CN101979974B - 一种输电塔全场应力监测方法 - Google Patents

一种输电塔全场应力监测方法 Download PDF

Info

Publication number
CN101979974B
CN101979974B CN201010275930XA CN201010275930A CN101979974B CN 101979974 B CN101979974 B CN 101979974B CN 201010275930X A CN201010275930X A CN 201010275930XA CN 201010275930 A CN201010275930 A CN 201010275930A CN 101979974 B CN101979974 B CN 101979974B
Authority
CN
China
Prior art keywords
electric transmission
pole tower
transmission pole
coordinate system
finite element
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201010275930XA
Other languages
English (en)
Other versions
CN101979974A (zh
Inventor
费庆国
韩晓林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201010275930XA priority Critical patent/CN101979974B/zh
Publication of CN101979974A publication Critical patent/CN101979974A/zh
Application granted granted Critical
Publication of CN101979974B publication Critical patent/CN101979974B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明提供一种输电塔全场应力监测方法,其特征在于包括以下步骤:(1)建立输电塔高保真有限元模型;(2)在输电塔上安装GPS;(3)获得工作状态下的GPS数据,运用姿态求解技术获得高精度的输电塔姿态数据;(4)将姿态数据代入输电塔高保真有限元模型,获得工作状态下的全场应力。本发明克服现有监测技术仅能获得输电塔工作状态下数量有限测点应力的不足,通过将GPS数据与结构有限元数据相结合,获得工作状态下输电塔的全场应力。

Description

一种输电塔全场应力监测方法
技术领域
本发明涉及一种应用于工程结构全场应力监测的方法,尤其是一种应用于输电塔的全场应力监测的方法。
背景技术
输电塔是高压与超高压输电线路的核心组成部分,输电塔通常情况下具有塔体高、跨距大、柔度大等高耸结构和大跨度结构的共同特点,对地震、风以及导线覆冰等环境载荷反应灵敏,极端条件下的倒塌破坏会造成严重后果。2008年初全国范围内的暴风雪、冻雨等极端天气条件,引起湖南、贵州等地多起输电线路输电塔倒塌进而导致大范围停电事故,对地区性国民经济的正常运行和群众的正常生活造成了严重的影响。这就使得输电塔结构安全监测十分必要。
应力是输电塔结构最为重要的力学参数之一,掌握输电塔结构在工作荷载下的应力状态对于实施结构安全评估十分重要。目前,掌握输电塔的应力主要有两种方法:其一,在设计阶段,通过有限元分析,获得输电塔结构在预设荷载下的应力;其二,在输电塔建成后,在塔上安装若干传感器,获得输电塔工作荷载下的局部应力。这两种方式的不足在于:对第一种方法,不能获得输电塔结构真实工作状态下的应力;对第二种方法,受制于传感器数量,仅能获得有限测点上的应力,不能获得输电塔的全场应力。对输电塔结构安全监测而言,最为重要的是获得输电塔在真实工作状态下、承受工作荷载时、结构的全场应力状态。
发明内容
发明目的:本发明的目的在于针对现有技术的不足,提供一种对工作状态下的输电塔进行全场应力监测的方法。
技术方案:本发明所述的输电塔全场应力监测方法,包括以下步骤:
(1)建立输电塔高保真有限元模型,具体包括:
(11)建立输电塔的初始有限元模型;
(12)根据输电塔的测量数据对初始有限元模型进行修正;
(13)获得输电塔高保真有限元模型;
(2)在输电塔上安装GPS;
(3)获得工作状态下的GPS数据,运用姿态求解技术获得高精度的输电塔姿态数据;
(4)将姿态数据代入输电塔高保真有限元模型,获得工作状态下的全场应力,具体包括:
(41)建立结构的静力方程;
(42)将步骤(3)中获得姿态数据作为位移边界条件代入方程;
(43)解方程得到全场应力。
本发明的有益效果为:1、本发明克服现有监测技术仅能获得输电塔工作状态下数量有限测点应力的不足,通过将GPS数据与结构有限元数据相结合,获得工作状态下输电塔的全场应力;2、本发明运用姿态求解技术、高保真建模技术,可以实现工作状态下输电塔结构全场应力高精度监测。
具体实施方式
下面通过实施例的方式,对本发明技术方案进行详细说明,但是本发明的保护范围不局限于所述实施例。
实施例:一种输电塔全场应力监测方法,包括以下步骤:
(1)建立输电塔高保真有限元模型,具体方法如下:
首先,建立输电塔的初始有限元模型;
其次,根据输电塔的测量数据对初始有限元模型进行修正;
最后,获得输电塔高保真有限元模型;
(2)在输电塔上安装GPS;
(3)获得工作状态下的GPS数据,运用姿态求解技术获得高精度的输电塔姿态数据,方法如下:
A、B为两GPS天线,称为基线,长为L,设A、B在当地地理坐标系中的坐标为:
S → 1 = ( X 1 , Y 1 , Z 1 ) ; S → 2 = ( X 2 , Y 2 , Z 2 )
θ1,θ2,θ3为三个结构姿态角,则有关系式:
θ 1 = cos - 1 ( X 2 - X 1 L )
θ 2 = cos - 1 ( X 2 - X 1 L )
θ 3 = cos - 1 ( Z 2 - Z 1 L )
L = ( X 2 - X 1 ) 2 + ( Y 2 - Y 1 ) 2 + ( Z 2 - Z 1 ) 2
GPS采用的是地球坐标系,而输电塔姿态采用的是在当地地理坐标系下的坐标,因此需要将地球坐标系下的坐标转换为当地地理坐标系下的坐标,二者存在如下变换关系:
SL=TSE
Figure GSB00000599307700035
λ、
Figure GSB00000599307700036
是当地的地理经度、纬度;SE
Figure GSB00000599307700037
基线在地球坐标系中的位置向量;SL
Figure GSB00000599307700038
基线在当地地理坐标系中的位置向量;T是地球坐标系到地理坐标系的转换矩阵;
(4)将姿态数据代入依据输电塔高保真有限元模型建立的结构静力方程,获得工作状态下的全场应力,具体包括:
首先,依据高保真有限元模型,建立结构的静力方程;
其次,将步骤(3)中获得姿态数据作为位移边界条件代入方程;
最终,解方程得到全场应力。

