CN102004187A - 串联附加电阻差值法的特小直流电阻测量方法 - Google Patents

串联附加电阻差值法的特小直流电阻测量方法 Download PDF

Info

Publication number
CN102004187A
CN102004187A CN 201010290345 CN201010290345A CN102004187A CN 102004187 A CN102004187 A CN 102004187A CN 201010290345 CN201010290345 CN 201010290345 CN 201010290345 A CN201010290345 A CN 201010290345A CN 102004187 A CN102004187 A CN 102004187A
Authority
CN
China
Prior art keywords
resistance
direct
double bridge
small
add
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010290345
Other languages
English (en)
Other versions
CN102004187B (zh
Inventor
杨东
杨光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangzhou (Jiangdu) New Energy Automobile Industry Research Institute of Jiangsu University
Original Assignee
Jiangsu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu University filed Critical Jiangsu University
Priority to CN 201010290345 priority Critical patent/CN102004187B/zh
Publication of CN102004187A publication Critical patent/CN102004187A/zh
Application granted granted Critical
Publication of CN102004187B publication Critical patent/CN102004187B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开一种串联附加电阻差值法的特小直流电阻测量方法,测量电阻值小于1×10-4~10-7Ω之间特小直流电阻,先将直流双臂电桥左右两端接头均连接特小被测电阻RX的任一端,在特小被测电阻RX一端与直流双臂电桥一端接头之间串接附加电阻,测量出第一次被测总电阻R1,再将直流双臂电桥的串接附加电阻一端以及另一端分别连接特小被测电阻的两端,测量出第二次被测总电阻R2,最后根据公式RX=R2-R1计算出特小被测电阻RX,由不附加电阻和附加电阻两次测量得到的差值决定特小被测电阻RX值,排除了直流双臂电桥内部的标准电阻以及所有接触电阻和测量导线电阻的影响,在不增加电流端电流的情况下测量特小电阻,测量方法简单有效,测量结果可靠精确。

