CN101995361B CN2009101088860A CN200910108886A CN101995361B CN 101995361 B CN101995361 B CN 101995361B CN 2009101088860 A CN2009101088860 A CN 2009101088860A CN 200910108886 A CN200910108886 A CN 200910108886A CN 101995361 B CN101995361 B CN 101995361B
Authority
CN
China
Prior art keywords
long glass
glass fibres
glass fiber
plastics
measuring method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009101088860A
Other languages
Chinese (zh)
Other versions
CN101995361A (en
Inventor
赖华林
余志东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN HALCYON ENGINEERING PLASTICS CO., LTD.
Original Assignee
SHENZHEN HALCYON ENGINEERING PLASTICS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN HALCYON ENGINEERING PLASTICS Co Ltd filed Critical SHENZHEN HALCYON ENGINEERING PLASTICS Co Ltd
Priority to CN2009101088860A priority Critical patent/CN101995361B/en
Publication of CN101995361A publication Critical patent/CN101995361A/en
Application granted granted Critical
Publication of CN101995361B publication Critical patent/CN101995361B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Extrusion Moulding Of Plastics Or The Like (AREA)
  • Reinforced Plastic Materials (AREA)

Abstract

The invention relates to a long glass fiber filling quantity measuring method in the plastic modification processing process. Long glass fiber is sampled at a glass fiber material feeding opening of a double-screw extruding machine of melt modified plastics, and the modified plastics are sampled at a modified plastic material collecting opening. Measuring tools comprise a timing stopwatch and an electronic scale. The method comprises the following steps of: 1. after the plastic modification extrusion of the double-screw extruding machine is stable, maintaining all processing parameters unchanged, and respectively sampling long glass fiber at the glass fiber feeding material opening and sampling the modified plastics at the modified plastic material collecting opening in the same sampling time metered by the timing stopwatch; 2. respectively weighing the reducing quantity of the long glass fiber and the producing quantity of the modified plastics in the same metering time by the electronic scale; and 3. calculating the filling quantity of the long glass fiber through dividing the reducing quantity of the long glass fiber by the producing quantity of the modified plastics. The measuring method of the invention is practical and reliable, adopts the simple measuring tools, and has the short measuring period, the whole measuring process can be completed in two minutes, and the measuring error is within one percent of the filling quantity of the glass fiber.

