CN101942802A - Two-fabric one-membrane sliding layer paving method and tensioning device thereof - Google Patents

Two-fabric one-membrane sliding layer paving method and tensioning device thereof Download PDF

Info

Publication number
CN101942802A
CN101942802A CN 201010512205 CN201010512205A CN101942802A CN 101942802 A CN101942802 A CN 101942802A CN 201010512205 CN201010512205 CN 201010512205 CN 201010512205 A CN201010512205 A CN 201010512205A CN 101942802 A CN101942802 A CN 101942802A
Authority
CN
China
Prior art keywords
sliding layer
cloth
film sliding
geomembrane
upper strata
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010512205
Other languages
Chinese (zh)
Other versions
CN101942802B (en
Inventor
吴阿勤
赵飞
孙爱军
杨建新
李正文
于海波
杨慧丰
鲍俊杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201010512205XA priority Critical patent/CN101942802B/en
Publication of CN101942802A publication Critical patent/CN101942802A/en
Application granted granted Critical
Publication of CN101942802B publication Critical patent/CN101942802B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The invention discloses a two-fabric one-membrane sliding layer tensioning device. A two-fabric one-membrane sliding layer (4) comprises a lower geotextile positioned on a bottom layer, a geomembrane positioned on an intermediate layer and an upper geotextile positioned on an upper layer. The two-fabric one-membrane sliding layer tensioning device comprises a tensioner (1) of which one end is fixed on the geomembrane and the upper geotextile while the other end is fixed on a stationary fixing device (2). In the tensioning device, the geomembrane and the geotextile are tensioned by connecting one end of the tensioning device with the geomembrane and the upper geotextile and connecting the other end of the tensioner with the stationary fixing device, so as to ensure the close adhesion of two fabrics and one membrane and effectively solves the problem of blistering of the two fabrics and the one membrane before casting concrete; and the sliding layer has the characteristics of simple structure, easy process and convenient assembly and disassembly. The invention also discloses a two-fabric one-membrane sliding layer paving method using the tensioning device.

Description

A kind of two cloth, one film sliding layer laying method and take-up device thereof
Technical field
The present invention relates to CRTS II template formula non-fragment orbit sliding layer laying technology field, more particularly, relate to a kind of two cloth, one film sliding layer laying method and take-up device thereof.
Background technology
China's passenger dedicated railway line development is rapid, and CRTS II template formula non-fragment orbit still belongs to new technology at home, does not have identical experience to use for reference.Two cloth, one film sliding layer is the important step in the unballasted track bed plate construction, lower floor's geotextiles and upper strata geotextiles that it has comprised the geomembrane of water leakage and has laid respectively at geomembrane lower floor and upper strata.
The laying step of two cloth, one film sliding layer generally comprises:
1. bridge floor is thoroughly cleared up, particularly pollutions such as greasy dirt should be cleared up especially, guarantee the bridge floor cleaning;
2. in being coated with brush, scrapes by cementing agent coating adhesive.Cementing agent should be coated with to be scraped evenly, and THICKNESS CONTROL is about 0.5mm, and with being coated with the shop, once brushing length is long when the laying of geotextiles in requirement.At beam-ends shearing teeth groove and geotextiles joint, the both sides (direction across bridge) of Ying Zailiang seam, shearing teeth groove and geotextiles butt joint are respectively brushed the wide cementing agent of 30cm one;
3. the bottom geotechnique is laid to put on the beam face starting point of brushing cementing agent and slowly launch, and scrape on geotextiles with floating rule and to press several times, it is firm that itself and beam face are bondd, and forbids to have had phenomenons such as drum, foaming;
4. geomembrane is launched on lower floor's geotextiles and wipes off, must not be wrinkling, its seam adopts the hot-melt welding machine welding, should avoid damaging lower floor during welding and spread geotextiles;
5. the upper strata geotextiles that on geomembrane, paves, geotextiles continuous monoblock in upper strata is laid;
6. after sliding layer is laid and finished, put bed plate bar shaped concrete pad at the sliding layer end face.
It is more that preceding two cloth of bed plate concreting one film sliding layer plays bulging phenomenon, and the drum phenomenon has appearred in two cloth, one film sliding layer in laying, and its main cause is analyzed as follows:
(1) deposits and cause distortion in the transportation;
(2) two cloth one film sliding layer when construction temperature influence, film should not be sprawled, or low temperature lays that to finish back temperature difference before concreting bigger, caused bulging, be out of shape;
The hollowing phenomenon of two cloth, one film sliding layer will have a strong impact on the construction quality of bed plate, and therefore, out-of-flatness is laid in counteracting, variations in temperature causes the hollowing phenomenon of two cloth, one film to seem very important.
Summary of the invention
In view of this, the invention provides a kind of two cloth, one film sliding layer laying method and take-up device thereof,, reduce of the influence of hollowing phenomenon the bed plate construction quality to avoid the generation of two cloth, one film sliding layer hollowing phenomenon.
For achieving the above object, the invention provides following technical scheme:
A kind of two cloth, one film sliding layer take-up device, described two cloth, one film sliding layer comprises lower floor's geotextiles of being positioned at bottom, be positioned at the geomembrane in intermediate layer and be positioned at the upper strata geotextiles on upper strata, comprise: an end is fixed on described geomembrane and the upper strata geotextiles, and the other end is fixed on the strainer on the fixed fastening devices.
Preferably, in above-mentioned two cloth, one film sliding layer take-up device, described fastening devices is the WELDING STUDS in the Bridge Beam end shear groove.
Preferably, in above-mentioned two cloth, one film sliding layer take-up device, also comprise the clamping plate that are used to clamp described geomembrane and upper strata geotextiles, an end of described strainer links to each other with described clamping plate.
Preferably, in above-mentioned two cloth, one film sliding layer take-up device, described clamping plate are provided with hangers, and described strainer links to each other with described hangers.
Preferably, in above-mentioned two cloth, one film sliding layer take-up device, described hangers is two, and two hangers are continuous by rope, and described strainer links to each other with described rope.
Preferably, in above-mentioned two cloth, one film sliding layer take-up device, described clamping plate are a plurality of, and are evenly distributed on described geomembrane and the upper strata geotextiles.
Preferably, in above-mentioned two cloth, one film sliding layer take-up device, described clamping plate are 1, and the two ends of these clamping plate are near the both sides of described geomembrane and upper strata geotextiles.
Preferably, in above-mentioned two cloth, one film sliding layer take-up device, described strainer is extension spring or feed screw apparatus.
Preferably, in above-mentioned two cloth, one film sliding layer take-up device, described strainer is a flower basket bolt.
A kind of two cloth, one film sliding layer laying method after described two cloth, one film sliding layer laying finishes, is installed aforesaid take-up device.
From above-mentioned technical scheme as can be seen, the present invention is connected on geomembrane and the upper strata geotextiles by strainer one end, and the other end is connected the tension that realizes on the fixed fastening devices geomembrane and upper strata geotextiles.Thereby can guarantee the closely connected of two cloth, one film, effectively solve two cloth, one film rising before concreting and rouse phenomenon, and the sliding layer clamp structure be simple, is easy to processing, installs and convenient disassembly.
Description of drawings
In order to be illustrated more clearly in the embodiment of the invention or technical scheme of the prior art, to do to introduce simply to the accompanying drawing of required use in embodiment or the description of the Prior Art below, apparently, accompanying drawing in describing below only is some embodiments of the present invention, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain other accompanying drawing according to these accompanying drawings.
The structural representation of two cloth, the one film sliding layer take-up device that Fig. 1 provides for the embodiment of the invention one;
The structural representation of two cloth, the one film sliding layer take-up device that Fig. 2 provides for the embodiment of the invention two;
The structural representation of two cloth, the one film sliding layer take-up device that Fig. 3 provides for the embodiment of the invention three.
The specific embodiment
The invention discloses a kind of two cloth, one film sliding layer laying method and take-up device thereof,, reduce of the influence of hollowing phenomenon the bed plate construction quality to avoid the generation of two cloth, one film sliding layer hollowing phenomenon.
Below in conjunction with the accompanying drawing in the embodiment of the invention, the technical scheme in the embodiment of the invention is clearly and completely described, obviously, described embodiment only is the present invention's part embodiment, rather than whole embodiment.Based on the embodiment among the present invention, those of ordinary skills belong to the scope of protection of the invention not making the every other embodiment that is obtained under the creative work prerequisite.
See also Fig. 1-Fig. 3, the structural representation of two cloth, the one film sliding layer take-up device that Fig. 1 provides for the embodiment of the invention one; The structural representation of two cloth, the one film sliding layer take-up device that Fig. 2 provides for the embodiment of the invention two; The structural representation of two cloth, the one film sliding layer take-up device that Fig. 3 provides for the embodiment of the invention three.
Wherein, 1 is strainer, and 2 is fastening devices, and 3 is clamping plate, and 4 is two cloth, one film sliding layers, and 5 is rope.
Two cloth, one film sliding layer 4 comprises lower floor's geotextiles of being positioned at bottom, be positioned at the geomembrane in intermediate layer and be positioned at the upper strata geotextiles on upper strata, two cloth, one film sliding layer take-up device provided by the invention, comprise: an end is fixed on described geomembrane and the upper strata geotextiles, and the other end is fixed on the strainer 1 on the fixed fastening devices 2.Need to prove, fastening devices 2 is fixed devices, and fastening devices 2 is connected by strainer 1 with the upper strata geotextiles with the geomembrane that sticks together, and strainer 1 has the pretension function, can regulate the distance between the two, guarantee that geomembrane and upper strata geotextiles are in tensioning state.
In sum, the present invention is connected on geomembrane and the upper strata geotextiles by strainer 1 one ends, and the other end is connected the tension that realizes on the fixed fastening devices 2 geomembrane and upper strata geotextiles.Thereby can guarantee the closely connected of two cloth, one film, effectively solve two cloth, one film rising before concreting and rouse phenomenon, and the sliding layer clamp structure be simple, is easy to processing, installs and convenient disassembly.
Preferably, fastening devices 2 can be chosen as the WELDING STUDS in the Bridge Beam end shear groove.By selecting for use WELDING STUDS as fastening devices 2 of the present invention, can save the step of making fastening devices, directly strainer 1 is connected WELDING STUDS and gets final product.
Further, in order to optimize technique scheme, take-up device provided by the invention also comprises the clamping plate 3 that are used to clamp described geomembrane and upper strata geotextiles, and an end of described strainer 1 links to each other with described clamping plate 3.Clamping plate 3 are that the two boards body forms, and the top and bottom that the two boards body places geomembrane and upper strata geotextiles respectively add geomembrane and upper strata geotextiles holds, and the two boards body passes through bolton.
Preferably, clamping plate 3 are provided with hangers, and described strainer 1 links to each other with described hangers.Hangers is provided with in the connection of strainer 1 for convenience, can easily the hook hook be located at the connection that realizes the two on the hangers as hook is set on strainer 1.
In order to make strainer 1 more even with being connected of clamping plate 3, hangers is preferably two, and two hangers are continuous by rope 5, and described strainer 1 links to each other with described rope.Make strainer 1 be connected with clamping plate 3 uniformly by rope 5 and two hangers, avoided geomembrane and the skew of upper strata geotextiles that the tightening force skew of 1 pair of clamping plate 3 of strainer causes or be torn.
Clamping plate 3 are for being evenly distributed in a plurality of on described geomembrane and the upper strata geotextiles, also can be 1, when clamping plate 3 are one, make the both sides of the two ends of clamping plate 3 near described geomembrane and upper strata geotextiles, promptly the length of these clamping plate is near the width of described geomembrane and upper strata geotextiles.If a plurality of clamping plate 3 are set on the width of geomembrane and upper strata geotextiles, then the length of clamping plate 3 is shorter, if be provided with one, then the length of clamping plate 3 is longer.The length of clamping plate 3 can design according to actual needs voluntarily.
Strainer 1 provided by the invention can be extension spring or feed screw apparatus.Extension spring can be tight with geomembrane and upper strata geotechnique's Bradley by its elastic force, but the elastic force of extension spring is unadjustable, so need the extension spring of the different elastic force of replacing to realize the tension effect of different tightening forces.Feed screw apparatus is compared the adjustability that can realize tightening force with extension spring, regulate its tightening force by the threaded engagement position of leading screw in the feed screw apparatus and screw.Strainer 1 can also be flower basket bolt, and flower basket bolt is a kind of concrete form of feed screw apparatus.
The present invention also provides a kind of two cloth, one film sliding layer laying method, comprises step:
(1) bridge floor is thoroughly cleared up, particularly pollutions such as greasy dirt should be cleared up especially, guarantee the bridge floor cleaning;
(2) in being coated with brush, scrapes by cementing agent coating adhesive;
Cementing agent should be coated with to be scraped evenly, and THICKNESS CONTROL is about 0.5mm, and with being coated with the shop, once brushing length is long when the laying of geotextiles in requirement.At beam-ends shearing teeth groove and geotextiles joint, the both sides (direction across bridge) of Ying Zailiang seam, shearing teeth groove and geotextiles butt joint are respectively brushed the wide cementing agent of 30cm one.
(3) the bottom geotechnique is laid put on the beam face starting point of brushing cementing agent and slowly launch, and scrape on geotextiles with floating rule and to press several times, it is firm that itself and beam face are bondd, and forbids to have had phenomenons such as drum, foaming;
(4) geomembrane is launched on lower floor's geotextiles and wipes off, must not be wrinkling, its seam adopts the hot-melt welding machine welding, should avoid damaging lower floor during welding and spread geotextiles;
(5) the upper strata geotextiles that on geomembrane, paves, geotextiles continuous monoblock in upper strata is laid;
(6) after sliding layer is laid and finished, put bed plate bar shaped concrete pad at the sliding layer end face;
(7) when two cloth, one film sliding layer lay finish after, two cloth, one film sliding layer take-up device recited above is installed, and geomembrane and upper strata geotechnique's charity are added prestressing force strains.
Each embodiment adopts the mode of going forward one by one to describe in this manual, and what each embodiment stressed all is and the difference of other embodiment that identical similar part is mutually referring to getting final product between each embodiment.
To the above-mentioned explanation of the disclosed embodiments, make this area professional and technical personnel can realize or use the present invention.Multiple modification to these embodiment will be conspicuous concerning those skilled in the art, and defined herein General Principle can realize under the situation that does not break away from the spirit or scope of the present invention in other embodiments.Therefore, the present invention will can not be restricted to these embodiment shown in this article, but will meet and principle disclosed herein and features of novelty the wideest corresponding to scope.

Claims (10)

1. cloth one film sliding layer take-up device, described two cloth, one film sliding layer (4) comprises lower floor's geotextiles of being positioned at bottom, be positioned at the geomembrane in intermediate layer and be positioned at the upper strata geotextiles on upper strata, it is characterized in that, comprise: an end is fixed on described geomembrane and the upper strata geotextiles, and the other end is fixed on the strainer (1) on the fixed fastening devices (2).
2. two cloth, one film sliding layer take-up device as claimed in claim 1 is characterized in that described fastening devices (2) is the WELDING STUDS in the Bridge Beam end shear groove.
3. two cloth, one film sliding layer take-up device as claimed in claim 1 is characterized in that, also comprises the clamping plate (3) that are used to clamp described geomembrane and upper strata geotextiles, an end of described strainer (1) link to each other with described clamping plate (3).
4. two cloth, one film sliding layer take-up device as claimed in claim 3 is characterized in that described clamping plate (3) are provided with hangers, and described strainer (1) links to each other with described hangers.
5. two cloth, one film sliding layer take-up device as claimed in claim 4 is characterized in that described hangers is two, and two hangers are continuous by rope (5), and described strainer (1) links to each other with described rope (5).
6. two cloth, one film sliding layer take-up device as claimed in claim 3 is characterized in that described clamping plate (3) are a plurality of, and is evenly distributed on described geomembrane and the upper strata geotextiles.
7. two cloth, one film sliding layer take-up device as claimed in claim 3 is characterized in that described clamping plate (3) are 1, and the both sides of close respectively described geomembrane in the two ends of these clamping plate (3) and upper strata geotextiles.
8. two cloth, one film sliding layer take-up device as claimed in claim 1 is characterized in that described strainer (1) is extension spring or feed screw apparatus.
9. two cloth, one film sliding layer take-up device as claimed in claim 1 is characterized in that described strainer (1) is a flower basket bolt.
10. cloth one a film sliding layer laying method is characterized in that, after described two cloth, one film sliding layer laying finishes, installs as each described take-up device of claim 1-9.
CN201010512205XA 2010-10-19 2010-10-19 Two-fabric one-membrane sliding layer paving method and tensioning device thereof Expired - Fee Related CN101942802B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010512205XA CN101942802B (en) 2010-10-19 2010-10-19 Two-fabric one-membrane sliding layer paving method and tensioning device thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010512205XA CN101942802B (en) 2010-10-19 2010-10-19 Two-fabric one-membrane sliding layer paving method and tensioning device thereof

Publications (2)

Publication Number Publication Date
CN101942802A true CN101942802A (en) 2011-01-12
CN101942802B CN101942802B (en) 2012-07-04

Family

ID=43434988

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010512205XA Expired - Fee Related CN101942802B (en) 2010-10-19 2010-10-19 Two-fabric one-membrane sliding layer paving method and tensioning device thereof

Country Status (1)

Country Link
CN (1) CN101942802B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102121215A (en) * 2011-03-29 2011-07-13 中交第四公路工程局有限公司 Pre-tension paving method for slide layer of high-speed railway ballastless track
CN109112935A (en) * 2018-10-17 2019-01-01 安徽徽风新型合成材料有限公司 A kind of Novel geotechnical grid is laid with tool and method
CN110468783A (en) * 2019-07-02 2019-11-19 中铁十局集团第五工程有限公司 A kind of geomembrane protection construction method based under dynamic load
CN115162735A (en) * 2022-08-15 2022-10-11 陈建 Standardized construction presses down dirt cloth laying device
CN107144468B (en) * 2017-06-19 2023-05-23 中铁六局集团有限公司 Ballastless track horizontal pulling and pressing loading system and loading method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100631029B1 (en) * 2006-01-12 2006-10-09 주식회사 효성엘비데크 Precasted concrete plate assembly and the construction method using thereof
CN101139817A (en) * 2007-09-30 2008-03-12 刘名君 Sliding layer for bridge trackway longitudinal spacer assembly
CN101195983A (en) * 2007-12-29 2008-06-11 中铁二局股份有限公司 Unballasted track bed plate construction method
CN101831847A (en) * 2010-04-28 2010-09-15 肇庆俊富纤网材料有限公司 Post-poured strip construction method for ballastless track
CN201817757U (en) * 2010-10-19 2011-05-04 中铁四局集团有限公司 Tension device of sliding layer with two geotextile layers and one geotextile film

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100631029B1 (en) * 2006-01-12 2006-10-09 주식회사 효성엘비데크 Precasted concrete plate assembly and the construction method using thereof
CN101139817A (en) * 2007-09-30 2008-03-12 刘名君 Sliding layer for bridge trackway longitudinal spacer assembly
CN101195983A (en) * 2007-12-29 2008-06-11 中铁二局股份有限公司 Unballasted track bed plate construction method
CN101831847A (en) * 2010-04-28 2010-09-15 肇庆俊富纤网材料有限公司 Post-poured strip construction method for ballastless track
CN201817757U (en) * 2010-10-19 2011-05-04 中铁四局集团有限公司 Tension device of sliding layer with two geotextile layers and one geotextile film

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《中国高新技术企业》 20090531 鲍国等 京津城际高速铁路CRTS Ⅱ型板式无碴轨道底座板铺设技术 , 第05期 2 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102121215A (en) * 2011-03-29 2011-07-13 中交第四公路工程局有限公司 Pre-tension paving method for slide layer of high-speed railway ballastless track
CN102121215B (en) * 2011-03-29 2012-04-25 中交第四公路工程局有限公司 Pre-tension paving method for slide layer of high-speed railway ballastless track
CN107144468B (en) * 2017-06-19 2023-05-23 中铁六局集团有限公司 Ballastless track horizontal pulling and pressing loading system and loading method
CN109112935A (en) * 2018-10-17 2019-01-01 安徽徽风新型合成材料有限公司 A kind of Novel geotechnical grid is laid with tool and method
CN109112935B (en) * 2018-10-17 2020-08-07 安徽徽风新型合成材料有限公司 Tool and method for laying geocell
CN110468783A (en) * 2019-07-02 2019-11-19 中铁十局集团第五工程有限公司 A kind of geomembrane protection construction method based under dynamic load
CN115162735A (en) * 2022-08-15 2022-10-11 陈建 Standardized construction presses down dirt cloth laying device
CN115162735B (en) * 2022-08-15 2023-12-12 杭州万载市政园林工程有限公司 Dust suppression cloth laying device for standardized construction

Also Published As

Publication number Publication date
CN101942802B (en) 2012-07-04

Similar Documents

Publication Publication Date Title
CN101942802B (en) Two-fabric one-membrane sliding layer paving method and tensioning device thereof
CN104847023B (en) Rubber watertight strip construction method
CN101195983B (en) Unballasted track bed plate construction method
CN105401492A (en) Waterproof vibration-damping composite structure applied to embedded track system and construction method of waterproof vibration-damping composite structure
CN101832033B (en) Strengthening method for armoured concrete slab
CN201817757U (en) Tension device of sliding layer with two geotextile layers and one geotextile film
CN104481165B (en) Reinforced beam affixing steel plate pressurization fixing device and reinforcement means
CN202023123U (en) Rapid transit railway ballastless track sliding layer pre-tensioning laying device
CN105421191A (en) Prefabricated rubber track and paving method thereof
CN104100100A (en) Method for strengthening reinforced concrete girder by using slightly curved and tensioned carbon fiber plates
CN105275219A (en) Fiber belt-anchoring device having wedge plate
KR101028144B1 (en) Constructing method for waterproofing bridge surface
KR100638990B1 (en) Waterproof structure using sheets and waterproofing method using the same
CN102121215B (en) Pre-tension paving method for slide layer of high-speed railway ballastless track
CN204456939U (en) A kind of building progressive collapse-resisting hardened system
JP4247071B2 (en) Waterproofing method for floor slab and tack sheet material used therefor
KR20120066723A (en) Drainage rubber structure for bridge expansion joint
JP3506342B2 (en) Concrete joint waterproofing method
CN203188613U (en) Anti-slipping type main and auxiliary keel combination structure with wood replaced by steel for building
CN205918107U (en) Off device is kept somewhere to floor construction joint
CN205276070U (en) A waterproof damping composite construction for embedded track system
JP2018040116A (en) Repair method of concrete structure
JP6756766B2 (en) Asphalt sheet, pavement structure using asphalt sheet and pavement method using asphalt sheet
CN212052375U (en) Combined reinforcing structure for solving cracked steel bridge deck by adopting lightweight aggregate concrete
CN206553919U (en) A kind of highway bridge waterproof layer device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704

Termination date: 20201019

CF01 Termination of patent right due to non-payment of annual fee