CN102011573A - Method for uniformly injecting multi-component thermal fluid in horizontal well - Google Patents

Method for uniformly injecting multi-component thermal fluid in horizontal well Download PDF

Info

Publication number
CN102011573A
CN102011573A CN2010105973409A CN201010597340A CN102011573A CN 102011573 A CN102011573 A CN 102011573A CN 2010105973409 A CN2010105973409 A CN 2010105973409A CN 201010597340 A CN201010597340 A CN 201010597340A CN 102011573 A CN102011573 A CN 102011573A
Authority
CN
China
Prior art keywords
horizontal well
hot fluid
discharge orifice
multielement hot
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010105973409A
Other languages
Chinese (zh)
Other versions
CN102011573B (en
Inventor
孙永涛
邹剑
马增华
孙玉豹
林涛
张玉久
王少华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Oilfield Services Ltd
China National Offshore Oil Corp CNOOC
CNOOC China Ltd Tianjin Branch
Original Assignee
China Oilfield Services Ltd
China National Offshore Oil Corp CNOOC
CNOOC China Ltd Tianjin Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Oilfield Services Ltd, China National Offshore Oil Corp CNOOC, CNOOC China Ltd Tianjin Branch filed Critical China Oilfield Services Ltd
Priority to CN201010597340.9A priority Critical patent/CN102011573B/en
Publication of CN102011573A publication Critical patent/CN102011573A/en
Application granted granted Critical
Publication of CN102011573B publication Critical patent/CN102011573B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigating Or Analyzing Materials Using Thermal Means (AREA)

Abstract

The invention provides a method for uniformly injecting a multi-component thermal fluid in a horizontal well. The method comprises the following steps: (1) segmenting horizontal segments in the horizontal well; (2) initially setting the size of each discharge orifice on a tubular column in each segment of the horizontal well and the number of discharge orifices at a tail end; (3) detecting the temperature, pressure and dryness of the multi-component thermal fluid; (4) obtaining the on-way temperature, pressure, dryness and heat loss of each shaft segment of the horizontal well by iterative calculation; (5) obtaining the actual number of the discharge orifices on the tubular column in each segment of the horizontal well and the size of each discharge orifice by iterative calculation; and (6) drilling the tubular column based on the calculation result, putting the tubular column subject to drilling down into the well, and injecting the multi-component thermal fluid in the tubular column. The invention has the advantages of wide oil pool application range, relatively simple technology and low cost, and ensures that the oil pool at the horizontal well segment can be subject to uniform steam injection without changing the traditional well orifices and steam injection pipes. Besides, by using the invention, the producing degree of the oil reservoir is improved and the optimal exploitation effect can be ensured by injecting the multi-component thermal fluid in the horizontal well of the exploited oil pool.

