CN101984538A - 采用曼彻斯特编码的电子式互感器数据同步处理方法 - Google Patents
采用曼彻斯特编码的电子式互感器数据同步处理方法 Download PDFInfo
- Publication number
- CN101984538A CN101984538A CN2010101818283A CN201010181828A CN101984538A CN 101984538 A CN101984538 A CN 101984538A CN 2010101818283 A CN2010101818283 A CN 2010101818283A CN 201010181828 A CN201010181828 A CN 201010181828A CN 101984538 A CN101984538 A CN 101984538A
- Authority
- CN
- China
- Prior art keywords
- data
- mutual inductor
- electronic mutual
- pps
- manchester
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/16—Electric power substations
Landscapes
- Synchronisation In Digital Transmission Systems (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101818283A CN101984538B (zh) | 2010-05-25 | 2010-05-25 | 采用曼彻斯特编码的电子式互感器数据同步处理方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101818283A CN101984538B (zh) | 2010-05-25 | 2010-05-25 | 采用曼彻斯特编码的电子式互感器数据同步处理方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101984538A true CN101984538A (zh) | 2011-03-09 |
CN101984538B CN101984538B (zh) | 2012-12-19 |
Family
ID=43641708
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010101818283A Active CN101984538B (zh) | 2010-05-25 | 2010-05-25 | 采用曼彻斯特编码的电子式互感器数据同步处理方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101984538B (zh) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102932103A (zh) * | 2012-10-22 | 2013-02-13 | 武汉烽火富华电气有限责任公司 | 一种基于数字化变电站的数据传输速率自适应接收方法 |
CN103763085A (zh) * | 2014-01-17 | 2014-04-30 | 南京信息职业技术学院 | 一种多路数据高速采集合并方法及装置 |
CN104090157A (zh) * | 2014-05-14 | 2014-10-08 | 贵州电力试验研究院 | 一种数字化变电站独立计量系统构架方法 |
CN104280607A (zh) * | 2014-05-14 | 2015-01-14 | 贵州电力试验研究院 | 一种数字化变电站独立计量系统的数据同步分帧器 |
CN106226722A (zh) * | 2016-07-08 | 2016-12-14 | 中国能源建设集团湖南省电力设计院有限公司 | 一种全光纤电流互感器分析装置 |
CN106353550A (zh) * | 2016-08-19 | 2017-01-25 | 四方继保(武汉)软件有限公司 | 一种采用同步串行编码的电子式互感器数据处理方法 |
CN109309682A (zh) * | 2018-10-29 | 2019-02-05 | 中国电力科学研究院有限公司 | 一种用于数字化计量的ft3到iec61850-9-2协议转换方法及系统 |
CN110061827A (zh) * | 2018-01-19 | 2019-07-26 | 中电普瑞电力工程有限公司 | 一种基于同步时钟的等间隔数据采集方法及装置 |
CN110487304A (zh) * | 2018-05-14 | 2019-11-22 | 迈来芯科技有限公司 | 位置感测设备 |
CN115173556A (zh) * | 2022-07-11 | 2022-10-11 | 烟台东方威思顿电气有限公司 | 一种分布式环网柜配电自动化装置及数据同步采集方法 |
CN115914885A (zh) * | 2022-11-30 | 2023-04-04 | 江苏易立电气股份有限公司 | 一种基于曼彻斯特编码通信的数字式配电站所终端 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080183406A1 (en) * | 2007-01-30 | 2008-07-31 | Myongji University Industry And Academia Cooperation Foundation | Online IED Fault Diagnosis Device and Method for Substation Automation System Based on IEC61850 |
CN101350518A (zh) * | 2008-09-05 | 2009-01-21 | 国电南瑞科技股份有限公司 | 数字化保护测控装置采样值处理方法 |
CN101447122A (zh) * | 2008-12-08 | 2009-06-03 | 中国电力科学研究院 | 一种变电站的数据采集、传输及控制智能装置 |
CN101545939A (zh) * | 2009-04-28 | 2009-09-30 | 江苏省电力试验研究院有限公司 | 兼容iec61850协议的电子式互感器暂态特性校验系统 |
-
2010
- 2010-05-25 CN CN2010101818283A patent/CN101984538B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080183406A1 (en) * | 2007-01-30 | 2008-07-31 | Myongji University Industry And Academia Cooperation Foundation | Online IED Fault Diagnosis Device and Method for Substation Automation System Based on IEC61850 |
CN101350518A (zh) * | 2008-09-05 | 2009-01-21 | 国电南瑞科技股份有限公司 | 数字化保护测控装置采样值处理方法 |
CN101447122A (zh) * | 2008-12-08 | 2009-06-03 | 中国电力科学研究院 | 一种变电站的数据采集、传输及控制智能装置 |
CN101545939A (zh) * | 2009-04-28 | 2009-09-30 | 江苏省电力试验研究院有限公司 | 兼容iec61850协议的电子式互感器暂态特性校验系统 |
