CN101968531A CN 201010295074 CN201010295074A CN101968531A CN 101968531 A CN101968531 A CN 101968531A CN 201010295074 CN201010295074 CN 201010295074 CN 201010295074 A CN201010295074 A CN 201010295074A CN 101968531 A CN101968531 A CN 101968531A
Authority
CN
China
Prior art keywords
load
container
isolating switch
genset
cabinet system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010295074
Other languages
Chinese (zh)
Other versions
CN101968531B (en
Inventor
樊斌
唐猛
黄卓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSSC Huangpu Wenchong Shipbuilding Co Ltd
Original Assignee
CSSC Guangzhou Huangpu Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSSC Guangzhou Huangpu Shipbuilding Co Ltd filed Critical CSSC Guangzhou Huangpu Shipbuilding Co Ltd
Priority to CN2010102950744A priority Critical patent/CN101968531B/en
Publication of CN101968531A publication Critical patent/CN101968531A/en
Application granted granted Critical
Publication of CN101968531B publication Critical patent/CN101968531B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a load cabinet system, comprising a box type substation container, a resistance and inductance integrated load container, a notebook computer and a remote controller. The box type substation container is formed in a way that a high-voltage switch cabinet is connected with two high-voltage transformers; the resistance and inductance integrated load container is formed by two generator measuring instruments that are connected through an instrument-parallelizing wire; the box type substation container and the resistance and inductance integrated load container are connected through a circuit breaker; and the resistance and inductance integrated load container is externally connected with the notebook computer and the remote controller. The system can be used for accurately testing the load capability and the electric index of various marine generator sets, comprises an input voltage transformation part, a test and control part and a load cabinet part, and can be matched with a computer to realize the intelligentization and automatically complete the special test to all the electric parameters and dynamic parameters of the generator sets.

Description

The load cabinet system
Technical field
The present invention relates to a kind of load capacity of all kinds of marine generator groups and load cabinet system of electric index tested, belong to the shipbuilding technology field.
Background technology
Along with expanding economy, the rise of floating trade, the ocean shipping is day by day prosperous.The also development constantly of modern steamer manufacturing industry along with the progress of science and technology, more and more towards integration, systematization and intelligent development, genset is the power core of ship, can the state quality of its operation have determined steamer move down healthy and stablely, yet generally lack a kind of system that can test all kinds of marine generator groups in the market.
Summary of the invention
In order to overcome the deficiency of existing Related product, the invention provides a kind of brand-new load cabinet system, this system can accurately test the load capacity and the electric index of all kinds of marine generator groups, form by input transformation, observing and controlling part and load cabinet three parts, can be used with computing machine and realize intellectuality, automatically finish special project test to all electric parameters of genset and dynamic parameter, generate chart, curve and examining report simultaneously, the detection means of science is provided for high-power generator group equipment.
In order to realize the foregoing invention purpose, the technical solution adopted in the present invention is:
A kind of load cabinet system, form by box-type substation container, resistance sense integral type load container, notebook computer and remote controllers, the box-type substation container connects two high-tension transformers by high-tension switch cabinet and constitutes, resistance sense integral type load container is formed by connecting by the parallel operation line by two generator measurement instrument, box-type substation container and resistance sense integral type load container are formed by connecting external notebook computer of resistance sense integral type load container and remote controllers by isolating switch.
Preferably, above-mentioned isolating switch comprises first isolating switch and second isolating switch, and two high-tension transformers of box-type substation container connect first isolating switch and second isolating switch respectively, and first isolating switch and second isolating switch are high-pressure vacuum breaker.
Preferably, above-mentioned first isolating switch and second isolating switch are respectively by external first genset of power cable and the 3rd genset.
Preferably, above-mentioned first genset and the 3rd genset are the 440V genset.
Preferably, external second genset of the high-tension switch cabinet of above-mentioned box-type substation container.
Preferably, above-mentioned second genset is the 6600V genset.
Preferably, above-mentioned generator measurement instrument is divided into automatically, manually and three kinds of control modes of Based Intelligent Control.
Preferably, two generator measurement instrument parallel operation lines of above-mentioned resistance sense integral type load container are connected to the connection of 485 parallel operation lines.
Preferably, be connected by 100M Long-distance Control cable between above-mentioned resistance sense integral type load container and the remote controllers.
Preferably, be connected by order wire between above-mentioned resistance sense integral type load container and the notebook computer, notebook computer is connected with printer, is used for printing reports.
Compare with background technology, the present invention has following advantage:
1. native system can comprise that dynamic parameter tests to all electrical quantitys of genset, form by observing and controlling part and load cabinet two parts, be used with host computer, realize intelligent, automatically finish special project test, generate chart, curve and examining report simultaneously all electrical quantitys of genset.
2. multiple different control mode is provided, has comprised local control, Long-distance Control and Based Intelligent Control, and manual and automatic selection is provided respectively, realized comprehensive control by control panel, disengaging is hand-manipulated, really accomplishes intellectuality.
3. designed the many places protection switch; as blower fan, temperature and voltage protection switch, blower fan etc. break down, ventilate smooth temperature too high, in time stop loading work when load voltage is too high, alarm; guarantee the safety of genset and load cabinet, avoid accident to take place.
Description of drawings
Fig. 1 is a structural representation of the present invention.
Reference numeral: 1-box-type substation container; 2-resistance sense integral type load container; The 3-notebook computer; The 4-remote controllers; The 5-printer; 6-first isolating switch; 7-second isolating switch; 8-first genset; 9-second genset; 10-the 3rd genset; The 11-high-tension switch cabinet; The 12-high-tension transformer; 13-generator measurement instrument.
Embodiment
Understand and enforcement the present invention for the ease of those of ordinary skills, the present invention is described in further detail below in conjunction with the drawings and the specific embodiments.All embodiment abide by above-mentioned method fully and operate, and each embodiment only puts down in writing crucial technical data.
Be illustrated in figure 1 as the structural representation of this load cabinet system, this entire system is made up of box-type substation container 1 and resistance sense integral type load container 2, connect by isolating switch between box-type substation container 1 and the resistance sense integral type load container 2, isolating switch is divided into first isolating switch 6 and second isolating switch 7, and first isolating switch 6 and second isolating switch 7 are high-pressure vacuum breaker.
Box-type substation container 1 is an integral body, inside is made of high-tension switch cabinet 11 and two high-tension transformers 12, high-tension switch cabinet 11 connects two high-tension transformers 12 respectively, and high-tension switch cabinet 11 outside second genset 9 that connect, be the 6600V group of motors, and two high-tension transformers 12 connect first isolating switch 6 and second isolating switch 7 respectively.
Resistance sense integral type load container 2 is formed by connecting by the parallel operation line by two generator measurement instrument 13, be that 485 parallel operation lines connect between two generator measurement instrument 13, what present embodiment adopted is 21000KW resistance, 1575KVA sense generator special measurement instrument, have manual, automatic and three kinds of control modes of intelligence, and be connected with second isolating switch 7 with first isolating switch 6 respectively.
Resistance sense integral type load container 2 also external notebook computer 3 and remote controllers 4, with be connected by 100M Long-distance Control cable between the remote controllers 4, with be connected by order wire between the notebook computer 3, notebook computer 3 is connected with printer 5, is used for printing reports.
First isolating switch 6 and second isolating switch 7 are except being connected box-type substation container 1 and resistance sense integral type load container 2, also respectively by external first genset 8 of power cable and the 3rd genset 10, these two genset are the 440V genset.
The performance index of above-mentioned equipment component is as follows:
One, vacuum circuit breaker:
Rated voltage 7.2,12KV
Specified 1min industrial frequency withstand voltage 49KV
The withstand voltage 87KV of lightning impulse
Rated frequency 50-60HZ
Main bus-bar rated current 630A
Branch bar rated current 630A
4 seconds heat-stable current (effective value) 25,31.5,40,50 kA
Specified dynamic current (peak value) 40,50,63,80,100 kA,
Degree of protection shell IP4X, between compartment, the breaker chamber door is opened for IP2X
Insulation resistance (1000V) megohmmeter: 〉=1M Ω
Two, the high-tension switch cabinet major parameter requires (with the supporting use of high-tension transformer)
Adopt the AC metal closed armored withdraw type switchgear of KYN28-12 type
Basic parameter: 12kV 630A
Performance specification
⑴ the shell of, cabinet and the dividing plate of each functional unit adopt the aluminizing zine plate to assemble.The shell protection grade of switchgear is higher to be IP4X.Door-plate all adopts electrostatic plastic spraying to make its surperficial impact resistance, and is corrosion-resistant, good looking appearance.
⑵, have built on stilts turnover line, cable turnover line and about the function of contact.
⑶ the Installation and Debugging of, equipment and maintenance can be carried out in the front, so can lean on the wall installation or form dual arrangement back-to-back.Has the advantage of saving floor area, reducing gross investment.
, owing to adopted the middle form, the position, cable vault increases greatly, so equipment can connect multiway cable.
⑸, handcart be indoor to have installed specific guide rail, slides and works interior for circuit breaker cart.The static contact front end is equipped with valve mechanism, thereby has ensured operating personnel and maintenance personal's safety.
⑹ three holes of, bus-bar room sidewall are used to install the bus insulation sleeve pipe, and the bus between the equipment is separated, and the accident that can prevent enlarges.
⑺ in, the cable vault current transformer, grounding switch, lightning arrester and cable can be installed, and detachable metal shrouding that cracks in its bottom preparation or magnetic conduction shrouding not, guarantee on-the-spot easy construction.
⑻ install all kinds of Quadratic Finite Element devices or combine the guarantor except that being used to, metering house, also can increase little bus-bar room at the top, metering house according to customer requirements, can lay ten five the tunnel and control little bus.
⑼, above handcart chamber, bus-bar room, cable vault, be provided with pressure relief device.In when, internal fault taking place in isolating switch or bus, the cable vault producing electric arc when, along with air pressure inside rises, the pressure of top arrangement discharges sheet metal will be opened automatically, relief pressure and drainage gas, to guarantee the safety of operating personnel and equipment, prevent that fault from enlarging.
⑽ what, circuit breaker cart and cabinet adopted is mid-pull-out type, and withdrawing from, transport, keeping in repair of operation, observation and circuit breaker cart has more hommization.And the same size handcart has interchangeability.Isolating switch moves in equipment and adopts the leading screw propulsive mechanism, makes isolating switch very easily reliable when turnover.
⑾, prevent the maloperation interlocking device
Safe and reliable interlocking device is housed in the switchgear, satisfies five anti-requirements fully.
Tell-tale button or KK type switch are housed, to prevent that mistake from closing, mistake is divided isolating switch on metering house's door.
Circuit breaker cart is when test or working position, and isolating switch just can close branch, and after the combined floodgate of isolating switch, isolating switch can't move, and has prevented that on-load from drawing mistake to close insulating contact by mistake.
Isolating switch and grounding switch mechanism interlocking, have only when circuit breaker cart in testing position or after withdrawing from cabinet, the grounding switch while handcart that could close a floodgate can not enter the working position.During non-testing position, grounding switch can not close a floodgate handcart, has realized like this preventing closing isolating switch before charged splice grafting ground switch and grounding switch from not dividing in equipment.
Isolating switch is in the working position, and Xiamen and back door can't be opened, and have prevented mistakenly entering charged chamber.
Circuit breaker cart in test or working position, and is not controlled voltage really, only manual separating brake (can not establish this interlocking according to customer requirement).
Handcart is in the working position, and secondary plug is locked can not be pulled out.
Between each switchgear electric interlock can be installed.The switchgear with grounding switch can not install electromagnetic lock additional, prevents mistakenly entering charged chamber.
Design for 3000 meters by sea level elevation.
When manipulating, following explanation is arranged:
One native system has two kinds of control modes: this machine, long-range, three kinds of control modes of intelligence
1. this machine control: the control panel by load box directly carries out tests such as power adds, off-load, and checks parameter;
2. Long-distance Control: carry out tests such as power adds, off-load by the Long-distance Control case;
3. Based Intelligent Control: the PC monitoring, Long-distance Control is the important control mode of this genset intelligent test system.
Two load cabinet methods of operating
1, connects ground protection: casing is had the terminal reliable ground that ground connection indicates, to guarantee personal safety.
2, open air outlet: all upper cover plates of cabinet are opened and fixed.
3, inspection panel switch: whether all power setting buttons of inspection load cabinet and Long-distance Control case panel
Be in closed condition.
4, connect power cable: open the wiring door, and use hook that door is fixed, the phase three-wire three power cable of the Devices to test order according to A, B, C is connected to respectively on the line bank of every road load, wiring must be firm.When working, need load two loops are cashier's office in a shop all connected power cable, after the cable wiring finishes this door is closed as parallel operation.
5, connect working power: connect or external power supply in selecting as required, adopt external power supply as need, please
The working power line is connected in " working power " air plug, and " working power switching " switch on the load cabinet control panel pulled to the relevant position, attention must guarantee that practical power conforms to the position of the switch, and forbids to operate this switch in the course of the work, otherwise with burning apparatus.
6, connect working power: open " working power " switch on the load cabinet control panel 1, the working power pilot lamp is bright.
7, select control mode: please confirm to adopt which kind of control mode earlier before loading, " control model " switch on the load cabinet control panel is pulled the relevant position.This switch of quiescing in the loading procedure
(1) this machine: select " this machine " control mode, promptly control by load control panel cashier's office in a shop, Long-distance Control case and host computer all can not be controlled, and host computer is image data in real time.
(2) long-range: select " long-range " control mode, promptly control by the control panel on the Long-distance Control case, load cabinet itself and host computer all can not be controlled, and host computer is image data in real time.During Long-distance Control, need Long-distance Control case and load equipment are connected by the Long-distance Control line, and guarantee the dry no short circuit risk of external control aviation plug, can control on the Long-distance Control case and add off-load this moment.
(3) intelligence: select " intelligence " control mode, promptly control and image data by host computer,
Load cabinet itself and Long-distance Control case all can not be controlled.
During Based Intelligent Control, need notebook computer and load equipment are connected by the RS485 order wire, test with supporting upper computer software control load.
8, select unit/parallel operation pattern: please confirm to adopt which kind of mode of operation earlier before loading, " fan power/mode of operation " switch on the load cabinet control panel is pulled the relevant position.Blower fan begins to rotate.
Please don't operate this switch in the loading procedure!
(1) unit starts: select " unit startups " mode of operation, the fan starting in loop 1 and loop 2, stop to load with power, unloading and operate on the control panel in two loops respectively.
(2) parallel operation starts: select " parallel operation startups " mode of operation, the fan starting in loop 1 and loop 2, stop and power loads, unloads all control operations on 1 control panel of loop.
(3) stop: when load quit work, operating switch was pulled stop position, and this moment, blower fan stopped operating.
9, begin band and carry test:
(1) on the control panel of load cabinet or Long-distance Control case, presets required loading performance number.
(2) pre-setting method: the power setting button that will need to load is pressed, and button is pressed representative and preset connection
Button is upspring to represent and is preset disconnection.
Example: load resistive 170KW as need, during perceptual 155KVA, then need resistive 100KW, 50KW, 20KW, perceptual 100KVA, 50KVA, 5KVA button are pressed, i.e. success is preset in expression.
(3) after presetting successfully, " adding off-load control " button (pilot lamp is bright) of pressing on the control panel of load cabinet or Long-distance Control case can load according to prevalue, and the power pilot lamp that presets is lighted.
(4) change loaded value as needing in loading procedure, preset the performance number that needs change earlier, pressing " adding off-load controls " button again can load according to the performance number after the change.
Example: if in the course of the work, need the 170KW that will load to be increased to 200KW, the 20KW button that need will load is pressed and is upspring, and one grade of 50KW button is pressed again, i.e. success is reinitialized in expression.
(5) resistive load can transfer the files and inductive load can transfer the files and can finely tune performance number, loading method: at first pull power change switch to the performance number that needs fine setting, pressing " adding off-load control " button again can load according to the performance number of fine setting, after hours switch is rotated to zero-span.
(6) in the course of work, can be by 8961F1 on the load cabinet control panel or the various electrical quantitys of upper computer software real time inspection.
10, impact, the prominent experimental implementation of unloading:
(1) " isolating switch logical " on load cabinet or the Long-distance Control case control panel pressed, the 8961F1 data presentation is normal, will resistive and perceptual power switch, treat that fan operation is normal after, add again/off-load tests.
(2) according to test request, preset required performance number, pre-setting method is the same, and " adding off-load control " button is not pressed.
(3) 8961F1 carries out dynamic parametric test, if carry out pressing " test " key behind impact test and Selection 8961F1 " impact " key, finishes behind the test duration 12S; Unload test if dash forward, press " adding off-load control " button, treat that machine turns round loading normally later on by pressing " test " key behind 8961F1 " prominent unloading " key, finishes behind the test duration 12S.Attention: can disappear after the data shutdown on the 8961F1, please after test is finished, not read test data with software corresponding on the PC before the outage, and preserve.
(4) PC is long-range does sudden unloading process test, and control mode need be in this seat in the plane puts, and utilizes upper computer software Long-distance Control sudden unloading process, clicks the impact experiment, prominently unloads button and test, and can call the performance graph chart data of surveying instrument together after the 15S test finishes.Comprise " impact voltage curve ", " impact frequency curve ", " impact current curve ", " the prominent voltage curve that unloads ", " the prominent frequency curve that unloads ", " the prominent current curve that unloads ".
11, shut down:
(1) each power setting button that will load is successively earlier pressed and is upspring.
(2) press and upspring by " adding off-load control " button on load cabinet or the Long-distance Control case control panel again
(pilot lamp goes out) can unload.
(3) blower fan is still in operation, dissipates in about five minutes in the cabinet behind the waste heat, again with " fan power/work
Pattern " switch pulls to " stopping " position, and blower fan stops operating.
(4) " working power " switch on the switching off load cabinet control panel 1, the working power pilot lamp goes out,
8961F1 stops video data.
(5) remove various lines, roof door and inlet wire door are closed respectively lock.
12, the use of blower fan, temperature, over-voltage protecting function:
Under the normal condition; three protection switches should be in downward position (represents downwards to cut off when unusual and loads the protection machine; upwards defencive function is closed in expression); so that fan trouble appears, the smooth temperature of ventilating is too high, in time stop loading work when load voltage is too high (corresponding alarm indicator bright and with chimes of doom); guarantee the safety of genset and load cabinet, avoid the generation of accident.This function all sets when dispatching from the factory, please don't arbitrarily change.
When breaking down, should at first ascertain the reason and get rid of fault to guarantee the safe handling of equipment.Maybe when alarm when the wrong report situation occurring, corresponding gauge tap can be got to the temporary transient de-preservation function in position upwards in maintenance process, pending fault should in time be got to protection switch downward position after solving.
Adopt native system, can carry out following parameter testing:
1, test parameter: can measure basic functions such as generator stable state three-phase voltage, electric current, active power, reactive power, applied power, power factor, frequency, working time.
2, frequency analysis: provide harmonic wave forms, data, histogram, electric current and voltage 2~50 order harmonic components and total harmonic distortion.
3, the test of adjusting: 100 seconds setting times, can catch voltage, frequency setting maximal value, minimum value, can calculate that relative voltage, frequency setting rise, decline scope and regulation.
4, fluctuation test: 60 seconds fluctuation time, can catch voltage, frequency jitter maximal value, minimum value, can calculate steady frequency band, steady state voltage deviation, voltage modulated, stability bandwidth.
5, impact test: 12 seconds impact time, can catch transient voltage, frequency minima, current maxima and release time, can calculate impact transient voltage deviation, instantaneous frequency is poor.40 μ S sampling times.
6, prominently unload test: 12 seconds prominent unloading the time, can catch transient voltage, frequency maximal value, current minimum and release time, can calculate impact transient voltage deviation, instantaneous frequency is poor.40 μ S sampling times.
7, record wave energy: 5 kinds of mode record voltage real-time waveforms, 4~280 seconds writing times.Can carry out the accurate sampling of 128 points to each cycle at most.
8, control automatically: native system has automatic value-added tax function, only need import the correlation parameter of tested genset during test on computers, system will finish from 0%, 25%, 50%, 75%, 100%, 110%, 100%, 75%, 50%, 25%, 0% loading in strict accordance with the regulation of GB automatically and test (stepping time can arbitrarily be set), when breaking down in the stepping process, can suspend test, fault is got rid of the back program still can continue to finish dependence test, and test process is unaffected.And variation, release time and curve that parameters such as the V of genset, I, KW, Hz are occurred in loading store in the mode of form and figure and show.
9, segmentation control: optimize sectional type power investing method, be provided with conveniently, cover all performance numbers.
10, testing software: be used with computer software, generate various charts, curve and examining report automatically.Standard operation is authoritative strong.Data content is abundant, and the form applicability is strong.
11, data query: can carry out the inquiry of test result in the past according to production code member.
12, printed report: can show or print following report:
A, examining report b, unit steady-state behaviour test report c, detection data
13, print plot: can show or print following figure
A, real-time display voltage, electric current, frequency, powertrace b, voltage harmonic curve
C, voltage harmonic histogram d, current harmonics curve e, current harmonics histogram
F, impact voltage curve g, impact current curve h, impact frequency curve
I, anticlimax voltage curve j, anticlimax current curve k, anticlimax frequency curve
L, record ripple curve map m, voltage curve n, current curve diagram
O, power p, frequency curve chart q, power factor curve figure
14, load deixis: the every gear switch on the control panel all is provided with corresponding pilot lamp, and the user is come into plain view to the duty of equipment.No matter be manually control on control panel, still be Long-distance Control on control desk, or carry out prestowage automatically by host computer, the gear pilot lamp of loading all can be lighted.Make things convenient for the user can both in time grasp the load condition of load in each position, effectively reduce the probability of maloperation.
15, ipc monitor function: host computer has real-time monitoring and control, can preserve parameters in real time, no matter by which kind of mode load, all can collect whole dynamic parameters and static data, and generate various curves, or directly print.
16, parallel operation function: system's may command single loop load or multiloop load load test, when the multiloop parallel operation loads, both can show and write down the parameter in each loop, also can show and write down the total parameter after the parallel operation.
17, steady state data prompting: system can list the maximal value and the minimum value of all parameters in the steady state data automatically, makes things convenient for the user that parameter is compared.
18, load affirmation: system has the loading and unloading secondary and confirms function, the hidden danger that can effectively avoid user misoperation to bring.
19, this machine/long-distance intelligent interlocking: load cabinet control panel is provided with manual switch, can carry out manual interlocking, prevents that repetitive operation from bringing infringement to equipment.
20, data are preserved at interval: steady state data minimum resolving time is 1S, and transient data minimum resolving time is 40US.
21, control mode
A, local control:
Manually: by manual control panel, the user can finish desired all tests of native system, all interconnection switches of energy segmentation, and gauge tap is finished all functions test, and by computer recording related parameter is arranged, and generates form.
Automatically: can finish the test of native system all functions by local computer, and record related parameter generation form.
B, Long-distance Control:
Manually: can finish desired all tests of native system by 100 meters outer remote manual controllers, all interconnection switches of energy segmentation, gauge tap is finished all functions test, and can be carried out record to data by computing machine, and generates form.
Automatically: finish the test of native system all functions by 100 meters outer notes instincts, and record related parameter, generate form.
22, defencive function: have temperature detection protection and blower fan and detect kinds of protect functions such as defencive function, cut off load immediately if any abnormal host, protection genset and load equipment.
23, intelligentized design: realize intelligent control, the various parameters of automatically testing genset comprise dynamic parameter.The detection means of science is provided for the high-power generator group.
 
This system can accurately test the load capacity and the electric index of all kinds of marine generator groups, form by input transformation, observing and controlling part and load cabinet three parts, can be used with computing machine and realize intellectuality, automatically finish special project test to all electric parameters of genset and dynamic parameter, generate chart, curve and examining report simultaneously, the detection means of science is provided for high-power generator group equipment.
The above, only be in order to concrete case study on implementation of the present invention to be described, but be not in order to limit practical range of the present invention, such as those skilled in the art must be covered by the scope of claim of the present invention not breaking away from all equivalence changes of being finished under indicated spirit of the present invention and the principle or modifying.

Claims (10)

1. load cabinet system, by box-type substation container (1), resistance sense integral type load container (2), notebook computer (3) and remote controllers (4) are formed, it is characterized in that: described box-type substation container (1) connects two high-tension transformers (12) by high-tension switch cabinet (11) and constitutes, described resistance sense integral type load container (2) is formed by connecting by the parallel operation line by two generator measurement instrument (13), described box-type substation container (1) is formed by connecting external notebook computer of described resistance sense integral type load container (2) (3) and remote controllers (4) with described resistance sense integral type load container (2) by isolating switch.
2. load cabinet system as claimed in claim 1, it is characterized in that: described isolating switch comprises first isolating switch (6) and second isolating switch (7), two high-tension transformers (12) of described box-type substation container (1) connect first isolating switch (6) and second isolating switch (7) respectively, and first isolating switch (6) and second isolating switch (7) are high-pressure vacuum breaker.
3. load cabinet system as claimed in claim 2 is characterized in that: described first isolating switch (6) and second isolating switch (7) are respectively by external first genset of power cable (8) and the 3rd genset (10).
4. load cabinet system as claimed in claim 3 is characterized in that: described first genset (8) and the 3rd genset (10) are the 440V genset.
5. load cabinet system as claimed in claim 1 is characterized in that: external second genset of high-tension switch cabinet (11) (9) of described box-type substation container (1).
6. load cabinet system as claimed in claim 5 is characterized in that: described second genset (9) is the 6600V genset.
7. load cabinet system as claimed in claim 1 is characterized in that: described generator measurement instrument is divided into automatically, manual and three kinds of control modes of Based Intelligent Control.
8. as the described load cabinet system of one of claim 1-7, it is characterized in that: two generator measurement instrument (13) parallel operation line of described resistance sense integral type load container (2) is connected to 485 parallel operation lines and connects.
9. as the described load cabinet system of one of claim 1-7, it is characterized in that: be connected by 100M Long-distance Control cable between described resistance sense integral type load container (2) and the described remote controllers (4).
10. as the described load cabinet system of one of claim 1-7, it is characterized in that: be connected by order wire between described resistance sense integral type load container (2) and the described notebook computer (3), described notebook computer (3) is connected with printer (5).
CN2010102950744A 2010-09-29 2010-09-29 Load cabinet system Expired - Fee Related CN101968531B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102950744A CN101968531B (en) 2010-09-29 2010-09-29 Load cabinet system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102950744A CN101968531B (en) 2010-09-29 2010-09-29 Load cabinet system

Publications (2)

Publication Number Publication Date
CN101968531A true CN101968531A (en) 2011-02-09
CN101968531B CN101968531B (en) 2012-07-04

Family

ID=43547715

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102950744A Expired - Fee Related CN101968531B (en) 2010-09-29 2010-09-29 Load cabinet system

Country Status (1)

Country Link
CN (1) CN101968531B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102332752A (en) * 2011-09-19 2012-01-25 中国电力科学研究院 Detection platform and method capable of carrying out remote pretesting and self-evaluation on transformer substation automatic system
CN105277756A (en) * 2015-11-21 2016-01-27 成都科瑞信科技有限责任公司 Testing rotating speed automatic adjustment type motor test system on the basis of voltage detection
CN105319517A (en) * 2014-07-30 2016-02-10 中国广核集团有限公司 Test system of nuclear power plant emergency power supply device
CN107015169A (en) * 2017-05-23 2017-08-04 江苏新航电气有限公司 Detect the dry type load device of bank electricity variable-frequency power sources performance
CN107632259A (en) * 2017-09-14 2018-01-26 广东海能全宇动力科技有限公司 A kind of testing station for realizing multimode multi-parameters test generating set
CN109444593A (en) * 2018-11-21 2019-03-08 科大智能电气技术有限公司 A kind of automatization test system and method for distribution terminal load function
CN109474221A (en) * 2018-11-14 2019-03-15 苏州绿控传动科技股份有限公司 A kind of motor plus-minus load avoids the host computer button design method of maloperation
CN110320047A (en) * 2019-06-25 2019-10-11 广州供电局有限公司 Diesel generating set test macro
CN111999066A (en) * 2020-08-31 2020-11-27 河南柴油机重工有限责任公司 Capacity expansion method and device for diesel generating set test bed load
CN113311280A (en) * 2021-07-30 2021-08-27 中国人民解放军海军工程大学 Health grading monitoring device for complex electromechanical system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5210445A (en) * 1992-08-27 1993-05-11 Tatsumi Corporation Change-over type loading device assembly
US5281908A (en) * 1992-03-10 1994-01-25 Tatsumi Corporation Loading device assembly
CN1439103A (en) * 2000-06-26 2003-08-27 捷装技术公司 Alternator testing method and system using timed application of load
CN200953034Y (en) * 2006-08-30 2007-09-26 中国航空工业第一集团公司沈阳发动机设计研究所 Loading box and power generator circuit testing device
CN201804092U (en) * 2010-09-29 2011-04-20 广州中船黄埔造船有限公司 Load cabinet system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5281908A (en) * 1992-03-10 1994-01-25 Tatsumi Corporation Loading device assembly
US5210445A (en) * 1992-08-27 1993-05-11 Tatsumi Corporation Change-over type loading device assembly
CN1439103A (en) * 2000-06-26 2003-08-27 捷装技术公司 Alternator testing method and system using timed application of load
CN200953034Y (en) * 2006-08-30 2007-09-26 中国航空工业第一集团公司沈阳发动机设计研究所 Loading box and power generator circuit testing device
CN201804092U (en) * 2010-09-29 2011-04-20 广州中船黄埔造船有限公司 Load cabinet system

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102332752A (en) * 2011-09-19 2012-01-25 中国电力科学研究院 Detection platform and method capable of carrying out remote pretesting and self-evaluation on transformer substation automatic system
CN105319517A (en) * 2014-07-30 2016-02-10 中国广核集团有限公司 Test system of nuclear power plant emergency power supply device
CN105277756A (en) * 2015-11-21 2016-01-27 成都科瑞信科技有限责任公司 Testing rotating speed automatic adjustment type motor test system on the basis of voltage detection
CN107015169A (en) * 2017-05-23 2017-08-04 江苏新航电气有限公司 Detect the dry type load device of bank electricity variable-frequency power sources performance
CN107632259A (en) * 2017-09-14 2018-01-26 广东海能全宇动力科技有限公司 A kind of testing station for realizing multimode multi-parameters test generating set
CN109474221A (en) * 2018-11-14 2019-03-15 苏州绿控传动科技股份有限公司 A kind of motor plus-minus load avoids the host computer button design method of maloperation
CN109474221B (en) * 2018-11-14 2022-06-14 苏州绿控传动科技股份有限公司 Upper computer key design method for avoiding misoperation during loading and unloading of motor
CN109444593A (en) * 2018-11-21 2019-03-08 科大智能电气技术有限公司 A kind of automatization test system and method for distribution terminal load function
CN109444593B (en) * 2018-11-21 2021-04-06 科大智能电气技术有限公司 Automatic testing system and method for load-carrying performance of power distribution terminal
CN110320047A (en) * 2019-06-25 2019-10-11 广州供电局有限公司 Diesel generating set test macro
CN111999066A (en) * 2020-08-31 2020-11-27 河南柴油机重工有限责任公司 Capacity expansion method and device for diesel generating set test bed load
CN113311280A (en) * 2021-07-30 2021-08-27 中国人民解放军海军工程大学 Health grading monitoring device for complex electromechanical system
CN113311280B (en) * 2021-07-30 2021-12-28 中国人民解放军海军工程大学 Health grading monitoring device for complex electromechanical system

Also Published As

Publication number Publication date
CN101968531B (en) 2012-07-04

Similar Documents

Publication Publication Date Title
CN101968531B (en) Load cabinet system
CN201540676U (en) Factory power supply integrated automatic training device
CN102780234B (en) High-voltage electric debugging method for power generation project
CN101931172B (en) Electric debugging method of dry-quenching power distribution system
CN102590717B (en) Withstand voltage testing method for geographic information system (GIS)
CN101951030B (en) Load cabinet system
CN104124916B (en) High aititude photovoltaic plant electric network fault simulated testing system mobile detection apparatus
CN203217023U (en) Motor and transformer microcomputer integration test stand
CN204928102U (en) Net fault monitoring processing apparatus is joined in marriage to distributing type self -adaptation
CN201804092U (en) Load cabinet system
CN204089727U (en) High aititude photovoltaic plant electric network fault simulated testing system mobile detection apparatus
CN103941192B (en) Energy storage power station test load
CN101640425A (en) Intelligent electric load management device
CN201813216U (en) Loading cabinet system
CN104184410B (en) High aititude photovoltaic plant grid disturbance simulated testing system mobile detection apparatus
CN204089728U (en) High aititude photovoltaic plant grid disturbance simulated testing system mobile detection apparatus
CN111262224A (en) Multi-voltage transformer ferromagnetic resonance suppression method based on island mode
CN106787196B (en) A kind of power distribution automation monitor terminal
CN207066733U (en) A kind of secondary conditioning device of switch cubicle mechanical characteristic test
CN206922507U (en) A kind of intelligent integrated switch board
CN113410035B (en) Anti-resonance voltage transformer with grounding compensation function based on Y-shaped wiring
CN104749453A (en) Method for reducing influences imposed on user voltage sag by external grid single-phase grounding fault
Simpson Instrumentation, measurement techniques, and analytical tools in power quality studies
CN202872357U (en) Optimized comprehensive protection device of power grid
Zhang et al. On-site Detecting Method for the Loss Characteristic in 110kV Power Transformer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CSSC HUANGPU WENCHONG SHIP-BUILDING COMPANY LTD.

Free format text: FORMER NAME: CSSC GUANGZHOU SHIPBUILDING CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 510715, 188 Cheung Chau Street, Whampoa District, Guangzhou, Guangdong, Guangzhou

Patentee after: CSSC HUANGPU WENCHONG SHIPBUILDING Co.,Ltd.

Address before: 510715, 188 Cheung Chau Street, Whampoa District, Guangzhou, Guangdong, Guangzhou

Patentee before: CSSC Guangzhou Huangpu Shipbuilding Co.,Ltd.

EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20110209

Assignee: GUANGZHOU WENCHONG SHIPYARD Co.,Ltd.

Assignor: CSSC HUANGPU WENCHONG SHIPBUILDING Co.,Ltd.

Contract record no.: X2021440000195

Denomination of invention: Load cabinet system

Granted publication date: 20120704

License type: Common License

Record date: 20211021

EE01 Entry into force of recordation of patent licensing contract
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704