Description

串联附加电阻差值法的特小直流电阻测量方法
技术领域
本发明属于电工测量技术,涉及直流电阻的测量方法,尤其是对电阻值小于1×10-4~10-7Ω之间的特小直流电阻的测量。
背景技术
随着新技术的发展,新导体材料、新大型电器和新大型电机的不断涌现,对这些新材料、新器件等试验时,常常要进行电阻率的测量,有的金属试样受几何形状的影响,其电阻很小,只有几μΩ或更小。为了克服测量小直流电阻时的测量结果受测量导线电阻的影响,根据中国国家标准GB 3048.2-83的规定,阻值在10Ω以下的小直流电阻测量都必须采用“四点法”,四点法如附图1所示,采用直流双臂电桥ZSD测量直流小电阻,属于电桥测量法,即将被测电阻RX两端采用两对接头,一对是电流接头C1、C2,另一对是电位接头P1、P2,共四个接点,电流接头C1、C2在外接触面积大,电位接头P1、P2在内,这样,测量导线电阻和电流端接触电阻不参与电桥平衡,排除测量导线电阻的影响,通过被测电阻RX与接入直流双臂电桥ZSD内部的标准电阻比较得出电阻值,标准电阻精度高时比较的结果精度也就高,使得10Ω以下的小电阻测量准确,最小分辨率能达到0.1μΩ。但这种测量方法的缺陷是:虽然能够解决测量导线电阻对测量的影响,但没有解决直流双臂电桥ZSD内部具有的标准电阻对测量的影响,其有效测量范围一般在1×10-4~11Ω,当需要测量小于1×10-4~10-7Ω的特小电阻时,其误差大大超出允许值。
发明内容
本发明的目的是为克服上述现有技术中四点法测量小直流电阻的不足,提供了一种串联附加电阻差值法的特小直流电阻精确测量方法,在不提高直流双臂电桥ZSD测量电流的情况下,能精确测量阻值小于1×10-4~10-7Ω之间的特小直流电阻。
本发明实现上述目的采用的技术方案是:直流双臂电桥的左右两端接头中的一对电流接头在外,另一对电位接头内;先将直流双臂电桥左右两端接头均连接特小被测电阻RX的任一端,在特小被测电阻RX一端与直流双臂电桥一端接头之间串接附加电阻RAdd,测量出第一次被测总电阻R1为:R1=RAdd+rA1+rA2;rA1是附加电阻连接点的接触电阻;rA2是直流双臂电桥另一端连接点的接触电阻;再将直流双臂电桥的串接附加电阻RAdd一端以及不具有附加电阻RAdd另一端分别连接特小被测电阻RX的两端,测量出第二次被测总电阻R2为:R2=RAdd+rA1+rA2+RX;最后根据公式RX=R2-R1计算出特小被测电阻RX
本发明测量的特小被测电阻值由不附加电阻和附加电阻两次测量得到的差值决定,排除了直流双臂电桥ZSD内部的标准电阻以及所有接触电阻和测量导线电阻的影响,在不增加电流端电流的情况下测量特小电阻,使被测特小电阻无温升现象,测量方法简单有效,测量结果可靠精确。
附图说明
图1是现有技术中直流双臂电桥ZSD四点法测量小直流电阻的电路原理图;
图2-3为本发明电路原理图。
具体实施方式
本发明在图1的直流电桥ZSD四点法的基础上,保留直流双臂电桥ZSD的一档步进盘标准电阻(0.01Ω),精确测量小于1×10-4~10-7Ω的特小电阻。在测量特小被测电阻RX时附加电阻RAdd,通过两次测量最后得出特小被测电阻RX值,具体测量步骤如下:
第一步:参见图2,直流双臂电桥ZSD有左右两端接头,四个接点,一对是电流接头C1、C2,另一对是电位接头P1、P2,电流接头C1、C2在外,电位接头P1、P2在内。直流双臂电桥ZSD的左端为C1、P1端,右端为C2、P2端。将直流双臂电桥ZSD左右两端接头均连接特小被测电阻RX任一端(图2所示为右端),在特小被测电阻RX一端与直流双臂电桥ZSD的一端(图2所示为左端)接头C1、P1之间串接附加电阻RAdd,附加电阻RAdd数值约在0.0001Ω左右,直流双臂电桥ZSD的另一端(图2所示为右端)不具有附加电阻RAdd,由于附加电阻RAdd值的确定是为了选定直流双臂电桥ZSD的0.01Ω挡步进盘标准电阻,特小电阻值RX最终是通过两次测量的差值得到,因此本发明对附加电阻RAdd的精确度基本不作要求。
采用图2连接方法测量时,特小被测电阻RX部分补充了约在0.0001Ω左右的附加电阻RAdd,直流双臂电桥ZSD倍率档选为最小倍率×0.01档,步进盘选择了0.01Ω档(即0档上面一档),即有标准电阻与之对应,符合直流双臂电桥测量原理,此时用四点法直流双臂电桥ZSD测出的第一次被测总电阻R1为:
R1=RAdd+rA1+rA2                        (1)
其中:RAdd-附加电阻;
rA1-附加电阻连接点的接触电阻;
rA2-直流双臂电桥ZSD另一端(即图2-3右端)连接点的接触电阻;
第二步:参见图3,将直流双臂电桥ZSD的串接有附加电阻RAdd一端以及不具有附加电阻RAdd另一端分别连接特小被测电阻RX的两端,即将附加电阻RAdd的一端连接特小被测电阻RX的左端,直流双臂电桥ZSD的C2、P2端连接被测电阻RX的右端。测量时,第二次被测总电阻R2中包含了实际的特小被测电阻RX和第一次被测总电阻R1,第二次被测总电阻R2为:
R2=RAdd+rA1+rA2+RX                            (2)
通过上述两次测量得出的第一次被测总电阻R1和第二次被测总电阻R2,根据公式计算出特小被测电阻RX,将式(2)-(1),即可得特小被测电阻RX为:
RX=R2-R1                                      (3)
该特小被测电阻RX的值是第二次测量的增量部分,前后两次测量的电阻包含了相同的附加电阻RAdd、几乎相同的两接触电阻rA1、rA2,影响电桥平衡的那部分接触电阻和电桥内部导线电阻。通过公式(3)可知,本发明完全不需要提高测量电流,就可得到小于1×10-4~10-7Ω的特小被测电阻RX的准确值。
在用直流双臂电桥ZSD测量特小被测电阻RX时,要保证图2和图3两次连接的附加电阻RAdd、附加电阻连接点的接触电阻rA1和直流双臂电桥ZSD右端连接点的接触电阻rA2的一致性,使rA1和rA尽量小,在相同的温度环境下测量,可保证特小被测电阻RX的准确性。其中附加电阻RAdd两次测量都采用同一个电阻。
为方便操作,本发明在测量时,将被测电阻连接点、附加电阻和四点法接线连接点均做成附件,附加电阻RAdd用温度电阻率极低的锰铜片制成。附件分成左右两端,如果左端连接附件串接附加电阻RAdd,右端就不串接附加电阻。左端从首端的连接器开始、到软连接导线、到附加电阻RAdd、到尾端“四点法”左连接器;右端仅有首端的连接器和尾端“四点法”右连接器。首端的连接器要满足对连接器接触电阻要求,首端的连接器一般按被测对象的形式设计。如大型电机、变压器绕组;铜绞线、铝绞线;铜圆、铜排、铝排等。附件可按连接分类设计,主要可安排三类:第一类,连接大型电机、变压器接线端的测量附件;由于绕组都是螺栓接线端子,所以附件设计成线鼻型测量首端的连接器。第二类,连接基本均匀圆柱截面的接线测量附件,设计成试样夹型首端的连接器。第三,连接均匀矩形截面的接线测量附件,设计成夹持平面与试样平面能自动保持平行的试样夹首端的连接器。将左、右附件连接器首端均接于特小被测电阻RX的右端,左端附件为具有附加电阻RAdd的连接器,右端附件为不具有附加电阻的连接器,左、右连接器的末端都有“四点法”连接点C1/P1、P2/C2。将C1、C2、P1、P2四点接于直流双臂电桥ZSD的C1/P1、P2/C2四端子即可进行测量。两次测量时,先将适合试样接线的左右接线器准备好,以及一些辅助的器具,如高分辨率温度计、0.1℃精度的液体温度槽(小试样适用、大型电机、变压器等则采用温度系数补偿法)等。第一次测量时,先将左右接线器均接于试样的左端(如大型电机绕组的一端),左右接线器尾端的“四点法”接点与直流双臂电桥ZSD接线端子用导线连接;记录测量点温度;按照直流双臂电桥ZSD测量方法完成第一次测量,记录第一次被测总电阻为R1。第二次测量时,将左接线器接于试样的左端,右接线器接于试样的右端(如大型电机绕组的左右两端),再重复上面的测量记录。如果要数次测量取平均值,则重复上述操作即可。

Claims (2)

1.一种串联附加电阻差值法的特小直流电阻测量方法,直流双臂电桥的左右两端接头中的一对电流接头在外,另一对电位接头内,其特征是采用如下步骤:
(1)将直流双臂电桥左右两端接头均连接特小被测电阻RX的任一端,在特小被测电阻RX一端与直流双臂电桥一端接头之间串接附加电阻RAdd,测量出第一次被测总电阻R1为:R1=RAdd+rA1+rA2
rA1是附加电阻连接点的接触电阻;
rA2是直流双臂电桥另一端连接点的接触电阻;
(2)将直流双臂电桥的串接附加电阻RAdd一端以及不具有附加电阻RAdd另一端分别连接特小被测电阻RX的两端,测量出第二次被测总电阻R2为:R2=RAdd+rA1+rA2+RX
(3)根据公式RX=R2-R1计算出特小被测电阻RX
2.根据权利要求1所述的串联附加电阻差值法的特小直流电阻测量方法,其特征是:所述直流双臂电桥的步进盘选择0.01Ω档,倍率档选择最小倍率×0.01档。
CN 201010290345 2010-09-21 2010-09-21 串联附加电阻差值法的特小直流电阻测量方法 Active CN102004187B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010290345 CN102004187B (zh) 2010-09-21 2010-09-21 串联附加电阻差值法的特小直流电阻测量方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010290345 CN102004187B (zh) 2010-09-21 2010-09-21 串联附加电阻差值法的特小直流电阻测量方法

Publications (2)

Publication Number Publication Date
CN102004187A true CN102004187A (zh) 2011-04-06
CN102004187B CN102004187B (zh) 2013-07-17

Family

ID=43811713

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010290345 Active CN102004187B (zh) 2010-09-21 2010-09-21 串联附加电阻差值法的特小直流电阻测量方法

Country Status (1)

Country Link
CN (1) CN102004187B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104198791A (zh) * 2014-09-22 2014-12-10 富阳精密仪器厂 双臂电桥
CN105277794A (zh) * 2015-11-19 2016-01-27 广州供电局有限公司 电缆接头压接电阻的测量方法与系统
CN104198787B (zh) * 2014-09-22 2017-01-18 富阳精密仪器厂 单双臂电桥
CN107064642A (zh) * 2017-06-23 2017-08-18 东旭科技集团有限公司 电阻率测量装置及方法
CN113671339A (zh) * 2021-09-22 2021-11-19 广州粤芯半导体技术有限公司 验证探针异常和接触异常的装置和方法以及晶圆测试方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN86200939U (zh) * 1986-02-05 1986-09-17 浙江大学 双电桥在线电阻测量仪
WO2007045246A1 (en) * 2005-10-17 2007-04-26 Capres A/S Eliminating inline positional errors for four-point resistance measurement
CN101201368A (zh) * 2007-12-21 2008-06-18 中国计量科学研究院 一种宽频开尔文双电桥及测量方法、自控系统及方法和应用

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN86200939U (zh) * 1986-02-05 1986-09-17 浙江大学 双电桥在线电阻测量仪
WO2007045246A1 (en) * 2005-10-17 2007-04-26 Capres A/S Eliminating inline positional errors for four-point resistance measurement
CN101201368A (zh) * 2007-12-21 2008-06-18 中国计量科学研究院 一种宽频开尔文双电桥及测量方法、自控系统及方法和应用

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《电气应用》 20070331 杨东等 用直流双电桥测量特小电阻的方法研究 92-96 1-2 第26卷, 第5期 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104198791A (zh) * 2014-09-22 2014-12-10 富阳精密仪器厂 双臂电桥
CN104198787B (zh) * 2014-09-22 2017-01-18 富阳精密仪器厂 单双臂电桥
CN104198791B (zh) * 2014-09-22 2017-05-03 杭州戎密科技有限公司 双臂电桥
CN105277794A (zh) * 2015-11-19 2016-01-27 广州供电局有限公司 电缆接头压接电阻的测量方法与系统
CN105277794B (zh) * 2015-11-19 2018-06-08 广州供电局有限公司 电缆接头压接电阻的测量方法与系统
CN107064642A (zh) * 2017-06-23 2017-08-18 东旭科技集团有限公司 电阻率测量装置及方法
CN107064642B (zh) * 2017-06-23 2023-12-26 东旭光电科技股份有限公司 电阻率测量装置及方法
CN113671339A (zh) * 2021-09-22 2021-11-19 广州粤芯半导体技术有限公司 验证探针异常和接触异常的装置和方法以及晶圆测试方法
CN113671339B (zh) * 2021-09-22 2024-02-09 粤芯半导体技术股份有限公司 验证探针异常和接触异常的装置和方法以及晶圆测试方法

Also Published As

Publication number Publication date
CN102004187B (zh) 2013-07-17

Similar Documents

Publication Publication Date Title
CN102004187B (zh) 串联附加电阻差值法的特小直流电阻测量方法
CN101363881A (zh) 一种电阻测试方法
CN103823138A (zh) 利用辅助线监测供电线路电参数的电路
CN109884366A (zh) 电流传感器以及用于测量电流的方法
CN104576613A (zh) 电迁移测试方法及结构
CN101210943A (zh) 测量电力直流系统对地绝缘电阻的方法
EP2833157B1 (en) Identifying defective electrical cables
CN205384360U (zh) 一种bms电流参数校准装置
US9742349B2 (en) PV junction unit, PV junction box and method for monitoring current in PV string
CN101842958A (zh) 用来给至少一个可重复充电的能量储存器进行充电的充电器
CN108089137B (zh) 一种电池组电压及温度测量电路的测量方法
CN105058275A (zh) 一种热电偶检定专用夹具及热电偶检定方法
CN210780681U (zh) 降低组件功率重复性测试的辅助测试工装及测试系统
CN202332865U (zh) 一种光伏汇流和电流监测结构
WO2014174852A1 (en) Circuit board inspection apparatus and circuit board inspection method
CN103339807B (zh) 电源排插和功率测量方法
CN108565082A (zh) 微欧姆电流检测电阻
CN113820544A (zh) 对地阻抗测量电路、对地阻抗测量方法
CN109444553B (zh) 导线连接器电阻测量方法和测量系统
EP3527995B1 (en) Shunt resistor and measurement system
CN202886448U (zh) 一种电流检测电路
CN208156121U (zh) 一种发动机线束短路的检查装置
CN209858106U (zh) 一种温度检测模块性能测试设备
CN212031707U (zh) 电表装夹工具
CN217739306U (zh) Ntc电阻的可靠性检测装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20171211

Address after: 212005 South Xu Road, Zhenjiang, Zhenjiang, Jiangsu

Patentee after: JIANGSU HUIZHI INTELLECTUAL PROPERTY SERVICES CO., LTD.

Address before: 212013 Zhenjiang City, Jiangsu Province University Road, No. 301

Patentee before: Jiangsu University

TR01 Transfer of patent right
CP02 Change in the address of a patent holder

Address after: 212005 No. 3 Tieta Road, Guyang Town, Dantu District, Zhenjiang City, Jiangsu Province

Patentee after: JIANGSU HUIZHI INTELLECTUAL PROPERTY SERVICES CO., LTD.

Address before: 212005 101 South Xu Road, Zhenjiang, Jiangsu

Patentee before: JIANGSU HUIZHI INTELLECTUAL PROPERTY SERVICES CO., LTD.

CP02 Change in the address of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20191216

Address after: 225200 No. 88 Wenchang East Road, Jiangdu District, Yangzhou, Jiangsu.

Patentee after: Yangzhou (Jiangdu) New Energy Automobile Industry Research Institute of Jiangsu University

Address before: 212005 No.3, Tower Road, Guyang Town, Dantu District, Zhenjiang City, Jiangsu Province

Patentee before: JIANGSU HUIZHI INTELLECTUAL PROPERTY SERVICES CO., LTD.

TR01 Transfer of patent right