Description

Long glass fibres loading measuring method in a kind of modifying plastics process
Technical field
The present invention relates to the measurement of spun glass loading, particularly relate to the long glass fibres loading measuring method in a kind of modifying plastics process.
Background technology
Long glass fibres loading measuring method in the existing modifying plastics process adopts firing method to measure mostly, measures time-consuming reaching about half an hour, both combustion plant need be provided, and consumes energy pollutes atmosphere; Need provide burning to use the material sample again, cause material loss, waste easily, the material that is not suitable for involving great expense is measured.Also having a kind of method is the calculation of parameter spun glass loadings such as engine speed, feeding rotating speed through measuring extruder, and this method receives the influence of raw materials for production and extruder stability easily, and measuring error is bigger.
Summary of the invention
Technical matters to be solved by this invention is the deficiency that remedies above-mentioned prior art, proposes the long glass fibres loading measuring method in a kind of modifying plastics process.
Technical matters of the present invention adopts following technical scheme to solve:
Long glass fibres loading measuring method in this modifying plastics process comprises sampling method and survey instrument.
The characteristics of the long glass fibres loading measuring method in this modifying plastics process are:
Said sampling method is included in the spun glass spout sampling long glass fibres of the double screw extrusion machine of melt modification plastics, at modified plastics material receiving port sampling modified plastics;
Said survey instrument comprises Chronograph and electronic scales;
May further comprise the steps:
1) the double screw extrusion machine modifying plastics extrude stable after, keep all machined parameters constant, in the identical sample time of Chronograph metering, respectively at spun glass spout sampling long glass fibres, at modified plastics material receiving port sampling modified plastics;
2) weigh the reduction and the modified plastics quantum of output of long glass fibres in the identical metering time respectively with electronic scales;
3) reduction with long glass fibres calculates the long glass fibres loading divided by the modified plastics quantum of output.
Further technical scheme below technical matters of the present invention adopts solves:
Preferably, said Chronograph is the stopwatch timer.
Preferably, said electronic scales is that precision is that thousand minutes positions, ranges are at least 30 kilograms electronic scales.Measuring error is controlled in 1% the spun glass loading.
After said modifying plastics process comprises that plastic raw materials mixes, extrude, cool off then, the process of pelletizing through screw extruder.
It is that the double screw extrusion machine running is stable that said double screw extrusion machine modifying plastics is extruded stable, and the traction of material bar is smooth and easy.
Be a kind of in 1 minute, 2 minutes and 5 minutes the identical sample time of said Chronograph metering.
Preferably, be 1 minute the identical sample time of said Chronograph metering.
Preferably, said modified plastics is polyethylene terephthalate (the abbreviation code name is PET) section, is called for short the PET section.
The beneficial effect of the present invention and prior art contrast is:
The measuring method of long glass fibres loading of the present invention is practical reliable, and survey instrument is simple, and measuring period is short, and whole measuring process can be accomplished in 2 minutes, and measuring error is in the one percentage point of spun glass loading.The measuring method of long glass fibres loading of the present invention can be widely used in the modification in-process measurement long glass fibres loading that various plastics are filled long glass fibres; So that in time adjust the modification working process parameter; The loading of guaranteeing long glass fibres adheres to specification; Help improving working (machining) efficiency, economize on resources.
Embodiment
Below in conjunction with five specific embodiments the present invention is described further.
Embodiment 1
The PET section is placed double screw extrusion machine, set the extruder technological parameter, open machine then, carry out extruding pelletization, long glass fibres is added by the spun glass spout of double screw extrusion machine, and adding number of share of stock is 1 strand.After waiting to expect that the bar traction is smooth and easy, keep all machined parameters constant, spun glass is placed on the electronic scales, be 1 minute the identical sample time of Chronograph metering, writes down the weight that long glass fibres reduces in 1 minute., connected material 1 minute simultaneously the weight that is connected material with the electronic scales weighing at the material receiving port place of double screw extrusion machine.Go out the long glass fibres loading with the long glass fibres reduction divided by the material recuperation then, and compare with empirical value and combustion testing value.Long glass fibres is the long glass fibres that Taishan glass fiber Ltd produces.220 ℃ of one district's temperature of double screw extrusion machine, 250 ℃ of two district's temperature, 250 ℃ of three district's temperature, 240 ℃ of four district's temperature, 230 ℃ of five district's temperature, 225 ℃ of head temperatures;
Embodiment 2
Basically with embodiment 1, difference is: be 2 minutes the identical sample time of Chronograph metering.
Embodiment 3
Basically with embodiment 1, difference is: be 5 minutes the identical sample time of Chronograph metering.
Embodiment 4
Basically with embodiment 1, difference is: long glass fibres is the long glass fibres that Jushi Group Co., Ltd. produces.
Embodiment 5
Basically with embodiment 1, difference is: long glass fibres is the long glass fibres that Great Wall spun glass company limited produces.
The measurement result contrast of embodiment 1~3 sees the following form 1
Table 1
Measuring Time (minute) Glass reduction (g) Produce material amount (g) Glass loading (%) Firing method test result (%) Glass loading empirical value (%)
1 81 528 15.3 15.8 16
2 165 1064 15.5 15.2 16
5 401 2571 15.6 15.7 16
The measurement result contrast of embodiment 1,4,5 sees the following form 2
Table 2
The spun glass kind Glass loading (%) Firing method test result (%) Glass loading empirical value (%)
Mount Taishan 15.3 15.8 16
Megalith 15.1 15.7 16
Great Wall 15.0 15.5 16
The measurement result of embodiment 1~5 in the contrast table 1,2 has to draw a conclusion:
1) the identical type long glass fibres is in different sample times, the long glass fibres loading basically identical that measures;
2) the variety classes long glass fibres is in identical sample time, and the long glass fibres loading that measures is difference to some extent, and reason is that different types of spun glass thickness there are differences.
Above content is to combine concrete preferred implementation to the further explain that the present invention did, and can not assert that practical implementation of the present invention is confined to these explanations.For the those of ordinary skill of technical field under the present invention, make some being equal under the prerequisite of the present invention design and substitute or obvious modification not breaking away from, and performance or purposes are identical, all should be regarded as belonging to protection scope of the present invention.

