CN101968045A - Pneumatically controlled delivery pump of concrete for mines - Google Patents
Pneumatically controlled delivery pump of concrete for mines Download PDFInfo
- Publication number
- CN101968045A CN101968045A CN2010105369724A CN201010536972A CN101968045A CN 101968045 A CN101968045 A CN 101968045A CN 2010105369724 A CN2010105369724 A CN 2010105369724A CN 201010536972 A CN201010536972 A CN 201010536972A CN 101968045 A CN101968045 A CN 101968045A
- Authority
- CN
- China
- Prior art keywords
- pump
- close type
- open
- pump housing
- pump body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The invention relates to a delivery technology of concrete for mines, in particular to a pneumatically controlled delivery pump of concrete for mines, belonging to the technical field of mechanical processing. The pneumatically controlled delivery pump comprises a pump truck, wherein a rotary fixing device and an open-close type stirring pump body are fixed on the pump truck; one end of a rotary shifting fork passing through the open-close type stirring pump body is connected with a power source, and the other end of the rotary shifting fork is supported on the rotary fixing device; a pressure source is connected with the open-close type stirring pump body; the open-close type stirring pump body comprises an upper pump body and a lower pump body; a connecting plate is welded at the periphery of the pump body; screw holes are uniformly distributed on the connecting plate; the upper pump body is connected with the lower pump body through bolts; and a feeding sealed cap is arranged at the top of the open-close type stirring pump body.
Description
Technical field
The present invention relates to a kind of mining transmission and concrete transmission technology, be specifically related to a kind of mining concrete gas control transfer pump, belong to the Machining Technology field.
Background technique
The concrete construction of mine down-hole is the technology of an extensive use in mine construction and the production process.At present, concrete constructions such as the down-hole borehole wall, pump house on the ore deposit mainly are to utilize mechanical spray pump construction or artificial casting and constructing.Employing manual type construction, the used labor strength of the preparation of construction work of each teams and groups is excessive and efficient is lower, and often occurs dangerous in the work progress; With mechanical spray pump construction, existing normal concrete transfer pump complex structure, bad and volume is excessive easily, very difficult in narrow and small condition construction, its construction quality is not suitable for the construction of mine down-hole yet, and therefore present most of mine still adopts the mode of artificial pouring construction to construct.Existing form of construction work mainly has following defective: 1, the defective of usefulness artificial construction cast concrete: needs are pricked shelfs in a large number, labor intensity is big, the construction period is long, construction quality is poor, inefficiency.2, the concrete pump used of construction now is because volume is big, complex structure, cost height, and the transhipment difficulty is not explosion-proof, is suitable for space-constrained construction operation under the mine, is difficult to satisfy the construction operation requirement of small space under the mine.
Summary of the invention
The objective of the invention is for overcoming above-mentioned the deficiencies in the prior art part, a kind of mining concrete gas control transfer pump is provided, this transfer pump includes pump truck, rotary fixing device, the open-close type stirring pump housing, rotation shift fork, charging sealing cover, pressure source and power source and forms, adopting explosion-proof threephase asynchronous is power source, bellows chamber is a pressure source, power source is realized concrete agitating function, pressure source realization conveying function, change original manually-operable into mechanical execution, improve work personnel's safety coefficient and labor intensity greatly, save the labour force.
The present invention realizes with following technological scheme: a kind of mining concrete gas control transfer pump, it includes pump truck, be fixed with rotary fixing device and open-close type on the pump truck and stir the pump housing, the rotation shift fork passes the open-close type stirring pump housing one end and links to each other with power source, the other end is supported on the rotary fixing device, pressure source stirs the pump housing with open-close type and links to each other, it is characterized in that: described open-close type stirs the pump housing and comprises upper pump casing and lower pump body, the periphery of the pump housing is welded with connecting plate, be evenly equipped with screw on the connecting plate, upper pump casing is connected by bolt with lower pump body, and described open-close type stirs pump housing top the charging sealing cover.
There is spherical end cap at the two ends, the left and right sides that described open-close type stirs the pump housing, open-close type stirs axle sleeve and wick sealing between the pump housing and the running shaft, axle sleeve one end has sealing cover, and described open-close type stirs also has delivery pipe on the pump housing, and open-close type stirs the pump housing and is fixed on the pump truck by support.
Described rotary fixing device includes bearing support, and running shaft is fixed in the bearing support, and the bearing support two ends have bearing (ball) cover and saturating lid respectively.
Described rotation shift fork includes running shaft, and three groups of shift forks are arranged on the running shaft, has last three stirring band steels to link to each other on the two adjacent groups shift fork, and every group of shift fork has diagonal brace each other.
Advantage of the present invention is: this transfer pump adopts combined type to connect, and is simple in structure, is convenient to transport at the construction field (site) and keep in repair; Adopting explosion-proof threephase asynchronous is power source, realizes its agitating function, has saved a large amount of manpower and materials, can make stirring more even simultaneously, and concrete quality is better than manual operation; The employing bellows chamber is a pressure source, and the transmission and concrete transmission after will stirring by high pressure is to the job site, and mechanization degree is higher, high working efficiency, and its concrete quality stirs more even than common mode, carries gunite effect good, has significant use value.
Description of drawings
Below in conjunction with drawings and Examples the present invention is described in further detail:
Fig. 1 is a structural representation of the present invention:
Fig. 2 is the rotary fixing device structural representation:
Fig. 3 stirs the pump body structure schematic representation for open-close type:
Fig. 4 is the plan view of Fig. 3:
Fig. 5 is rotation shift fork structural representation:
Fig. 6 is the plan view of Fig. 5:
Among the figure: 1, pump truck, 2, rotary fixing device, 21, saturating lid, 22, bearing support, 23, bearing (ball) cover, 3, open-close type stirs the pump housing, 31, end cap, 32, axle sleeve, 33, lower pump body, 34, upper pump casing, 35, support, 36, the wick sealing, 37, delivery pipe, 4, the charging sealing cover, 41, spherical end cap, 42, bolt hole, 43, connecting plate, 5, the rotation shift fork, 51, running shaft, 52, shift fork, 53, stir band steel, 54 diagonal braces, 6, power source, 7, pressure source.
Embodiment
As shown in the figure: a kind of mining concrete gas control transfer pump, it includes pump truck 1, be fixed with rotary fixing device 2 and open-close type on the pump truck and stir the pump housing 3, rotation shift fork 5 passes the open-close type stirring pump housing 3 one ends and links to each other with power source 7, the other end is supported on the rotary fixing device 2, and pressure source 6 stirs the pump housing 3 with open-close type and links to each other.
Described open-close type stirs the pump housing 3 and comprises upper pump casing 34 and lower pump body 33, and the periphery of the pump housing is welded with connecting plate 43, is evenly equipped with screw 42 on the connecting plate, and upper pump casing is connected by bolt with lower pump body, and described open-close type stirs pump housing top charging sealing cover 4.
There is spherical end cap 41 at the two ends, the left and right sides that described open-close type stirs the pump housing 3, open-close type stirs axle sleeve 32 and wick sealing 36 between the pump housing and the running shaft 51, axle sleeve one end has sealing cover 31, described open-close type stirs also has delivery pipe 37 on the pump housing, open-close type stirs the pump housing and is fixed on the pump truck by support 35.
Described rotary fixing device 2 includes bearing support 22, and running shaft 51 is fixed in the bearing support, and the bearing support two ends cover 21 and bearing (ball) cover 23 respectively.
Described rotation shift fork 5 includes running shaft 51, and three groups of shift forks 52 are arranged on the running shaft, has last three stirring band steels 53 to link to each other on the two adjacent groups shift fork, and every group of shift fork has diagonal brace 54 each other.
Concrete working procedure: start the rotation of power source driven rotary shift fork; By the artificial raw material that mining concrete is required: water, stone, lime, sand etc. are put into open-close type by material feeding mouth by a certain percentage and are stirred in the pump housing, after stirring through the mining concrete of certain hour, the material feeding mouth sealing cover are closed; Close power source breakout pressure source simultaneously, the mining concrete after pressurized gas will stir by suction tude is transported to specified position by discharge port.Whole process operation is simple, and the efficient height has been saved great amount of manpower and material resources simultaneously.
Claims (4)
1. mining concrete gas control transfer pump, it includes pump truck (1), be fixed with rotary fixing device (2) and open-close type on the pump truck and stir the pump housing (3), rotation shift fork (5) passes the open-close type stirring pump housing (3) one ends and links to each other with power source (7), the other end is supported on the rotary fixing device (2), pressure source (6) stirs the pump housing (3) with open-close type and links to each other, it is characterized in that: described open-close type stirs the pump housing (3) and comprises upper pump casing (34) and lower pump body (33), the periphery of the pump housing is welded with connecting plate (43), be evenly equipped with screw (42) on the connecting plate, upper pump casing is connected by bolt with lower pump body, and described open-close type stirs pump housing top charging sealing cover (4).
2. a kind of mining concrete gas control transfer pump according to claim 1, it is characterized in that: there is spherical end cap (41) at the two ends, the left and right sides that described open-close type stirs the pump housing (3), open-close type stirs axle sleeve (32) and wick sealing (36) between the pump housing and the running shaft (51), axle sleeve one end has sealing cover (31), described open-close type stirs also has delivery pipe (37) on the pump housing, open-close type stirs the pump housing and is fixed on the pump truck by support (35).
3. a kind of mining concrete gas control transfer pump according to claim 1, it is characterized in that: described rotary fixing device (2) includes bearing support (22), running shaft (51) is fixed in the bearing support, and the bearing support two ends have bearing (ball) cover (23) and saturating lid (21) respectively.
4. a kind of mining concrete gas control transfer pump according to claim 1, it is characterized in that: described rotation shift fork (5) includes running shaft (51), three groups of shift forks (52) are arranged on the running shaft, have last three stirring band steels (53) to link to each other on the two adjacent groups shift fork, every group of shift fork has diagonal brace (54) each other.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105369724A CN101968045A (en) | 2010-11-02 | 2010-11-02 | Pneumatically controlled delivery pump of concrete for mines |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105369724A CN101968045A (en) | 2010-11-02 | 2010-11-02 | Pneumatically controlled delivery pump of concrete for mines |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101968045A true CN101968045A (en) | 2011-02-09 |
Family
ID=43547253
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010105369724A Pending CN101968045A (en) | 2010-11-02 | 2010-11-02 | Pneumatically controlled delivery pump of concrete for mines |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101968045A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104210026A (en) * | 2014-09-19 | 2014-12-17 | 宾阳县新桥镇前程机械厂 | Concrete and mortar dual-purpose blender |
CN105465157A (en) * | 2016-01-26 | 2016-04-06 | 马宁 | Pump truck rotating shaft device |
-
2010
- 2010-11-02 CN CN2010105369724A patent/CN101968045A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104210026A (en) * | 2014-09-19 | 2014-12-17 | 宾阳县新桥镇前程机械厂 | Concrete and mortar dual-purpose blender |
CN105465157A (en) * | 2016-01-26 | 2016-04-06 | 马宁 | Pump truck rotating shaft device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201074574Y (en) | Novel gray mortar slip-casting delivery pump | |
CN102889088B (en) | Crawler belt walking wet type concrete sprayer | |
CN101949216A (en) | Pneumatic control concrete pump truck for mine | |
CN201874768U (en) | Concrete pneumatic control delivery pump for mine | |
CN101968045A (en) | Pneumatically controlled delivery pump of concrete for mines | |
CN206937616U (en) | A kind of mixing device for construction site | |
CN207327263U (en) | A kind of Non-fired brick moulding machine | |
CN201261692Y (en) | Hoisting tool for building large-sized blast furnace bottom and furnace hearth | |
CN203317548U (en) | Mining continuous discharge type concrete mixer | |
CN206715779U (en) | A kind of architectural engineering stirring material work pool | |
CN201794612U (en) | Pneumatically-controlled conveying pump truck of concrete for mine | |
CN207413252U (en) | A kind of engineering Mixing Machine | |
CN201310361Y (en) | Dry blast feeding machine | |
CN209408926U (en) | Covered with Angles grouting equipment | |
CN217292820U (en) | Mining concrete mixer | |
CN206860183U (en) | For shield launching and the servicing unit of reception | |
CN204955087U (en) | Cement pipe refining cloth machine | |
CN201483652U (en) | Feeder | |
CN208375576U (en) | A kind of road and bridge construction concrete mixer | |
CN202936192U (en) | Gas pressure type automatic water discharge device | |
CN213062962U (en) | Small-size portable cement conveying and lifting device | |
CN207058893U (en) | A kind of practical cement mixer for building | |
CN220261470U (en) | Full-hydraulic control mining concrete mixer | |
CN215515900U (en) | Unloading equipment that construction engineering stability is high | |
CN215325651U (en) | Powder delivery pump for concrete preparation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20110209 |