CN101968919A - 指南针地震预报仪 - Google Patents
指南针地震预报仪 Download PDFInfo
- Publication number
- CN101968919A CN101968919A CN 201010502009 CN201010502009A CN101968919A CN 101968919 A CN101968919 A CN 101968919A CN 201010502009 CN201010502009 CN 201010502009 CN 201010502009 A CN201010502009 A CN 201010502009A CN 101968919 A CN101968919 A CN 101968919A
- Authority
- CN
- China
- Prior art keywords
- compass
- alarm
- contact pins
- earthquake
- prospector
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Geophysics And Detection Of Objects (AREA)
Abstract
本发明公开了一种指南针地震预报仪,该指南针地震预报仪由报警器1和安装在报警器上盖上的指南针2组成。报警器1由线路板3、报警灯4和报警铃5组成。其特征是:指南针2刻度盘上安装两个接触柱6和7,接触柱6和7分别安装在指南针刻度盘上经与轴心对称的90°和270°的直线上,两个接触柱的距离小于指南针指针8的长度。接触柱6和7为导电材料,接触柱6和7的下端用导线连在一起和线路板3连接,指南针指针顶针9的下端用导线和线路板3连接,采用直流或交流电源。本发明的有益效果是:该指南针地震预报仪结构简单,体积小,价格低廉,无误报,能提前5小时-13分钟预报6-8级地震,适合家庭和单位使用。
Description
技术领域
本发明属于地震预报技术领域,具体地说它涉及带有指南针的地震预报仪。
技术背景
目前,世界上还没有一种能准确预报地震的仪器。已有的地应力探测仪和地电阻测试仪它们是依据地震前地应力和地电阻率发生变化预报地震,而地应力和地电阻率的变化受干旱和下雨等干扰太多,而且这些干扰根本无法彻底消除,因此目前已有的地震预报仪都不能准确预报地震。
发明内容
本发明的目的是克服现有技术中的不足,提供一种能准确预报地震的仪器。该指南针地震预报仪是根据地球的磁场是由岩石圈形成的,地震是岩石圈断裂形成的,岩石圈发生断裂,该地区磁场方向就发生变化,使指南针发生偏转的理论发明的。
本发明的指南针地震预报仪是根据我提出的地球膨裂说发明的。地球膨裂说认为,太阳系是原始太阳爆炸形成的,也就是行星是太阳爆炸形成的。40亿年前,由于地球气温的不断下降,地球的岩石圈形成。岩石圈的温度低于居里温度(400-700摄氏度),岩石圈又含有铁磁性物质,所以具有磁性。岩是圈下部是熔融的物质,温度高于居里温度,因此不具有磁性。因为太阳的磁场遍布整个太阳系,太阳的磁S极位于太阳的地理南极,地球又是由铁磁性物质形成的,所以地球岩石圈在太阳磁场的磁化下,在地球的地理南极,形成了和太阳磁S极相反的磁N极。
因为只有地震时近百公里厚的岩石圈断裂才能使磁场方向发生变化,使指南针发生偏转,所以磁场方向发生变化这一地震前兆是无干扰的。因此根据磁场方向发生变化这一地震前兆发明的指南针地震预报仪能准确预报地震。
因为地震前岩石圈就已开始断裂,该地区磁场方向就开始变化,指南针就开始偏转,所以指南针地震预报仪能提前准确预报地震。
本发明解决其技术问题所采用的技术方案是:本发明的指南针地震预报仪由报警器1和安装在报警器上盖上的指南针2组成。报警器1由线路板3、报警灯4和报警铃5组成。其特征是:指南针2刻度盘上安装两个接触柱6和7,接触柱6和7分别安装在指南针刻度盘上经与轴心对称的90°和270°的直线上,两个接触柱的距离小于指南针指针8的长度。接触柱6和7为导电材料,接触柱6和7的下端用导线连在一起和线路板3连接,指南针指针顶针9的下端用导线和线路板3连接,报警灯4和报警铃5均与线路板连接,采用直流或交流电源。当地震发生前岩石圈就已开始断裂,该地区磁场方向就开始变化,指南针指针8就开始偏转,当指南针指针8和接触柱6或接触柱7接触,便接通电路,报警器报警灯4和报警铃5就会报警,提前预报地震。
本发明的有益效果是:该指南针地震预报仪结构简单,体积小,价格低廉,无误报,能提前5小时-13分钟预报6-8级地震,适合家庭和单位使用。
附图说明
附图1是本发明的结构示意图。
具体实施方式
下面结合附图对本发明作进一步的描述:附图1中指南针地震预报仪由报警器1和安装在报警器上盖上的指南针2组成。报警器1由线路板3、报警灯4和报警铃5组成。指南针2底盘上安装两个接触柱6和7,接触柱6和7分别安装在指南针刻度盘上经与轴心对称的90°和270°的直线上,两个接触柱的距离小于指南针指针8的长度。接触柱6和7为导电材料,接触柱6和7的下端用导线连在一起和报警器的线路板3连接,指南针指针顶针9的下端用导线和报警器的线路板3连接,报警灯4和报警铃5均与线路板连接,采用直流或交流电源。当地震发生前岩石圈就已开始断裂,该地区磁场方向就开始变化,指南针指针8就开始偏转,当指南针指针8和接触柱6或接触柱7接触,便接通电路,报警器报警灯4和报警铃5就会报警,提前预报地震。
使用方法1:将指南针地震预报仪朝南平放在桌子上,指南针指针8指向指南针刻度盘上的0°,如果报警器报警灯4和报警铃5报警,说明还有13分钟将发生6-8级地震。
使用方法2:将指南针地震预报仪平放在桌子上,转动该地震预报仪将指南针指针8指向指南针刻度盘上的30°,如果报警器报警灯4和报警器铃报警,说明还有13分钟将发生3-5级地震。如果报警后13分钟没发生3-5级地震,那么5小时后将发生6-8级地震。
Claims (1)
1.一种指南针地震预报仪,是由报警器1和安装在报警器上盖上的指南针2组成,报警器1由线路板3、报警灯4和报警铃5组成,其特征是:指南针2底盘上安装两个接触柱6和7,接触柱6和7分别安装在指南针刻度盘上经与轴心对称的90°和270°的直线上,两个接触柱的距离小于指南针指针8的长度。接触柱6和7为导电材料。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010502009 CN101968919A (zh) | 2010-09-29 | 2010-09-29 | 指南针地震预报仪 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010502009 CN101968919A (zh) | 2010-09-29 | 2010-09-29 | 指南针地震预报仪 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101968919A true CN101968919A (zh) | 2011-02-09 |
Family
ID=43548066
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010502009 Pending CN101968919A (zh) | 2010-09-29 | 2010-09-29 | 指南针地震预报仪 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101968919A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102722961A (zh) * | 2012-06-03 | 2012-10-10 | 孙骏 | 地磁异常报警器 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201229646Y (zh) * | 2008-06-23 | 2009-04-29 | 倪秀清 | 利用磁针感应地磁变化触发临震预警装置 |
CN201307326Y (zh) * | 2008-10-27 | 2009-09-09 | 梁忠志 | 电子地震预报仪 |
CN101609592A (zh) * | 2008-06-20 | 2009-12-23 | 王亚桥 | 地震预警器 |
-
2010
- 2010-09-29 CN CN 201010502009 patent/CN101968919A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101609592A (zh) * | 2008-06-20 | 2009-12-23 | 王亚桥 | 地震预警器 |
CN201229646Y (zh) * | 2008-06-23 | 2009-04-29 | 倪秀清 | 利用磁针感应地磁变化触发临震预警装置 |
CN201307326Y (zh) * | 2008-10-27 | 2009-09-09 | 梁忠志 | 电子地震预报仪 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102722961A (zh) * | 2012-06-03 | 2012-10-10 | 孙骏 | 地磁异常报警器 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106597065A (zh) | Mems非接触式高压直流验电器 | |
CN102323493B (zh) | 一种风沙流沙粒荷质比实时测量系统 | |
CN202720810U (zh) | 电磁场、电磁波及天线测试系统 | |
CN104535847A (zh) | 组合式海洋电场传感器 | |
CN109752768A (zh) | 太阳能供电野外地电地磁高密度点阵测量采集大数据系统 | |
CN101968919A (zh) | 指南针地震预报仪 | |
CN101592737B (zh) | 一种地震预报监测装置 | |
CN103116181A (zh) | 一种地震探测系统及地震仪 | |
CN207601331U (zh) | 一种高精度集中式地电测量仪 | |
CN209542860U (zh) | 太阳能供电野外地电地磁大数据高密度点阵测量采集设备 | |
CN213517304U (zh) | 一种城镇燃气管道电位变化的监测装置 | |
CN202116649U (zh) | 一种区域阴极保护及接地系统干扰测试的室内模拟装置 | |
CN204330896U (zh) | 组合式海洋电场传感器 | |
CN203929896U (zh) | 防爆数字接地电阻测试仪 | |
CN105301325B (zh) | 以霍尔感应理论对特高压直流避雷器泄漏电流采集的方法 | |
CN204989391U (zh) | 一种变电站接地网水平均压导体腐蚀状态遥控检测装置 | |
CN105158633B (zh) | 以云平台共享特高压直流避雷器状态在线检测数据的方法 | |
CN105242303B (zh) | 一种接受地壳力学信息的元件 | |
CN204331050U (zh) | 用于单通道激电接收机的多电道控制转换单元装置 | |
CN202710642U (zh) | 一种改进的电流传感器 | |
CN1099599C (zh) | 地球等微子监测仪 | |
CN202126274U (zh) | 一种风沙电场、沙粒带电和风速等多因素实时同步测量系统 | |
CN206804890U (zh) | 一种气象潮位自动观测系统 | |
CN213120413U (zh) | 一种地埋电缆探测设备 | |
CN103630870A (zh) | 一种虚负载式电能表走字架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20110209 |