CN101945423B - A kind of load report method, device and system - Google Patents

A kind of load report method, device and system Download PDF

Info

Publication number
CN101945423B
CN101945423B CN200910088432.1A CN200910088432A CN101945423B CN 101945423 B CN101945423 B CN 101945423B CN 200910088432 A CN200910088432 A CN 200910088432A CN 101945423 B CN101945423 B CN 101945423B
Authority
CN
China
Prior art keywords
measurement
load
public
network equipment
load value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN200910088432.1A
Other languages
Chinese (zh)
Other versions
CN101945423A (en
Inventor
张大钧
王树立
苏晓勃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Telecommunications Technology CATT
Original Assignee
China Academy of Telecommunications Technology CATT
Filing date
Publication date
Application filed by China Academy of Telecommunications Technology CATT filed Critical China Academy of Telecommunications Technology CATT
Priority to CN200910088432.1A priority Critical patent/CN101945423B/en
Publication of CN101945423A publication Critical patent/CN101945423A/en
Application granted granted Critical
Publication of CN101945423B publication Critical patent/CN101945423B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The embodiment of the invention discloses a kind of load report method, device and system, the method comprises the following steps: the public-measurement that first network equipment receives from second network equipment asks message, carries load fluctuation thresholding in described public-measurement request message;The load condition of described first network device measuring system, obtains initial measurement, and returns public-measurement response message to described second network equipment, carry described initial measurement in described public-measurement response message;Described first network equipment measures the load condition of the most described system every Preset Time, obtain periodic measurements, and when described periodic measurements meets the condition of described load fluctuation threshold sets, send public-measurement report to described second network equipment, described periodic measurements is carried in the report of described public-measurement.What the embodiment of the present invention decreased measurement report reports number of times, reduces the process load between the network equipment.

Description

A kind of load report method, device and system
Technical field
The present invention relates to mobile communication technology field, particularly relate to a kind of load report method, device and System.
Background technology
In existing mobile communication system, the network equipment, when carrying out cross-system reorientation, needs to obtain in advance Know the load condition of goal systems.Such as, RNC (Radio Network Controller, wireless network control Device processed) carry out cross-system location time, can by with BSC (Base Station Controller, base station Controller) between Iur-g interface obtain GSM (Global System for Mobile in time Communications, global system for mobile communications) information on load of community, select the mesh of optimum exactly Mark switching cell.Wherein, the mode the most accurately of the information on load obtaining GSM cell is periodic measurement Reporting, when the cycle of measurement is sufficiently small (such as 0.5s), RNC can obtain the negative of GSM cell in real time Lotus information.
In current agreement, there is periodic measurement reporting schemes (event E/ event F) based on thresholding, After certain measurement type (such as, LOAD) of Ji Dang community reaches certain thresholding, then start and periodically survey Amount reports;When the conditions are not met, not reporting measurement reports.
Inventor is during realizing the present invention, and at least there are the following problems to find prior art:
Due to TD (Time Division, the time-division) community under RNC 2G (2nd Generation, Second filial generation mobile communication technology) adjacent area Numerous (thousand of can be reached), each 2G adjacent area needs Report 3 kinds of information on loads, and every kind of load message of each GSM cell is individually to report, therefore, The periodicity of information on load reports the process load that can be greatly increased RNC and BSC, and when GSM is little When the load in district is not changed in or changes less, this periodicity reports demand then to become nonsensical.And It is based on thresholding that periodic measurement reporting schemes can only (such as, traffic be less at night in some moment Period) reduce measurement report the amount of reporting, at Peak Hour, the load of all communities is substantially all Can reach to report thresholding, it will frequently reporting measurement reports, be further exacerbated by between RNC and BSC Signaling traffic load.
Summary of the invention
The embodiment of the present invention provides a kind of load report method, device and system, decreases measurement report Report number of times.
The embodiment of the present invention proposes a kind of load report method, comprises the following steps:
The public-measurement that first network equipment receives from second network equipment asks message, described public survey Amount request message carries load fluctuation thresholding;
The load condition of described first network device measuring system, obtains initial measurement, and to described Second the network equipment return public-measurement response message, described public-measurement response message carries described at the beginning of Beginning measurement result;
Described first network equipment measures the load condition of the most described system every Preset Time, obtains week Phase measurement result, and when described periodic measurements meets the condition of described load fluctuation threshold sets, Send public-measurement report to described second network equipment, the described cycle is carried in the report of described public-measurement Measurement result.
Preferably, described periodic measurements meets the condition of described load fluctuation threshold sets, particularly as follows:
Described periodic measurements is the last with described first network equipment on described second network equipment The absolute value of the difference between the load value of report is more than described load fluctuation thresholding.
Preferably, described public-measurement request message includes Target Cell Identifier, measures mark, public survey Amount type and reporting schemes.
Preferably, described reporting schemes is amendment mode and comprises described load fluctuation thresholding.
Preferably, described public-measurement type is that load LOAD measures.
Preferably, described periodic measurements includes uplink load value and/or downlink load value, described first The last load value reported to described second network equipment of the network equipment include uplink load value and/or under Row load value,
Described periodic measurements is the last with described first network equipment on described second network equipment The absolute value of the difference between the load value of report, more than described load fluctuation thresholding, specifically includes:
Uplink load value in described periodic measurements is the last with described first network equipment to described The absolute value of the difference between uplink load value in the load value that second network equipment reports is negative more than described Lotus fluctuation thresholding;And/or
Downlink load value in described periodic measurements is the last with described first network equipment to described The absolute value of the difference between downlink load value in the load value that second network equipment reports is negative more than described Lotus fluctuation thresholding.
Preferably, described first network equipment is any one in following equipment:
Radio network controller (RNC), base station controller BSC and enode b E-NodeB.
Preferably, described second network equipment is any one in following equipment:
RNC, BSC and E-NodeB.
The embodiment of the present invention also proposes a kind of network equipment, including:
Receiver module, asks message for receiving the public-measurement from other network equipments, described public Measurement request message is carried load fluctuation thresholding;
Measurement module, periodically surveys after receiving described public-measurement request message at receiver module The load condition of amount system, obtains initial measurement and periodic measurements;
Sending module, for returning public-measurement response message to other network equipments described, described public Measure and response message carries the initial measurement that described measurement module obtains, and at described measurement module When the periodic measurements obtained meets the condition of described load fluctuation threshold sets, to other networks described Equipment sends public-measurement report, carries described periodic measurements in the report of described public-measurement.
Preferably, the described network equipment, also include:
Judge module, described negative for judging whether the periodic measurements that described measurement module obtains meets The condition of lotus fluctuation threshold sets.
Preferably, the periodic measurements that described measurement module obtains meets described load fluctuation threshold sets Condition, particularly as follows:
Periodic measurements and the described sending module that described measurement module obtains the last to described other The absolute value of the difference between the load value that the network equipment reports is more than described load fluctuation thresholding.
Preferably, described public-measurement request message includes Target Cell Identifier, measures mark, public survey Amount type and reporting schemes.
Preferably, described reporting schemes is amendment mode and comprises described load fluctuation thresholding.
Preferably, described public-measurement type is that load LOAD measures.
Preferably, described periodic measurements includes uplink load value and/or downlink load value, described transmission The last load value reported to other network equipments described of module includes uplink load value and/or descending negative Charge values,
Periodic measurements and the described sending module that described measurement module obtains the last to described other The absolute value of the difference between the load value that the network equipment reports is more than described load fluctuation thresholding, specifically wraps Include:
Uplink load value in described periodic measurements and described sending module the last to described other The absolute value of the difference between uplink load value in the load value that the network equipment reports is more than described load ripple Dynamic thresholding;And/or
Downlink load value in described periodic measurements and described sending module the last to described other The absolute value of the difference between downlink load value in the load value that the network equipment reports is more than described load ripple Dynamic thresholding.
The embodiment of the present invention also proposes a kind of network equipment, including:
Sending module, for sending public-measurement request message to other network equipments, makes other nets described The load condition of network device measuring system, carries load fluctuation thresholding in described public-measurement request message;
Receiver module, for receiving the public-measurement response message from other network equipments described, described Public-measurement response message carries the initial measurement that other network equipments described obtain, and described When the periodic measurements that other network equipments obtain meets the condition of described load fluctuation threshold sets, connect Receive the public-measurement from other network equipments described to report, described week is carried in the report of described public-measurement Phase measurement result.
Preferably, the periodic measurements that other network equipments described obtain meets described load fluctuation thresholding The condition set, particularly as follows:
On periodic measurements and other network equipment the last times described that other network equipments described obtain The absolute value of the difference between the load value of report is more than described load fluctuation thresholding.
Preferably, described public-measurement request message includes Target Cell Identifier, measures mark, public survey Amount type and reporting schemes.
Preferably, described reporting schemes is amendment mode and comprises described load fluctuation thresholding.
Preferably, described public-measurement type is that load LOAD measures.
Preferably, described periodic measurements includes uplink load value and/or downlink load value, described other The load value that network equipment the last time reports includes uplink load value and/or downlink load value,
On periodic measurements and other network equipment the last times described that other network equipments described obtain The absolute value of the difference between the load value of report, more than described load fluctuation thresholding, specifically includes:
Uplink load value in described periodic measurements reported with other network equipment the last times described The absolute value of the difference between uplink load value in load value is more than described load fluctuation thresholding;And/or
Downlink load value in described periodic measurements reported with other network equipment the last times described The absolute value of the difference between downlink load value in load value is more than described load fluctuation thresholding.
The embodiment of the present invention also proposes a kind of load reporting system, including:
First network equipment, asks message for receiving the public-measurement from second network equipment, described Public-measurement request message carries load fluctuation thresholding;Periodically measure the load condition of system, obtain Take initial measurement and periodic measurements, return public-measurement response to described second network equipment and disappear Breath, carries described initial measurement, and ties at described period measurement in described public-measurement response message When fruit meets the condition of described load fluctuation threshold sets, send public-measurement to described second network equipment Report, carries described periodic measurements in the report of described public-measurement;
Second network equipment, for sending public-measurement request message to described first network equipment, makes institute State the load condition of system described in first network device measuring, receive the public affairs from described first network equipment Measure response message altogether, described public-measurement response message carries at the beginning of the acquisition of described first network equipment Beginning measurement result, and described first network equipment obtain periodic measurements meet described load fluctuation During the condition of threshold sets, receive the public-measurement from described first network equipment and report, described public Measurement report carries described periodic measurements.
Preferably, the periodic measurements that described first network equipment obtains meets described load fluctuation thresholding The condition set, particularly as follows:
Periodic measurements and the described first network equipment that described first network equipment obtains the last to The absolute value of the difference between the load value that described second network equipment reports is more than described load fluctuation door Limit.
The technical scheme of the embodiment of the present invention has the following advantages, because using amendment reporting schemes, reduces Measurement report report number of times, reduce process load between the network equipment, simultaneously can standard in time Really reflect the load condition of current community.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to reality Execute the required accompanying drawing used in example or description of the prior art to be briefly described, it should be apparent that below, Accompanying drawing in description is only some embodiments of the present invention, for those of ordinary skill in the art, On the premise of not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is a kind of load report method flow chart in the embodiment of the present invention one;
Fig. 2 is a kind of load report method flow chart in the embodiment of the present invention two;
Fig. 3 is a kind of network equipment infrastructure schematic diagram in the embodiment of the present invention three;
Fig. 4 is a kind of network equipment infrastructure schematic diagram in the embodiment of the present invention four;
Fig. 5 is a kind of load reporting system structural representation in the embodiment of the present invention five.
Detailed description of the invention
The embodiment of the present invention is for measuring type LOAD (load), it is proposed that between a kind of system, load is upper Reporting method, and define a kind of reporting schemes On Modification (amendment mode) and Load Change Limit (load fluctuation thresholding), the network equipment, after receiving public-measurement request message, measures system Load condition, returns the public-measurement response message carrying measurement result, and every after measuring for the first time The load condition of primary system is measured, when measurement result meets load fluctuation threshold sets every Preset Time During condition, send the public-measurement report carrying measurement result.
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out Clearly and completely describe, it is clear that described embodiment be a part of embodiment of the present invention rather than Whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art are not making wound The every other embodiment obtained under the property made work premise, broadly falls into the scope of protection of the invention.
As it is shown in figure 1, be a kind of load report method flow chart in the embodiment of the present invention one, including Following steps:
Step 101, first network equipment receives the public-measurement request message from second network equipment, This public-measurement request message carries load fluctuation thresholding.
Specifically, public-measurement request message includes Target Cell Identifier, measures mark, public-measurement Type and reporting schemes, this public-measurement type is that load LOAD measures, and this reporting schemes is amendment Mode also comprises load fluctuation thresholding, and first network equipment and second network equipment can be RNC, BSC With any one in E-NodeB (enode b).
Step 102, the load condition of first network device measuring system, obtain initial measurement, And return public-measurement response message to second network equipment, at the beginning of this public-measurement response message carries Beginning measurement result.
Wherein, initial measurement includes uplink load value and/or downlink load value.
Step 103, first network equipment is measured the load condition of primary system every Preset Time, is obtained Take periodic measurements, and when periodic measurements meets the condition of load fluctuation threshold sets, to Second network equipment sends public-measurement report, carries periodic measurements in the report of this public-measurement.
Wherein, periodic measurements meets the condition of load fluctuation threshold sets, particularly as follows: the cycle surveys Amount result and the last difference between the load value that second network equipment reports of first network equipment Absolute value more than load fluctuation thresholding, this load fluctuation thresholding determines according to the empirical value in existing network.
Specifically, periodic measurements includes uplink load value and/or downlink load value, and first network sets The standby the last load value reported to second network equipment includes uplink load value and/or downlink load Value, above-mentioned periodic measurements is the last with first network equipment to bearing that second network equipment reports The absolute value of the difference between charge values is more than load fluctuation thresholding, specifically includes:
Uplink load value in periodic measurements set to the second network with first network equipment the last time The absolute value of the difference between uplink load value in the standby load value reported is more than load fluctuation thresholding; And/or
Downlink load value in periodic measurements set to the second network with first network equipment the last time The absolute value of the difference between downlink load value in the standby load value reported is more than load fluctuation thresholding.
The technical scheme of the embodiment of the present invention has the following advantages, because using amendment reporting schemes, subtracts That has lacked measurement report reports number of times, reduces the process load between the network equipment, simultaneously can and Time reflect the load condition of current community exactly.
Below in conjunction with concrete application scenarios, the load report method in above-described embodiment is done further In detail, concrete description.
As in figure 2 it is shown, be a kind of load report method flow chart in the embodiment of the present invention two, including Following steps:
Step 201, RNC sends public-measurement request message, this public-measurement request message to BSC In carry load fluctuation thresholding.
As shown in table 1, for public-measurement request message structure table, wherein, the request of this public-measurement disappears Breath includes Target Cell Identifier, measures mark, public-measurement type and reporting schemes, this public-measurement Type is LOAD, and this reporting schemes is amendment mode and comprises load fluctuation thresholding.
Table 1 public-measurement request message structure table
Content name Describe
Target Cell Identifier Mark needs the community carrying out load measurement
Measure mark Identify a public-measurement
Public-measurement type Mark " Load " type
Reporting schemes Mark amendment mode, and provide the numerical value of Load Change Limit
Step 202, the public-measurement that BSC receives from RNC is asked message, is measured the load of system Situation, obtains initial measurement.
Wherein, initial measurement includes uplink load value and/or downlink load value.
Step 203, BSC returns public-measurement response message, this public-measurement response message to RNC In carry initial measurement.
As shown in table 2, for public-measurement response message structural table, wherein, the response of this public-measurement disappears Breath includes uplink load value and downlink load value.
Table 2 public-measurement response message structural table
Content name Describe
Uplink load value 0 represents minimum load, and 100 represent peak load
Downlink load value 0 represents minimum load, and 100 represent peak load
Step 204, BSC measures the load condition of primary system every Preset Time, and the cycle that obtains surveys Amount result.
Step 205, BSC judge periodic measurements and the last load value reported to RNC it Between the absolute value of difference whether more than load fluctuation thresholding.If the absolute value of this difference is more than load Fluctuation thresholding, then perform step 206;If the absolute value of this difference is not more than load fluctuation thresholding, Then perform step 204.
Specifically, for judging that periodic measurements and the last time are between the load value that RNC reports Whether the absolute value of difference, more than load fluctuation thresholding, can carry out defined below:
Fn=0, n=0;
Fn=(Mn-a), n > 0
Wherein, a represents the load value that the last time reports, and Mn represents that BSC n-th is measured and obtains Periodic measurements, Fn represent BSC n-th measure obtain periodic measurements and nearest Secondary difference between the load value that BSC reports.
If the absolute value of Fn is more than Load Change Limit, BSC by initiating public-measurement report Announcement reports load value, arranges n=0 simultaneously.
Step 206, BSC sends public-measurement report to RNC, carries week in the report of this public-measurement Phase measurement result.
As shown in table 3, for public-measurement report structure table, wherein, the report of this public-measurement includes Row load value and downlink load value.
Table 3 public-measurement report structure table
Content name Describe
Uplink load value 0 represents minimum load, and 100 represent peak load
Downlink load value 0 represents minimum load, and 100 represent peak load
It should be noted that after execution of step 206, step 204 can be continued executing with, measure system The load condition of system, obtains the periodic measurements of subsequent time.
It addition, each sequence of steps can be carried out by method in the embodiment of the present invention according to actual needs Adjust.
The technical scheme of the embodiment of the present invention has the following advantages, because using amendment reporting schemes, subtracts That has lacked measurement report reports number of times, reduces the process load between the network equipment, simultaneously can and Time reflect the load condition of current community exactly.
The embodiment of the present invention additionally provides a kind of network equipment applying above-mentioned load report method.
As it is shown on figure 3, be a kind of network equipment infrastructure schematic diagram in the embodiment of the present invention three, including:
Receiver module 310, asks message for receiving the public-measurement from other network equipments, should Public-measurement request message carries load fluctuation thresholding.
Above-mentioned receiver module 310 is to be responsible in the above network equipment receiving from other network equipments Public-measurement request message part, can be software, hardware or both combinations.
Measurement module 320, the cycle after receiving public-measurement request message at receiver module 310 Property ground measure the load condition of system, obtain initial measurement and periodic measurements.
Above-mentioned measurement module 320 is to be responsible in the above network equipment periodically measuring the negative of system Lotus situation, obtains initial measurement and the part of periodic measurements, can be software, hardware or Both combinations.
Sending module 330, for returning public-measurement response message to other network equipments, this is public Measure and response message carries the initial measurement that measurement module 320 obtains, and at measurement module 320 When the periodic measurements obtained meets the condition of load fluctuation threshold sets, set to other networks described Preparation send public-measurement to report, carries periodic measurements in the report of this public-measurement.
Above-mentioned sending module 330 is to be responsible in the above network equipment returning public affairs to other network equipments Measure response message and the part of public-measurement report altogether, can be software, hardware or both combinations.
Judge module 340, for judging whether the periodic measurements that measurement module 320 obtains meets The condition of load fluctuation threshold sets.
Above-mentioned judge module 340 is to be responsible in the above network equipment judging that measurement module 320 obtains Periodic measurements whether meet the part of condition of load fluctuation threshold sets, can be software, Hardware or both combinations.
The periodic measurements that above-mentioned measurement module 320 obtains meets the bar of load fluctuation threshold sets Part, particularly as follows: the periodic measurements that measurement module 320 obtains is the last with sending module 330 The absolute value of the difference between the load value that other network equipments report is more than load fluctuation thresholding, should Load fluctuation thresholding determines according to the empirical value in existing network.
Above-mentioned public-measurement request message includes Target Cell Identifier, measures mark, public-measurement type And reporting schemes.Wherein, reporting schemes is amendment mode and comprises described load fluctuation thresholding, public Measurement type is LOAD.
Specifically, periodic measurements includes uplink load value and/or downlink load value, sending module 330 the last times included uplink load value and/or downlink load to the load value that other network equipments report Value,
The periodic measurements that above-mentioned measurement module 320 obtains and sending module 330 the last time are to it The absolute value of the difference between the load value that his network equipment reports is more than load fluctuation thresholding, specifically wraps Include:
Uplink load value in periodic measurements set to other networks with sending module 330 the last time The absolute value of the difference between uplink load value in the standby load value reported is more than load fluctuation thresholding; And/or
Downlink load value in periodic measurements set to other networks with sending module 330 the last time The absolute value of the difference between downlink load value in the standby load value reported is more than load fluctuation thresholding.
The network equipment in the embodiment of the present invention can be any in RNC, BSC and E-NodeB A kind of.
The technical scheme of the embodiment of the present invention has the following advantages, because using amendment reporting schemes, subtracts That has lacked measurement report reports number of times, reduces the process load between the network equipment, simultaneously can and Time reflect the load condition of current community exactly.
As shown in Figure 4, for a kind of network equipment infrastructure schematic diagram in the embodiment of the present invention four, this net Network equipment 400 includes:
Sending module 410, for sending public-measurement request message to other network equipments so that it is he The network equipment measures the load condition of system, carries load fluctuation thresholding in this public-measurement request message.
Above-mentioned sending module 410 is to be responsible in the above network equipment 400 sending out to other network equipments Send the part of public-measurement request message, can be software, hardware or both combinations.
Receiver module 420, for receiving the public-measurement response message from other network equipments, should Public-measurement response message carries the initial measurement that other network equipments obtain, and at other nets When the periodic measurements that network equipment obtains meets the condition of load fluctuation threshold sets, receive from this The public-measurement report of other network equipments, carries this periodic measurements in the report of this public-measurement.
Above-mentioned receiver module 420 is to be responsible in the above network equipment 400 receiving from other networks The public-measurement response message of equipment and the part of public-measurement report, can be software, hardware or two The combination of person.
The periodic measurements that other network equipments above-mentioned obtain meets described load fluctuation threshold sets Condition, particularly as follows: other network equipments of periodic measurements and this that other network equipments obtain are nearest The absolute value of the difference between the load value once reported is more than load fluctuation thresholding, this load fluctuation door Limit determines according to the empirical value in existing network.
Above-mentioned public-measurement request message includes Target Cell Identifier, measures mark, public-measurement type And reporting schemes.Wherein, above-mentioned reporting schemes is amendment mode and comprises described load fluctuation thresholding, Above-mentioned public-measurement type is LOAD.
Above-mentioned periodic measurements includes uplink load value and/or downlink load value, and other network equipments are The nearly load value once reported includes uplink load value and/or downlink load value,
On periodic measurements and these other network equipment the last times that other network equipments above-mentioned obtain The absolute value of the difference between the load value of report, more than load fluctuation thresholding, specifically includes:
The load value that uplink load value in periodic measurements reported with other network equipment the last times In uplink load value between the absolute value of difference more than load fluctuation thresholding;And/or
The load value that downlink load value in periodic measurements reported with other network equipment the last times In downlink load value between the absolute value of difference more than load fluctuation thresholding.
The network equipment 400 in the embodiment of the present invention can be in RNC, BSC and E-NodeB Any one.
The technical scheme of the embodiment of the present invention has the following advantages, because using amendment reporting schemes, subtracts That has lacked measurement report reports number of times, reduces the process load between the network equipment, simultaneously can and Time reflect the load condition of current community exactly.
The embodiment of the present invention additionally provides a kind of system applying above-mentioned load report method.
As it is shown in figure 5, be a kind of load reporting system structural representation in the embodiment of the present invention five, Including first network equipment 510 and second network equipment 520, wherein,
First network equipment 510, asks for receiving the public-measurement from second network equipment 520 Message, carries load fluctuation thresholding in this public-measurement request message;Periodically measure the negative of system Lotus situation, obtains initial measurement and periodic measurements, returns public affairs to second network equipment 520 Measure response message altogether, this public-measurement response message carries initial measurement, and surveys in the cycle When amount result meets the condition of load fluctuation threshold sets, send public survey to second network equipment 520 Amount report, carries periodic measurements in the report of this public-measurement.
Second network equipment 520, for sending public-measurement request message to first network equipment 510, Make first network equipment 510 measure the load condition of system, receive from first network equipment 510 Public-measurement response message, carries what first network equipment 510 obtained in this public-measurement response message Initial measurement, and first network equipment 510 obtain periodic measurements meet load fluctuation During the condition of threshold sets, receiving the public-measurement from first network equipment 510 and report, this is public Measurement report carries described periodic measurements.
The periodic measurements that above-mentioned first network equipment 510 obtains meets load fluctuation threshold sets Condition, particularly as follows:
The periodic measurements that first network equipment 510 obtains is the last with first network equipment 510 The absolute value of the difference between the load value that second network equipment 520 reports is more than load fluctuation door Limit, this load fluctuation thresholding determines according to the empirical value in existing network.
Above-mentioned public-measurement request message includes Target Cell Identifier, measures mark, public-measurement type And reporting schemes.Wherein, above-mentioned reporting schemes is amendment mode and comprises described load fluctuation thresholding, Above-mentioned public-measurement type is LOAD.
Above-mentioned periodic measurements includes uplink load value and/or downlink load value, first network equipment 510 the last times included uplink load value and/or descending to the load value that second network equipment 520 reports Load value, above-mentioned periodic measurements and first network equipment 510 the last time are to second network equipment The absolute value of the difference between 520 load values reported is more than load fluctuation thresholding, specifically includes:
Uplink load value in periodic measurements and first network equipment 510 the last time are to the second net The absolute value of the difference between uplink load value in the load value that network equipment 520 reports is more than load ripple Dynamic thresholding;And/or
Downlink load value in periodic measurements and first network equipment 510 the last time are to the second net The absolute value of the difference between downlink load value in the load value that network equipment 520 reports is more than load ripple Dynamic thresholding.
First network equipment 510 and second network equipment 520 in the embodiment of the present invention can be Any one in RNC, BSC and E-NodeB.
The technical scheme of the embodiment of the present invention has the following advantages, because using amendment reporting schemes, subtracts That has lacked measurement report reports number of times, reduces the process load between the network equipment, simultaneously can and Time reflect the load condition of current community exactly.
Through the above description of the embodiments, those skilled in the art is it can be understood that arrive this Bright can add the mode of required general hardware platform by software and realize, naturally it is also possible to by hardware, But the former is more preferably embodiment in the case of a lot.Based on such understanding, technical scheme The part contributed prior art the most in other words can embody with the form of software product, This computer software product is stored in a storage medium, including some instructions with so that a station terminal It is each that equipment (can be mobile phone, personal computer, server, or the network equipment etc.) performs the present invention Method described in individual embodiment.
The above is only the preferred embodiment of the present invention, it is noted that general for the art For logical technical staff, under the premise without departing from the principles of the invention, it is also possible to make some improvement and profit Decorations, these improvements and modifications also should regard protection scope of the present invention.
It will be appreciated by those skilled in the art that the module in the device in embodiment can describe according to embodiment Carry out being distributed in the device of embodiment, it is also possible to carry out respective change and be disposed other than the one of the present embodiment In individual or multiple device.The module of above-described embodiment can be integrated in one, it is also possible to separates and disposes, can To merge into a module, it is also possible to be further split into multiple submodule.
The invention described above embodiment sequence number, just to describing, does not represent the quality of embodiment.
The several specific embodiments being only the present invention disclosed above, but, the present invention is not limited to this, The changes that any person skilled in the art can think of all should fall into protection scope of the present invention.

Claims (16)

1. a load report method, it is characterised in that comprise the following steps:
The public-measurement that first network equipment receives from second network equipment asks message, described public survey Amount request message carries load fluctuation thresholding;
The load condition of described first network device measuring system, obtains initial measurement, and to described Second the network equipment return public-measurement response message, described public-measurement response message carries described at the beginning of Beginning measurement result;
Described first network equipment measures the load condition of the most described system every Preset Time, obtains week Phase measurement result, and the last to described the at described periodic measurements and described first network equipment When the absolute value of the difference between the load value that two network equipments report is more than described load fluctuation thresholding, to Described second network equipment sends public-measurement report, carries the described cycle and survey in the report of described public-measurement Amount result;
Wherein, described public-measurement request message includes reporting schemes;
Described reporting schemes is amendment mode and comprises described load fluctuation thresholding.
2. the method for claim 1, it is characterised in that described public-measurement request message is also wrapped Include Target Cell Identifier, measure mark and public-measurement type.
3. method as claimed in claim 2, it is characterised in that described public-measurement type is load LOAD measures.
4. the method for claim 1, it is characterised in that described periodic measurements includes up Load value and/or downlink load value, described first network equipment is the last on described second network equipment The load value of report includes uplink load value and/or downlink load value,
Described periodic measurements is the last with described first network equipment on described second network equipment The absolute value of the difference between the load value of report, more than described load fluctuation thresholding, specifically includes:
Uplink load value in described periodic measurements is the last with described first network equipment to described The absolute value of the difference between uplink load value in the load value that second network equipment reports is negative more than described Lotus fluctuation thresholding;And/or
Downlink load value in described periodic measurements is the last with described first network equipment to described The absolute value of the difference between downlink load value in the load value that second network equipment reports is negative more than described Lotus fluctuation thresholding.
5. the method for claim 1, it is characterised in that described first network equipment is for divide into Any one in Bei:
Radio network controller (RNC), base station controller BSC and enode b E-NodeB.
6. the method for claim 1, it is characterised in that described second network equipment is for divide into Any one in Bei:
RNC, BSC and E-NodeB.
7. a network equipment, it is characterised in that including:
Receiver module, asks message for receiving the public-measurement from other network equipments, described public Measurement request message is carried load fluctuation thresholding;
Measurement module, periodically surveys after receiving described public-measurement request message at receiver module The load condition of amount system, obtains initial measurement and periodic measurements;
Sending module, for returning public-measurement response message to other network equipments described, described public Measure and response message carries the initial measurement that described measurement module obtains, and at described measurement module The periodic measurements obtained is the last with described sending module to bearing that other network equipments described report When the absolute value of the difference between charge values is more than described load fluctuation thresholding, send out to other network equipments described Send public-measurement to report, described periodic measurements is carried in the report of described public-measurement;
Described public-measurement request message includes reporting schemes;
Described reporting schemes is amendment mode and comprises described load fluctuation thresholding.
8. the network equipment as claimed in claim 7, it is characterised in that also include:
Judge module, described negative for judging whether the periodic measurements that described measurement module obtains meets The condition of lotus fluctuation threshold sets.
9. the network equipment as claimed in claim 7, it is characterised in that described public-measurement request message is also Including Target Cell Identifier, measure mark and public-measurement type.
10. the network equipment as claimed in claim 9, it is characterised in that described public-measurement type is negative Lotus LOAD measures.
11. network equipments as claimed in claim 7, it is characterised in that described periodic measurements includes Uplink load value and/or downlink load value, described sending module is the last on other network equipments described The load value of report includes uplink load value and/or downlink load value,
Periodic measurements and the described sending module that described measurement module obtains the last to described other The absolute value of the difference between the load value that the network equipment reports is more than described load fluctuation thresholding, specifically wraps Include:
Uplink load value in described periodic measurements and described sending module the last to described other The absolute value of the difference between uplink load value in the load value that the network equipment reports is more than described load ripple Dynamic thresholding;And/or
Downlink load value in described periodic measurements and described sending module the last to described other The absolute value of the difference between downlink load value in the load value that the network equipment reports is more than described load ripple Dynamic thresholding.
12. 1 kinds of network equipments, it is characterised in that including:
Sending module, for sending public-measurement request message to other network equipments, makes other nets described The load condition of network device measuring system, carries load fluctuation thresholding in described public-measurement request message;
Receiver module, for receiving the public-measurement response message from other network equipments described, described Public-measurement response message carries the initial measurement that other network equipments described obtain, and described The load that the periodic measurements that other network equipments obtain reported with other network equipment the last times described When the absolute value of the difference between value is more than described load fluctuation thresholding, receives and set from other networks described Standby public-measurement report, carries described periodic measurements in the report of described public-measurement;
Described public-measurement request message includes reporting schemes;
Described reporting schemes is amendment mode and comprises described load fluctuation thresholding.
13. network equipments as claimed in claim 12, it is characterised in that described public-measurement request message Also include Target Cell Identifier, measure mark and public-measurement type.
14. network equipments as claimed in claim 13, it is characterised in that described public-measurement type is negative Lotus LOAD measures.
15. network equipments as claimed in claim 12, it is characterised in that described periodic measurements includes Uplink load value and/or downlink load value, the load value that other network equipment the last times described report includes Uplink load value and/or downlink load value,
On periodic measurements and other network equipment the last times described that other network equipments described obtain The absolute value of the difference between the load value of report, more than described load fluctuation thresholding, specifically includes:
Uplink load value in described periodic measurements reported with other network equipment the last times described The absolute value of the difference between uplink load value in load value is more than described load fluctuation thresholding;And/or
Downlink load value in described periodic measurements reported with other network equipment the last times described The absolute value of the difference between downlink load value in load value is more than described load fluctuation thresholding.
16. 1 kinds of load reporting systems, it is characterised in that including:
First network equipment, asks message for receiving the public-measurement from second network equipment, described Public-measurement request message carries load fluctuation thresholding;Periodically measure the load condition of system, obtain Take initial measurement and periodic measurements, return public-measurement response to described second network equipment and disappear Breath, carries described initial measurement, and ties at described period measurement in described public-measurement response message Fruit and the last difference between the load value that described second network equipment reports of described first network equipment When the absolute value of value is more than described load fluctuation thresholding, send public-measurement report to described second network equipment Accuse, described periodic measurements is carried in the report of described public-measurement;
Second network equipment, for sending public-measurement request message to described first network equipment, makes institute State the load condition of system described in first network device measuring, receive the public affairs from described first network equipment Measure response message altogether, described public-measurement response message carries at the beginning of the acquisition of described first network equipment Beginning measurement result, and described first network equipment obtain periodic measurements meet described load fluctuation During the condition of threshold sets, receive the public-measurement from described first network equipment and report, described public Measurement report carries described periodic measurements;
Described public-measurement request message includes reporting schemes;
Described reporting schemes is amendment mode and comprises described load fluctuation thresholding.
CN200910088432.1A 2009-07-07 A kind of load report method, device and system Active CN101945423B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910088432.1A CN101945423B (en) 2009-07-07 A kind of load report method, device and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910088432.1A CN101945423B (en) 2009-07-07 A kind of load report method, device and system

Publications (2)

Publication Number Publication Date
CN101945423A CN101945423A (en) 2011-01-12
CN101945423B true CN101945423B (en) 2016-12-14

Family

ID=

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1703110A (en) * 2004-05-24 2005-11-30 华为技术有限公司 Public measuring method of wireless resource management
CN101150565A (en) * 2006-09-21 2008-03-26 中兴通讯股份有限公司 Control method for public measurement in target radio network controller
CN101170814A (en) * 2006-10-23 2008-04-30 中兴通讯股份有限公司 Method for radio network controller to obtain minimum receiving power
CN101170815A (en) * 2006-10-23 2008-04-30 中兴通讯股份有限公司 Device for radio network controller to obtain minimum receiving power
CN101175289A (en) * 2007-11-20 2008-05-07 中兴通讯股份有限公司 Common measuring method suitable for TD-SCDMA system
CN101222724A (en) * 2007-01-11 2008-07-16 中兴通讯股份有限公司 Common measuring method supporting node B performance statistics in WCDMA system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1703110A (en) * 2004-05-24 2005-11-30 华为技术有限公司 Public measuring method of wireless resource management
CN101150565A (en) * 2006-09-21 2008-03-26 中兴通讯股份有限公司 Control method for public measurement in target radio network controller
CN101170814A (en) * 2006-10-23 2008-04-30 中兴通讯股份有限公司 Method for radio network controller to obtain minimum receiving power
CN101170815A (en) * 2006-10-23 2008-04-30 中兴通讯股份有限公司 Device for radio network controller to obtain minimum receiving power
CN101222724A (en) * 2007-01-11 2008-07-16 中兴通讯股份有限公司 Common measuring method supporting node B performance statistics in WCDMA system
CN101175289A (en) * 2007-11-20 2008-05-07 中兴通讯股份有限公司 Common measuring method suitable for TD-SCDMA system

Similar Documents

Publication Publication Date Title
CN101390424B (en) System, apparatus and method for a two-stage mechanism for quiet period management in spectrum agile radio networks
CN104581779B (en) A kind of method for processing business and device
CN102065495A (en) Method, system and base station for selecting target cell
CN109347989A (en) Meter design method, apparatus and system design method based on NB-IoT Internet of Things
US10172142B2 (en) Interference coordinator method and device
CN107592644A (en) Circuit domain fallback method, base station and terminal
CN105393608B (en) A kind of method of user equipment and power distribution
CN102158930B (en) Method and equipment for accessing MTC (Multimedia Telephone Communication) equipment
CN104427625A (en) Network resource scheduling method and system based on user experience
CN103826263B (en) A kind of network shunt method and apparatus
CN106162917A (en) The method for pre-emptively of transfer resource and equipment on a kind of unauthorized carrier wave
CN106937293A (en) The distribution method and device of a kind of frequency spectrum resource
CN103249076A (en) Reference signal measurement method and device
CN106034339A (en) Method and device for blind handover or blind redirection in mobile communication system
CN103841605B (en) A kind of method and apparatus for realizing multiple BBU equipment rooms baseband signal collaboration processing
CN108243498A (en) A kind of method and apparatus of satellite system resource allocation
CN104955128A (en) Load information transmission method, load information transmission system and network element
CN101945423B (en) A kind of load report method, device and system
CN106535232B (en) A kind of frequency point optimization method and device
CN106559908A (en) A kind of method and apparatus for realizing listem-before-talk
CN101990228B (en) Communication network equipment fault detection method and device
US20140169344A1 (en) Random Access Method, Mobile Terminal, and Mobile Communications Sytem
CN103002458B (en) Base station selection method and device
CN103249058B (en) Special state measures the method for adjustment and device of scene configuration information
CN102572847B (en) Spectrum allocation method and system

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20110505

Address after: 100191 Haidian District, Xueyuan Road, No. 40,

Applicant after: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

Address before: 100083 Haidian District, Xueyuan Road, No. 29,

Applicant before: DATANG MOBILE COMMUNICATIONS EQUIPMENT Co.,Ltd.

GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee after: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

Address before: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee before: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

TR01 Transfer of patent right

Effective date of registration: 20210603

Address after: 100085 1st floor, building 1, yard 5, Shangdi East Road, Haidian District, Beijing

Patentee after: DATANG MOBILE COMMUNICATIONS EQUIPMENT Co.,Ltd.

Address before: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee before: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY