CN101964078A - Data analysis method for product life cycle management system - Google Patents
Data analysis method for product life cycle management system Download PDFInfo
- Publication number
- CN101964078A CN101964078A CN2009100897995A CN200910089799A CN101964078A CN 101964078 A CN101964078 A CN 101964078A CN 2009100897995 A CN2009100897995 A CN 2009100897995A CN 200910089799 A CN200910089799 A CN 200910089799A CN 101964078 A CN101964078 A CN 101964078A
- Authority
- CN
- China
- Prior art keywords
- public
- business domains
- relation
- behavior
- platform domain
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention discloses a data analysis method for a product life cycle management system, which comprises the following steps of: building a platform domain for storing public model information; dividing the platform domain into different service domains; and setting interdependent relations and conflicting relations between the deferent service domains. The method solves the problem of low efficiency because a product lifecycle management (PLM) system model in related technology is applied facing an overall system and required data classes need to be selected from all system models during configuration.
Description
Technical field
The present invention relates to manufacture field, in particular to a kind of data analysing method that is used for product life cycle management system.
Background technology
PLM (Product Lifecycle Management, product life cycle management system) is information that product is relevant and the management software system of relevant manufacturing process integration, is used for constructing one and plans to finish the environment that the parallelization of product design and maintenance is cooperated from product in enterprises.
Traditional PLM system model adopts Object-oriented Technique to set up, and what mainly comprise is the data model of using towards total system.
In realizing process of the present invention, the inventor finds because the PLM system model in the correlation technique uses towards total system, so when it is configured, need from all system models, select need data class, cause efficient not high.
Summary of the invention
The invention provides a kind of data analysing method that is used for product life cycle management system, the PLM system model that can solve in the correlation technique is used towards total system, so when it is configured, need from all system models, select the data class of needs, cause efficient not high.
In an embodiment of the present invention, provide a kind of data analysing method that is used for product life cycle management system, may further comprise the steps: set up platform domain, be used to store public model information; According to functional field platform domain is divided into different business domains; Set relation of interdependence or mutual conflict relationship between the different business domains.
Preferably, in above-mentioned data analysing method, set up platform domain, be used for storing public model information and specifically comprise: public behavior, common class and the public attribute of platform domain are set, and relation between the common class and behavior; With additional specific common class or the specific public relation of giving of public behavior.
Preferably, in above-mentioned data analysing method, according to functional field platform domain is divided into different business domains and specifically comprises: the needs according to business domains refer to business domains with public behavior, common class and public relation in the platform domain; Set peculiar behavior, class and relation in each business domains, and distinctive behavior appended to specific class and specific pass is fastened.
Preferably, in above-mentioned data analysing method, further comprising the steps of: according to relation of interdependence between each business domains or mutual conflict relationship, the product life cycle management system in customization specific transactions territory.
In the above-described embodiments, by system model is divided into different territories according to functional field, reduced the complicacy of modeling process, simultaneously by dependence or the conflict relationship between the business domains is set, relation between the system model each several part is come out by the mode explicit expression of configuration, thereby can be written into specific system model according to demand, improve running efficiency of system, and improved convenience and the dirigibility of carrying out applied customization based on system model, overcome because the PLM system model in the correlation technique is used towards total system, so when it is configured, need from all system models, select the data class of needs, cause the not high problem of efficient.
Description of drawings
Accompanying drawing described herein is used to provide further understanding of the present invention, constitutes the application's a part, and illustrative examples of the present invention and explanation thereof are used to explain the present invention, do not constitute improper qualification of the present invention.In the accompanying drawings:
Fig. 1 shows the data analysing method process flow diagram that is used for product life cycle management system according to an embodiment of the invention;
Fig. 2 shows the data analysing method synoptic diagram that is used for product life cycle management system in accordance with a preferred embodiment of the present invention.
Embodiment
Below with reference to the accompanying drawings and in conjunction with the embodiments, describe the present invention in detail.
Fig. 1 shows the data analysing method process flow diagram that is used for product life cycle management system according to an embodiment of the invention, may further comprise the steps:
S102 sets up platform domain, is used to store public model information;
S104 is divided into different business domains according to functional field with platform domain;
S106 sets relation of interdependence or mutual conflict relationship between the different business domains.
In the present embodiment, by system model is divided into different territories according to functional field, reduced the complicacy of modeling process, simultaneously by dependence or the conflict relationship between the business domains is set, relation between the system model each several part is come out by the mode explicit expression of configuration, thereby can be written into specific system model according to demand, improve running efficiency of system, and improved convenience and the dirigibility of carrying out applied customization based on system model, overcome because the PLM system model in the correlation technique is used towards total system, so when it is configured, need from all system models, select the data class of needs, cause the not high problem of efficient.
Preferably, in above-mentioned data analysing method, set up platform domain, be used for storing public model information and specifically comprise: public behavior, common class and the public attribute of platform domain are set, and relation between the common class and behavior; With additional specific common class or the specific public relation of giving of public behavior.
Preferably, in above-mentioned data analysing method, according to functional field platform domain is divided into different business domains and specifically comprises: the needs according to business domains refer to business domains with public behavior, common class and public relation in the platform domain; Set peculiar behavior, class and relation in each business domains, and distinctive behavior appended to specific class and specific pass is fastened.Special behavior, class, relation by structure in business domains and management special domain have reduced the influence that the change of business domains demand brings the total system model, and have established towards the basis of industry accumulation solution.
Preferably, in above-mentioned data analysing method, further comprising the steps of: according to relation of interdependence between each business domains or mutual conflict relationship, the product life cycle management system in customization specific transactions territory.
Fig. 2 shows the data analysing method synoptic diagram that is used for product life cycle management system in accordance with a preferred embodiment of the present invention, comprising: at first define platform domain.The public model information of storage total system in the platform domain; Define relation and behavior between behavior public in the platform domain, class, attribute, the class then, and behavior is additional to certain kinds or relation, make these classes or relation have specific behavior; Divide business domains afterwards.Business domains refers to the part system model towards specific functional field; Divide different business domains according to functional field; Then the behavior in the platform domain of using in the business domains, class, relation are referred to business domains, avoid the foundation that repeats of model; Then define peculiar behavior, class, relation in each business domains, and corresponding behavior is attached to certain kinds or the pass is fastened; Define interdepending or conflict relationship between the different business territory at last.Finish the division and the definition in territory in the system model.
In an embodiment of the present invention, by this method construct towards the PLM system model of discrete manufacturing, this system model has comprised a business domains surplus a platform domain and 10, has mutual dependence or conflict relationship between these territories.Based on this system model, can customize out specific PLM fast and use, also the model of application need that can be fast that certain is new is reflected in the system model, has guaranteed the efficient of system applies operation simultaneously.The system model of setting up based on simple object-oriented method was compared in the past, the lifting by a relatively large margin of this method the system model dirigibility of setting up, reduced the complicacy that system model is set up, guaranteed the efficient of system applies operation simultaneously again and towards model representation and the accumulation ability of specific industry.
Obviously, those skilled in the art should be understood that, above-mentioned each module of the present invention or each step can realize with the general calculation device, they can concentrate on the single calculation element, perhaps be distributed on the network that a plurality of calculation element forms, alternatively, they can be realized with the executable program code of calculation element, thereby, they can be stored in the memory storage and carry out by calculation element, perhaps they are made into each integrated circuit modules respectively, perhaps a plurality of modules in them or step are made into the single integrated circuit module and realize.Like this, the present invention is not restricted to any specific hardware and software combination.
The above is the preferred embodiments of the present invention only, is not limited to the present invention, and for a person skilled in the art, the present invention can have various changes and variation.Within the spirit and principles in the present invention all, any modification of being done, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.
Claims (4)
1. a data analysing method that is used for product life cycle management system is characterized in that, may further comprise the steps:
Set up platform domain, be used to store public model information;
According to functional field described platform domain is divided into different business domains;
Set relation of interdependence or conflict relationship mutually between the described different business domains.
2. data analysing method according to claim 1 is characterized in that, sets up platform domain, is used to store public model information and specifically comprises:
Public behavior, common class and public attribute in the platform domain are set, and relation between the described common class and behavior;
With additional specific described common class or the specific described public relation of giving of described public behavior.
3. data analysing method according to claim 1 is characterized in that, according to functional field described platform domain is divided into different business domains and specifically comprises:
Needs according to described business domains refer to described business domains with public behavior, common class and public relation in the described platform domain;
Set peculiar behavior in each described business domains, class and relation, and described distinctive behavior appended to specific described class and specific described pass is fastened.
4. according to each described data analysing method of claim 1-3, it is characterized in that, further comprising the steps of:
According to relation of interdependence between each described business domains or mutual conflict relationship, customize the product life cycle management system of specific described business domains.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100897995A CN101964078A (en) | 2009-07-24 | 2009-07-24 | Data analysis method for product life cycle management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100897995A CN101964078A (en) | 2009-07-24 | 2009-07-24 | Data analysis method for product life cycle management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101964078A true CN101964078A (en) | 2011-02-02 |
Family
ID=43516943
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009100897995A Pending CN101964078A (en) | 2009-07-24 | 2009-07-24 | Data analysis method for product life cycle management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101964078A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103106274A (en) * | 2013-02-07 | 2013-05-15 | 天津市亚安科技股份有限公司 | File processing method of product lifecycle management (PLM) system |
CN105573274A (en) * | 2015-12-16 | 2016-05-11 | 山东山大华天软件有限公司 | TS16949 association object control method based on PLM system |
-
2009
- 2009-07-24 CN CN2009100897995A patent/CN101964078A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103106274A (en) * | 2013-02-07 | 2013-05-15 | 天津市亚安科技股份有限公司 | File processing method of product lifecycle management (PLM) system |
CN105573274A (en) * | 2015-12-16 | 2016-05-11 | 山东山大华天软件有限公司 | TS16949 association object control method based on PLM system |
CN105573274B (en) * | 2015-12-16 | 2018-04-13 | 山东山大华天软件有限公司 | TS16949 affiliated partner control methods based on PLM system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106230987B (en) | A kind of information integrated system and method based on electric power PaaS cloud platform | |
CN106599104A (en) | Mass data association method based on redis cluster | |
CN103714129A (en) | Device and method for buildingg dynamic data structures and relationships based on condition rules | |
CN102880709B (en) | Data warehouse management system and data warehouse management method | |
CN103019685B (en) | A kind of system and method dynamically generating business interface based on page elements | |
CN101714157A (en) | Method, device and heterogeneous database system for generating heterogeneous database report | |
CN102169505A (en) | Recommendation system building method based on cloud computing | |
CN105229591A (en) | Overall situation polymerization NameSpace is created in order to storage administration | |
CN104809247A (en) | Allocation and recovery method of database connections | |
CN104838369A (en) | Dynamic management of cloud computing infrastructure | |
CN106502589B (en) | The load of caching or the system and method for persistence are realized based on cloud computing | |
CN104574051A (en) | Charging method and device | |
CN106598498A (en) | Storage virtualization system and method for compatibilizing and integrating heterogeneous storage devices | |
Wang et al. | Optimal production and inventory rationing policies with selective-information sharing and two demand classes | |
CN102375894A (en) | Method for managing different types of file systems | |
CN103729742A (en) | Data resource management system based on SOA framework and model drive framework | |
CN101964078A (en) | Data analysis method for product life cycle management system | |
CN101615130A (en) | Service function management system and method | |
CN102932416A (en) | Intermediate data storage method, processing method and device in information flow task | |
CN106682978A (en) | Clearing and settling rule generating method and device | |
CN106856441A (en) | VIM systems of selection and device in NFVO | |
CN109586970A (en) | Resource allocation methods, apparatus and system | |
CN103310304A (en) | Method and device for managing process model | |
CN107632783A (en) | By the method, apparatus of distributed memory system access container, readable storage medium storing program for executing | |
CN103425793A (en) | Method for accessing database by means of database storage layer used in instant communication system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent for invention or patent application | ||
CB02 | Change of applicant information |
Address after: 100080, Room 802, satellite building, No. 63, Zhichun Road, Beijing, Haidian District Applicant after: Beijing CAXA Technology Co., Ltd. Address before: 100080, Room 802, satellite building, No. 63, Zhichun Road, Beijing, Haidian District Applicant before: Beijing Digital Dafang Technology Co., Ltd. |
|
COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: BEIJING DIGITAL DAFANG TECHNOLOGY CO., LTD. TO: CAXA TECHNOLOGY CO., LTD. |
|
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20110202 |