Non-Patent Citations (2)
Title |
---|
《电力系统保护与控制》 20100316 赵应兵等 基于IEC61850_9_2的电子式互感器合并单元的研制 104-106,110 1-3 第38卷, 第6期 * |
《电力系统自动化》 20070410 梁晓兵等 基于IEC61850的新型合并单元的研制 85-89 1-3 第31卷, 第7期 * |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102932103B (zh) * | 2012-10-22 | 2016-04-20 | 武汉烽火富华电气有限责任公司 | 一种基于数字化变电站的数据传输速率自适应接收方法 |
CN102932103A (zh) * | 2012-10-22 | 2013-02-13 | 武汉烽火富华电气有限责任公司 | 一种基于数字化变电站的数据传输速率自适应接收方法 |
CN103763085A (zh) * | 2014-01-17 | 2014-04-30 | 南京信息职业技术学院 | 一种多路数据高速采集合并方法及装置 |
CN103763085B (zh) * | 2014-01-17 | 2016-08-17 | 南京信息职业技术学院 | 一种多路数据高速采集合并方法及装置 |
CN104280607B (zh) * | 2014-05-14 | 2017-07-28 | 贵州电力试验研究院 | 一种数字化变电站独立计量系统的数据同步分帧器 |
CN104280607A (zh) * | 2014-05-14 | 2015-01-14 | 贵州电力试验研究院 | 一种数字化变电站独立计量系统的数据同步分帧器 |
CN104090157A (zh) * | 2014-05-14 | 2014-10-08 | 贵州电力试验研究院 | 一种数字化变电站独立计量系统构架方法 |
CN106226722A (zh) * | 2016-07-08 | 2016-12-14 | 中国能源建设集团湖南省电力设计院有限公司 | 一种全光纤电流互感器分析装置 |
CN106353550A (zh) * | 2016-08-19 | 2017-01-25 | 四方继保(武汉)软件有限公司 | 一种采用同步串行编码的电子式互感器数据处理方法 |
CN106353550B (zh) * | 2016-08-19 | 2017-06-16 | 四方继保(武汉)软件有限公司 | 一种采用同步串行编码的电子式互感器数据处理方法 |
CN110061827A (zh) * | 2018-01-19 | 2019-07-26 | 中电普瑞电力工程有限公司 | 一种基于同步时钟的等间隔数据采集方法及装置 |
CN110487304A (zh) * | 2018-05-14 | 2019-11-22 | 迈来芯科技有限公司 | 位置感测设备 |
CN109309682A (zh) * | 2018-10-29 | 2019-02-05 | 中国电力科学研究院有限公司 | 一种用于数字化计量的ft3到iec61850-9-2协议转换方法及系统 |
CN115173556A (zh) * | 2022-07-11 | 2022-10-11 | 烟台东方威思顿电气有限公司 | 一种分布式环网柜配电自动化装置及数据同步采集方法 |
CN115914885A (zh) * | 2022-11-30 | 2023-04-04 | 江苏易立电气股份有限公司 | 一种基于曼彻斯特编码通信的数字式配电站所终端 |
Also Published As
Publication number | Publication date |
---|---|
CN101984538B (zh) | 2012-12-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101984538B (zh) | 采用曼彻斯特编码的电子式互感器数据同步处理方法 | |
CN103605023B (zh) | 一种合并单元时间特性测量方法及测量装置 | |
CN102565542B (zh) | 基于iec61850-9-2标准的容性设备介质损耗在线监测方法 | |
CN103792419B (zh) | 实现模拟量与数字量混合接入的同步采样方法 | |
CN104991221B (zh) | 对分布式变电站中的计量装置进行校准的装置及检测方法 | |
CN106773635A (zh) | 一种授时精度检测系统及实现方法 | |
CN102928803A (zh) | 一种基于同步脉冲输出电源的电子式互感器校验装置 | |
CN102510327B (zh) | 提高远程双向时间比对调制解调器同步精度的方法及装置 | |
CN103199862A (zh) | 一种用于模数混合录波的数据同步方法 | |
CN104297593B (zh) | 一种用于智能变电站合并单元的守时误差检测方法 | |
CN202217149U (zh) | 高精度电力时间同步装置 | |
CN114142957B (zh) | 一种远距离时频设备测试方法 | |
CN105548947B (zh) | 一种数字化电能表同步溯源方法及系统 | |
CN202939299U (zh) | 一种基于同步脉冲输出电源的电子式互感器校验装置 | |
CN102169138A (zh) | 一种电网测控或计量装置相差校正处理方法 | |
CN103197273A (zh) | 用于电子互感器输出校验仪的溯源装置 | |
CN103235279A (zh) | 一种电子互感器输出校验装置 | |
CN109307790B (zh) | 一种对高压三相电能计量同步采样的方法及系统 | |
CN203708224U (zh) | 一种多用途串行时间码解码器 | |
CN110830140A (zh) | 一种分布式录波装置及其数据同步方法 | |
CN106209090A (zh) | 一种基于fpga的合并单元秒脉冲同步输出系统及方法 | |
CN103499807B (zh) | 一种消除数字电能表截断误差的校验方法 | |
CN203178460U (zh) | 用于电子互感器输出校验仪的溯源装置 | |
CN201845066U (zh) | 应用于智能变电站的输电线路行波故障测距装置 | |
CN103616580B (zh) | 合并单元数据转换角差测试方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: NARI NANJING CONTROL SYSTEM LTD. Effective date: 20141203 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20141203 Address after: High road high tech Development Zone Nanjing city Jiangsu province 210061 No. 20 Patentee after: NARI Technology Development Co., Ltd. Patentee after: SGCC NARI Nanjing Control System Co., Ltd. Address before: High road high tech Development Zone Nanjing city Jiangsu province 210061 No. 20 Patentee before: NARI Technology Development Co., Ltd. |