CN101958813B - Method for delaying data acquisition and device thereof - Google Patents
Method for delaying data acquisition and device thereof Download PDFInfo
- Publication number
- CN101958813B CN101958813B CN201010281530.XA CN201010281530A CN101958813B CN 101958813 B CN101958813 B CN 101958813B CN 201010281530 A CN201010281530 A CN 201010281530A CN 101958813 B CN101958813 B CN 101958813B
- Authority
- CN
- China
- Prior art keywords
- data acquisition
- delay
- task
- time
- acquisition task
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/08—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
- H04L43/0852—Delays
Abstract
The invention discloses a method for delaying data acquisition and a device thereof. The method comprises the following steps: periodically acquiring a data acquisition task from a task table by a minimum granularity timer, wherein, the task table stores a plurality of the data acquisition tasks; when the previous granularity data of the current data acquisition task A is completely acquired and the current granularity time is up, setting delay identification of the data acquisition task A to be the current granularity time, otherwise, returning to the timer for obtaining a data acquisition task from the task table; periodically acquiring a data acquisition task from the task table by a relative timer; when the current data acquisition task is the data acquisition task A, determining delay time according to the delay identification of the data acquisition task A; and when the delay time is greater than or equal to the delay value of the data acquisition task A, acquiring the data, otherwise, returning to the timer for obtaining a data acquisition task from the task table. By adopting the method and the device provided by the invention, a plurality of the data acquisition tasks with different delay values can be completed only by the minimum granularity timer and the relative timer.
Description
Technical field
The present invention relates to the communications field, specially refer to a kind of method and apparatus that postpones image data.
Background technology
Data acquisition is function indispensable in communication system, often have multiple data acquisition tasks, and the granularity of the desired data acquisition of each data acquisition task is different in a communication system.In addition, communication system also needs to use certain delay ready to guarantee the data of this granularity while realizing the data acquisition of each granularity, and the length of delay of each data acquisition required by task also has difference.Therefore,, how efficiently the acquisition function of realizing flexibly data become the key issue of data acquisition in communication system to meet granularity, the different demand of length of delay.
In communication system, a data acquisition tasks realizes the function of data acquisition with special absolute timer and relative timer at present.Wherein definitely timer is the minimum particle size timer of each data acquisition task, the granularity of each data acquisition task is the integral multiple of minimum particle size, be 0 data acquisition task or according to postponing to arrange absolute timer for realizing length of delay, the next data acquisition time point of absolute timer is set simultaneously, and relative timer is not only 0 data acquisition task for realizing length of delay.
The method of above-mentioned delay image data has following shortcoming: the flexibility ratio of data acquisition is limited, in the time that the length of delay of each data acquisition task is different, must at least one minimum particle size timer and be that the multiple special relative timer that configures of each data acquisition task is with data acquisition.And when carrying out the traffic carrying capacity of data acquisition when large, a large amount of relative timers can cause the waste of resource.
Summary of the invention
Main purpose of the present invention, for a kind of method and apparatus that postpones image data is provided, postpones mark for each data acquisition task arranges one, identifies the computing relay time by delay.Only complete the data acquisition task of multiple different length of delays with a minimum particle size timer and relative timer.
The present invention proposes a kind of method that postpones image data, comprising:
A data acquisition task is obtained in the timing of minimum particle size timer from task list, and described task list is stored multiple data acquisition tasks;
When the data of the upper granularity of current data acquisition tasks A gathered complete, and the time of current granularity arrive time, the delay that data acquisition task A is set is designated the current granularity time, obtains a data acquisition task otherwise return to described timing from task list;
A data acquisition task is obtained in relative timer timing from task list;
In the time that current data acquisition tasks is data acquisition task A, determine time of delay according to the delay mark of data acquisition task A;
In the time that be more than or equal to the length of delay of data acquisition task A time of delay, image data is obtained a data acquisition task otherwise return to described timing from task list.
Preferably, the described mark of the delay according to data acquisition task A comprises definite time of delay:
Obtain the delay mark of data acquisition task A;
Judge according to described delay mark whether the current granularity time of data acquisition task A arrives;
In the time that the current granularity time of data acquisition task A arrives, calculate current time and the time difference that postpones mark, the described time difference is time of delay, obtains a data acquisition task otherwise return to described timing from task list.
Preferably, described relative timer is 1 minute timer.
Preferably, after carrying out described image data, comprising:
The time delay that relative timer arranges data acquisition task A is designated a preset value.
Preferably, before the described delay that data acquisition task A is set of execution is designated the current granularity time, comprising:
Minimum timing device judges whether the delay mark of data acquisition task A is described preset value, and in the time that the delay of data acquisition task A is designated described preset value, the data of the upper granularity of data acquisition task A have gathered complete.
The present invention also proposes a kind of device that postpones image data, comprises minimum particle size timer and relative timer, and described minimum particle size timer comprises:
First obtains task module, obtains a data acquisition task for timing from task list, and described task list is stored multiple data acquisition tasks;
First arranges module, gather complete for the data when the upper granularity of current data acquisition tasks A, and the time of current granularity, while arrival, the delay that data acquisition task A is set was designated the current granularity time, obtains a data acquisition task otherwise return to described timing from task list;
Described relative timer comprises:
Second obtains task module, obtains a data acquisition task for timing from task list;
Determination module, when being data acquisition task A when current data acquisition tasks, determines time of delay according to the delay mark of data acquisition task A;
Acquisition module, when be more than or equal to the length of delay of data acquisition task A when time of delay, image data, returns to described timing and from task list, obtains a data acquisition task.
Preferably, described determination module comprises:
Acquiring unit, for obtaining the delay mark of data acquisition task A;
Judging unit, for judging according to described delay mark whether the current granularity time of data acquisition task A arrives;
Computing unit, in the time that the current granularity time of data acquisition task A arrives, calculates current time and the time difference that postpones mark, and the described time difference is time of delay, obtains a data acquisition task otherwise return to described timing from task list.
Preferably, described relative timer is 1 minute timer.
Preferably, described relative timer also comprises that second arranges module, be designated a preset value for the time delay that data acquisition task A is set, in the time that the delay of data acquisition task A is designated described preset value, the data of the upper granularity of data acquisition task A have gathered complete.
Preferably, described minimum timing device also comprises judge module, whether is described preset value for the delay mark that judges data acquisition task A, in the time that the delay of data acquisition task A is designated described preset value, the data of the upper granularity of data acquisition task A have gathered complete.
The method and apparatus of the delay image data that the present invention proposes, for each business setting one postpones mark.The delay mark of minimum particle size timer current data acquisition tasks is set to the current granularity time, and then relative timer identifies the computing relay time according to postponing, in the time that be more than or equal to default length of delay time of delay, and image data.The method and apparatus of above-mentioned delay image data only completes the data acquisition task of multiple different length of delays with a minimum particle size timer and relative timer.
Brief description of the drawings
Fig. 1 is the schematic flow sheet that the present invention postpones method one embodiment of image data;
Fig. 2 is the schematic flow sheet that the present invention postpones to determine in method one embodiment of image data time of delay;
Fig. 3 is the schematic flow sheet that the present invention postpones the another embodiment of method of image data;
Fig. 4 is the structural representation that the present invention postpones device one embodiment of image data;
Fig. 5 is the structural representation that the present invention postpones determination module in device one embodiment of image data;
Fig. 6 is the structural representation that the present invention postpones the another embodiment of device of image data.
Realization, functional characteristics and the advantage of the object of the invention, in connection with embodiment, are described further with reference to accompanying drawing.
Embodiment
The method and apparatus of the delay image data that the present invention proposes, for each business setting one postpones mark.The delay mark of minimum particle size timer current data acquisition tasks is set to the current granularity time, and then relative timer identifies the computing relay time according to postponing, in the time that be more than or equal to default length of delay time of delay, and image data.
With reference to Fig. 1, method one embodiment that the present invention postpones image data is proposed, comprising:
Step S101, a data acquisition task is obtained in the timing of minimum particle size timer from task list, and this task list is stored multiple data acquisition tasks;
System manager sets in advance a task list, and this task list is stored multiple data acquisition tasks, and the granularity of each data acquisition task may be different with delay value, but the granularity of each data acquisition task is the integral multiple of minimum particle size.The timing of minimum particle size timer as obtained a data acquisition task in every 5 minutes in task list.The time delay that system manager sets in advance separately for each data acquisition task simultaneously identifies and gives a preset value, and time delay mark is not the starting point that the time delay of 0 data acquisition task is waited for for identifying delay value.
Step S102, when the data of the upper granularity of current data acquisition tasks A have gathered complete, and the time of current granularity, the delay that data acquisition task A is set was designated the current granularity time while arrival, from task list, obtain a data acquisition task otherwise return to timing.
When minimum particle size timer obtains a data acquisition task A, whether the data that check a granularity in this data acquisition task have gathered complete, and the time of current granularity whether arrive, the data of a upper granularity have gathered complete explanation data acquisition task A not in postponing wait state.When the data of the upper granularity of data acquisition task A gathered complete, and the time of current granularity arrive time, the delay that data acquisition task A is set is designated the current granularity time.
When postpone while being designated initialization preset value time, illustrate that the data acquisition of the upper granularity of data acquisition task A finishes, can continue to carry out the data acquisition of current granularity, delay is set and is designated the current granularity time.Otherwise minimum particle size timer continues from task list, to obtain data acquisition task, carries out next data acquisition task.
Step S103, a data acquisition task is obtained in relative timer timing from task list;
In the work of minimum particle size timer simultaneously, relative timer is also in non-stop run, and data acquisition task is obtained in timing from task list.
Step S104, in the time that current data acquisition tasks is data acquisition task A, determines time of delay according to the delay mark of data acquisition task A.
In the time that relative timer is carried out data acquisition task A, can be according to the time of delay of the delay mark specified data acquisition tasks A of data acquisition task A.
Step S105, in the time that be more than or equal to the length of delay of data acquisition task A time of delay, image data.
In the time that delay time is more than or equal to the delay value of data acquisition task, illustrate that the time point of data acquisition arrives, relative timer starts image data.
The method of delay image data of the present invention, postpones mark for each data acquisition task arranges one, identifies the computing relay time by delay.Only complete the data acquisition task of multiple different length of delays with a minimum particle size timer and relative timer.
With reference to Fig. 2, in one embodiment, step S104 can comprise:
Step S1041, relative timer obtains the delay mark of data acquisition task A.
Relative timer circulates between each task in task list, in the time carrying out data acquisition task A, obtains the delay mark of data acquisition task A.
Step S1042, judges according to postponing mark whether the current granularity time of data acquisition task A arrives.
In the time of the delay wait state of data acquisition task A in current granularity, postpone to be designated the current granularity time of data acquisition task A, otherwise postpone value default while being designated system initialization, therefore relative timer is identified and can be judged whether the current granularity time of data acquisition task A arrives by time delay.
Step S1043, in the time that the current granularity time of data acquisition task A arrives, calculates current time and the time difference that postpones mark, and this time difference is time of delay, obtains a data acquisition task otherwise return to timing from task list.
While arrival as the current granularity time of data acquisition tasks A, relative timer obtains current time, relatively current time and the time difference that postpones mark, owing to postponing to be designated the current granularity time, thereby this time difference is the time of delay that data acquisition task A started from the current granularity time.
In one embodiment, relative timer is 1 minute timer.
Can use 1 minute timer that system is general as relative timer, trigger every 1 minute.Arrange when within 1 minute, timer is system initialization, success or not is set for it and minimum particle size timer does not have incidence relation, can realize and want two relatively independent operations of timer.
With reference to Fig. 3, the another embodiment of method that the present invention postpones image data is proposed, in the above-described embodiments, after execution step S105, comprising:
Step S106, the time delay that relative timer arranges data acquisition task A is designated a preset value.
After the data acquisition of the current granularity of data acquisition task A, data acquisition task A is reset to a preset value by relative timer, and when this preset value is system initialization, system manager sets in advance.
Before execution step S102, comprising:
Step S1011, minimum timing device judges whether the delay mark of data acquisition task A is preset value, and in the time that the delay of data acquisition task A is designated preset value, the data of the upper granularity of data acquisition task A have gathered complete.
When preset value in the time postponing mark nonsystematic initialization, the still time delay wait state in a upper granularity of data acquisition task A be described, minimum particle size timer no longer arranges the time delay mark of data acquisition tasks A, then next data acquisition task of execution.
The method of the delay image data that the present invention proposes, for each data acquisition task arranges a delay mark, identify the computing relay time by delay, can realize the time of delay of each business by a relative timer, exempt a large amount of special relative timers, avoided the wasting of resources.Further, adjust delay value according to the actual needs of each data acquisition task.
With reference to Fig. 4, device one embodiment that the present invention postpones image data is proposed, comprise minimum particle size timer 10 and relative timer 20, minimum particle size timer 10 comprises:
First obtains task module 11, obtains a data acquisition task for timing from task list, and this task list is stored multiple data acquisition tasks;
First arranges module 12, gather complete for the data when the upper granularity of current data acquisition tasks A, and the time of current granularity, the delay that data acquisition task A is set was designated the current granularity time while arrival, from task list, obtain a data acquisition task otherwise return to timing;
Second obtains task module 21, obtains a data acquisition task for timing from task list;
System manager sets in advance a task list, and this task list is stored multiple data acquisition tasks, and the granularity of each data acquisition task may be different with delay value, but the granularity of each data acquisition task is the integral multiple of minimum particle size.First obtains task module 11 timings as in task list, obtains a data acquisition task in every 5 minutes.The time delay that system manager sets in advance separately for each data acquisition task simultaneously identifies and gives a preset value, and time delay mark is not the starting point that the time delay of 0 data acquisition task is waited for for identifying delay value.
First obtains task module 11 obtains after a data acquisition task A, if in this data acquisition task the data of a granularity gathered complete, and the time of current granularity arrive, illustrate that data acquisition task A is not in postponing wait state.First the delay that module 12 arranges data acquisition task A is set is designated the current granularity time.Be failure to actuate otherwise first arranges module 12, obtain task module 11 by first and continue from task list, to obtain data acquisition task, carry out next data acquisition task.
In the work of minimum particle size timer simultaneously, relative timer is also in non-stop run, and second obtains task module 21 timings obtains data acquisition task from task list.
In the time that second obtains task module 21 and get data acquisition task A, determination module 22 is according to the time of delay of the delay mark specified data acquisition tasks A of data acquisition task A.
In the time that delay time is more than or equal to the delay value of data acquisition task, illustrate that the time point of data acquisition arrives, acquisition module 23 starts image data, otherwise second obtains task module 21 continue to obtain next data acquisition task from task list.
The device of delay image data of the present invention, postpones mark for each data acquisition task arranges one, identifies the computing relay time by delay.Only complete the data acquisition task of multiple different length of delays with a minimum particle size timer 10 and relative timer 20.
With reference to Fig. 5, in the device of the delay image data of an embodiment, determination module 22 can comprise:
Acquiring unit 221, for obtaining the delay mark of data acquisition task A;
Judging unit 222, for judging according to postponing mark whether the current granularity time of data acquisition task A arrives;
Relative timer circulates between each task in task list, and in the time that second obtains task module 21 and get data acquisition task A, acquiring unit 221 obtains the delay mark of data acquisition task A.
In the time of the delay wait state of data acquisition task A in current granularity, postpone to be designated the current granularity time of data acquisition task A, otherwise postpone value default while being designated system initialization, therefore judging unit 222 is identified and can be judged whether the current granularity time of data acquisition task A arrives by time delay.
While arrival as the current granularity time of data acquisition tasks A, computing unit 223 obtains current time, relatively current time and the time difference that postpones mark, owing to postponing to be designated the current granularity time, thereby this time difference is the time of delay that data acquisition task A started from the current granularity time.
In the device of the delay image data of an embodiment, relative timer is 1 minute timer.
Relative timer can use 1 minute timer that system is general as relative timer, triggers every 1 minute.Arrange when within 1 minute, timer is system initialization, success or not is set for it and minimum particle size timer does not have incidence relation, can realize and want two relatively independent operations of timer.
With reference to Fig. 6, the another embodiment of device that the present invention postpones image data is proposed, in the device of the delay image data of an above-mentioned embodiment, relative timer 20 also comprises that second arranges module 24, is designated a preset value for the time delay that data acquisition task A is set.
Whether minimum timing device 10 also comprises judge module 13, be preset value for the delay mark that judges data acquisition task A, and in the time that the delay of data acquisition task A is designated preset value, the data of the upper granularity of data acquisition task A have gathered complete.
After the data acquisition of the current granularity of data acquisition task A, second arranges module 24 resets to a preset value by data acquisition task A, and when this preset value is system initialization, system manager sets in advance.
The device of the delay image data that the present invention proposes, for each data acquisition task arranges a delay mark, identify the computing relay time by delay, can realize the time of delay of each business by a relative timer 20, exempt a large amount of special relative timers, avoided the wasting of resources.Further, adjust delay value according to the actual needs of each data acquisition task.
The foregoing is only the preferred embodiments of the present invention; not thereby limit the scope of the claims of the present invention; every equivalent structure or conversion of equivalent flow process that utilizes specification of the present invention and accompanying drawing content to do; or be directly or indirectly used in other relevant technical fields, be all in like manner included in scope of patent protection of the present invention.
Claims (10)
1. a method that postpones image data, is characterized in that, comprising:
A data acquisition task is obtained in the timing of minimum particle size timer from task list, and described task list is stored multiple data acquisition tasks;
When the data of the upper granularity of current data acquisition tasks A gathered complete, and the time of current granularity arrive time, the delay that data acquisition task A is set is designated the current granularity time, obtains a data acquisition task otherwise return to described timing from task list;
A data acquisition task is obtained in relative timer timing from task list;
In the time that current data acquisition tasks is data acquisition task A, determine time of delay according to the delay mark of data acquisition task A;
In the time that be more than or equal to the length of delay of data acquisition task A time of delay, image data is obtained a data acquisition task otherwise return to described timing from task list.
2. the method for delay image data as claimed in claim 1, is characterized in that, the described mark of the delay according to data acquisition task A comprises definite time of delay:
Obtain the delay mark of data acquisition task A;
Judge according to described delay mark whether the current granularity time of data acquisition task A arrives;
In the time that the current granularity time of data acquisition task A arrives, calculate current time and the time difference that postpones mark, the described time difference is time of delay, obtains a data acquisition task otherwise return to described timing from task list.
3. the method for delay image data as claimed in claim 1 or 2, is characterized in that, described relative timer is 1 minute timer.
4. the method for delay image data as claimed in claim 1 or 2, is characterized in that, after carrying out described image data, comprising:
The time delay that relative timer arranges data acquisition task A is designated a preset value.
5. the method for delay image data as claimed in claim 4, is characterized in that, before the described delay that data acquisition task A is set of execution is designated the current granularity time, comprising:
Minimum timing device judges whether the delay mark of data acquisition task A is described preset value, and in the time that the delay of data acquisition task A is designated described preset value, the data of the upper granularity of data acquisition task A have gathered complete.
6. a device that postpones image data, is characterized in that, comprises minimum particle size timer and relative timer, and described minimum particle size timer comprises:
First obtains task module, obtains a data acquisition task for timing from task list, and described task list is stored multiple data acquisition tasks;
First arranges module, gather complete for the data when the upper granularity of current data acquisition tasks A, and the time of current granularity, while arrival, the delay that data acquisition task A is set was designated the current granularity time, obtains a data acquisition task otherwise return to described timing from task list;
Described relative timer comprises:
Second obtains task module, obtains a data acquisition task for timing from task list;
Determination module, when being data acquisition task A when current data acquisition tasks, determines time of delay according to the delay mark of data acquisition task A;
Acquisition module, when be more than or equal to the length of delay of data acquisition task A when time of delay, image data, returns to described timing and from task list, obtains a data acquisition task.
7. the device of delay image data as claimed in claim 6, is characterized in that, described determination module comprises:
Acquiring unit, for obtaining the delay mark of data acquisition task A;
Judging unit, for judging according to described delay mark whether the current granularity time of data acquisition task A arrives;
Computing unit, in the time that the current granularity time of data acquisition task A arrives, calculates current time and the time difference that postpones mark, and the described time difference is time of delay, obtains a data acquisition task otherwise return to described timing from task list.
8. the device of the delay image data as described in claim 6 or 7, is characterized in that, described relative timer is 1 minute timer.
9. the device of the delay image data as described in claim 6 or 7, it is characterized in that, described relative timer also comprises that second arranges module, be designated a preset value for the time delay that data acquisition task A is set, in the time that the delay of data acquisition task A is designated described preset value, the data of the upper granularity of data acquisition task A have gathered complete.
10. whether the device of delay image data as claimed in claim 9, is characterized in that, described minimum timing device also comprises judge module, be described preset value for the delay mark that judges data acquisition task A.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010281530.XA CN101958813B (en) | 2010-09-14 | 2010-09-14 | Method for delaying data acquisition and device thereof |
PCT/CN2011/070577 WO2012034368A1 (en) | 2010-09-14 | 2011-01-25 | Method and apparatus for delaying data collection |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010281530.XA CN101958813B (en) | 2010-09-14 | 2010-09-14 | Method for delaying data acquisition and device thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101958813A CN101958813A (en) | 2011-01-26 |
CN101958813B true CN101958813B (en) | 2014-06-04 |
Family
ID=43485934
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010281530.XA Active CN101958813B (en) | 2010-09-14 | 2010-09-14 | Method for delaying data acquisition and device thereof |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN101958813B (en) |
WO (1) | WO2012034368A1 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102262562A (en) * | 2011-07-18 | 2011-11-30 | 李建成 | Task processing method and system |
CN106851686B (en) * | 2017-01-22 | 2020-03-31 | 郑州信工智能化系统有限公司 | Method and system for realizing wireless MAC protocol with time compensation data acquisition |
CN110704492A (en) * | 2018-06-25 | 2020-01-17 | 中兴通讯股份有限公司 | Data acquisition method and device and computer readable storage medium |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1143671B1 (en) * | 2000-04-07 | 2004-07-21 | NTT DoCoMo, Inc. | Device and method for reducing delay jitter in data transmission |
CN1984119A (en) * | 2005-12-13 | 2007-06-20 | 中兴通讯股份有限公司 | Method for controlling flow by time-division technology |
CN101197712A (en) * | 2007-10-19 | 2008-06-11 | 中兴通讯股份有限公司 | Method for capturing performance object data in telecommunication network management system |
CN101345652A (en) * | 2008-08-15 | 2009-01-14 | 北京立通无限科技有限公司 | Data acquisition method and data acquisition equipment |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW556061B (en) * | 2002-04-30 | 2003-10-01 | Realtek Semiconductor Corp | Non-equal period timing method and device of timer |
US7451357B2 (en) * | 2004-11-18 | 2008-11-11 | International Business Machines Corporation | Apparatus and system for adjusting trace data granularity |
CN101296137B (en) * | 2007-08-28 | 2011-05-25 | 深圳市宏电技术股份有限公司 | Method for implementing controllable timing work of data terminal unit |
CN101316160B (en) * | 2008-06-11 | 2010-12-15 | 南京磐能电力科技股份有限公司 | Multi-node synchronization sampling and data transmission method |
-
2010
- 2010-09-14 CN CN201010281530.XA patent/CN101958813B/en active Active
-
2011
- 2011-01-25 WO PCT/CN2011/070577 patent/WO2012034368A1/en active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1143671B1 (en) * | 2000-04-07 | 2004-07-21 | NTT DoCoMo, Inc. | Device and method for reducing delay jitter in data transmission |
CN1984119A (en) * | 2005-12-13 | 2007-06-20 | 中兴通讯股份有限公司 | Method for controlling flow by time-division technology |
CN101197712A (en) * | 2007-10-19 | 2008-06-11 | 中兴通讯股份有限公司 | Method for capturing performance object data in telecommunication network management system |
CN101345652A (en) * | 2008-08-15 | 2009-01-14 | 北京立通无限科技有限公司 | Data acquisition method and data acquisition equipment |
Also Published As
Publication number | Publication date |
---|---|
WO2012034368A1 (en) | 2012-03-22 |
CN101958813A (en) | 2011-01-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106445705B (en) | Platform cascading method and system based on RabbitMQ and socket | |
CN105786667A (en) | Distributed automated testing method and system | |
CN103514030B (en) | The event collection reporting system of android system and collecting and reporting method thereof | |
CN106293919A (en) | The built-in tasks dispatching device of a kind of Time Triggered and method | |
CN101958813B (en) | Method for delaying data acquisition and device thereof | |
JP2018045671A (en) | Method and apparatus for scheduling cloud server | |
CN103346974A (en) | Controlling method of service process and network device | |
CN103617098B (en) | Intelligent backup method and intelligent backup system based on data variation | |
CN104168310A (en) | Method and apparatus for scheduling cloud end vertual server | |
CN104104720A (en) | Server cluster management method and system | |
CN101345652A (en) | Data acquisition method and data acquisition equipment | |
CN105049549B (en) | A kind of method and system for realizing floating IP address automatic drift | |
CN102402459B (en) | Method and device for summarizing performance data of network management system | |
CN105159728A (en) | Method and device for obtaining NTP time information based on android system | |
EP2830381A3 (en) | Method for configuring timing resource in device to device communication | |
US20130219052A1 (en) | Dynamic configuration of interconnected devices for measuring performance characteristics in a network | |
CN105095045A (en) | Method and system for monitoring background service of Android system | |
CN107529180B (en) | Base station cloud test environment construction device and method | |
CN112769829A (en) | Deployment method of cloud physical machine, related equipment and readable storage medium | |
CN104104969B (en) | Video interception method and device | |
CN103647672A (en) | Network equipment configuration method and system | |
CN102647293A (en) | Auto-filling method and device of northbound FTP (File Transfer Protocol) performance file for telecommunication network management system | |
CN103856537A (en) | Method, platform and system for obtaining operation state of application program on terminal | |
CN102819455A (en) | Method for managing progresses at application layer and managing system | |
CN101420330B (en) | Collecting method and device for performance data of mail proxy gateway |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20191217 Address after: 314400 No.11, Weisan Road, Nongfa District, Chang'an Town, Haining City, Jiaxing City, Zhejiang Province Patentee after: Haining hi tech Zone Science and Innovation Center Co., Ltd Address before: 518057 Nanshan District Guangdong high tech Industrial Park, South Road, science and technology, ZTE building, Ministry of Justice Patentee before: ZTE Communications Co., Ltd. |