Description

A kind of method of in horizontal well, evenly injecting multielement hot fluid
Technical field
The present invention relates to the heavy crude heat extraction technology, relate in particular to a kind of method of in horizontal well, evenly injecting multielement hot fluid.
Background technology
Present marine viscous crude field is being carried out multielement hot fluid (N 2+ CO 2+ steam) application test of handling up.Horizontal well field measurement and analog study both at home and abroad shows, horizontal well is generally annotated way of steam and is caused easily that advance by leaps and bounds in net horizontal section gas part, oil reservoir is employed inhomogeneous, the horizontal segment oil reservoir has been employed the 1/3-1/2 that the well section only accounts for horizontal section length, and, the horizontal segment oil reservoir is employed uneven can the aggravation with the increase in the vapour cycle of showwing loving care for, even causes local vapour to scurry and water outlet.
External Canada and domestic Liaohe Oil Field primary study and used the two-tube steam injection technology technology of horizontal well, adopt the inner and outer pipes mode respectively horizontal well heel and end to be annotated vapour, steam injects from two passages, one is that 1.9 " integral joint tubing is injected into the horizontal segment tiptoe; one is that 41/2 " vacuum heat insulation tube and 1.9 " integral joint tubing annular space well is annotated heel from the bottom; carry out flow-control by ground flow mediation valve door, realize two controls that go out vapour point different displacements from top.Two-tube steam injection technology can realize annotating the dynamic adjustment of vapour amount at well head, and notes vapour utilization rate is improved, and has improved the horizontal well development effect to a certain extent, but technical requirements and cost height.
Summary of the invention
The technical problem to be solved in the present invention provides a kind of oil reservoir wide accommodation, and application process is simple, cost is low, does not need the method for evenly injecting multielement hot fluid in horizontal well that changes existing well head and annotate steam pipe.
In order to address the above problem, the invention provides a kind of method of in horizontal well, evenly injecting multielement hot fluid, may further comprise the steps:
(1) measures the horizontal well entire length, and horizontal segment in the horizontal well is carried out segmentation according to measurement result;
(2) measure the horizontal well internal diameter, and discharge orifice size and terminal discharge orifice number on the tubing string in each section horizontal well are carried out initial setting according to measurement result;
(3) detect multielement hot fluid temperature, pressure and the mass dryness fraction of preparing injection;
(4) according to testing result in the step (3) and horizontal well along each section of journey characteristic iterative computation horizontal well pit shaft along Cheng Wendu, pressure, mass dryness fraction and heat waste, wherein, pit shaft is along the journey temperature loss:
q ′ = - dH m dz + G tol g
In the following formula, q ' is the heat waste of pit shaft unit length;
H mTotal energy for multielement hot fluid;
G TolBe the multielement hot fluid mass flow;
G is an acceleration of gravity;
Z is a well depth;
Wellbore pressure is:
dp dz = ρ m g sin θ - λ ρ m u m 2 2 d
In the following formula, p is a pressure;
ρ mBe multielement hot fluid density;
G is an acceleration of gravity;
Z is a well depth;
θ is a hole angle;
λ is a resistance coefficient;
u mBe multielement hot fluid speed;
D is a tubing diameter.
The mass dryness fraction design formulas:
dx dz = c 1 M H 2 O G H 2 O 1 ( p - p w ) 2 ( p dp w dT dT dz - p w dp dz )
In the following formula, χ is a steam quality;
Z is a well depth;
Figure BDA0000039417340000032
Be the saturation water mass flow;
Figure BDA0000039417340000033
Molal weight for water;
P is a pressure;
p wBe water saturation pressure;
T is the multielement hot fluid temperature;
Steam to the heat output of cement sheath outer rim in the dz section is in the oil pipe:
dQ=2πr toU to(T s-T h)dz
In the following formula, Q is the pit shaft radial flow heat;
r To-oil pipe external diameter;
U To-overall coefficient of heat transfer;
T h-cement sheath outer rim temperature;
T s-multielement hot fluid temperature;
Z is a well depth.
Heat conduction from the cement sheath outer rim to the stratum is:
dQ=2πλ e(T h-T e)dz/f(t)
In the following formula, Q is the pit shaft radial flow heat;
λ e-stratum thermal transmittance;
T e-surface temperature;
T h-cement sheath outer rim temperature;
F (t)-nondimensional time function;
Z is a well depth;
(5) according to initial set value in result of calculation in the step (4) and step (1), (2) and evenly inject the principle iteration and calculate actual discharge orifice number and discharge orifice size on every section horizontal well tubing string, wherein, i section discharge orifice diameter is:
d i = 2 q nπv o ( i )
In the following formula, d iIt is i section discharge orifice diameter;
Q is the multielement hot fluid flow;
N is the horizontal segment segments;
v O (i)It is i section discharge orifice discharge velocity.
I section discharge orifice number is:
N i = π ( d i 2 ) 2 A 1 = q nv o ( i ) A 1
In the following formula, d iIt is i section discharge orifice diameter;
A 1For presetting the discharge orifice area;
Q is the multielement hot fluid flow;
N is the horizontal segment segments;
v O (i)It is i section discharge orifice discharge velocity;
(6) according to result of calculation in the step (5) tubing string is punched, will punch in the tubing string lower going-into-well of back, then multielement hot fluid is injected this tubing string.
Further, according to the principle of one section in every 50-70 rice horizontal well is carried out segmentation in the described step (1).
Further, setting the discharge orifice size in the described step (2) is 1-2 centimetre.
Further, set terminal discharge orifice number according to the maximum speed limit of discharge orifice in the described step (2).
Further, adopt thermometer, pressure to take into account temperature, pressure and mass dryness fraction that hygrometer detects the multielement hot fluid of preparing injection in the described step (3) respectively.
Further, on tubing string, carry out 360 degree spiral punchings in the described step (5).
The present invention has following advantage:
1, the present invention is according to horizontal well and each parameter measurements of multielement hot fluid are calculated along Cheng Wendu, pressure, mass dryness fraction and heat waste horizontal well, and according to discharge orifice size and number on the tubing string in the result of calculation correction horizontal well, to reach the purpose of even heated fluid injection in horizontal well, its oil reservoir wide accommodation, and technology is simple relatively, cost is low, do not need to change existing well head and annotate steam pipe, can make the net horizontal section oil reservoir evenly inhale vapour, improve the development degree of oil reservoir, guarantee that horizontal well injects multi-element fluid exploitation oil reservoir and reaches best exploitation effect.
2, application process of the present invention is simple, reliable, can realize automation mechanized operation, and the present invention and can using in multiple different occasions only needs to adjust measurement parameter, and dependability height of the present invention is effective.
Description of drawings
Below in conjunction with accompanying drawing embodiments of the present invention are described further:
Fig. 1 shows horizontal well casing programme schematic diagram;
Fig. 2 shows horizontal segment and evenly injects schematic diagram.
The specific embodiment
The present invention includes following steps:
(1) measures the horizontal well entire length, and horizontal segment in the horizontal well is carried out segmentation according to measurement result.
The horizontal well casing programme comprises well head 1, pit shaft 2 and horizontal segment 3 as shown in Figure 1, and horizontal segment 3 tubing strings 6 are provided with discharge orifice 4.Major length is a horizontal section length herein, can realize even injection in order to make horizontal segment, and in the homogeneous oil reservoir, general every 50-70 rice is divided into one section.
(2) measure the horizontal well internal diameter, and discharge orifice size and terminal discharge orifice number on the tubing string in each section horizontal well are carried out initial setting according to measurement result.
Horizontal segment evenly injects as shown in Figure 2, and multielement hot fluid 5 injection strings 6 are provided with discharge orifice 4 on the tubing string 6, and multielement hot fluid 5 enters annular space 8 between tubing string 6 and the screen casing 7 by discharge orifice 4, also piles up layer of gravel 10 between screen casing 7 and the stratum 9.
Discharge orifice size too conference influences the injection string structural performance; The discharge orifice size is too little, and the discharge orifice chock pressure difference is big, effluxvelocity is big, and screen casing is caused certain impact, and therefore, general discharge orifice size dimension is arranged on 1-2 centimetre.Terminal discharge orifice number will according to the injection string end whether opening, the maximum speed limit of discharge orifice (<30m/s) be provided with.
(3) detect multielement hot fluid temperature, pressure and the mass dryness fraction of preparing injection.
Adopt thermometer, pressure to take into account temperature, pressure and mass dryness fraction that hygrometer detects the multielement hot fluid of preparing injection respectively.
(4) according to testing result in the step (3) and horizontal well along each section of journey characteristic iterative computation horizontal well pit shaft along Cheng Wendu, pressure, mass dryness fraction and heat waste.
Because Calculation of Heat loss relates to pressure, temperature and the mass dryness fraction of multielement hot fluid, pressure, temperature and the mass dryness fraction that therefore must calculate multielement hot fluid earlier distribute; And to determine pressure, temperature and the mass dryness fraction in shaft bottom, just must fall according to the charge velocity of multielement hot fluid and the heat waste and the pressure of shaft column calculation of parameter pit shaft.This shows that pit shaft multielement hot fluid pressure, temperature, mass dryness fraction and Calculation of Heat loss intercouple, the calculating of each will could be determined through iteration.
(A) wellbore pressure calculates
It is the synthesis result of friction loss, potential variation and kinetic energy change that the pressure of the interior gas-liquid phase pipe of pit shaft falls, and the momentum balance equation of being followed is (get and to be positive direction vertically downward):
dp dz = ρ m g sin θ - λ ρ m u m 2 2 d - - - ( 1 )
(B) the pit shaft mass dryness fraction is calculated
Multielement hot fluid flowing in pit shaft for two-phase, multi-component complexity flow, liquid phase is a water, and gas phase is by saturated vapour, N 2, CO 2The mist of forming, by law of partial pressure as can be known: the partial pressure of saturated vapour is directly proportional with shared mole percent:
y H 2 O ′ ′ = p w ( T ) / p = G H 2 O ′ ′ M H 2 O / [ G H 2 O ′ ′ M H 2 O + G CO 2 M CO 2 + G N 2 M N 2 ] - - - ( 2 )
Wherein, steam saturation pressure p wCan try to achieve by water vapour character.
Order c 1 = [ G CO 2 M CO 2 + G N 2 M N 2 ]
If this moment, steam quality was x, then have
Figure BDA0000039417340000073
The arrangement of substitution (2) formula can get:
p w ( T ) p = xG H 2 O M H 2 O c 1 - - - ( 3 )
Because T is the function of z, x, p also are the functions of z, p wBe the function of T,, can obtain the mass dryness fraction design formulas formula (3) differentiate:
dx dz = c 1 M H 2 O G H 2 O 1 ( p - p w ) 2 ( p dp w dT dT dz - p w dp dz ) - - - ( 4 )
(C) temperature in wellbore is calculated
According to energy-balance equation, the heat waste in the pit shaft unit interval, on the unit length equals in the unit interval, the minimizing of multielement hot fluid energy on the unit length, promptly (ignores kinetic energy rejection):
q ′ = - dH m dz + Gg - - - ( 5 )
Wherein, H m = G CO 2 h CO 2 ( T ) + G N 2 h N 2 ( T ) + ( 1 - x ) G H 2 O h H 2 o ′ ( T ) + x G H 2 O h H 2 O ′ ′ ( T )
Differentiate gets to formula (5):
dH m dz = G CO 2 dh CO 2 dT + G N 2 dh N 2 dT + [ ( 1 + x ) G H 2 O dh H 2 o ′ dT + x G H 2 O dh H 2 O ′ ′ dT ] dT dZ + r G H 2 O dx dz - - - ( 6 )
Wherein, r=h " (T)-h ' (T), will can obtain the temperature computation formula after formula (6) substitution formula (5) arrangement:
dT dz = [ rc 1 M H 2 O ( p - p w ) 2 p w dp dz + Gg - q 1 ] / c 2 - - - ( 7 )
Wherein, c 2 = G CO 2 dh CO 2 dT + G N 2 dh N 2 dT + ( 1 - x ) G H 2 O dh H 2 o ′ ′ dT + x G H 2 O dh H 2 O ′ ′ dT + r c 1 p M H 2 O ( p - p w ) 2 dp w dT
Simultaneous formula (1), (4), (7) have promptly constituted multielement hot fluid two phase flow temperature, pressure and mass dryness fraction Mathematical Modeling.
(D) wellbore heat loss calculation
Adopt the method for Ramey (1962 by U.S. professor Ramey proposition) and Satter (nineteen sixty-five Satter improves and promotes) on the basis of Ramey method, regard by of the one dimension steady state heat conduction of oil pipe center radially conducting heat of heat waste as the cement sheath outer rim formed to the one dimension unsteady heat transfer two parts between the stratum to the cement sheath outer rim; And radially heat waste is along the well depth direction, and time dependent; Suppose that in the unit interval heat waste on the pit shaft segment length dz is dQ.
A) the oil pipe center is to the heat transfer of cement sheath outer rim
Steam to the heat output of cement sheath outer rim in the dz section is in the oil pipe:
dQ=2πr toU to(T s-T h)dz (8)
Wherein, U to = r to [ 1 r ti h f + ln r to r ti λ tub + ln r i r to λ ins + 1 r i ( h c + h r ) + ln r co r ci λ cas + ln r h r co λ cem ]
Every thermal resistance that is respectively thermal resistance, casing wall thermal resistance and the cement sheath of tube inner wall Forced Convection Heat Transfer thermal resistance, tubing wall thermal resistance, annulus fluid or gas in the bracket.
B) heat conduction from the cement sheath outer rim to the stratum
Owing to be unsettled conduction of heat, the heat waste on stratum is begun greatly, but with the carrying out of the vapour of showwing loving care for, formation temperature increases, heat transfer power temperature difference T will reduce, and cause the heat waste reduction.
Be formulated as:
dQ=2πλ e(T h-T e)dz/f(t) (9)
Wherein,
Figure BDA0000039417340000082
Be the nondimensional time function.
(5) according to initial set value in result of calculation in the step (4) and step (1), (2) and evenly inject the principle iteration and calculate actual discharge orifice number and discharge orifice size on every section horizontal well tubing string.
Distribute along Cheng Wendu, pressure and mass dryness fraction according to the pit shaft of trying to achieve,, evenly be injected to prerequisite, anti-horizontal segment every section required discharge orifice size, number and discharge velocity of pushing away with every section in conjunction with horizontal segment segments and terminal discharge orifice size, number.
(A) assumed condition
In order to make multielement hot fluid evenly inject the stratum, must satisfy 2 conditions along whole horizontal segment:
A) a level injection section oil jacket annular space internal pressure equates, and more than or equal to strata pressure+injecting multielement hot fluid pressure reduction, i.e. (n is that horizontal segment evenly injects segments):
p o1=p o2=…=p oi=…=p on=p o (10)
B) each section of horizontal segment injection rate equates, promptly
q 1=q 2=…=q i=…=q n=q/n (11)
(B) the even injection parameter of horizontal segment is found the solution
When multielement hot fluid flowed at horizontal segment, its fluidised form was a turbulent flow, between venthole n-1 and the n along the stroke pressure loss was:
p i - 1 - p i = 8 gl C 2 R υ i 2 2 g ρ m g (i=1、2...n) (12)
Wherein,
Figure BDA0000039417340000092
J=0.01~0.02,
Figure BDA0000039417340000093
υ iBe multielement hot fluid flow velocity in the i section ascending pipe, its design formulas:
Simultaneously by the local pressure loss formula:
p i - 1 - p i = λ l 4 R υ i 2 2 g ρ m g - - - ( 13 )
Therefore, ζ v o ( i - 1 ) 2 2 g ρ m g = ζ v o ( i ) 2 2 g ρ m g + 8 gl C 2 R υ i 2 2 g ρ m g - - - ( 14 )
Then, i-1 section discharge orifice discharge velocity is:
v o ( i - 1 ) = ζ v o ( i 2 ) + 8 gl C 2 R υ i 2 ζ - - - ( 15 )
Wherein, v O (n)Can try to achieve according to terminal discharge orifice size, number,, can obtain every section discharge orifice muzzle velocity one by one therefore according to counter the pushing away of formula (15).
Because every section is evenly injected (injection rate is known), then by i section discharge orifice discharge velocity formula, can try to achieve the diameter of this section discharge orifice:
d i = 2 q nπ v o ( i ) - - - ( 16 )
According to presetting the discharge orifice area A 1, the required discharge orifice number of i section then:
N i = π ( d i 2 ) 2 A 1 = q nv o ( i ) A 1 - - - ( 17 )
Horizontal segment every section required discharge orifice size, number and earial drainage speed can be tried to achieve in simultaneous formula (15), (16), (17), and the horizontal segment segments, terminal discharge orifice number and the discharge orifice size that are provided with in the integrating step 1.
(6) according to result of calculation in the step (5) tubing string is punched, will punch in the tubing string lower going-into-well of back, then multielement hot fluid is injected this tubing string.
According to every section discharge orifice parameter, on the horizontal segment injection string, carry out 360 degree spiral punchings, be lowered to the even injection that this tubing string just can be realized multielement hot fluid.
The present invention is according to horizontal well and each parameter measurements of multielement hot fluid are calculated along Cheng Wendu, pressure, mass dryness fraction and heat waste horizontal well, and according to discharge orifice size and number on the tubing string in the result of calculation correction horizontal well, to reach the purpose of even heated fluid injection in horizontal well, its oil reservoir wide accommodation, and technology is simple relatively, cost is low, do not need to change existing well head and annotate steam pipe, can make the net horizontal section oil reservoir evenly inhale vapour, improve the development degree of oil reservoir, guarantee that horizontal well injects multi-element fluid exploitation oil reservoir and reaches best exploitation effect.
Elaborate below in conjunction with a specific embodiment:
One horizontal well implementing plan multielement hot fluid injects operation, and its well head injection parameter (temperature: 140 ℃, pressure: 8MPa), multielement hot fluid component (N 2: 687Nm 3/ h, CO 2: 147Nm 3/ h and water: 6.9t/h), heat injection pipe string combination and heat insulation mode: " vacuum heat-insulation oil pipe+annular space fills nitrogen, well vertical section: 500m, inclination section: 700, horizontal segment: 310m (horizontal segment end openings) to adopt 4-1/2.
1, horizontal segment segments, terminal discharge orifice number and size are provided with
Every section product degree of horizontal segment is set to 62m, and then the horizontal segment segments is: the 310m/62m=5 section; Terminal discharge orifice number is set to 40, and its size is 10mm.
2, associating pressure, temperature and heat waste design formulas, every section pressure of iterative computation pit shaft, temperature, heat waste, enthalpy, thermal transmittance, fluidised form distribute, and result of calculation is as shown in table 2.
Table 2 pit shaft is along the journey parameter distribution
The degree of depth Pressure Temperature Heat waste The steam enthalpy Thermal transmittance Fluidised form
0 7.9178 139.136 0.00E+00 5.72E+02 0.836 GAP
41.64 8.0847 138.742 2.29E-01 5.70E+02 0.836 GAP
71.08 8.2103 138.464 4.58E-01 5.69E+02 0.836 GAP
100.52 8.3371 138.187 6.87E-01 5.68E+02 0.835 GAP
129.96 8.4649 137.912 9.14E-01 5.67E+02 0.835 GAP
159.4 8.5939 137.637 1.14E+00 5.66E+02 0.835 GAP
188.84 8.7239 137.362 1.37E+00 5.65E+02 0.835 GAP
218.28 8.8551 137.089 1.59E+00 5.64E+02 0.834 GAP
247.72 8.9873 136.816 1.82E+00 5.63E+02 0.834 GAP
277.16 9.1207 136.544 2.04E+00 5.62E+02 0.834 GAP
306.6 9.2551 136.273 2.27E+00 5.61E+02 0.834 GAP
336.04 9.3905 136.003 2.49E+00 5.60E+02 0.833 GAP
365.48 9.527 135.733 2.71E+00 5.59E+02 0.833 GAP
394.92 9.6646 135.465 2.94E+00 5.58E+02 0.833 GAP
424.36 9.8032 135.197 3.16E+00 5.57E+02 0.833 GAP
453.8 9.9428 134.929 3.38E+00 5.56E+02 0.832 GAP
483.24 10.0834 134.663 3.60E+00 5.55E+02 0.832 GAP
512.68 10.2251 134.397 3.82E+00 5.54E+02 0.832 GAP
542.12 10.3678 134.132 4.04E+00 5.53E+02 0.831 GAP
571.56 10.5115 133.868 4.26E+00 5.52E+02 0.831 GAP
601 10.6562 133.605 4.64E+00 5.51E+02 0.831 GAP
645 10.8742 133.213 4.97E+00 5.50E+02 0.831 GAP
689 11.123 132.82 5.31E+00 5.49E+02 0.83 GAP
733 11.3994 132.426 5.64E+00 5.47E+02 0.83 GAP
777 11.6907 132.033 5.98E+00 5.46E+02 0.829 GAP
821 11.981 131.642 6.31E+00 5.44E+02 0.829 GAP
865 12.2572 131.254 6.64E+00 5.43E+02 0.829 GAP
909 12.521 130.869 6.97E+00 5.42E+02 0.828 GAP
953 12.7936 130.485 7.29E+00 5.40E+02 0.828 GAP
997 13.0702 130.102 7.62E+00 5.39E+02 0.828 GAP
1041 13.2781 129726 7.95E+00 5.37E+02 0.827 GAP
1085 13.4285 129357 8.27E+00 5.36E+02 0.827 GAP
1129 13.5472 128992 8.59E+00 5.35E+02 0.826 GAP
1173 13.6108 128634 8.91E+00 5.33E+02 0.826 GAP
1200 13.6309 128.28 9.23E+00 5.32E+02 0.826 SLUG
3, according to the even injection parameter design formulas of horizontal segment, every section discharge orifice number of calculated level section, discharge orifice size and earial drainage speed, result of calculation is as shown in table 3, at last according to this uniform Design parameter, 360 degree spiral punchings can realize that just multielement hot fluid evenly injects in horizontal well on the horizontal segment injection string.
Table 3 horizontal segment multielement hot fluid evenly injects design
Figure BDA0000039417340000121
Be each parameter situation among the present invention below:
The d-tubing diameter, m;
The Z-well depth, m;
u m-multielement hot fluid average speed, m/s;
ρ m-multielement hot fluid averag density, kg/m 3
θ-hole angle, radian;
χ-steam quality, %;
P-multielement hot fluid pressure, MPa;
p w-water saturation pressure, MPa;
T-multielement hot fluid temperature, ℃;
λ-two phase flow the coefficient of friction resistance;
The heat waste of q '-pit shaft unit length, W/m;
H mThe total energy of-multielement hot fluid, W;
G Tol-multielement hot fluid mass flow, kg/s;
Figure BDA0000039417340000131
Figure BDA0000039417340000132
Figure BDA0000039417340000133
Figure BDA0000039417340000134
-CO 2, N 2, saturation water, saturated vapour mass flow, kg/s;
Figure BDA0000039417340000136
Figure BDA0000039417340000138
-CO 2, N 2, saturation water, saturated vapour heat content, kJ/kg;
Figure BDA0000039417340000139
Figure BDA00000394173400001310
Figure BDA00000394173400001311
-water, CO 2, N 2Molal weight, kg/mol;
r Ti-pipe aperture, m;
r To-oil pipe external diameter, m;
r Ci-casing inner diameter, m;
r Co-cover external diameter of pipe, m;
r h-cement sheath external diameter, m;
λ Tub-oil pipe thermal transmittance, W/ (m 2K);
λ Cas-sleeve pipe thermal transmittance, W/ (m 2K);
λ Cem-cement sheath thermal transmittance, W/ (m 2K);
λ e-stratum thermal transmittance, W/ (m 2K);
T h-cement sheath outer rim temperature, ℃;
T e-surface temperature, ℃;
T s-multielement hot fluid temperature, ℃;
The a-geothermal gradient, ℃/m, common a=0.03~0.035 ℃;
The t-heat injection cumulative time, h;
The Z-well depth, m;
u m-multielement hot fluid average speed, m/s;
ρ m-multielement hot fluid averag density, kg/m 3
Figure BDA0000039417340000141
-stratum thermal diffusion coefficient, m 2/ h;
Q-pit shaft radial flow heat, W;
U To-overall coefficient of heat transfer, W/ (m 2K);
F (t)-nondimensional time function;
The n-horizontal segment evenly injects segments;
The every segment length of l-, m;
p i-horizontal segment i section oil pipe internal pressure, MPa; (i=1,2...n)
p Oi-horizontal segment i section oil jacket annular pressure, MPa; (i=1,2...n)
p o-horizontal segment oil jacket annular pressure, MPa;
A-injection string sectional area, m 2
υ iFlow velocity in the-Di i section injection string, m/s; (i=1,2...n)
q i-Di i section flow, t/s; (i=1,2...n)
The q-multielement hot fluid injects total amount, t/s;
d i-Di i section discharge orifice diameter, m; (i=1,2...n)
The C-constant;
ζ-local losses coefficient;
v O (i)-Di i section discharge orifice discharge velocity, m/s; (i=1,2...n)
N i-Di i section earial drainage hole count; (i=1,2...n)
A 1-preset discharge orifice area, m 2
Application process of the present invention is simple, reliable, can realize automation mechanized operation, and the present invention and can using in multiple different occasions only needs to adjust measurement parameter, and dependability height of the present invention is effective.
In sum; being preferred embodiment of the present invention only below, is not to be used to limit protection scope of the present invention, therefore; all any modifications of being done within the spirit and principles in the present invention, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (6)

1. a method of evenly injecting multielement hot fluid in horizontal well is characterized in that, may further comprise the steps:
(1) measures the horizontal well entire length, and horizontal segment in the horizontal well is carried out segmentation according to measurement result;
(2) measure the horizontal well internal diameter, and discharge orifice size and terminal discharge orifice number on the tubing string in each section horizontal well are carried out initial setting according to measurement result;
(3) detect multielement hot fluid temperature, pressure and the mass dryness fraction of preparing injection;
(4) according to testing result in the step (3) and horizontal well along each section of journey characteristic iterative computation horizontal well pit shaft along Cheng Wendu, pressure, mass dryness fraction and heat waste, wherein, pit shaft is along the journey temperature loss:
q ′ = - dH m dz + G tol g
In the following formula, q ' is the heat waste of pit shaft unit length;
H mTotal energy for multielement hot fluid;
G TolBe the multielement hot fluid mass flow;
G is an acceleration of gravity;
Z is a well depth;
Wellbore pressure is:
dp dz = ρ m g sin θ - λ ρ m u m 2 2 d
In the following formula, p is a pressure;
ρ mBe multielement hot fluid density;
G is an acceleration of gravity;
Z is a well depth;
θ is a hole angle;
λ is a resistance coefficient;
u mBe multielement hot fluid speed;
D is a tubing diameter.
The mass dryness fraction design formulas:
dx dz = c 1 M H 2 O G H 2 O 1 ( p - p w ) 2 ( p dp w dT dT dz - p w dp dz )
In the following formula, χ is a steam quality;
Z is a well depth;
Figure FDA0000039417330000022
Be the saturation water mass flow;
Figure FDA0000039417330000023
Molal weight for water;
P is a pressure;
p wBe water saturation pressure;
T is the multielement hot fluid temperature;
Steam to the heat output of cement sheath outer rim in the dz section is in the oil pipe:
dQ=2πr toU to(T s-T h)dz
In the following formula, Q is the pit shaft radial flow heat;
r To-oil pipe external diameter;
U To-overall coefficient of heat transfer;
T h-cement sheath outer rim temperature;
T s-multielement hot fluid temperature;
Z is a well depth.
Heat conduction from the cement sheath outer rim to the stratum is:
dQ=2πλ e(T h-T e)dz/f(t)
In the following formula, Q is the pit shaft radial flow heat;
λ e-stratum thermal transmittance;
T e-surface temperature;
T h-cement sheath outer rim temperature;
F (t)-nondimensional time function;
Z is a well depth;
(5) according to initial set value in result of calculation in the step (4) and step (1), (2) and evenly inject the principle iteration and calculate actual discharge orifice number and discharge orifice size on every section horizontal well tubing string, wherein, i section discharge orifice diameter is:
d i = 2 q nπv o ( i )
In the following formula, d iIt is i section discharge orifice diameter;
Q is the multielement hot fluid flow;
N is the horizontal segment segments;
v O (i)It is i section discharge orifice discharge velocity.
I section discharge orifice number is:
N i = π ( d i 2 ) 2 A 1 = q nv o ( i ) A 1
In the following formula, d iIt is i section discharge orifice diameter;
A 1For presetting the discharge orifice area;
Q is the multielement hot fluid flow;
N is the horizontal segment segments;
v O (i)It is i section discharge orifice discharge velocity;
(6) according to result of calculation in the step (5) tubing string is punched, will punch in the tubing string lower going-into-well of back, then multielement hot fluid is injected this tubing string.
2. the method for evenly injecting multielement hot fluid in horizontal well as claimed in claim 1 is characterized in that: according to the principle of one section in every 50-70 rice horizontal well is carried out segmentation in the described step (1).
3. the method for evenly injecting multielement hot fluid in horizontal well as claimed in claim 1 is characterized in that: set the discharge orifice size in the described step (2) for 1-2 centimetre.
4. the method for evenly injecting multielement hot fluid in horizontal well as claimed in claim 1 is characterized in that: set terminal discharge orifice number according to the maximum speed limit of discharge orifice in the described step (2).
5. the method for evenly injecting multielement hot fluid in horizontal well as claimed in claim 1 is characterized in that: adopt thermometer, pressure to take into account temperature, pressure and mass dryness fraction that hygrometer detects the multielement hot fluid of preparing injection in the described step (3) respectively.
6. the method for evenly injecting multielement hot fluid in horizontal well as claimed in claim 1 is characterized in that: carry out 360 degree spiral punchings in the described step (5) on tubing string.
CN201010597340.9A 2010-12-20 2010-12-20 Method for uniformly injecting multi-component thermal fluid in horizontal well Active CN102011573B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010597340.9A CN102011573B (en) 2010-12-20 2010-12-20 Method for uniformly injecting multi-component thermal fluid in horizontal well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010597340.9A CN102011573B (en) 2010-12-20 2010-12-20 Method for uniformly injecting multi-component thermal fluid in horizontal well

Publications (2)

Publication Number Publication Date
CN102011573A true CN102011573A (en) 2011-04-13
CN102011573B CN102011573B (en) 2014-03-12

Family

ID=43841882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010597340.9A Active CN102011573B (en) 2010-12-20 2010-12-20 Method for uniformly injecting multi-component thermal fluid in horizontal well

Country Status (1)

Country Link
CN (1) CN102011573B (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103775058A (en) * 2013-12-31 2014-05-07 中国石油天然气股份有限公司 Shaft heat loss determining method
CN103939071A (en) * 2014-04-16 2014-07-23 中国石油天然气股份有限公司 Horizontal well steam flooding well network structure and steam flooding method
CN104392092A (en) * 2014-10-10 2015-03-04 中国石油天然气股份有限公司 Temperature calculation and control method and device for mixed liquor of gravity fire flooding production well
CN105626021A (en) * 2014-11-06 2016-06-01 中国石油化工股份有限公司 Heavy oil thermal recovery steam injection device and heavy oil thermal recovery method
CN105672968A (en) * 2016-03-24 2016-06-15 中国石油天然气股份有限公司 Steam injection pipe for oil deposit exploitation and oil deposit exploitation method
CN106441637A (en) * 2016-08-31 2017-02-22 中国石油天然气股份有限公司 Steam injection pipe heat loss determination method and device
CN106650040A (en) * 2016-12-02 2017-05-10 中国石油天然气股份有限公司 Method for calculating parameters of steam boiler based on a boiler and an injection known wellhead steam injection parameters
CN107514251A (en) * 2016-06-17 2017-12-26 中国石油天然气股份有限公司 SAGD horizontal well concentric tube steam injection heat-transferring methods
CN107575214A (en) * 2016-07-04 2018-01-12 中国石油天然气股份有限公司 The Forecasting Methodology of temperature and pressure in the pit shaft of process is adopted for noting
CN110630234A (en) * 2018-06-21 2019-12-31 中国石油天然气股份有限公司 Steam injection method for heavy oil thermal recovery well
CN110984936A (en) * 2019-12-23 2020-04-10 中国石油大学(华东) Preheating method for improving single horizontal well SAGD (steam assisted gravity drainage) exploitation efficiency
CN111022014A (en) * 2019-12-23 2020-04-17 西南石油大学 Method for developing hot dry rock resources by utilizing gravity drainage technology
CN111997577A (en) * 2020-03-25 2020-11-27 中国海洋石油集团有限公司 Heat-insulation type canned electric submersible pump injection-production integrated tubular column structure and technological method
CN113033124A (en) * 2021-05-08 2021-06-25 南昌大学 Parameter configuration method and system for computational fluid dynamics simulation
CN113847003A (en) * 2020-06-28 2021-12-28 中国石油天然气股份有限公司 Method for uniformly using horizontal section of thickened oil horizontal well

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6257334B1 (en) * 1999-07-22 2001-07-10 Alberta Oil Sands Technology And Research Authority Steam-assisted gravity drainage heavy oil recovery process
CN101122224A (en) * 2006-08-11 2008-02-13 中国石油天然气股份有限公司 Gravity-assisted steam flooding exploitation method for heavy laver common heavy oil reservoir
CN101255788A (en) * 2008-04-15 2008-09-03 中国石化集团胜利石油管理局石油开发中心 Thermochemistry auxiliary reinforced steam flooding method
US20080251255A1 (en) * 2007-04-11 2008-10-16 Schlumberger Technology Corporation Steam injection apparatus for steam assisted gravity drainage techniques
CN101892827A (en) * 2010-04-30 2010-11-24 钟立国 Optimized steam injection technology for horizontal well in segments

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6257334B1 (en) * 1999-07-22 2001-07-10 Alberta Oil Sands Technology And Research Authority Steam-assisted gravity drainage heavy oil recovery process
CN101122224A (en) * 2006-08-11 2008-02-13 中国石油天然气股份有限公司 Gravity-assisted steam flooding exploitation method for heavy laver common heavy oil reservoir
US20080251255A1 (en) * 2007-04-11 2008-10-16 Schlumberger Technology Corporation Steam injection apparatus for steam assisted gravity drainage techniques
CN101255788A (en) * 2008-04-15 2008-09-03 中国石化集团胜利石油管理局石油开发中心 Thermochemistry auxiliary reinforced steam flooding method
CN101892827A (en) * 2010-04-30 2010-11-24 钟立国 Optimized steam injection technology for horizontal well in segments

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨兵,等: "海上稠油油藏多元热流体吞吐开采技术优化研究", 《石油地质与工程》 *

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103775058A (en) * 2013-12-31 2014-05-07 中国石油天然气股份有限公司 Shaft heat loss determining method
CN103775058B (en) * 2013-12-31 2016-08-31 中国石油天然气股份有限公司 A kind of determination method of wellbore heat loss
CN103939071A (en) * 2014-04-16 2014-07-23 中国石油天然气股份有限公司 Horizontal well steam flooding well network structure and steam flooding method
CN103939071B (en) * 2014-04-16 2016-08-17 中国石油天然气股份有限公司 A kind of horizontal well steam flooding well web frame and steam drive method
CN104392092A (en) * 2014-10-10 2015-03-04 中国石油天然气股份有限公司 Temperature calculation and control method and device for mixed liquor of gravity fire flooding production well
CN105626021A (en) * 2014-11-06 2016-06-01 中国石油化工股份有限公司 Heavy oil thermal recovery steam injection device and heavy oil thermal recovery method
CN105626021B (en) * 2014-11-06 2018-05-29 中国石油化工股份有限公司 Thick oil heat production steam injection device and thick oil thermal recovery method
CN105672968A (en) * 2016-03-24 2016-06-15 中国石油天然气股份有限公司 Steam injection pipe for oil deposit exploitation and oil deposit exploitation method
CN105672968B (en) * 2016-03-24 2018-02-02 中国石油天然气股份有限公司 A kind of oil reservoir recovery method
CN107514251A (en) * 2016-06-17 2017-12-26 中国石油天然气股份有限公司 SAGD horizontal well concentric tube steam injection heat-transferring methods
CN107575214A (en) * 2016-07-04 2018-01-12 中国石油天然气股份有限公司 The Forecasting Methodology of temperature and pressure in the pit shaft of process is adopted for noting
CN106441637A (en) * 2016-08-31 2017-02-22 中国石油天然气股份有限公司 Steam injection pipe heat loss determination method and device
CN106650040A (en) * 2016-12-02 2017-05-10 中国石油天然气股份有限公司 Method for calculating parameters of steam boiler based on a boiler and an injection known wellhead steam injection parameters
CN106650040B (en) * 2016-12-02 2020-05-08 中国石油天然气股份有限公司 Method for calculating steam injection boiler parameters by using known well head steam injection parameters through one boiler and one injection
CN110630234A (en) * 2018-06-21 2019-12-31 中国石油天然气股份有限公司 Steam injection method for heavy oil thermal recovery well
CN110630234B (en) * 2018-06-21 2021-11-02 中国石油天然气股份有限公司 Steam injection method for heavy oil thermal recovery well
CN110984936A (en) * 2019-12-23 2020-04-10 中国石油大学(华东) Preheating method for improving single horizontal well SAGD (steam assisted gravity drainage) exploitation efficiency
CN111022014A (en) * 2019-12-23 2020-04-17 西南石油大学 Method for developing hot dry rock resources by utilizing gravity drainage technology
CN111997577A (en) * 2020-03-25 2020-11-27 中国海洋石油集团有限公司 Heat-insulation type canned electric submersible pump injection-production integrated tubular column structure and technological method
CN111997577B (en) * 2020-03-25 2022-05-20 中国海洋石油集团有限公司 Injection-production integrated tubular column structure of heat-insulation canned electric submersible pump and technological method
CN113847003A (en) * 2020-06-28 2021-12-28 中国石油天然气股份有限公司 Method for uniformly using horizontal section of thickened oil horizontal well
CN113033124A (en) * 2021-05-08 2021-06-25 南昌大学 Parameter configuration method and system for computational fluid dynamics simulation

Also Published As

Publication number Publication date
CN102011573B (en) 2014-03-12

Similar Documents

Publication Publication Date Title
CN102011573B (en) Method for uniformly injecting multi-component thermal fluid in horizontal well
CN101684727B (en) Optimization method for determining proportion of mixing light oil into heavy oil of ultra-deep well and light hydrocarbon mixer thereof
CN109598099B (en) Double-tube SAGD long horizontal well uniform steam injection numerical simulation method considering oil reservoir and shaft coupling
CN103775058B (en) A kind of determination method of wellbore heat loss
CN103590812A (en) Calculating method, calculating device and determining method of gas well effusion volume
Nian et al. Study on the effect of wellbore heat capacity on steam injection well heat loss
CN103939071A (en) Horizontal well steam flooding well network structure and steam flooding method
CN106968667A (en) A kind of temperature field prediction method and device
CN107575214B (en) Prediction method of temperature and pressure in well bore for injection-production process
CN103362476A (en) Casing type downhole heat exchanger heating system capable of preventing wall of producing well from paraffin precipitation
CN103726815B (en) A kind of CO 2drive produced well pit shaft fluidised form is determined and parameter optimization method
EA021981B1 (en) Steam distribution apparatus and method for enhanced oil recovery of viscous oil
CN112347601A (en) Method for optimizing online real-time foaming agent addition of gas well foam drainage gas production
Du et al. Experimental and numerical simulation research on heat transfer performance of coaxial casing heat exchanger in 3500m-deep geothermal well in Weihe Basin
CN114048657B (en) Construction method of temperature field distribution model of horizontal well drilling shaft
Zhu et al. Heat transfer performance of new efficient coaxial casing heat exchanger based on thermostatic thermal response test
CN110761764B (en) Liquid carbon dioxide fracturing method
CN104481481B (en) Method for reducing viscosity of casing of heavy oil well by agent blending
Wang et al. A novel downhole gas separator in ESP systems
CN205532540U (en) Steam injection tubular is used in oil reservoir exploitation
CN113468743A (en) Medium-deep buried pipe fluid temperature field analysis method considering groundwater seepage
CN106021958A (en) Method and device for determining temperatures of upper end and lower end of gas injection well packer
CN109812237B (en) Drilling fluid discharge capacity determination method meeting requirements for cleaning of special-shaped well hole
Li et al. Heat extraction performance of the super-long gravity heat pipe applied to geothermal reservoirs of multi-aquifers
Xu et al. A study on unsteady seepage field of fractured horizontal well in tight gas reservoir

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant