CN102001772A - Method for treating industrial waste sewage - Google Patents

Method for treating industrial waste sewage Download PDF

Info

Publication number
CN102001772A
CN102001772A CN 201010593196 CN201010593196A CN102001772A CN 102001772 A CN102001772 A CN 102001772A CN 201010593196 CN201010593196 CN 201010593196 CN 201010593196 A CN201010593196 A CN 201010593196A CN 102001772 A CN102001772 A CN 102001772A
Authority
CN
China
Prior art keywords
sewage
basin
concentration basin
sent
concentration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010593196
Other languages
Chinese (zh)
Inventor
赵永生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panzhihua Gangcheng Group Co Ltd
Original Assignee
Panzhihua Gangcheng Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panzhihua Gangcheng Group Co Ltd filed Critical Panzhihua Gangcheng Group Co Ltd
Priority to CN 201010593196 priority Critical patent/CN102001772A/en
Publication of CN102001772A publication Critical patent/CN102001772A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Separation Of Suspended Particles By Flocculating Agents (AREA)

Abstract

The invention discloses a method for treating industrial waste sewage, belonging to the technical field of environmental protection. The method for treating industrial waste sewage is used for precipitating the materials of suspended matter, impurities and the like in a concentration basin to further reduce the deposition of the materials in a tilting plate precipitation basin. The method for treating industrial waste sewage comprises the following steps of: firstly, storing industrial waste sewage collected from a tailing ditch in a sewage basin; secondly, sending sewage in the sewage basin into the tilting plate precipitation basin for preliminary precipitation, recycling precipitated clear water at the upper part of the tilting plate precipitation basin, and sending the lower sewage into the concentration basin; thirdly, adding a sewage treatment agent into the concentration basin, fully mixing the sewage treatment agent with the sewage, and continuing to precipitate; and finally, recycling the precipitated clear water at the upper part of the concentration basin, and sending the lower sewage into a filter press for filter pressing.

Description

A kind of treatment process of industrial effluent sewage
Technical field
The present invention relates to a kind of treatment process of industrial effluent sewage, belong to environmental technology field.
Background technology
Sewage disposal mainly adopts inclined-plate clarifying basin, concentration basin etc. that the impurity in the sewage is separated with water, existing general press filtration operating method is: with medicament is that flocculation agent is invested the mine tailing ditch, be extracted into inclined-plate clarifying basin by sump pump, fine particle in the sedimentation sewage, import concentration basin then, send into pressure filter by the slag stock pump again.This operating method has following several big defective: 1, concentration basin does not play inspissated, stores storing hardly, just is equivalent to a pipeline; 2, the sewage that puts down from inclined-plate clarifying basin is directly taken out to pressure filter, and is time-consuming during suppressing filter because the moisture content in the sewage is too many, power consumption; Simultaneously, also cause operation hours long, the wearing and tearing of equipment are big, and filtering equipment causes big restriction to production, and equipment does not also have the repair time; 3, the easy material stock of inclined-plate clarifying basin, easily stifled, cleaning must regularly stop production.
Summary of the invention
Technical problem to be solved by this invention is: provide materials such as suspended substance in a kind of sewage, impurity mainly to precipitate in concentration basin, and then reduce the treatment process of the industrial effluent sewage that material piles up in inclined-plate clarifying basin.
The technical scheme that adopts for solving the problems of the technologies described above is: a kind of treatment process of industrial effluent sewage, carry out according to the following steps,
The industrial effluent sewage of earlier the mine tailing ditch being collected is stored in the sewage lagoon; Then the sewage in the sewage lagoon is sent into and carried out preliminary sedimentation in the inclined-plate clarifying basin, and the clear water above the inclined-plate clarifying basin of post precipitation is recycled, the sewage of below is sent in the concentration basin; Then in concentration basin, add the sewage disposal medicament, make itself and sewage thorough mixing, continue then to precipitate; Then the clear water above the concentration basin of post precipitation is reclaimed, the sewage of below is sent into carried out the press filtration processing in the pressure filter.
Further be when in concentration basin, adding medicament, to be that the bottom from concentration basin adds.
The optimal way of such scheme is, when the concentration basin bottom adds medicament, is to finish by the drug feeding pipeline that is laid on the concentration basin bottom.
Further be that the sedimentation time behind the sewage addition agent medicine in concentration basin is 30~40 minutes.
Further be that the sewage in the sewage lagoon is sent in the inclined-plate clarifying basin by sump pump; Sewage in the inclined-plate clarifying basin is sent in the concentration basin by the thrust-augmenting nozzle of bottom, pond; Sewage in the concentration basin is delivered in the pressure filter by the slag stock pump, and clear water is sent in the sewage lagoon by the upflow tube on top.
The invention has the beneficial effects as follows: by adding the operation of sewage disposal medicament originally at the mine tailing ditch, change into and in concentration basin, add the sewage disposal medicament again, thereby make a large amount of suspended substances and the impurity that contain in the sewage by inclined-plate clarifying basin post precipitation input concentration basin, can in concentration basin, be handled to greatest extent and be condensed, and finally precipitate, concentration basin is really played concentrate the suspended substance in the sewage and the effect of impurity, improve the suspended substance in the sewage after concentrated and the content of impurity simultaneously, for the suppressing filter of postorder saves time, raise the efficiency.After the clear water of concentration basin top reclaims, can reduce a large amount of excessive moistures, reduce the loss of filter plate the washing away of the filter plate of pressure filter.In addition, because the sewage disposal medicament just adds in concentration basin, like this, suspended substance and the impurity in the sewage is concentrated in inclined-plate clarifying basin, the agglomerative comparatively small amt, so precipitation, the amount of piling up are also less in inclined-plate clarifying basin, prolonged blocked and time of clearing up of inclined-plate clarifying basin.
Description of drawings
Fig. 1 is the treatment scheme synoptic diagram of the treatment process of a kind of industrial effluent sewage of the present invention;
Fig. 2 is the A-A view of Fig. 1 of the present invention.
Be labeled as among the figure: mine tailing ditch 1, sewage lagoon 2, inclined-plate clarifying basin 3, concentration basin 4, pressure filter 5, drug feeding pipeline 6, sump pump 7, thrust-augmenting nozzle 8, slag stock pump 9, upflow tube 10.
Embodiment
Be that materials such as suspended substance, impurity in a kind of sewage provided by the invention mainly precipitate in concentration basin as shown in Figure 1 and Figure 2, and then reduce the treatment process of the industrial effluent sewage that material piles up in inclined-plate clarifying basin.This industry effluent sewage treatment process is undertaken by following step, and the industrial effluent sewage of earlier mine tailing ditch 1 being collected is stored in the sewage lagoon 2; Then the sewage in the sewage lagoon 2 is sent into and carried out preliminary sedimentation in the inclined-plate clarifying basin 3, and the clear water of inclined-plate clarifying basin 3 tops of post precipitation is recycled, the sewage of below is sent in the concentration basin 4; Then in concentration basin 4, add the sewage disposal medicament, make itself and sewage thorough mixing, continue then to precipitate; Follow clear water recovery, the sewage of below is sent into carried out the press filtration processing in the pressure filter 5 concentration basin 4 tops of post precipitation.Like this, by the operation of will add the sewage disposal medicament at mine tailing ditch 1 originally, change into and in concentration basin 4, add the sewage disposal medicament again, thereby make a large amount of suspended substances and the impurity that contain in the sewage by inclined-plate clarifying basin 3 post precipitations input concentration basin 4, can in concentration basin 4, be handled to greatest extent and be condensed, and finally precipitate, concentration basin 4 is really played concentrate the suspended substance in the sewage and the effect of impurity, the suspended substance in the sewage after concentrating and the content of impurity have been improved simultaneously, for the suppressing filter of postorder saves time, make the original plate of making a call to shorten to half hour in one and a half hours, thereby shortened the working hour of suppressing filter equipment greatly, saved the energy, the wearing and tearing of equipment have been reduced, improved production efficiency, and can also reduce a large amount of excessive moistures, reduced the loss of filter plate the washing away of the filter plate of pressure filter.In addition, because the sewage disposal medicament just adds in concentration basin, like this, suspended substance in the sewage and impurity are concentrated in inclined-plate clarifying basin 3, the agglomerative comparatively small amt, also just be not easy in inclined-plate clarifying basin 3 precipitation, pile up, prolonged blocked and time of clearing up of inclined-plate clarifying basin 3.
In order to make sewage disposal medicament and sewage thorough mixing, improve contacting of suspended substance in medicament and the sewage and impurity, and then accelerate concentrating and rate of set of suspended substance and impurity, when in concentration basin 4, adding medicament, be from the bottom adding of concentration basin 4; And be to finish by the drug feeding pipeline 6 that is laid on concentration basin 4 bottoms.The benefit of Jia Ruing is like this, suspended substance in the sewage and impurity generally all concentrate on settling tank 4 bottoms through post precipitation, so from 4 ends of concentration basin add medicament can make medicament directly with sewage suspended substance with the impurity mixing with contact, contact faster, mix more abundant, carry out dosing by the drug feeding pipeline 6 that is laid on concentration basin 4 bottoms, convenient, fast.After the medicament interpolation is finished, medicament contacts, mixes and react all with impurity with suspended substance in the sewage needs the time, in order to make medicament fully contact, mix and react with impurity with suspended substance, can enhance productivity again, save the sewage disposal time, the sedimentation time behind the sewage addition agent medicine in concentration basin 4 is 30~40 minutes.
Further, top at concentration basin 4 is provided with the upflow tube 10 that is connected with sewage lagoon 2, bottom at inclined-plate clarifying basin 3 is provided with the thrust-augmenting nozzle 8 that is connected with concentration basin 4, make the clear water on concentration basin 4 tops can flow back in the sewage lagoon 2 very easily, the sewage of inclined-plate clarifying basin 3 bottoms is imported in the concentration basin 4 very easily, unlike from sewage lagoon 2, sewage being imported inclined-plate clarifying basin 3, need to use 7 sump pumps, sewage after concentrating is sent into pressure filter 5 from concentration basin 4 needs slag stock pump 9 like that, save energy so to greatest extent, reduce cost of sewage disposal, and after the clear water on concentration basin 4 tops reclaims by upflow tube 10, can reduce the water yield of sending in the pressure filter 5 in a large number, and then reduce moisture to the washing away of the filter plate of pressure filter 5, and reduce the wearing and tearing of filter plate, prolong the work-ing life of equipment.

Claims (5)

1. the treatment process of an industrial effluent sewage is carried out according to the following steps,
The industrial sewage or the trade effluent of earlier mine tailing ditch (1) being collected are stored in the sewage lagoon (2); Then the sewage in the sewage lagoon (2) is sent in the inclined-plate clarifying basin (3) and carried out preliminary sedimentation, and the clear water above the inclined-plate clarifying basin (3) of post precipitation is recycled, the sewage of below is sent in the concentration basin (4); Then add the sewage disposal medicament to concentration basin (4) in, make itself and sewage thorough mixing, continuation precipitates then; Then the clear water above the concentration basin (4) of post precipitation is reclaimed, the sewage of below is sent into carried out the press filtration processing in the pressure filter (5).
2. the treatment process of a kind of industrial effluent sewage according to claim 1 is characterized in that: when adding medicament in concentration basin (4), be that the bottom from concentration basin (4) adds.
3. the treatment process of a kind of industrial effluent sewage according to claim 2 is characterized in that: when concentration basin (4) bottom adds medicament, be to finish by the drug feeding pipeline (6) that is laid on concentration basin (4) bottom.
4. the treatment process of a kind of industrial effluent sewage according to claim 1, it is characterized in that: the sedimentation time behind the sewage addition agent medicine in concentration basin (4) is 30~40 minutes.
5. according to the treatment process of each described a kind of industrial effluent sewage in the claim 1~4, it is characterized in that: the sewage in the sewage lagoon (2) is sent in the inclined-plate clarifying basin (3) by sump pump (7); The sewage of (3) is sent in the concentration basin (4) by the thrust-augmenting nozzle (8) of bottom, pond in the inclined-plate clarifying basin; Sewage in the concentration basin (4) is delivered in the pressure filter (5) by slag stock pump (9), and clear water is sent in the sewage lagoon (2) by the upflow tube (10) on top.
CN 201010593196 2010-12-17 2010-12-17 Method for treating industrial waste sewage Pending CN102001772A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010593196 CN102001772A (en) 2010-12-17 2010-12-17 Method for treating industrial waste sewage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010593196 CN102001772A (en) 2010-12-17 2010-12-17 Method for treating industrial waste sewage

Publications (1)

Publication Number Publication Date
CN102001772A true CN102001772A (en) 2011-04-06

Family

ID=43809521

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010593196 Pending CN102001772A (en) 2010-12-17 2010-12-17 Method for treating industrial waste sewage

Country Status (1)

Country Link
CN (1) CN102001772A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102228763A (en) * 2011-05-27 2011-11-02 云南大红山管道有限公司 Concentration tank overflow sewage treatment device
CN117756360A (en) * 2024-02-22 2024-03-26 山东润通齿轮集团有限公司 integrated sewage treatment system for gear production workshop and application method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003080267A (en) * 2001-09-13 2003-03-18 Meiki Kiki Kk Treatment equipment for muddy water outflowed during tunnel construction
CN1486939A (en) * 2003-07-28 2004-04-07 李显贵 Sewage and waste water treating apparatus and method with natural organic polymer flocculant
CN2663409Y (en) * 2003-08-29 2004-12-15 李文彬 Acid washing and phosphorization sewage treatment machine
CN101069792A (en) * 2007-03-09 2007-11-14 广东省大宝山矿业有限公司 Dimension block-ore production environment-protective treatment system
CN101318743A (en) * 2007-06-08 2008-12-10 鞍钢集团矿业公司 Wastewater treatment method for lean iron ore sorting factory
CN101633536A (en) * 2008-07-21 2010-01-27 张通 Method for treating small-size electroplating waste water

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003080267A (en) * 2001-09-13 2003-03-18 Meiki Kiki Kk Treatment equipment for muddy water outflowed during tunnel construction
CN1486939A (en) * 2003-07-28 2004-04-07 李显贵 Sewage and waste water treating apparatus and method with natural organic polymer flocculant
CN2663409Y (en) * 2003-08-29 2004-12-15 李文彬 Acid washing and phosphorization sewage treatment machine
CN101069792A (en) * 2007-03-09 2007-11-14 广东省大宝山矿业有限公司 Dimension block-ore production environment-protective treatment system
CN101318743A (en) * 2007-06-08 2008-12-10 鞍钢集团矿业公司 Wastewater treatment method for lean iron ore sorting factory
CN101633536A (en) * 2008-07-21 2010-01-27 张通 Method for treating small-size electroplating waste water

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102228763A (en) * 2011-05-27 2011-11-02 云南大红山管道有限公司 Concentration tank overflow sewage treatment device
CN102228763B (en) * 2011-05-27 2013-09-25 云南大红山管道有限公司 Concentration tank overflow sewage treatment device
CN117756360A (en) * 2024-02-22 2024-03-26 山东润通齿轮集团有限公司 integrated sewage treatment system for gear production workshop and application method thereof
CN117756360B (en) * 2024-02-22 2024-04-30 山东润通齿轮集团有限公司 Integrated sewage treatment system for gear production workshop and application method thereof

Similar Documents

Publication Publication Date Title
CN101628761B (en) Treatment method of nickel-cobalt-manganese wastewater generated in waste and old battery treatment process
CN202953895U (en) Electrocoagulation sewage treatment system
CN204454832U (en) Cultivating wastewater purification reclaiming system
CN105293782A (en) System for treating and recycling waste water resulting from lithium battery production
CN205115245U (en) Mud zero release processing system
CN207575885U (en) A kind of mixing plant sewage disposal system
CN101805075A (en) Method for purification treatment of underground wastewater of coal mine
CN102001772A (en) Method for treating industrial waste sewage
CN201737805U (en) Wastewater treatment device made of corrugated paper
CN108947137A (en) A kind of kitchen garbage percolation liquid treatment method
CN209292153U (en) Integrated high-efficiency magnetic-coagulation water treatment facilities
CN101428934A (en) Apparatus for treating waste water apparatus for treating waste water from regeneration slurry boxboard production
CN100450941C (en) Technical methd for treating mine wastewater by using membrane technology
CN202688121U (en) Waste muddy water recycling system
CN212246582U (en) Coal-containing wastewater treatment device of many function combination
CN205188014U (en) Wet flue gas desulfurization effluent treatment plant of thermal power plant
CN205295010U (en) Lithium cell waste water's processing and recovery system
CN209721674U (en) A kind of rapidly-assembled magnetic-coagulation precipitated separation technology equipment
CN205035216U (en) Paper mill plain boiled water multilevel processing recycling system
CN102180555A (en) Method for treating organic matters in spirulina cultivating waste water
CN207091155U (en) A kind of biogas slurry utilization of wastewater resource system
CN110563186A (en) Device and method for graded precipitation treatment of biogas slurry and sewage manure
CN201240912Y (en) Recycling apparatus for coal pit water
CN204380393U (en) A kind of water circulation system
CN217230439U (en) Antimony-arsenic-containing wastewater treatment system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110406