Claims (2)

1.一种输电塔全场应力监测方法,其特征在于包括以下步骤:
(1)建立输电塔高保真有限元模型;
(2)在输电塔上安装GPS;
(3)获得工作状态下的GPS数据,运用姿态求解技术获得高精度的输电塔姿态数据,具体方法如下:
A、B为两GPS天线,
Figure FSB00000599307600011
称为基线,长为L,设A、B在当地地理坐标系中的坐标为:
S → 1 = ( X 1 , Y 1 , Z 1 ) ; S → 2 = ( X 2 , Y 2 , Z 2 )
θ1,θ2,θ3为三个结构姿态角,则有关系式:
θ 1 = cos - 1 ( X 2 - X 1 L )
θ 2 = cos - 1 ( X 2 - X 1 L )
θ 3 = cos - 1 ( Z 2 - Z 1 L )
L = ( X 2 - X 1 ) 2 + ( Y 2 - Y 1 ) 2 + ( Z 2 - Z 1 ) 2
GPS采用的是地球坐标系,而输电塔姿态采用的是在当地地理坐标系下的坐标,因此需要将地球坐标系下的坐标转换为当地地理坐标系下的坐标,二者存在如下变换关系:
SL=TSE
Figure FSB00000599307600018
λ、
Figure FSB00000599307600019
是当地的地理经度、纬度;SE基线在地球坐标系中的位置向量;SL
Figure FSB000005993076000111
基线在当地地理坐标系中的位置向量;T是地球坐标系到地理坐标系的转换矩阵;
(4)将姿态数据代入依据输电塔高保真有限元模型建立的结构静力方程,获得工作状态下的全场应力,具体方法如下:
(41)依据高保真有限元模型,建立结构的静力方程;
(42)将步骤(3)中获得姿态数据作为位移边界条件代入方程;
(43)解方程得到全场应力。
2.根据权利要求1所述的输电塔全场应力监测方法,其特征在于步骤(1)包括如下步骤:
(11)建立输电塔的初始有限元模型;
(12)根据输电塔的测量数据对初始有限元模型进行修正;
(13)获得输电塔高保真有限元模型。
CN201010275930XA 2010-09-07 2010-09-07 一种输电塔全场应力监测方法 Active CN101979974B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010275930XA CN101979974B (zh) 2010-09-07 2010-09-07 一种输电塔全场应力监测方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010275930XA CN101979974B (zh) 2010-09-07 2010-09-07 一种输电塔全场应力监测方法

