CN102011507A - 一种钢管填料型输电塔构件 - Google Patents

一种钢管填料型输电塔构件 Download PDF

Info

Publication number
CN102011507A
CN102011507A CN2010105526072A CN201010552607A CN102011507A CN 102011507 A CN102011507 A CN 102011507A CN 2010105526072 A CN2010105526072 A CN 2010105526072A CN 201010552607 A CN201010552607 A CN 201010552607A CN 102011507 A CN102011507 A CN 102011507A
Authority
CN
China
Prior art keywords
steel tube
power transmission
transmission tower
steel pipe
packing material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010105526072A
Other languages
English (en)
Inventor
刘学武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Electric Power Research Institute Co Ltd CEPRI filed Critical China Electric Power Research Institute Co Ltd CEPRI
Priority to CN2010105526072A priority Critical patent/CN102011507A/zh
Publication of CN102011507A publication Critical patent/CN102011507A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明涉及一种钢管填料型输电塔构件,其包括钢管、连接件和用于支撑钢管的填充物,填充物填充在钢管的内部,连接件连接于钢管的两端,连接件上设有用于连接输电塔的连接孔,钢管的壁厚为2~10mm,填充物的密度为0.6~1.5g/cm3。该构件采用钢管为主体结构,可有效提高构件的整体弯曲稳定性和扭转稳定性;在钢管内部填满填充物,对钢管本身具有一定的承载能力,可防止钢管轴心受力构件发生局部失稳,在承载力不降低的情况下还可以减小钢管的壁厚,能降低输电塔的用钢量;填充物采用矿渣等废弃材料,是一种废物再利用的绿色构件,造价低,重量轻;填充物与钢管之间无粘结,结构简单且简化了制造工艺,安装使用都很方便。

Description

一种钢管填料型输电塔构件
技术领域
本发明属于电力工程领域的输电塔构件,具体涉及一种钢管填料型输电塔构件。
背景技术
现有的输电塔构件多为角钢构件和钢管构件。由于连接和构造的原因,角钢构件往往处于偏心受力状态,其性能不能得到充分发挥;钢管构件的局部屈曲易先于整体屈曲发生,导致构件性能的利用率大打折扣。
为了充分发挥钢材的优越性能,而又不增加输电塔的造价以及制作难度,发明一种新的输电塔构件意义深远。
发明内容
为了克服现有技术中的缺陷,本发明提供了一种造价低,且具有较高承载能力的钢管填料型输电塔构件。
为此,本发明提出了一种钢管填料型输电塔构件,其特征在于:该构件包括钢管、连接件和用于支撑钢管的填充物,所述填充物填充在钢管的内部,所述连接件连接于钢管的两端,所述连接件上设有用于连接输电塔的连接孔,所述钢管的壁厚为2~10mm,所述填充物的密度为0.6~1.5g/cm3
其中,所述钢管为钢材制成的空心圆柱形钢管。
其中,所述连接件为钢板制成的圆形端板。
其中,所述填充物采用具有承载能力的废弃材料。
其中,所述填充物采用矿渣。
本发明的有益效果在于:
该输电塔构件采用钢管为主体结构,能够有效提高构件的整体弯曲稳定性和扭转稳定性;在钢管内部填满填充物,对钢管本身具有一定的承载能力,可以防止钢管轴心受力构件发生局部失稳,在承载力不降低的情况下还可以减小钢管的壁厚,能降低输电塔的用钢量;填充物采用矿渣等废弃材料,是一种废物再利用的绿色构件,造价低,重量轻;填充物与钢管之间无粘结,结构简单且简化了制造工艺,安装使用都很方便。
附图说明
图1是本发明所述钢管填料型输电塔构件的结构示意图;
图2是沿输电塔构件轴向的剖面图;
图3是输电塔构件的中部截面放大示意图;
其中,1-钢管,2-填充物,3-连接件,4-连接孔。
具体实施方式
下面结合附图对本发明的钢管填料型输电塔构件作进一步详细的说明。
如图1-3所示,本例所述的钢管填料型输电塔构件主要由钢管1、填充物2和两个连接件3组成。钢管1为钢材制成的空心圆柱形钢管;填充物2采用具有承载能力的废弃材料,本例中的填充物2选用矿渣;连接件3为钢板制成的圆形端板。钢管1的内部填充满矿渣,两个连接件3安装在钢管1的两端,连接件3的外圈上均布有多个圆形连接孔4,以便与输电塔相连接。为了使该构件结构达到最佳效果,最好将钢管1的壁厚制成2~10mm,填充物2的密度为0.6~1.5g/cm3
该构件的制备工序为:
首先在钢管1的一端焊接一连接件3,然后在钢管中填充作为中心约束部分(即填充物2)的矿渣或矿渣等废弃材料,最后再将另一连接件3焊接在钢管1的另一端即完成整个构件的制备,在使用时直接通过连接件3上的连接孔4将该构件与输电塔相连接。
最后应当说明的是:以上实施例仅用以说明本发明的技术方案而非对其限制,尽管参照上述实施例对本发明进行了详细的说明,所属领域的普通技术人员应当理解:依然可以对本发明的具体实施方式进行修改或者等同替换,而未脱离本发明精神和范围的任何修改或者等同替换,其均应涵盖在本发明的权利要求范围当中。

