CN101949269A - 液压断开安全接头 - Google Patents

液压断开安全接头 Download PDF

Info

Publication number
CN101949269A
CN101949269A CN 201010509701 CN201010509701A CN101949269A CN 101949269 A CN101949269 A CN 101949269A CN 201010509701 CN201010509701 CN 201010509701 CN 201010509701 A CN201010509701 A CN 201010509701A CN 101949269 A CN101949269 A CN 101949269A
Authority
CN
China
Prior art keywords
piston
section
joint
top connection
safety joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010509701
Other languages
English (en)
Other versions
CN101949269B (zh
Inventor
兰中孝
艾教银
刘国军
吕丰
史健搏
余龙
汪玉梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Daqing Oilfield Co Ltd
Original Assignee
Daqing Oilfield Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daqing Oilfield Co Ltd filed Critical Daqing Oilfield Co Ltd
Priority to CN 201010509701 priority Critical patent/CN101949269B/zh
Publication of CN101949269A publication Critical patent/CN101949269A/zh
Application granted granted Critical
Publication of CN101949269B publication Critical patent/CN101949269B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Quick-Acting Or Multi-Walled Pipe Joints (AREA)

Abstract

液压断开安全接头,它涉及一种用于修井作业的安全接头,以解决连续油管修井作业管柱在施工时被卡,常规安全接头无法退出的问题。上接头的下部设置在下接头的内腔中,且上接头上的上连接段与下接头上的下连接段紧密配合、上接头上的定位段设置在下接头上的定位槽中,下接头上的活塞接触段的内径与上接头上的下活塞安装段的内径相等,活塞的轴心设有中心孔,活塞设置在上接头的内腔中,且上活塞头位于上接头的上活塞安装段中、下活塞头位于上接头与下接头的接触处,销钉穿过上接头的控制段后设置在上活塞头的销孔中,活塞的顶端设有与中心孔相通的锥孔,且锥孔上端直径大于下端直径。本发明用于钻井、打捞、洗井、连续油管修井作业等。

Description

液压断开安全接头
技术领域
本发明涉及一种用于修井作业的安全接头。
背景技术
目前,在修井作业时,为增强施工安全性,在施工管柱上一般安装安全接头,安全接头是连接在井内管柱上的一种易于脱扣、对扣的安全工具,它安装在管柱需要脱开的位置,可同管柱一起传送扭矩和承受各种复合应力,井内发生故障或管柱被卡死时通过井口操作完成作业管柱的脱扣、对扣,使得修井作业工具能从安全接头处退出。常规的安全接头在退出时靠机械旋转退出,但无法应用在连续油管修井作业施工管柱上,因为连续油管修井作业管柱无法转动,且上下活动负荷受限,因此,现有安全接头不适应在连续油管修井作业管柱上应用。
发明内容
本发明的目的是为了解决连续油管修井作业管柱在施工时被卡,常规安全接头无法退出的问题,提供一种液压断开安全接头。
本发明包括上接头、下接头、活塞和销钉,上接头的外表面由上至下分为控制段、上连接段、上过渡段和定位段,上接头的内腔表面由上至下分为上活塞安装段和下活塞安装段,下接头的内腔表面由上至下分为下连接段、下过渡段、定位槽、活塞接触段和下中心孔段,上接头的下部设置在下接头的内腔中,且上接头上的上连接段与下接头上的下连接段紧密配合、上接头上的定位段设置在下接头上的定位槽中,下接头上的活塞接触段的内径与上接头上的下活塞安装段的内径相等,活塞的轴心设有中心孔,活塞的外表面由上至下分为上活塞头、支撑段和下活塞头,上活塞头的外表面设有销孔,活塞设置在上接头的内腔中,且上活塞头位于上接头的上活塞安装段中、下活塞头位于上接头与下接头的接触处,销钉穿过上接头的控制段后设置在上活塞头的销孔中,活塞的顶端设有与中心孔相通的锥孔,且锥孔上端直径大于下端直径。
本发明与现有技术相比具有以下有益效果:一、本发明实现了在不转动管柱的情况下,通过投球蹩压,气压将销钉剪断,使上接头与下接头安全脱离分开,下接头及与下接头连接的工具留在井内供后序打捞,活塞和上接头及与上接头连接的连续油管全部起出;由此,本发明满足了连续油管修井作业施工在遇到井内发生故障或管柱被卡死时安全退出的需要。二、本发明应用简单,安全可靠,退出率可达100%。
附图说明
图1是本发明的整体结构主剖视图。
具体实施方式
具体实施方式一:结合图1说明本实施方式,本实施方式包括上接头1、下接头2、活塞3和销钉4,上接头1的外表面由上至下分为控制段1-1、上连接段1-2、上过渡段1-3和定位段1-4,上接头1的内腔表面由上至下分为上活塞安装段1-5和下活塞安装段1-6,下接头2的内腔表面由上至下分为下连接段2-1、下过渡段2-2、定位槽2-3、活塞接触段2-4和下中心孔段2-5,上接头1的下部设置在下接头2的内腔中,且上接头1上的上连接段1-2与下接头2上的下连接段2-1紧密配合、上接头1上的定位段1-4设置在下接头2上的定位槽2-3中,下接头2上的活塞接触段2-4的内径与上接头1上的下活塞安装段1-6的内径相等,活塞3的轴心设有中心孔3-4,活塞3的外表面由上至下分为上活塞头3-1、支撑段3-2和下活塞头3-3,上活塞头3-1的外表面设有销孔3-1-1,活塞3设置在上接头1的内腔中,且上活塞头3-1位于上接头1的上活塞安装段1-5中、下活塞头3-3位于上接头1与下接头2的接触处,销钉4穿过上接头1的控制段1-1后设置在上活塞头3-1的销孔3-1-1中,活塞3的顶端设有与中心孔3-4相通的锥孔3-5,且锥孔3-5上端直径大于下端直径。
具体实施方式二:结合图1说明本实施方式,本实施方式与具体实施方式一不同的是它还增加有至少一个上胶圈5,上活塞头3-1的外表面设有至少一个上胶圈槽3-1-2,至少一个上胶圈5设置在上胶圈槽3-1-2中。上胶圈5增加了上活塞头3-1与控制段1-1之间的密封。其它组成及连接关系与具体实施方式一相同。
具体实施方式三:结合图1说明本实施方式,本实施方式的上活塞头3-1的外表面设有四个上胶圈槽3-1-2,每个上胶圈槽3-1-2中装有一个上胶圈5。上胶圈5增加了上活塞头3-1与控制段1-1之间的密封。其它组成及连接关系与具体实施方式二相同。
具体实施方式四:结合图1说明本实施方式,本实施方式与具体实施方式一不同的是它还增加有至少一个下胶圈6,上连接段1-2的外表面设有至少一个下胶圈槽1-2-1,至少一个下胶圈6设置在下胶圈槽1-2-1中。下胶圈6增加了上连接段1-2与下连接段2-1之间的密封。其它组成及连接关系与具体实施方式一或二相同。
具体实施方式五:结合图1说明本实施方式,本实施方式的上连接段1-2的外表面设有两个下胶圈槽1-2-1,每个下胶圈槽1-2-1中装有一个下胶圈6。下胶圈6增加了上连接段1-2与下连接段2-1之间的密封。其它组成及连接关系与具体实施方式四相同。
本发明的工作原理:上接头1的上端与连续油管接头连接,下接头2的下端与修井作业工具连接,当连续油管修井作业管柱遇卡提不动时,先向管柱内投球,该球落在锥孔3-5处并将安全接头内腔封住,然后向连续油管内腔打气蹩压,气压顶着活塞3向下运动,当压力达到35MPa时,上活塞头3-1将销钉3剪断,使上接头1与下接头2安全脱离分开,下接头2及修井作业工具留在井内供后序打捞,活塞3、上接头1、连续油管接头及以上部分安全起出。
本发明已经过现场试验,在连续油管修井作业施工时,可以顺利退出安全接头以上的管柱,保证了施工安全;同时,本发明也能满足管柱强度要求,对施工无其它不利影响。

Claims (5)