Claims (7)

1. the long glass fibres loading measuring method in the modifying plastics process comprises sampling method and survey instrument, it is characterized in that:
Said sampling method is included in the spun glass spout sampling long glass fibres of the double screw extrusion machine of melt modification plastics, at modified plastics material receiving port sampling modified plastics;
Said survey instrument comprises Chronograph and electronic scales;
May further comprise the steps:
1) the double screw extrusion machine modifying plastics extrude stable after, keep all machined parameters constant, in the identical sample time of Chronograph metering, respectively at spun glass spout sampling long glass fibres, at modified plastics material receiving port sampling modified plastics;
2) weigh the reduction and the modified plastics quantum of output of long glass fibres in the identical metering time respectively with electronic scales;
3) reduction with long glass fibres calculates the long glass fibres loading divided by the modified plastics quantum of output.
2. the long glass fibres loading measuring method in the modifying plastics process as claimed in claim 1 is characterized in that:
Said Chronograph is the stopwatch timer.
3. the long glass fibres loading measuring method in according to claim 1 or claim 2 the modifying plastics process is characterized in that:
Said electronic scales is that precision is accurate to the electronic scales that thousand minutes positions, ranges are at least 30 kilograms.
4. the long glass fibres loading measuring method in the modifying plastics process as claimed in claim 3 is characterized in that:
After said modifying plastics process comprises that plastic raw materials mixes, extrude, cool off then, the process of pelletizing through double screw extrusion machine.
5. the long glass fibres loading measuring method in the modifying plastics process as claimed in claim 4 is characterized in that:
It is that the double screw extrusion machine running is stable that said double screw extrusion machine modifying plastics is extruded stable, and the traction of material bar is smooth and easy.
6. the long glass fibres loading measuring method in the modifying plastics process as claimed in claim 5 is characterized in that:
Be a kind of in 1 minute, 2 minutes and 5 minutes the identical sample time of said Chronograph metering.
7. the long glass fibres loading measuring method in the modifying plastics process as claimed in claim 6 is characterized in that:
Said modified plastics is the PET section.
CN2009101088860A 2009-08-11 2009-08-11 Long glass fiber filling quantity measuring method in plastic modification processing process Expired - Fee Related CN101995361B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101088860A CN101995361B (en) 2009-08-11 2009-08-11 Long glass fiber filling quantity measuring method in plastic modification processing process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101088860A CN101995361B (en) 2009-08-11 2009-08-11 Long glass fiber filling quantity measuring method in plastic modification processing process

Publications (2)

Publication Number Publication Date
CN101995361A CN101995361A (en) 2011-03-30
CN101995361B true CN101995361B (en) 2012-07-04

Family

ID=43785816

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101088860A Expired - Fee Related CN101995361B (en) 2009-08-11 2009-08-11 Long glass fiber filling quantity measuring method in plastic modification processing process

Country Status (1)

Country Link
CN (1) CN101995361B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103913396B (en) * 2013-08-23 2016-09-28 郑怡 Fiber content assay method in a kind of fibre reinforced concrete

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1030699A1 (en) * 1982-04-01 1983-07-23 Предприятие П/Я М-5314 Device for determination of binder content of glass-reinforced plastics
US5160578A (en) * 1990-04-23 1992-11-03 Phillips Petroleum Company Separating of fibers from a fiber-containing solid sample
CN1982865A (en) * 2005-12-12 2007-06-20 天津天纺投资控股有限公司 Method for quantitivelly and chemically analyzing cotton spandex covering yarn fiber content
JP4039063B2 (en) * 2002-01-16 2008-01-30 富士電機ホールディングス株式会社 Composition analysis method of glass cloth base resin substrate
CN101464241A (en) * 2009-01-21 2009-06-24 湖南中烟工业有限责任公司 Method for measuring additional fiber content in reconstituted tobacco by papermaking method
CN101470064A (en) * 2007-12-25 2009-07-01 天津天纺投资控股有限公司 Cotton and silk fiber blended product content analysis method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1030699A1 (en) * 1982-04-01 1983-07-23 Предприятие П/Я М-5314 Device for determination of binder content of glass-reinforced plastics
US5160578A (en) * 1990-04-23 1992-11-03 Phillips Petroleum Company Separating of fibers from a fiber-containing solid sample
JP4039063B2 (en) * 2002-01-16 2008-01-30 富士電機ホールディングス株式会社 Composition analysis method of glass cloth base resin substrate
CN1982865A (en) * 2005-12-12 2007-06-20 天津天纺投资控股有限公司 Method for quantitivelly and chemically analyzing cotton spandex covering yarn fiber content
CN101470064A (en) * 2007-12-25 2009-07-01 天津天纺投资控股有限公司 Cotton and silk fiber blended product content analysis method
CN101464241A (en) * 2009-01-21 2009-06-24 湖南中烟工业有限责任公司 Method for measuring additional fiber content in reconstituted tobacco by papermaking method

Also Published As

Publication number Publication date
CN101995361A (en) 2011-03-30

Similar Documents

Publication Publication Date Title
CN107745117A (en) 310 stainless steelwork and powder of stainless steel injection moulding feedings and preparation method
CN101995361B (en) Long glass fiber filling quantity measuring method in plastic modification processing process
CN103640141B (en) Disposal vacuum heparin tube PET pipe Shooting Technique
CN103234798A (en) High-uniformity quantitative splitting and subpackaging technology of standard coal sample
CN102269681A (en) Method for measuring vinyl acetate (VA) content in ethylene vinyl acetate (EVA)
DAI et al. Study on the rapid method to predict longevity of controlled release fertilizer coated by water soluble resin
CN108276648B (en) Polyethylene plastic evaporation residue standard sample master batch particles for food packaging and preparation method thereof
CN104804412A (en) Glass-fiber nylon material for railway insulating piece and preparation method thereof
CN108955846A (en) A kind of ingredient machine control system
CN102840904A (en) Method for monitoring accuracy degree of metering balance during production process
CN103358511B (en) Based on the plastics degree of crystallinity On-line Measuring Method of pressure sensor and temperature sensor
CN203525626U (en) Temperature control stirring device for storage battery adhesive
CN203350161U (en) Device for measuring permeability in natural fiber fabric
CN204509946U (en) A kind of decrement metering device
CN102951948A (en) Technological method for producing compound fertilizer by high tower melting method
CN101968428A (en) Method for testing porosity in carbon fiber precursor
CN105463642B (en) Dead zone length automatic testing method in the control of drawing frame autoleveller
CN114685910B (en) Colorant, coloring material and preparation method
CN210173959U (en) Batch type weighing and batching production system
CN115523994A (en) Method for judging accuracy of batching scale
WANG et al. Experimental study on rapeseed extrusion cooking using dimensional analysis
CN202692914U (en) Fabricated spline integration gauge
CN207535285U (en) A kind of new type plastic pipe on-line monitoring system
CN110501478A (en) A kind of detection method of natural rubber molecular weight
CN105171948B (en) The automatic proportioning prilling process of EMA thermal expansion materials

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHENZHEN HUALIXING NEW MATERIALS CO., LTD.

Free format text: FORMER NAME: SHENZHEN HALCYON ENGINEERING PLASTICS CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 518104, Shenzhen, Guangdong province Baoan District manhole town Wanfeng village, Dayang Industrial Zone, 19

Patentee after: SHENZHEN HALCYON ENGINEERING PLASTICS CO., LTD.

Address before: 518104, Shenzhen, Guangdong province Baoan District manhole town Wanfeng village, Dayang Industrial Zone, 19

Patentee before: Shenzhen Halcyon Engineering Plastics Co., Ltd.

C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: 518105 Guangdong city of Shenzhen province Baoan District Tantou town of Songgang West Industrial Park building A16

Patentee after: SHENZHEN HALCYON ENGINEERING PLASTICS CO., LTD.

Address before: 518104, Shenzhen, Guangdong province Baoan District manhole town Wanfeng village, Dayang Industrial Zone, 19

Patentee before: SHENZHEN HALCYON ENGINEERING PLASTICS CO., LTD.

C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: Longgang District of Shenzhen City, Guangdong province 518116 Baolong Industrial Zone Jinlong Road No. 6

Patentee after: SHENZHEN HALCYON ENGINEERING PLASTICS CO., LTD.

Address before: 518105 Guangdong city of Shenzhen province Baoan District Tantou town of Songgang West Industrial Park building A16

Patentee before: SHENZHEN HALCYON ENGINEERING PLASTICS CO., LTD.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704

Termination date: 20160811