN102012486A (en) 2011-04-13
CN102012486B true CN102012486B (en) 2012-11-14

Family

ID=43842717

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105459909A Expired - Fee Related CN102012486B (en) 2010-11-16 2010-11-16 Voltage measuring tool special for storage battery

Country Status (1)

Country Link
CN (1) CN102012486B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202012102032U1 (en) * 2012-06-04 2013-09-06 Weidmüller Interface GmbH & Co. KG Measuring instrument, in particular voltage tester
CN106053912A (en) * 2016-08-12 2016-10-26 中国南方电网有限责任公司超高压输电公司昆明局 Adjustable spacing universal meter
CN106443463B (en) * 2016-09-07 2019-08-27 广州皖力实业有限公司 Power battery Electromagnetic Control test device
CN110554244B (en) * 2019-09-20 2025-09-09 裕东(中山)机械工程有限公司 Mobile online resistance detection system for electrostatic powder spraying
CN110687351A (en) * 2019-10-11 2020-01-14 深圳市创荣发电子有限公司 Conductive adhesive carbon particle detection jig and detection method
CN119395378A (en) * 2024-10-16 2025-02-07 南通高塔机械设备租赁有限公司 A portable intelligent megohmmeter

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101629991A (en) * 2009-06-26 2010-01-20 河南省电力公司商丘供电公司 Specific tool for measuring battery
CN201444172U (en) * 2009-07-27 2010-04-28 山东电力集团公司超高压公司 Special voltmeter for wrist battery
CN201903631U (en) * 2010-11-16 2011-07-20 山东电力集团公司超高压公司 Special pressure measuring tool for storage battery

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101201121B1 (en) * 2005-12-02 2012-11-13 에스케이이노베이션 주식회사 Apparatus and method of testing for battery

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101629991A (en) * 2009-06-26 2010-01-20 河南省电力公司商丘供电公司 Specific tool for measuring battery
CN201444172U (en) * 2009-07-27 2010-04-28 山东电力集团公司超高压公司 Special voltmeter for wrist battery
CN201903631U (en) * 2010-11-16 2011-07-20 山东电力集团公司超高压公司 Special pressure measuring tool for storage battery

Also Published As

Publication number Publication date
CN102012486A (en) 2011-04-13

Similar Documents

Publication Publication Date Title
CN102012486A (en) Voltage measuring tool special for storage battery
CN101344369B (en) High-voltage switchgear handcart one-touch travel test device
CN201903631U (en) Special pressure measuring tool for storage battery
CN203165309U (en) Experimental device for measuring capacitance and air dielectric constant
CN202710709U (en) Voltage withstand testing jig of horizontal transformer
CN201540311U (en) A jig for measuring internal resistance of a battery
CN203838317U (en) Battery detection tool
CN206515446U (en) Cylindrical battery negative pole and enclosure voltage detection means
CN201489105U (en) Voltage calibration device of frictional static electricity tester
CN211855170U (en) Switch cabinet dynamic and static contact depth measurer
CN205229424U (en) Battery measuring device
CN203443986U (en) Combined type universal meter pen
CN203705534U (en) On-line monitoring device for lightning current of overhead transmission line
CN206772475U (en) A kind of leaf spring pressure-detecting device
CN203037677U (en) Double-wire input cable clamping device for fault indicator
CN203930044U (en) A kind of verification conversion equipment of three-phase multifunctional electrical energy meter
CN204855568U (en) Operation low pressure current transformer trouble -locating device
CN209264932U (en) A battery power detection device
CN210051819U (en) Portable phase detector
CN204479619U (en) Live working tools Insulation monitoring electrode special
CN210863884U (en) Portable disconnection-free grounding resistance detection device
CN207908547U (en) A kind of electric wire bridge gripper
CN218099514U (en) A tool for measuring batteries in narrow spaces
CN204989233U (en) Hydraulic generator shaft voltage measurement instrument
CN104697694B (en) A kind of detection method of circuit breaker short circuit protection detection means and application described device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121219

Owner name: MAINTENANCE BRANCH OF SHANDONG ELECTRIC POWER CO.,

Free format text: FORMER OWNER: ULTRA-HV COMPANY OF SHANDONG ELECTRIC POWER CORPORATION

Effective date: 20121219

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121219

Address after: 250021 No. ten, No. 111, weft Road, Shandong, Ji'nan

Patentee after: MAINTENANCE COMPANY OF SHANDONG ELECTRIC POWER Corp.

Patentee after: State Grid Corporation of China

Address before: 250021 No. ten, No. 111, weft Road, Shandong, Ji'nan

Patentee before: Extra-high Voltage Co., Ltd., Shandong Electric Power Corp.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121114