CN101942997A - 固井壁面封隔验窜仪 - Google Patents

固井壁面封隔验窜仪 Download PDF

Info

Publication number
CN101942997A
CN101942997A CN2010102617597A CN201010261759A CN101942997A CN 101942997 A CN101942997 A CN 101942997A CN 2010102617597 A CN2010102617597 A CN 2010102617597A CN 201010261759 A CN201010261759 A CN 201010261759A CN 101942997 A CN101942997 A CN 101942997A
Authority
CN
China
Prior art keywords
pipe
kettle
instrument
well cementation
packing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010102617597A
Other languages
English (en)
Other versions
CN101942997B (zh
Inventor
何保生
许明标
李玉光
由福昌
李滨
张凡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangtze University
China National Offshore Oil Corp CNOOC
CNOOC Research Institute Co Ltd
Original Assignee
Yangtze University
China National Offshore Oil Corp CNOOC
CNOOC Research Center
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangtze University, China National Offshore Oil Corp CNOOC, CNOOC Research Center filed Critical Yangtze University
Priority to CN 201010261759 priority Critical patent/CN101942997B/zh
Publication of CN101942997A publication Critical patent/CN101942997A/zh
Application granted granted Critical
Publication of CN101942997B publication Critical patent/CN101942997B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了一种固井壁面封隔验窜仪。本发明提供的固井壁面封隔验窜仪包括釜体,所述釜体包括釜盖和釜底,其特征在于:所述釜体内设置有能被所述釜盖密封的套管,所述套管与所述釜体之间形成可容纳模拟地层和固井水泥环的容置空间;所述釜盖上设有可测定所述模拟地层和固井水泥环的相交面的压力的二界面压力探头、可测定所述固井水泥环和所述套管的相交面的压力的一界面压力探头以及可测定所述容置空间的温度的温度探头;所述釜体的釜底设有堵头,所述堵头中设置有一延伸至所述套管内部的加热管和一延伸至所述模拟地层的验窜压力管。本发明设备能够很好的模拟现场实际的情况,并且结构构造简单、操作方便。

Description

固井壁面封隔验窜仪
技术领域
本发明涉及固井壁面封隔验窜仪。
背景技术
油气井注水泥后,由于环形空间液柱压力与地层压力不平衡关系的变化,使地层中的液体进入环形空间,产生纵向流动,这种纵向流动的现象称为环空窜流,地层中最活跃的是气体,气体的粘度比地层水的粘度低80~100倍,发生窜流的可能性最大,因此,一般又称为气体窜流或环空气窜。
发生环空气窜的主要危害是:直接影响水泥石胶结强度;导致层间窜流,直接影响油气层的测试评价,污染油气层,降低油气采收率;对油田开发后续作业如注水、酸化压裂和分层开采等造成不利影响;严重时可在井口冒油、冒气,甚至造成固井后井喷事故,即使采用挤水泥等补救工艺也很难奏效。
因而,及时、有效地验窜评价固井质量,对于现场施工至关重要,通过验窜评价,判定水泥浆的防窜能力,从而根据需要优化水泥浆防窜性能。
国内的固井验窜的评价方法不统一,每种都只适用于特定的情况,各有利弊。
发明内容
本发明的目的在于提供一种固井壁面封隔验窜仪。
本发明提供的固井壁面封隔验窜仪包括釜体,所述釜体包括釜盖和釜底,其中:所述釜体内设置有能被所述釜盖密封的套管,所述套管与所述釜体之间形成可容纳模拟地层和固井水泥环的容置空间;
所述釜盖上设有可测定所述模拟地层和固井水泥环的相交面的压力的二界面压力探头、可测定所述固井水泥环和所述套管的相交面的压力的一界面压力探头以及可测定所述容置空间的温度的温度探头;
所述釜体的釜底设有堵头,所述堵头中设置有一延伸至所述套管内部的加热管和一延伸至所述模拟地层的验窜压力管。
进一步,上述釜盖中分别设置有在所述固井水泥环和所述套管的相交处的管一、在所述模拟地层和固井水泥环的相交处的管二和与所述容置空间相连通的管三;所述管一内设置有所述一界面压力探头,所述管二内设置有所述二界面压力探头,所述管三内设置有所述温度探头。
上述验窜压力管、管一、管二和管三上均安装有用于释放压力的阀。
优选的是,上述釜体内壁上设置有支撑套;所述套管与所述支撑套之间形成可容纳所述模拟地层和所述固井水泥环的容置空间。
上述套管设置在所述釜体内部的中间。
上述一界面压力探头、上述二界面压力探头和上述温度探头均与计算机相连。
上述堵头是可上下移动地设置在所述釜底上的。
上述支撑套与所述釜盖之间设置一O型密封圈、所述堵头与所述套管之间设置另一O型密封圈。
上述固井壁面封隔验窜仪还包括能压住釜体的釜盖和釜体侧壁的压帽。
与套管对应处的上述釜盖上设置有密封用的凸块;所述凸块插向所述套管内部,并与所述套管内壁紧密接触。
本发明与现有技术相比有如下有益效果:
1.能够很好的模拟现场实际的情况;在压力加载过程中,能很好的掌握各个界面的压力变化;通过计算机的记录,能更方便直接的读取各个界面窜通的压力数据;
2.结构构造简单、操作方便、适用性强。
附图说明
图1为本发明提供的固井壁面封隔验窜仪的结构示意图。
具体实施方式
下面结合具体实施例对本发明作进一步说明,但本发明并不限于以下实施例。
下述实施例中,如无特殊说明,均为常规方法。
实施例1、固井壁面封隔验窜仪
如图1所示,本发明提供的固井壁面封隔验窜仪包括一圆柱形釜体11,釜体11包括釜盖5和釜底14。釜盖5通过螺纹连接在釜体11的内侧壁上。釜体11上还设置有能压住釜盖5和釜体侧壁的压帽9。釜体11内部中间设置有套管10,套管10要能被釜盖5密封,具体的结构是釜盖5上与套管10的对应处设置有插向套管10内部并与套管10内壁紧密接触的凸块6。
釜体11内壁上设置有支撑套12,支撑套12与釜盖5之间用O型密封圈4进一步密封。套管10与支撑套12之间形成可容纳模拟地层7和固井水泥环8的容置空间。本发明的验窜仪在具体实用时,是需将模拟地层7紧靠支撑套12放置,然后在模拟地层7与套管10之间注入水泥石形成固井水泥环8,因此模拟地层7和固井水泥环8是设置在支撑套12和套管10之间的。
釜盖5中分别设置有在固井水泥环8和套管10的相交处的管一、在模拟地层7和固井水泥环8的相交处的管二和与所述容置空间相连通的管三;管一内设置有一界面压力探头1,管二内设置有二界面压力探头2,管三内设置有温度探头3。探头1、2、3均与计算机18连接。采用这种结构,一界面压力探头1可测定所述固井水泥环和所述套管的相交面的压力,二界面压力探头2可测定所述模拟地层和固井水泥环的相交面的压力,温度探头3可测定上述容置空间的温度。管一、管二和管三上均安装有用于释放压力的阀。
釜体的釜底设有可上下移动的活动堵头17,活动堵头17可与支撑套12、套管10、釜底14以及釜盖5一起形成一密封空间,该空间内设置有模拟地层7和固井水泥环8。活动堵头17中设置有一延伸至套管10内部的加热管16和一延伸至模拟地层7的验窜压力管15。验窜压力管15上也安装有用于释放压力的阀。验窜压力管15外面连接空气泵。活动堵头17与套管10之间设置另一O型密封圈13。
实施例2、固井壁面封隔验窜仪的使用
1.首先在釜内支撑套12内侧环空内放入制做好的模拟地层7,将活动堵头17旋紧,关闭验窜压力管15。然后在模拟地层7与套管10之间的环空内倒入已配制好的水泥浆形成固井水泥环8;然后将釜盖5盖好、压帽9压好。
2.设置水泥石养护温度,同时开启加热管,对固井水泥环8进行加热养护。养护时间为24小时。
3.到达规定的养护时间之后,将活动堵头17旋下一部分;与此同时打开验窜压力管,使外界的压力可以通过该管进入支撑套12的底部,慢慢的加载测试压力直到窜通,此时在压力加载过程中可以对一、二界面进行验窜测试。
4.在压力加载之前打开与二界面压力探头2、一界面压力探头1相连的计算机,记录下压力加载直到窜通的整个试验过程,并通过计算机的记录来观察二界面压力探头2、一界面压力探头1的压力变化。
5.试验完毕后,打开二界面压力探头2、一界面压力探头1所在的管二和管一的阀,释放压力,然后打开釜盖5,取出试验模具。

Claims (10)

1.固井壁面封隔验窜仪,包括釜体,所述釜体包括釜盖和釜底,其特征在于:所述釜体内设置有能被所述釜盖密封的套管,所述套管与所述釜体之间形成可容纳模拟地层和固井水泥环的容置空间;
所述釜盖上设有可测定所述模拟地层和固井水泥环的相交面的压力的二界面压力探头、可测定所述固井水泥环和所述套管的相交面的压力的一界面压力探头以及可测定所述容置空间的温度的温度探头;
所述釜体的釜底设有堵头,所述堵头中设置有一延伸至所述套管内部的加热管和一延伸至所述模拟地层的验窜压力管。
2.如权利要求1所述的固井壁面封隔验窜仪,其特征在于:所述釜盖中分别设置有在所述固井水泥环和所述套管的相交处的管一、在所述模拟地层和固井水泥环的相交处的管二和与所述容置空间相连通的管三;所述管一内设置有所述一界面压力探头,所述管二内设置有所述二界面压力探头,所述管三内设置有所述温度探头。
3.如权利要求1或2所述的固井壁面封隔验窜仪,其特征在于:所述验窜压力管、管一、管二和管三上均安装有用于释放压力的阀。
4.如权利要求1-3中任一所述的固井壁面封隔验窜仪,其特征在于:所述釜体内壁上设置有支撑套;所述套管与所述支撑套之间形成可容纳所述模拟地层和所述固井水泥环的容置空间。
5.如权利要求1-4中任一所述的固井壁面封隔验窜仪,其特征在于:所述套管设置在所述釜体内部的中间。
6.如权利要求1-5中任一所述的固井壁面封隔验窜仪,其特征在于:所述一界面压力探头、所述二界面压力探头和所述温度探头均与计算机相连。
7.如权利要求1-6中任一所述的固井壁面封隔验窜仪,其特征在于:所述堵头是可上下移动地设置在所述釜底上的。
8.如权利要求1-7中任一所述的固井壁面封隔验窜仪,其特征在于:所述支撑套与所述釜盖之间设置一O型密封圈、所述堵头与所述套管之间设置另一O型密封圈。
9.如权利要求1-8中任一所述的固井壁面封隔验窜仪,其特征在于:所述固井壁面封隔验窜仪还包括能压住釜体的釜盖和釜体侧壁的压帽。
10.如权利要求1-9中任一所述的固井壁面封隔验窜仪,其特征在于:与套管对应处的所述釜盖上设置有密封用的凸块;所述凸块插向所述套管内部,并与所述套管内壁紧密接触。
CN 201010261759 2010-08-24 2010-08-24 固井壁面封隔验窜仪 Expired - Fee Related CN101942997B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010261759 CN101942997B (zh) 2010-08-24 2010-08-24 固井壁面封隔验窜仪

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010261759 CN101942997B (zh) 2010-08-24 2010-08-24 固井壁面封隔验窜仪

Publications (2)

Publication Number Publication Date
CN101942997A true CN101942997A (zh) 2011-01-12
CN101942997B CN101942997B (zh) 2013-05-29

Family

ID=43435179

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010261759 Expired - Fee Related CN101942997B (zh) 2010-08-24 2010-08-24 固井壁面封隔验窜仪

Country Status (1)

Country Link
CN (1) CN101942997B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103293101A (zh) * 2012-02-24 2013-09-11 中国石油天然气集团公司 一种井下环空微裂缝模拟装置
CN103806865A (zh) * 2014-02-14 2014-05-21 中国海洋石油总公司 一种模拟压力变化引起固井胶结失效的方法
CN104405366A (zh) * 2014-10-22 2015-03-11 西南石油大学 一种高温高压固井水泥环力学完整性测试装置及方法
CN106593416A (zh) * 2017-01-10 2017-04-26 中国石油大学(北京) 一种环空圈闭流体压力升高实验装置及方法
CN106593411A (zh) * 2017-01-10 2017-04-26 中国石油大学(北京) 一种水泥环密封性及套管抬升的实验装置及方法
CN110424947A (zh) * 2019-07-31 2019-11-08 长江大学 一种测量固井第一界面微环隙大小的方法
CN111997589A (zh) * 2020-09-10 2020-11-27 西南石油大学 全尺寸水泥环封隔能力及胶结强度测试装置及其测试方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2413019Y (zh) * 1999-11-22 2001-01-03 张顺 井下验窜封隔器
US20040020649A1 (en) * 2002-08-01 2004-02-05 Troy Fields Method and apparatus for pressure controlled downhole sampling
CN2883662Y (zh) * 2005-12-25 2007-03-28 张键 套管验窜封隔器
CN201241658Y (zh) * 2008-08-27 2009-05-20 大庆石油管理局 液压膨胀式套内封隔器
CN201794586U (zh) * 2010-08-24 2011-04-13 中国海洋石油总公司 一种固井壁面封隔验窜仪

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2413019Y (zh) * 1999-11-22 2001-01-03 张顺 井下验窜封隔器
US20040020649A1 (en) * 2002-08-01 2004-02-05 Troy Fields Method and apparatus for pressure controlled downhole sampling
CN2883662Y (zh) * 2005-12-25 2007-03-28 张键 套管验窜封隔器
CN201241658Y (zh) * 2008-08-27 2009-05-20 大庆石油管理局 液压膨胀式套内封隔器
CN201794586U (zh) * 2010-08-24 2011-04-13 中国海洋石油总公司 一种固井壁面封隔验窜仪

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103293101A (zh) * 2012-02-24 2013-09-11 中国石油天然气集团公司 一种井下环空微裂缝模拟装置
CN103293101B (zh) * 2012-02-24 2016-01-06 中国石油天然气集团公司 一种井下环空微裂缝模拟装置
CN103806865A (zh) * 2014-02-14 2014-05-21 中国海洋石油总公司 一种模拟压力变化引起固井胶结失效的方法
CN103806865B (zh) * 2014-02-14 2016-08-17 中国海洋石油总公司 一种模拟压力变化引起固井胶结失效的方法
CN104405366A (zh) * 2014-10-22 2015-03-11 西南石油大学 一种高温高压固井水泥环力学完整性测试装置及方法
CN106593416A (zh) * 2017-01-10 2017-04-26 中国石油大学(北京) 一种环空圈闭流体压力升高实验装置及方法
CN106593411A (zh) * 2017-01-10 2017-04-26 中国石油大学(北京) 一种水泥环密封性及套管抬升的实验装置及方法
CN106593411B (zh) * 2017-01-10 2018-03-16 中国石油大学(北京) 一种水泥环密封性及套管抬升的实验装置及方法
CN110424947A (zh) * 2019-07-31 2019-11-08 长江大学 一种测量固井第一界面微环隙大小的方法
CN111997589A (zh) * 2020-09-10 2020-11-27 西南石油大学 全尺寸水泥环封隔能力及胶结强度测试装置及其测试方法
CN111997589B (zh) * 2020-09-10 2022-03-25 西南石油大学 全尺寸水泥环封隔能力及胶结强度测试装置及其测试方法

Also Published As

Publication number Publication date
CN101942997B (zh) 2013-05-29

Similar Documents

Publication Publication Date Title
CN101942997B (zh) 固井壁面封隔验窜仪
US10823651B2 (en) Supercritical carbon dioxide fracturing core holder under the influence of pore pressure saturation
CN112145155B (zh) 可偏心测试固井第一界面胶结质量的评价装置的实验方法
CN204679347U (zh) 一种钻井液承压堵漏压裂试验装置
CN106596400B (zh) 一种固井第二界面胶结质量的评价装置及实验方法
CN102979505A (zh) 一种固井水泥环性能模拟实验装置及实验方法
CN102830057A (zh) 一种固井水泥石腐蚀评价方法
CN102175837B (zh) 一种测量泡沫油强度及稳定性的方法
CN102564702A (zh) 一种地层测试器中封隔器的测试装置及系统
CN103760065B (zh) 一种聚合物溶液流动有效视粘度的测试方法及其测试系统
CN108303310A (zh) 岩石常规三轴试验试件密封装置及其使用方法
CN201654010U (zh) 一种堵漏试验仪
CN201794586U (zh) 一种固井壁面封隔验窜仪
CN104502419A (zh) 一种自愈合水泥自愈合能力的评价装置及方法
CN202013351U (zh) 一种测量泡沫油强度及稳定性的装置
CN109633097A (zh) 固井水泥环微裂缝封堵剂封堵能力评价装置及评价方法
CN203081430U (zh) 一种高温高压砂床堵漏模拟装置
CN102192926B (zh) 水泥膨胀测量设备和方法
CN105424331A (zh) 用于大型压裂时水泥环的机械密封性评价的装置和方法
CN107489394A (zh) 一种裸眼封隔器三椭圆实验装置
CN108894773A (zh) 超临界co2压裂水泥胶结面致裂实验设备及方法
CN108196002B (zh) 一种压裂酸化用暂堵转向液性能评价装置及其测试方法
CN103806901B (zh) 油井井下快速测试系统的测试方法
CN102507096A (zh) 一种封隔器验封方法及该方法中所使用的验封装置
CN209356472U (zh) 固井水泥环微裂缝封堵剂进入能力评价装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 100010 Beijing, Chaoyangmen, North Street, No. 25, No.

Patentee after: China National Offshore Oil Corporation

Patentee after: CNOOC Research Institute

Patentee after: Yangtze University

Address before: 100010 Beijing, Chaoyangmen, North Street, No. 25, No.

Patentee before: China National Offshore Oil Corporation

Patentee before: CNOOC Research Center

Patentee before: Yangtze University

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130529

Termination date: 20150824

EXPY Termination of patent right or utility model