Claims (5)

1.一种钢管填料型输电塔构件,其特征在于:该构件包括钢管(1)、连接件(3)和用于支撑钢管的填充物(2),所述填充物(2)填充在钢管(1)的内部,所述连接件(3)连接于钢管(1)的两端,所述连接件(3)上设有用于连接输电塔的连接孔(4),所述钢管(1)的壁厚为2~10mm,所述填充物(2)的密度为0.6~1.5g/cm3
2.根据权利要求1所述的钢管填料型输电塔构件,其特征在于:所述钢管(1)为钢材制成的空心圆柱形钢管。
3.根据权利要求1所述的钢管填料型输电塔构件,其特征在于:所述连接件(3)为钢板制成的圆形端板。
4.根据权利要求1所述的钢管填料型输电塔构件,其特征在于:所述填充物(2)采用具有承载能力的废弃材料。
5.根据权利要求4所述的钢管填料型输电塔构件,其特征在于:所述填充物(2)采用矿渣。
CN2010105526072A 2010-11-19 2010-11-19 一种钢管填料型输电塔构件 Pending CN102011507A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105526072A CN102011507A (zh) 2010-11-19 2010-11-19 一种钢管填料型输电塔构件

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105526072A CN102011507A (zh) 2010-11-19 2010-11-19 一种钢管填料型输电塔构件

Publications (1)

Publication Number Publication Date
CN102011507A true CN102011507A (zh) 2011-04-13

Family

ID=43841819

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105526072A Pending CN102011507A (zh) 2010-11-19 2010-11-19 一种钢管填料型输电塔构件

Country Status (1)

Country Link
CN (1) CN102011507A (zh)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2651366Y (zh) * 2003-11-26 2004-10-27 张思忠 电线杆
CN101324115A (zh) * 2008-07-04 2008-12-17 华南理工大学 钢管再生混合构件
CN201635257U (zh) * 2009-12-23 2010-11-17 崔正龙 一种利用再生骨料混凝土的构件

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2651366Y (zh) * 2003-11-26 2004-10-27 张思忠 电线杆
CN101324115A (zh) * 2008-07-04 2008-12-17 华南理工大学 钢管再生混合构件
CN201635257U (zh) * 2009-12-23 2010-11-17 崔正龙 一种利用再生骨料混凝土的构件

Similar Documents

Publication Publication Date Title
CN201395874Y (zh) 一种双钢管约束屈曲支撑阻尼杆
CN201649348U (zh) 中部刚接双钢管防屈曲耗能支撑
CN107975459A (zh) 风力发电机塔架与机舱的连接装置及其混凝土塔架
CN201982255U (zh) 一种风机齿轮箱液压支撑装置
CN209780398U (zh) 一种铁塔构件防屈曲耗能加固装置
CN206682469U (zh) 一种具有防回流功能的汽车用水管
CN201902041U (zh) 一种钢管填料型输电塔构件
CN102953942A (zh) 一种风力发电机塔筒与导管架基础多边形斜撑连接结构
CN102011507A (zh) 一种钢管填料型输电塔构件
CN202402220U (zh) 一种减震风力发电塔
CN208633975U (zh) 一种三风轮式风力发电设备
CN201513665U (zh) 一种新型结构的弯管压力平衡型膨胀节
CN206418270U (zh) 一种针刺机的轴心偏心结构
CN201661107U (zh) 铁塔变截面组合接头
CN101725475A (zh) 具有预制钢筋混凝土基柱的风力发电塔筒
CN201183001Y (zh) 四辊破碎机套入式回转圆筒装置
CN102168498B (zh) 中空填料型夹层钢管输电塔构件及其制作方法
CN102644739B (zh) 一种联接法兰的密封方法及风力发电机
CN201590782U (zh) 一种新型太阳能电站集热器支架
CN201531699U (zh) 一种输送弯管及具有该输送弯管的混凝土输送机械
CN203488862U (zh) 一种聚丙乙烯大口径中空缠绕管
CN208281647U (zh) 一种可稳固放置的便捷式聚乙烯缠绕结构壁排水管
CN108718067A (zh) 一种防扭曲的多孔pe电力管
CN210800297U (zh) 一种新型塑钢螺旋式缠绕管组件
CN220226425U (zh) 一种钢管塔组装连接结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20130712

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20130712

Address after: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15

Applicant after: China Electric Power Research Institute

Applicant after: State Grid Corporation of China

Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15

Applicant before: China Electric Power Research Institute

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110413