1.一种液压断开安全接头,其特征在于:所述安全接头包括上接头(1)、下接头(2)、活塞(3)和销钉(4),上接头(1)的外表面由上至下分为控制段(1-1)、上连接段(1-2)、上过渡段(1-3)和定位段(1-4),上接头(1)的内腔表面由上至下分为上活塞安装段(1-5)和下活塞安装段(1-6),下接头(2)的内腔表面由上至下分为下连接段(2-1)、下过渡段(2-2)、定位槽(2-3)、活塞接触段(2-4)和下中心孔段(2-5),上接头(1)的下部设置在下接头(2)的内腔中,且上接头(1)上的上连接段(1-2)与下接头(2)上的下连接段(2-1)紧密配合、上接头(1)上的定位段(1-4)设置在下接头(2)上的定位槽(2-3)中,下接头(2)上的活塞接触段(2-4)的内径与上接头(1)上的下活塞安装段(1-6)的内径相等,活塞(3)的轴心设有中心孔(3-4),活塞(3)的外表面由上至下分为上活塞头(3-1)、支撑段(3-2)和下活塞头(3-3),上活塞头(3-1)的外表面设有销孔(3-1-1),活塞(3)设置在上接头(1)的内腔中,且上活塞头(3-1)位于上接头(1)的上活塞安装段(1-5)中、下活塞头(3-3)位于上接头(1)与下接头(2)的接触处,销钉(4)穿过上接头(1)的控制段(1-1)后设置在上活塞头(3-1)的销孔(3-1-1)中,活塞(3)的顶端设有与中心孔(3-4)相通的锥孔(3-5),且锥孔(3-5)上端直径大于下端直径。
2.根据权利要求1所述液压断开安全接头,其特征在于:所述安全接头还包括至少一个上胶圈(5),上活塞头(3-1)的外表面设有至少一个上胶圈槽(3-1-2),至少一个上胶圈(5)设置在上胶圈槽(3-1-2)中。
3.根据权利要求2所述液压断开安全接头,其特征在于:所述上活塞头(3-1)的外表面设有四个上胶圈槽(3-1-2),每个上胶圈槽(3-1-2)中装有一个上胶圈(5)。
4.根据权利要求1或2所述液压断开安全接头,其特征在于:所述安全接头还包括至少一个下胶圈(6),上连接段(1-2)的外表面设有至少一个下胶圈槽(1-2-1),至少一个下胶圈(6)设置在下胶圈槽(1-2-1)中。
5.根据权利要求4所述液压断开安全接头,其特征在于:所述上连接段(1-2)的外表面设有两个下胶圈槽(1-2-1),每个下胶圈槽(1-2-1)中装有一个下胶圈(6)。
CN 201010509701 2010-10-15 2010-10-15 液压断开安全接头 Active CN101949269B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010509701 CN101949269B (zh) 2010-10-15 2010-10-15 液压断开安全接头

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010509701 CN101949269B (zh) 2010-10-15 2010-10-15 液压断开安全接头

Publications (2)

Publication Number Publication Date
CN101949269A true CN101949269A (zh) 2011-01-19
CN101949269B CN101949269B (zh) 2012-12-05

Family

ID=43452883

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010509701 Active CN101949269B (zh) 2010-10-15 2010-10-15 液压断开安全接头

Country Status (1)

Country Link
CN (1) CN101949269B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013007026A1 (zh) * 2011-07-14 2013-01-17 四川宏华石油设备有限公司 井下工具的断开器
WO2013165412A1 (en) 2012-05-02 2013-11-07 Halliburton Energy Services, Inc. Mechanically activated contingency release system and method
CN104204398A (zh) * 2012-04-09 2014-12-10 哈利伯顿能源服务公司 压力激活的应急释放系统和方法
CN107829692A (zh) * 2017-12-06 2018-03-23 中国石油集团西部钻探工程有限公司 电动安全接头
CN111894478A (zh) * 2020-07-09 2020-11-06 宝鸡畅油石油设备有限公司 一种rd型安全接头

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1053279A (zh) * 1989-10-09 1991-07-24 加利福亚尼联合石油公司 液压释放油井工具
CN1066316A (zh) * 1991-04-30 1992-11-18 加利福尼亚联合石油公司 液压释放系统
US6318470B1 (en) * 2000-02-15 2001-11-20 Halliburton Energy Services, Inc. Recirculatable ball-drop release device for lateral oilwell drilling applications
US6408946B1 (en) * 2000-04-28 2002-06-25 Baker Hughes Incorporated Multi-use tubing disconnect
CN2893127Y (zh) * 2006-05-01 2007-04-25 辽河石油勘探局 一种新型液压安全接头
CN201810222U (zh) * 2010-10-15 2011-04-27 大庆油田有限责任公司 液压断开安全接头

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1053279A (zh) * 1989-10-09 1991-07-24 加利福亚尼联合石油公司 液压释放油井工具
CN1066316A (zh) * 1991-04-30 1992-11-18 加利福尼亚联合石油公司 液压释放系统
US6318470B1 (en) * 2000-02-15 2001-11-20 Halliburton Energy Services, Inc. Recirculatable ball-drop release device for lateral oilwell drilling applications
US6408946B1 (en) * 2000-04-28 2002-06-25 Baker Hughes Incorporated Multi-use tubing disconnect
CN2893127Y (zh) * 2006-05-01 2007-04-25 辽河石油勘探局 一种新型液压安全接头
CN201810222U (zh) * 2010-10-15 2011-04-27 大庆油田有限责任公司 液压断开安全接头

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013007026A1 (zh) * 2011-07-14 2013-01-17 四川宏华石油设备有限公司 井下工具的断开器
CN104204398A (zh) * 2012-04-09 2014-12-10 哈利伯顿能源服务公司 压力激活的应急释放系统和方法
WO2013165412A1 (en) 2012-05-02 2013-11-07 Halliburton Energy Services, Inc. Mechanically activated contingency release system and method
EP2844821A4 (en) * 2012-05-02 2016-05-11 Halliburton Energy Services Inc SYSTEM AND METHOD FOR RELEASING ACCESSORIES MECHANICALLY ACTUATED
CN107829692A (zh) * 2017-12-06 2018-03-23 中国石油集团西部钻探工程有限公司 电动安全接头
CN111894478A (zh) * 2020-07-09 2020-11-06 宝鸡畅油石油设备有限公司 一种rd型安全接头

Also Published As

Publication number Publication date
CN101949269B (zh) 2012-12-05

Similar Documents

Publication Publication Date Title
CN101949269B (zh) 液压断开安全接头
CN107255023A (zh) 具有坐封丢手功能的大通径免钻桥塞
CN202266215U (zh) 一种双向锚定定位器
CN207122297U (zh) 一种具有坐封丢手功能的大通径免钻桥塞
CN201771454U (zh) 可回收钻具装置
CN201810222U (zh) 液压断开安全接头
CN104499978B (zh) 一种碟簧双向震击加速器及其加速方法
CN107558933A (zh) 一种松砂式石油井下安全接头
CN202866673U (zh) 卡爪式丢手接头
CN107642341A (zh) 松砂式石油井下安全接头的使用方法
CN101979818B (zh) 液压整形器
CN105401903B (zh) 一种连续油管用三爪打捞器
CN201170062Y (zh) 一种油管脱接器
CN205063848U (zh) 一种滑套式安全接头
CN206477792U (zh) 一种螺纹驱动全机械式顶驱下套管工具
CN204200133U (zh) 一种钻井取心用投球装置
CN205382901U (zh) 一种液力机械双作用加压式取心工具
CN112228001B (zh) 一种低坐封力低解封力的封隔器
CN105089502B (zh) 一种变径式倒划眼器及工艺方法
CN201661242U (zh) 一种大孔径石油钻采冲击器
CN201277164Y (zh) 一种可泄油的防喷管式抽油泵
CN107654195A (zh) 复合冲击滚动自调式pdc钻头
CN200975242Y (zh) 一种水平井射孔液压延时撞击总成
CN114033310A (zh) 一种用于水平井的钻井提速装置
CN106014285B (zh) 井下施工用安全接头

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220114

Address after: 163453 Heilongjiang Province, Daqing City Ranghulu District Longnan Victory Road No. 1

Patentee after: Daqing Oilfield Co.,Ltd.

Patentee after: PetroChina Co Ltd

Address before: 163513 Heilongjiang Province, Daqing City Ranghulu District Longnan Victory Road No. 1

Patentee before: Daqing Oilfield Co.,Ltd.