Publications (2)

Publication Number Publication Date
CN101979974A CN101979974A (zh) 2011-02-23
CN101979974B true CN101979974B (zh) 2011-12-21

Family

ID=43600492

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010275930XA Active CN101979974B (zh) 2010-09-07 2010-09-07 一种输电塔全场应力监测方法

Country Status (1)

Country Link
CN (1) CN101979974B (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101847855B (zh) * 2010-05-25 2013-08-21 中国电力工程顾问集团中南电力设计院 架空输电线路铁塔抗导线舞动的方法
CN102254061B (zh) * 2011-06-09 2012-12-26 山东电力研究院 输电塔线塔耦合体系的有限元建模及受力方法
CN103018793B (zh) * 2012-12-05 2015-01-21 高强 一种极端气象条件下的架线的云预警系统和方法
CN107220396A (zh) * 2014-08-26 2017-09-29 江苏省电力公司南通供电公司 解决奇异性矩阵奇异性问题的输电铁塔杆件应力计算方法
CN105183936A (zh) * 2014-08-26 2015-12-23 国家电网公司 用于运行输电线路铁塔的非线性柔性构件的应力计算方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1542405A (zh) * 2003-11-06 2004-11-03 同济大学 大跨径桥梁结构挠度监测方法
CA2574752A1 (en) * 2006-01-20 2007-07-20 University Of Virginia Patent Foundation High mast inspection system, equipment and method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1542405A (zh) * 2003-11-06 2004-11-03 同济大学 大跨径桥梁结构挠度监测方法
CA2574752A1 (en) * 2006-01-20 2007-07-20 University Of Virginia Patent Foundation High mast inspection system, equipment and method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
汪江等.大跨越输电塔有限元刚度模拟实例研究.《特种结构》.2009,第26卷(第2期),28-30,91. *

Also Published As

Publication number Publication date
CN101979974A (zh) 2011-02-23

Similar Documents

Publication Publication Date Title
CN101979974B (zh) 一种输电塔全场应力监测方法
Jiang et al. Evaluating the spatio-temporal variation of China's offshore wind resources based on remotely sensed wind field data
CN104266686A (zh) 输电线路交叉跨越无线监测方法及装置
CN105444726A (zh) 一种基于北斗卫星的建筑结构变形监测方法及系统
CN204043602U (zh) 一种基于北斗卫星的超高层建筑物变形监测系统
CN105278004B (zh) 一种电网输电线路区段的气象情况分析方法
CN103401183B (zh) 一种装配式架线方法
CN102340139B (zh) 输电线路输送容量动态测算系统及方法
CN105953762A (zh) 一种用于净空距离测量的输电线路建模方法和测距装置
CN102946069A (zh) 特高压输电线路三维可视化智能监控系统
CN103321468B (zh) 拉线式三角形桁架测风塔
CN106408859B (zh) 输电线路塔线体系覆冰预警系统及方法
CN102980553B (zh) 一种圆拱型连栋温室骨架结构变形监测方法及装置
CN102645663A (zh) 一种基于坐标转换的输电线路杆塔坐标快速定位方法
CN204576755U (zh) 山体滑坡和泥石流灾害动态监测装置
CN104021266A (zh) 一种适用于海洋工程船的风载荷计算方法
CN203025938U (zh) 数字管网信息移动采集终端装置
CN203551291U (zh) 模拟动态环境试验平台
CN103216718B (zh) 一种风速仪
CN203190920U (zh) 一种导线弧垂观测仪
CN203285134U (zh) 拉线式三角形桁架测风塔
CN105301439A (zh) 一种架空线路接地故障的快速定位方法
CN202372652U (zh) 电力系统气象数据观测装置
CN203534752U (zh) 基于gps架空输电线路全天候弧垂观测控制系统
Xu et al. Observation and analysis of sea surface wind over the Qiongzhou Strait

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant