CN101943008A - 一种残采矿山矿柱加固方法 - Google Patents

一种残采矿山矿柱加固方法 Download PDF

Info

Publication number
CN101943008A
CN101943008A CN 201010263789 CN201010263789A CN101943008A CN 101943008 A CN101943008 A CN 101943008A CN 201010263789 CN201010263789 CN 201010263789 CN 201010263789 A CN201010263789 A CN 201010263789A CN 101943008 A CN101943008 A CN 101943008A
Authority
CN
China
Prior art keywords
pillar
ore pillar
stress
residual
ore
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010263789
Other languages
English (en)
Inventor
石飞
许振华
喻波
朱利平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nerin Engineering Co Ltd
Original Assignee
China Nerin Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nerin Engineering Co Ltd filed Critical China Nerin Engineering Co Ltd
Priority to CN 201010263789 priority Critical patent/CN101943008A/zh
Publication of CN101943008A publication Critical patent/CN101943008A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

一种残采矿山矿柱加固方法,其特征在于:以应力测试数据为基础,采用包柱方式加固残采矿柱,同时辅以矿柱监测措施,降低残矿回采的风险。矿柱设计首次采用以接近现状的应力测试数据为依据,使矿柱设计得以优化和比较安全可靠,由矿柱包柱内预埋应力、应变计来监测矿柱来压和变形,能够保障坑内人员的安全,克服以往对于矿柱破坏区残矿采用封闭矿区方式浪费资源和冒险强采安全性差的缺点。

Description

一种残采矿山矿柱加固方法
技术领域
本发明涉及一种矿山开采领域矿柱加固方法。
背景技术
目前,国内部分坑采矿山处于后期残采阶段。尤其是以前私人开采的矿山,由于采富弃贫、无序开采,空区顶、底板仍存有大部分矿石。为防止资源浪费及取得残采经济效益,许多矿山都加强了后期残采设计。在后期残采中存在大量矿柱受地压、爆破等原因影响,不同程度出现破损、变细、或者沿结构面破裂的状况,严重影响回采的安全。矿柱加固设计其目的在于加固矿柱提高矿柱强度,从而达到有效控制地压活动。因此,矿柱加固设计为残采设计的重要组成部分。以往对于矿柱破坏区残矿处理方式为封闭空区,放弃该区域残矿回采;或冒险强采。从降低资源浪费和提高安全保障角度出发以上两种方式都不可取。只有通过加固矿柱,提高矿柱强度,从而达到有效控制地压活动的方式,才可能降低回采的风险。为此,我们发明了一种加固坑采矿山矿柱的新方法。
发明内容
本发明的目的是提供一种残采矿山矿柱加固方法,降低残矿回采风险,保障采矿安全,克服以往对于矿柱破坏区残矿采用封闭矿区方式浪费资源和冒险强采安全性差的缺点。
一种残采矿山矿柱加固方法,其特征在于:以应力测试数据为基础,采用包柱方式加固残采矿柱,同时辅以矿柱监测措施,降低残矿回采的风险。
一种残采矿山矿柱加固方法,其特征在于:通过混凝土或者钢筋混凝土包裹体加固原矿柱的强度,在测试矿柱顶板围岩应力及矿柱附近主应力大小和方位的基础上,按测试值来确定残采矿柱所需包柱的强度、规格及配筋;同时,根据上述测试值选择残采矿柱包柱内预埋的应力、应变计量程;最后,按生产中测定的矿柱应力、位移变化值进行矿柱安全评估并采取相应的安全措施,从而达到安全残采的目的。
本发明方法具有如下优点:一、矿柱设计首次采用以接近现状的应力测试数据为依据,使矿柱设计得以优化和比较安全可靠。二、由矿柱包柱内预埋应力、应变计来监测矿柱来压和变形,能够保障坑内人员的安全。采用该新方法来加固残采矿柱,其目的是为了保障残采工作的安全;同样本发明方法也可用于新开采矿山的矿柱设计,保证坑采矿山采矿安全。
具体实施方式
下面详细说明本发明方法的实施例:
本发明方法工艺流程为:(1)进行地应力测试,取得最大主应力数据→(2)矿柱顶板围岩应力测试,取得测试数据→(3)矿柱设计及选取矿柱内预埋应力计、应变计量程→(4)矿柱施工及应力计、应变计埋设→(5)预埋应力计、应变计数值若持续上升且将达预警值时,坑内人员立即撤离采场。
采用混凝土或者钢筋混凝土包裹体加固原矿柱;为提高加固矿柱的抗剪强度,包柱配筋的设计,以主应力大小、方位作为包柱配筋设计的依据。按矿柱顶板围岩应力测试数据,合理选择应力、应变计量程,即应力、应变计量程应大于顶板围岩应力应变与矿柱从预埋应力计、应变计的位置至顶板间矿柱的应力应变之和。矿柱加固施工及应力计、应变计埋设好后,采矿过程中预埋的应力计、应变计数值若持续上升且将达预警值时,坑内人员需立即撤离采场。
以上内容是结合具体的优选实施方式对本发明所作的进一步详细说明,不能认定本发明的具体实施只局限于这些说明。对于本发明所属技术领域的普通技术人员来说,在不脱离本发明构思的前提下做出若干等同替代或明显变型,而且性能或用途相同,则应当视为属于本发明所提交的权利要求书确定的保护范围。

Claims (2)

1.一种残采矿山矿柱加固方法,其特征在于:以应力测试数据为基础,采用包柱方式加固残采矿柱,同时辅以矿柱监测措施,降低残矿回采的风险。
2.根据权利要求1所述的残采矿山矿柱加固方法,其特征在于:通过混凝土或者钢筋混凝土包裹体加固原矿柱的强度,在测试矿柱顶板围岩应力及矿柱附近主应力大小和方位的基础上,按测试值来确定残采矿柱所需包柱的强度、规格及配筋;同时,根据上述测试值选择残采矿柱包柱内预埋的应力、应变计量程;最后,按生产中测定的矿柱应力、位移变化值进行矿柱安全评估并采取相应的安全措施,从而达到安全残采的目的。
CN 201010263789 2010-08-26 2010-08-26 一种残采矿山矿柱加固方法 Pending CN101943008A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010263789 CN101943008A (zh) 2010-08-26 2010-08-26 一种残采矿山矿柱加固方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010263789 CN101943008A (zh) 2010-08-26 2010-08-26 一种残采矿山矿柱加固方法

Publications (1)

Publication Number Publication Date
CN101943008A true CN101943008A (zh) 2011-01-12

Family

ID=43435190

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010263789 Pending CN101943008A (zh) 2010-08-26 2010-08-26 一种残采矿山矿柱加固方法

Country Status (1)

Country Link
CN (1) CN101943008A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587973A (zh) * 2011-12-01 2012-07-18 中南大学 一种应用卸压预裂缝的高应力矿柱保护方法
CN102603240A (zh) * 2012-03-23 2012-07-25 中南大学 一种抵抗动载的岩柱加固方法
CN106121649A (zh) * 2016-08-29 2016-11-16 山东金岭矿业股份有限公司 采用阶段矿房法回采矿房的存窿矿石的回采方法
CN110410100A (zh) * 2019-07-13 2019-11-05 新疆大学 预应力纤维布加固房柱式采煤工作面遗留煤柱的方法
CN110952981A (zh) * 2019-11-14 2020-04-03 南华大学 一种缓倾斜中厚-厚大矿体残矿回采方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5135734A (en) * 1988-10-26 1992-08-04 Solvay & Cie (Societe Anonyme) Process for removing a residue containing sodium sulphate
US6672674B2 (en) * 2000-09-20 2004-01-06 Dbt Gmbh Longwall mining with blasting
CN1730904A (zh) * 2005-09-08 2006-02-08 东北大学 一种处理采空区的诱导冒落法
CN101403304A (zh) * 2008-10-30 2009-04-08 昆明理工大学 一种大型空区残矿回收方法
CN101403303A (zh) * 2008-10-23 2009-04-08 灵宝市金源矿业有限责任公司 一种适用于残采的巷道布局方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5135734A (en) * 1988-10-26 1992-08-04 Solvay & Cie (Societe Anonyme) Process for removing a residue containing sodium sulphate
US6672674B2 (en) * 2000-09-20 2004-01-06 Dbt Gmbh Longwall mining with blasting
CN1730904A (zh) * 2005-09-08 2006-02-08 东北大学 一种处理采空区的诱导冒落法
CN101403303A (zh) * 2008-10-23 2009-04-08 灵宝市金源矿业有限责任公司 一种适用于残采的巷道布局方法
CN101403304A (zh) * 2008-10-30 2009-04-08 昆明理工大学 一种大型空区残矿回收方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
《有色金属(矿山部分)》 20040531 覃和醒 加强地质和残采工作延长矿山寿命 17-18 1-2 第56卷, 第3期 *
《金属矿山》 20011130 张传信等 钢筋混凝土剪力洞加固永久矿柱中破碎带的实践 10-11 1-2 , 第11期 *
《金属矿山》 20100731 王清来等 复杂采空区条件下残矿回收与采区稳定性的有限元数值模拟研究 37-40 1-2 , 第7期 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587973A (zh) * 2011-12-01 2012-07-18 中南大学 一种应用卸压预裂缝的高应力矿柱保护方法
CN102603240A (zh) * 2012-03-23 2012-07-25 中南大学 一种抵抗动载的岩柱加固方法
CN106121649A (zh) * 2016-08-29 2016-11-16 山东金岭矿业股份有限公司 采用阶段矿房法回采矿房的存窿矿石的回采方法
CN110410100A (zh) * 2019-07-13 2019-11-05 新疆大学 预应力纤维布加固房柱式采煤工作面遗留煤柱的方法
CN110952981A (zh) * 2019-11-14 2020-04-03 南华大学 一种缓倾斜中厚-厚大矿体残矿回采方法

Similar Documents

Publication Publication Date Title
Zhang et al. Ground response of a gob-side entry in a longwall panel extracting 17 m-thick coal seam: a case study
Zhang et al. Stability and deformation of surrounding rock in pillarless gob-side entry retaining
Kuang et al. The impact of key strata movement on ground pressure behaviour in the Datong coalfield
Wang et al. Systematic principles of surrounding rock control in longwall mining within thick coal seams
CN101943008A (zh) 一种残采矿山矿柱加固方法
Liu et al. The elimination of coal and gas outburst disasters by ultrathin protective seam drilling combined with stress-relief gas drainage in Xinggong coalfield
Wang et al. Failure mechanism and control technology of longwall coalface in large-cutting-height mining method
Wang et al. Hydraulic support crushed mechanism for the shallow seam mining face under the roadway pillars of room mining goaf
Kang et al. Deformation characteristics and reinforcement technology for entry subjected to mining-induced stresses
CN105179017B (zh) 位移应变锚杆综合预警系统
CN103195443B (zh) 深部开采优化支护参数预防巷道滞后突水的方法
Li et al. Failure analysis and control measures of deep roadway with composite roof: A case study
Xu et al. The effects of caving of a coal mine's immediate roof on floor strata failure and water inrush
CN110295909A (zh) 只留齿形矿柱的充填体底下采矿方法
CN108798769A (zh) 条采采空区一体化综合治理施工方法
Li et al. Determination of working resistance based on movement type of the first subordinate key stratum in a fully mechanized face with large mining height
Wang et al. Method for determining the width of protective coal pillar in the pre-driven longwall recovery room considering main roof failure form
Yang et al. Validation study of no‐pillar mining method without advance tunneling: a case study of a mine in China
Chen et al. Mining‐induced failure characteristics and surrounding rock control of gob‐side entry driving adjacent to filling working face in the deep coal mine
Pan et al. A new model for the identification of subcritical surface subsidence in deep pillarless mining
Chen et al. Roadway surrounding rock under multi-coal-seam mining: deviatoric stress evolution and control technology
CN110130895B (zh) 一种弱化遗留煤柱潜在破坏面的煤柱破坏方法
Hong et al. A new cable truss support system for coal roadways affected by dynamic pressure
Lu et al. Fracture mechanics solution of confined water progressive intrusion height of mining fracture floor
Xie et al. Failure mechanism and control technology of thick and soft coal fully mechanized caving roadway under double gobs in close coal seams

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110112