CN101995356B - Drawing and screwing type assembly fixing device - Google Patents
Drawing and screwing type assembly fixing device Download PDFInfo
- Publication number
- CN101995356B CN101995356B CN 201010562114 CN201010562114A CN101995356B CN 101995356 B CN101995356 B CN 101995356B CN 201010562114 CN201010562114 CN 201010562114 CN 201010562114 A CN201010562114 A CN 201010562114A CN 101995356 B CN101995356 B CN 101995356B
- Authority
- CN
- China
- Prior art keywords
- solar module
- bolt
- measured
- sleeved
- longitudinal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The invention relates to a drawing and screwing type assembly fixing device which comprises a solar module to be tested, two longitudinal bars, two transverse bars, support columns, drawing plates and through bolts, wherein the two transverse bars are parallel to each other and are mounted on the two longitudinal bars, the transverse bars are perpendicular to the longitudinal bars, the longitudinal bar are provided with longitudinal regulating grooves, the through bolts are sleeved in the longitudinal regulating grooves, the transverse bars are sleeved on the through bolts through fixing holes arranged at both ends thereof, one support column and one drawing plate are sleeved on each through bolt, each drawing plate is provided with a regulating groove and a lifting hole, the distance from the lower end surface of the drawing plate to the bottom of the support column is more than the thickness of the solar module to be tested, and the solar module to be tested is fixed on the lower end surface of the drawing plate by a suspension bolt through a mounting hole in an aluminum border. The invention is simple and convenient in regulation, and an operator only needs to bear the weight of the solar module in the whole testing process, thereby ensuring convenient operation, greatly reducing the labor intensity of the operator and improving the working efficiency.
Description
Technical field:
The present invention relates to static pressure testing device of solar cell assembly, relate in particular to solar module static pressure test pothook type assembly stationary installation.
Background technology:
Solar module must bear the pressure of strong wind and the gravity of ice and snow in long-term outdoor use, therefore the load performance that needs simulation truth test solar module, according to the IEC standard, for the safety coefficient of test suite for fitful wind, need solar module can bear pressure greater than 2400Pa; For the safety coefficient of test suite with respect to sleet, need solar module can bear pressure greater than 5400Pa.People must carry out the bearing capacity test to the solar module surface for this reason, the back side to solar module evenly applies 2400Pa pressure, the assembly front surface is evenly applied the pressure of 5400Pa, the pressurized solar module is carried out coherent detection and judgement, and meet the following conditions: 1. no intermittent breaking phenomena in the experimentation; 2. there is not serious open defect; 3. under the standard test condition peak power output pad value be no more than the test before 5%; 4. insulation resistance is preceding identical with experiment.
At present, solar module is tested the module testing shelf structure of usefulness shown in figure l, it comprises two bar shaped steel pipe l and places framework 2, placing framework 2 is made up of a rectangle frame 21 and four support bars 22, support bar 22 is installed on four angles of rectangle frame 21, the interior rectangular area of rectangle frame 21 is greater than the area of solar module 3 to be measured, the length of bar shaped steel pipe 1 is greater than the length of rectangle frame 21, during use bar shaped steel pipe 1 directly is placed on the rectangle frame 21, both sides at bar shaped steel pipe l all have slotted eye 11, and the position of slotted eye 11 is corresponding to the position of mounting hole 31 on the solar module 3 aluminium frames to be measured.When the glass face for the treatment of shoot the sun energy battery component 3 is tested, solar module 3 to be measured is directly placed on the test desktop, make the glass of solar module 3 to be measured towards last, evenly exert pressure then.When the back side for the treatment of shoot the sun energy battery component 3 is tested, because the glass face must be downwards, must the glass face of solar module 3 to be measured is unsettled, need solar module 3 to be measured be fixed up with the module testing frame and exert pressure, preventing that glass face stress deformation is obstructed influences precision of test result.Concrete installation requirement is: the glass of solar module 3 to be measured is faced down to keep flat, the mounting hole 31 that slotted eye 11 on the bar shaped steel pipe l is aimed on the aluminium frame, pass the back side that mounting hole 31 and slotted eye 11 are fixedly mounted on bar shaped steel pipe 1 on the aluminium frame of solar module 3 to be measured with bolt, and then the bar shaped steel pipe l that solar module 3 to be measured will be housed is placed on the rectangle frame 21, make the glass of solar module 3 to be measured face down unsettled, can begin to carry out static pressure test, could simulate the truth of solar module 3 to be measured when using out of doors like this, but because bar shaped steel pipe 1, solar module 3 to be measured and placement framework 2 are all heavier, and volume ratio is bigger, the each placement, carry all gruelling, and it is not easy to operate, not only operating process is too loaded down with trivial details to use this testing jig, and the running time is longer.
Summary of the invention:
In order more easily solar module to be carried out static pressure test, the invention provides a kind of pull solid-spin assembly stationary installation, not only use lightly, and carrying, collection are convenient, can alleviate operator's labour intensity significantly.
The technical solution adopted in the present invention is: a kind of pull solid-spin assembly stationary installation, it is characterized in that: it comprises solar module to be measured, longitudinal rod, transverse bar, support column, pull plate and thru-bolt, two longitudinal rods are parallel, contour, be horizontally fixed on the frame, spacing between two longitudinal rods is greater than the width of solar module to be measured, two transverse bars are installed on two longitudinal rods in parallel to each other, transverse bar is vertical with longitudinal rod, be provided with vertical regulating tank at longitudinal rod, thru-bolt is sleeved in vertical regulating tank, two ends at transverse bar are provided with fixed orifice, transverse bar is sleeved on the thru-bolt by the fixed orifice that is arranged on two ends, and support column is sleeved on the thru-bolt; Be provided with regulating tank and hole for hoist at pull plate, pull plate is sleeved on the thru-bolt by regulating tank, and be positioned at the upper end of support column, the distance of support column bottom is arrived greater than the thickness of solar module to be measured in the lower surface of pull plate, and solar module to be measured is fixed on the lower surface of pull plate by Hanging bolt by the mounting hole on the aluminium frame.
Owing to the intersecting parallels structure that the assembly stationary installation is designed to formed by transverse bar and longitudinal rod, longitudinal rod is fixed on the frame, be provided with vertical regulating tank at longitudinal rod, thru-bolt is sleeved in vertical regulating tank, the two ends of transverse bar are sleeved on the thru-bolt by fixed orifice, support column and pull plate all are sleeved on the thru-bolt, and pull plate can remove by relative thru-bolt by regulating tank.When applied voltage test is carried out in the front for the treatment of shoot the sun energy battery component, unclamp the nut on the thru-bolt, regulate the spacing between two transverse bars, make it with solar components length direction to be measured shelve require corresponding, then pull plate is pushed the position parallel with longitudinal rod, screw the nut on the thru-bolt, manually lift solar module, make the glass of solar module to be measured towards last, back side aluminium frame directly is shelved on two transverse bars can carries out applied voltage test; After positive applied voltage test finishes, take out of solar module and overturn 180 °, make the aluminium frame at the solar module to be measured back side upwards, unclamp the nut on the thru-bolt, regulate the position of pull plate, make the mounting hole on the hole for hoist aligning aluminium frame on the pull plate, by Hanging bolt that the two is fixedly connected, at last thru-bolt is screwed, solar module to be measured so just is suspended on four pull plate lower surfaces, because the distance of support column lower surface is arrived greater than the thickness of solar module to be measured in the pull plate lower surface, when therefore carrying out applied voltage test at the back side for the treatment of shoot the sun energy battery component, glass facial disfigurement amount can not be subjected to any stopping, has guaranteed the accuracy of back side applied voltage test.
This solar module static pressure test pull solid-spin assembly stationary installation, use adjusting simple and convenient, the maximum weight that the operator will carry in whole test process is exactly the weight of solar module to be measured, without any condiment, and volume does not increase simple and convenient yet, greatly alleviate labor intensity of operating personnel, also improved work efficiency.
Description of drawings:
Fig. 1, Fig. 2 are existing static pressure test assembly fixture structure synoptic diagram;
Fig. 3 treats the structural representation of pressurized state for the present invention is in;
Fig. 4 is the vertical view of Fig. 3; Fig. 3 is A-A cut-open view among Fig. 4;
Fig. 5, Fig. 6 are the structural representation of transverse bar, and wherein Fig. 6 is B-B cut-open view among Fig. 5;
Among the figure: 1-bar shaped steel pipe; 2-places framework; 3-solar module to be measured; The 4-longitudinal rod; The 5-transverse bar; The 6-support column; The 7-pull plate; The 8-thru-bolt; The 9-Hanging bolt; The 11-slotted eye; The 21-rectangle frame; The 22-support bar; The 31-mounting hole; The vertical regulating tank of 41-; The 51-fixed orifice; The 71-regulating tank; The 72-hole for hoist.
Embodiment:
Introduce the specific embodiment of the present invention in detail below in conjunction with accompanying drawing:
EXAMPLE l: a kind of pull solid-spin assembly stationary installation, as Fig. 2~shown in Figure 6, it comprises solar module 3 to be measured, longitudinal rod 4, transverse bar 5, support column 6, pull plate 7 and thru-bolt 8, two longitudinal rods 4 are parallel, contour, be horizontally fixed on the frame, spacing between two longitudinal rods 4 is greater than the width of solar module 3 to be measured, two transverse bars 5 are installed on two longitudinal rods 4 in parallel to each other, transverse bar 5 is vertical with longitudinal rod 4, be provided with vertical regulating tank 41 at longitudinal rod 4, thru-bolt 8 is sleeved in vertical regulating tank 41, be provided with fixed orifice 5l at the two ends of transverse bar 5, transverse bar 5 is sleeved on the thru-bolt 8 by the fixed orifice 51 that is arranged on two ends, and support column 6 is sleeved on the thru-bolt 8; Be provided with regulating tank 71 and hole for hoist 72 at pull plate 7, pull plate 7 is sleeved on the thru-bolt 8 by regulating tank 71, and be positioned at the upper end of support column 6, the distance of support column 6 bottoms is arrived greater than the thickness of solar module 3 to be measured in the lower surface of pull plate 7, and solar module 3 to be measured is fixed on the lower surface of pull plate 7 by Hanging bolt 9 by the mounting hole 31 on the aluminium frame.
Concrete using method is as follows:
When the glass face for the treatment of shoot the sun energy battery component 3 is tested, unclamp the nut on all thru-bolts 8, forward pull plate 7 to the orientation parallel with longitudinal rod 4 and fixing, solar module 3 to be measured directly is shelved on the transverse bar 5, make the glass of solar module 3 to be measured towards last, evenly exert pressure then.After positive applied voltage test finishes, take out of solar module 3 to be measured and overturn 180 °, make the aluminium frame at solar module to be measured 3 back sides upwards, unclamp the nut on the thru-bolt 8, make pull plate 7 forward the position parallel with transverse bar 5 to, the mounting hole 31 that hole for hoist 72 on the pull plate 7 is aimed on the aluminium frame, and it is with Hanging bolt 9 that the two is fixedly connected, at last the nut on the thru-bolt 8 is screwed, solar module 3 to be measured so just is suspended on four pull plate 7 lower surfaces, just normal applied voltage test.
Claims (1)
1. pull solid-spin assembly stationary installation, it is characterized in that: it comprises solar module to be measured (3), longitudinal rod (4), transverse bar (5), support column (6), pull plate (7) and thru-bolt (8), two longitudinal rods (4) are parallel, contour, be horizontally fixed on the frame, spacing between two longitudinal rods (4) is greater than the width of solar module to be measured (3), two transverse bars (5) are installed on two longitudinal rods (4) in parallel to each other, transverse bar (5) is vertical with longitudinal rod (4), be provided with vertical regulating tank (41) at longitudinal rod (4), thru-bolt (8) is sleeved in vertical regulating tank (41), be provided with fixed orifice (51) at the two ends of transverse bar (5), transverse bar (5) is sleeved on the thru-bolt (8) by the fixed orifice (51) that is arranged on two ends, and support column (6) is sleeved on the thru-bolt (8); Be provided with regulating tank (71) and hole for hoist (72) at pull plate (7), pull plate (7) is sleeved on the thru-bolt (8) by regulating tank (71), and be positioned at the upper end of support column (6), the distance of support column (6) bottom is arrived greater than the thickness of solar module to be measured (3) in the lower surface of pull plate (7), and solar module to be measured (3) is fixed on the lower surface of pull plate (7) by Hanging bolt (9) by the mounting hole on the aluminium frame (31).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010562114 CN101995356B (en) | 2010-11-29 | 2010-11-29 | Drawing and screwing type assembly fixing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010562114 CN101995356B (en) | 2010-11-29 | 2010-11-29 | Drawing and screwing type assembly fixing device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101995356A CN101995356A (en) | 2011-03-30 |
CN101995356B true CN101995356B (en) | 2013-09-25 |
Family
ID=43785811
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010562114 Active CN101995356B (en) | 2010-11-29 | 2010-11-29 | Drawing and screwing type assembly fixing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101995356B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103439183B (en) * | 2013-08-13 | 2016-03-16 | 苏州盛康光伏科技有限公司 | The clamping tooling of mechanical load of photovoltaic module test |
CN109520838B (en) * | 2018-12-25 | 2023-12-15 | 西南交通大学 | Tensile property test device for shield tunnel bolt joint |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010101858A (en) * | 2008-10-27 | 2010-05-06 | Mitsubishi Heavy Ind Ltd | Tester and method for bearing durability test for solar battery panel |
CN101782485B (en) * | 2010-01-31 | 2013-12-18 | 常州亿晶光电科技有限公司 | Static pressure testing device of solar cell assembly |
CN101834226A (en) * | 2010-04-27 | 2010-09-15 | 常州亿晶光电科技有限公司 | Cushion type operating platform for solar modules at later stage of production |
CN201885928U (en) * | 2010-11-29 | 2011-06-29 | 常州亿晶光电科技有限公司 | Drawing screw-fixed module fixing device |
-
2010
- 2010-11-29 CN CN 201010562114 patent/CN101995356B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN101995356A (en) | 2011-03-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101995356B (en) | Drawing and screwing type assembly fixing device | |
CN201885928U (en) | Drawing screw-fixed module fixing device | |
CN102095636B (en) | Fixing device for pull hook assembly | |
CN101995355B (en) | Rotating rotary-fixing type assembly fixing device | |
CN201945500U (en) | Movable hanger assembly fixing device | |
CN201885929U (en) | Drawable hook type assembly fixing device | |
CN201885927U (en) | Rotating screw-fixed module fixing device | |
CN212413092U (en) | Electric bracket for protecting solar photovoltaic panel | |
CN202076285U (en) | Guide rail for fixedly mounting solar photovoltaic subassembly | |
CN102095635B (en) | Fixing device for rotary hook type assembly | |
CN218285432U (en) | Photovoltaic module installs frock | |
CN203350131U (en) | Load test device | |
CN215734152U (en) | Photovoltaic board installing support with adjustable equipment | |
CN113612443A (en) | Static mechanical load testing device for photovoltaic module | |
CN107134296B (en) | A kind of suspension type measuring instrument self-level(l)ing device | |
CN220754746U (en) | Photovoltaic module installing support | |
CN214490472U (en) | Steel structure device suitable for photovoltaic board | |
CN204302098U (en) | Photovoltaic module mechanical load test machine | |
CN215291573U (en) | Curtain height-adjustable's support structure | |
CN214776669U (en) | Solar cell array unfolding device | |
CN212613560U (en) | Rapid positioning support for mounting passive window | |
CN213937796U (en) | Novel solar support | |
CN217866550U (en) | Automatic assembling machine with finished product detection function | |
CN209356306U (en) | One kind fastening detection device for structural steelwork | |
CN216313003U (en) | Solar panel hook rack |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |