CN101931930B - Method and system for updating service information in subscription profile repository - Google Patents

Method and system for updating service information in subscription profile repository Download PDF

Info

Publication number
CN101931930B
CN101931930B CN200910168413XA CN200910168413A CN101931930B CN 101931930 B CN101931930 B CN 101931930B CN 200910168413X A CN200910168413X A CN 200910168413XA CN 200910168413 A CN200910168413 A CN 200910168413A CN 101931930 B CN101931930 B CN 101931930B
Authority
CN
China
Prior art keywords
information
flow
duration
surplus
spr
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN200910168413XA
Other languages
Chinese (zh)
Other versions
CN101931930A (en
Inventor
吴锦花
芮通
周晓云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN200910168413XA priority Critical patent/CN101931930B/en
Priority to PCT/CN2009/076193 priority patent/WO2010148621A1/en
Publication of CN101931930A publication Critical patent/CN101931930A/en
Application granted granted Critical
Publication of CN101931930B publication Critical patent/CN101931930B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W8/00Network data management
    • H04W8/02Processing of mobility data, e.g. registration information at HLR [Home Location Register] or VLR [Visitor Location Register]; Transfer of mobility data, e.g. between HLR, VLR or external networks
    • H04W8/06Registration at serving network Location Register, VLR or user mobility server
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/30Connection release
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W80/00Wireless network protocols or protocol adaptations to wireless operation
    • H04W80/04Network layer protocols, e.g. mobile IP [Internet Protocol]

Landscapes

  • Engineering & Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The invention discloses a method and a system for updating service information in a subscription profile repository. The method comprises the following steps that: when any internet protocol connectivity access network IP-CAN session of user equipment UE is ended, a policy and charging rules function entity (PCRF) reports consumption information or residual amount information of IP-CAN session to the subscription profile repository SPR; and the SPR updates according to received information. In the method and the system, PCRF reports consumption information of IP-CAN session or time length specified by SPR and/or residual amount information of flow to SPR when each IP-CAN session is ended, and SPR updates stored time length of subscription profile and/or residual amount information of flow according to the information reported by the PCRF, so the time length of subscription profile and/or residual amount information of flow can be stored; and thus precise time length and/or residual amount of flow can be acquired from SPR when the IP-CAN session is established so as to more reasonably draw a policy and charging control PCC strategy.

Description

A kind of method and system of upgrading the business information in the user-subscribed database
Technical field
The present invention relates to strategy and charging control technology field in the mobile communication technology, be specifically related to a kind of method and system of upgrading the business information in the user-subscribed database.
Background technology
As shown in Figure 1, third generation partner program (3GPP, 3rd Generation PartnershipProject) grouping system (EPS of evolution, Evolved Packet System) by the universal mobile telecommunications system land radio access web (E-UTRAN of evolution, Evolved Universal Terrestrial RadioAccess Network), mobile management unit (MME, Mobility Management Entity), gateway (S-GW, Serving Gateway), grouped data network gateway (P-GW or PDN GW, Packet Data Network Gateway), home subscriber server (HSS, Home SubscriberServer), authentication and authorization charging (the AAA of 3GPP, Authentication Authorization andAccounting) server, "Policy and Charging Rules Function entity (PCRF, Policy and ChargingRules Function) and other support nodes form.
Strategy and charging control (PCC, Policy and Charging Control) be the part of EPS, each functional entity of PCC can distribute as follows in the EPS framework: the "Policy and Charging Rules Function entity, strategy and charging execution function entity (PCEF, Policy and Charging Enforcement Function) is present among the P-GW, bearing binding and event reporting function entity (BBERF, Bearer Binding andEvent Report Function) can be present among the S-GW, professional Application Function (AF, Application Function) is present in carrier network agreement (IP, Internet Protocol) business network, user-subscribed database (SPR, Subscription Profile Repository) can be unified with HSS.
In 3GPP, can find corresponding PDN network by APN (APN, Access Point Name).Usually UE is called an IP to a connection of PDN network and connects Access Network (IP-CAN, IP Connectivity Access Network) session.
PCC is applicable to the IP-CAN session of all 3GPP, its framework as shown in Figure 2, PCRF mainly is responsible for the formulation of strategy and charging regulation, by the Gx interface PCC strategy and the charging regulation of formulating is handed down to PCEF, PCEF installs and carries out the PCC strategy, and report dependent event, with the mutual charge information of charge system.
PCRF by the Gxx interface with service quality (QoS, the Quality of Service) rule downloading of business to BBERF, the mutual charge information of BBERF discord charge system, only responsible bearing binding and dependent event reports.AF provides business information by Rx interface to PCRF, and SPR has preserved the business information that the user contracts, and PCRF can be by the Sp interface to the signatory business information of SPR inquiring user.PCEF sends to Online Charging System (OCS by the Gy interface with online charging information, OnlineCharging System) carries out the statistics of online charging, by the Gz interface offline charging information is sent to off-line accounting system (OFCS, Offline Charging System).
At present, in the PCC framework, the business information that the user contracts among the beared information that the business information that PCRF provides according to AF, PCEF report and the SPR is formulated the PCC strategy, dynamically issues the PCC strategy to PCEF, comprises QoS and charge information in the policy information.
PCC also has the consumption monitoring function, the consumption in consumption that can the Real Time Monitoring user resources and the control billing mechanism.PCRF arranges and sending threshold value (such as duration and/or flow) is realized the consumption monitoring to PCEF, to formulate dynamic PCC strategy.When reaching threshold value or IP-CAN session termination, PCEF reports consumption (such as duration and/or the flow that consumes) to PCRF.PCRF stores the consumption information reporting when last IP-CAN session termination of user to SPR.
But, because PCRF is based on user class to the mechanism that reports of SPR, when certain IP-CAN session termination, if still there is other IP-CAN session in UE and in the IP-CAN conversation procedure, UE initiates again new IP-CAN session, at this moment, the duration that the UE that obtains from SPR is signatory and/or the surplus of flow do not conform to the real surplus amount, so that impact is to the threshold value accuracy of new IP-CAN session consumption monitoring.For example, when PCRF is selected in the new IP-CAN session of initiating, do not have (for example to select the PCRF identical with existing IP-CAN session, the situation of many PCRF load balancing), to cause the user's that selected PCRF gets access to from SPR business information accurate not, thereby affect the PCC strategy that PCRF formulates.
Therefore, when how to be implemented in the IP-CAN conversation establishing, the surplus from SPR gets access to accurate duration and/or flow has become present problem demanding prompt solution.
Summary of the invention
The technical problem to be solved in the present invention provides a kind of method and system of upgrading the business information in the user-subscribed database, is implemented in when creating the IP-CAN session, gets access to accurate business information from SPR.
For solving the problems of the technologies described above, a kind of method of upgrading the business information in the user-subscribed database of the present invention, comprise: when the arbitrary procotol of user equipment (UE) connects Access Network IP-CAN session termination, "Policy and Charging Rules Function entity PCRF with the consumption information of IP-CAN session or surplus information reporting to user-subscribed database SPR; SPR upgrades according to the information that receives.
Further, consumption information comprises: the consumption information of the duration of IP-CAN session and/or flow; Surplus information comprises: the surplus information of the duration of IP-CAN session and/or flow.
Further, PCRF with the consumption information of IP-CAN session or surplus information reporting to SPR before, also comprise: during the IP-CAN session termination, strategy and charging execution function entity PCEF report duration that PCRF issues and/or the consumption information of flow threshold to PCRF;
If duration and/or flow threshold equal duration and/or the flow of SPR appointment, PCRF consumption information that PCEF is reported then, the consumption information as the IP-CAN session reports SPR; If PCEF reported consumption information to PCRF, the consumption that reports of the cumulative PCEF of PCRF then obtains the consumption of IP-CAN session, carry out with the consumption information reporting of IP-CAN session to SPR or
PCRF adopts duration and/or the flow of SPR appointment, deducts the consumption of IP-CAN session, obtains the surplus of duration and/or the flow of SPR appointment, carries out the surplus information reporting to SPR.
Further, after SPR receives the consumption information of IP-CAN session, according to this consumption information, the duration that the renewal user contracts and/or the surplus information of flow, concrete grammar is:
SPR reads duration that the user of current storage contracts and/or the surplus information of flow, from the surplus of current storage, deduct the consumption that PCRF reports, obtain duration that the user contracts and/or the real surplus amount of flow, adopt the information of this real surplus amount that calculates, upgrade duration that the user of current storage contracts and/or the surplus information of flow.
Further, after SPR receives the surplus information of IP-CAN session, according to this surplus information, the duration that the renewal user contracts and/or the surplus information of flow, concrete grammar is:
The duration that if the duration of IP-CAN session and/or flow are the user of the current storage of SPR contracts and/or the surplus of flow, then SPR adopts received surplus information, upgrades duration that the user of current storage contracts and/or the surplus information of flow;
The part of the duration that if the duration of IP-CAN session and/or flow are the user of the current storage of SPR contracts and/or the surplus of flow, another part of the surplus of SPR duration that the user of current storage is contracted and/or flow then, add the surplus that PCRF reports, obtain duration that the user contracts and/or the real surplus amount of flow, adopt the information of this real surplus amount that calculates, upgrade duration that the user of current storage contracts and/or the surplus information of flow.
Further, a kind of system that upgrades the business information in the user-subscribed database comprises: "Policy and Charging Rules Function entity PCRF, user-subscribed database SPR,
PCRF, when being used for the arbitrary procotol connection Access Network IP-CAN session termination when user equipment (UE), with the consumption information of IP-CAN session or surplus information reporting to SPR;
SPR is used for according to consumption information or surplus information, the duration that the renewal user contracts and/or the surplus information of flow.
Further, consumption information comprises: the consumption information of the duration of IP-CAN session and/or flow;
Surplus information comprises: the surplus information of the duration of IP-CAN session and/or flow.
Further, this system also comprises: strategy and charging execution function entity PCEF;
PCEF, be used for PCRF with the consumption information of IP-CAN session or surplus information reporting to SPR before, report duration that PCRF issues and/or the consumption information of flow threshold to PCRF;
If duration and/or flow threshold equal duration and/or the flow of SPR appointment, PCRF consumption information that PCEF is reported then, the consumption information as the IP-CAN session reports SPR; If PCEF reported consumption information to PCRF, the consumption that reports of the cumulative PCEF of PCRF then obtains the consumption of IP-CAN session, carry out with the consumption information reporting of IP-CAN session to SPR or
PCRF adopts duration and/or the flow of SPR appointment, deducts the consumption of IP-CAN session, obtains the surplus of duration and/or the flow of SPR appointment, carries out the surplus information reporting to SPR.
Further, SPR is according to consumption information, and the method for the duration that the renewal user contracts and/or the surplus information of flow is:
SPR reads duration that the user of current storage contracts and/or the surplus information of flow, from the surplus of current storage, deduct the consumption that PCRF reports, obtain duration that the user contracts and/or the real surplus amount of flow, adopt the information of this real surplus amount that calculates, upgrade duration that the user of current storage contracts and/or the surplus information of flow.
Further, SPR is according to surplus information, and the method for the duration that the renewal user contracts and/or the surplus information of flow is:
The duration that if the duration of IP-CAN session and/or flow are the user of the current storage of SPR contracts and/or the surplus of flow, then SPR adopts received surplus information, upgrades duration that the user of current storage contracts and/or the surplus information of flow;
The part of the duration that if the duration of IP-CAN session and/or flow are the user of the current storage of SPR contracts and/or the surplus of flow, another part of the surplus of SPR duration that the user of current storage is contracted and/or flow then, add the surplus that PCRF reports, obtain duration that the user contracts and/or the real surplus amount of flow, adopt the information of this real surplus amount that calculates, upgrade duration that the user of current storage contracts and/or the surplus information of flow.
In sum, the present invention is by when each IP-CAN session termination, PCRF reports consumption information or the duration of SPR appointment and/or the surplus information of flow of IP-CAN session to SPR, the duration that the information that SPR reports according to PCRF is contracted to the user who preserves and/or the surplus information of flow are upgraded, realize the duration of storing user subscription and/or the real surplus amount information of flow, thereby when creating the IP-CAN session, can get access to from SPR the surplus of accurate duration and/or flow, in order to more reasonably formulate the PCC strategy.
Description of drawings
Fig. 1 is EPS system architecture schematic diagram;
Fig. 2 is PCC system architecture schematic diagram;
Fig. 3 is the method flow diagram of the embodiment of the invention one;
Fig. 4 is the method flow diagram of the embodiment of the invention two.
Embodiment
The present invention adopts when arbitrary IP-CAN session termination, PCEF reports duration that PCRF issues and/or the consumption information of flow threshold to PCRF, PCRF reports consumption information or the duration of SPR appointment and/or the surplus information of flow of IP-CAN session to SPR, the information that SPR reports according to PCRF, the surplus information of the duration of storing user subscription and/or flow.The next IP-CAN session of APN of general situation, for the special case of many IP-CAN sessions of an APN, the IP-CAN session termination here refers to the termination of last IP-CAN session under this APN.
Below in conjunction with accompanying drawing the specific embodiment of the present invention is described.
Embodiment one:
In the present embodiment, when UE initiates certain business, PCEF sends IP-CAN conversation establishing Indication message to PCRF, PCRF obtains the signatory business information of UE from SPR, PCRF brings PCEF with duration and/or the flow threshold of IP-CAN session in IP-CAN conversation establishing response message, PCEF preserves threshold value, when the IP-CAN session termination, with consumption information such as the duration that consumes and/or flows, in the indication of IP-CAN session termination, report PCRF, PCRF sends a request message to SPR, report the consumption information of IP-CAN session or duration that SPR issues and/or the surplus information of flow, the information that SPR reports according to PCRF, the surplus information of the duration of storing user subscription and/or flow is returned response message to PCRF.
Figure 3 shows that the idiographic flow of the embodiment of the invention one, comprising:
After 301:PCEF receives the establishment IP-CAN bearing request message of UE, send IP-CAN conversation establishing Indication message to PCRF;
Carry user profile in IP-CAN bearing request message and the IP-CAN conversation establishing Indication message, such as user ID.
After 302:PCRF receives the IP-CAN conversation establishing Indication message of PCEF, to the signatory business information of SPR request IP-CAN session;
For IMS (IP Multimedia System) business, PCRF also obtains business information from AF, as, service identification; Professional for non-IMS, PCRF obtains business information from DPI (IP operation identification and control system) usually.
303:SPR searches the signatory business information of IP-CAN session according to user profile and business information, and returns to PCRF, comprises duration and/or the flow of SPR appointment in the signatory business information;
The signatory business information that the 304:PCRF storing received arrives is formulated the PCC strategy;
305:PCRF sends IP-CAN conversation establishing response message to PCEF, issues duration and/or the flow threshold of PCC strategy and this IP-CAN session;
The duration that PCRF issues and/or flow threshold can equal duration and/or the flow of SPR appointment, also can be the part of duration and/or the flow of SPR appointment, that is, PCRF issues threshold value to PCEF several times.
306:UE carries out business;
During the 307:IP-CAN session termination, PCEF sends IP-CAN session termination Indication message to PCRF, carries duration that PCRF issues and/or the consumption information of flow threshold in this message;
When PCRF issued threshold value to PCEF several times, after threshold value was finished, PCEF will report to PCRF, and PCRF issues threshold value to PCEF more again, and during session termination, PCEF reports consumption information after last time reporting to PCRF, and PCRF no longer issues threshold value.
PCEF receives when removing the IP-CAN conversation request message, termination IP-CAN session.
After 308:PCRF receives IP-CAN session termination Indication message, by the consumption information reporting with the IP-CAN session of sending a request message to SPR, or according to the duration of the consumption information calculations SPR appointment of IP-CAN session and/or the surplus of flow, the surplus information exchange is crossed request message report SPR;
PCRF is total consumption information of this IP-CAN session to the consumption information of the IP-CAN session that SPR reports, when PCRF issues threshold value to PCEF several times, and when threshold value was finished and reported consumption to PCRF, the consumption information of IP-CAN session was the consumption sum that each time of PCEF reports to PCEF.When PCRF with the duration of SPR appointment and/flow, during as the duration that issues to PCEF and/or flow threshold, during session termination, the consumption that PCEF reports is the consumption of IP-CAN session.
PCRF uses duration and/or the flow of SPR appointment to deduct the consumption sum (consumption of IP-CAN session) that each time of PCEF reports, and obtains the surplus of duration and/or the flow of SPR appointment.
After 309:SPR receives the request message of PCRF, according to consumption information or the surplus information of IP-CAN session, the surplus information of the duration of storing user subscription and/or flow, and return response message to PCRF.
The detailed process of the surplus information of the duration of SPR storing user subscription and/or flow comprises:
If SPR receives consumption information, then read duration that the user of current storage contracts and/or the surplus information of flow, deduct the consumption that PCRF reports the duration of contracting from the user who stores and/or the surplus of flow, obtain duration that the user contracts and/or the real surplus amount of flow, adopt duration that the current user who stores of information updating of the real surplus amount that calculates contracts and/or the surplus information of flow.
When SPR receives the surplus information of the duration of appointment and/or flow, the duration that if the duration of appointment and/or flow are the user of the current storage of SPR contracts and/or the surplus of flow, then directly adopt received surplus information, the duration that the user that SPR is stored contracts and/or the surplus information of flow are upgraded.
The part of the duration that if the duration of appointment and/or flow are the user of the current storage of SPR contracts and/or the surplus of flow, then SPR is with another part of the surplus of user's duration of contracting of storage and/or flow, add the duration of the SPR appointment that PCRF reports and/or the surplus of flow, obtain duration that the user contracts and/or the real surplus amount of flow, adopt duration that the user of the current storage of information updating SPR of the surplus that calculates contracts and/or the surplus information of flow.
Embodiment two:
In the present embodiment, UE is in certain business procedure the time, PCRF receives an external trigger or because internal trigger, need to initiate an IP-CAN session modification flow process, comprise the change to duration and/or the flow threshold of IP-CAN session, PCRF is handed down to PCEF with after changing duration and/or flow threshold, PCEF preserves the threshold value after upgrading, when session termination, PCEF is with the consumption information of duration and/or the flow of this IP-CAN session, in the indication of IP-CAN session termination, report PCRF, PCRF reports the consumption information of this IP-CAN session to SPR, or the duration that issues of SPR and/or the surplus information of flow, the information that SPR reports according to PCRF, the surplus information of the duration of storing user subscription and/or flow is returned response message to PCRF.
Figure 4 shows that the idiographic flow of the embodiment of the invention two, comprising:
401: in the business procedure, PCRF receives an external trigger or by internal trigger, initiates IP-CAN session modification flow process that IP-CAN session modification flow process can issue or revise duration and/or flow threshold;
External trigger may be from SPR, AF or PCEF, when changing such as CAMEL-Subscription-Information among the SPR.IP-CAN session modification flow process comprises: lifting, reduction or the deletion of certain existing duration and/or flow threshold, and newly-increased certain threshold value.
402:PCRF sends a request message (such as Diameter RAR) to PCEF, revises the IP-CAN session, issues or upgrades duration and/or flow threshold;
403:PCEF returns response message (such as Diameter RAA) to PCRF, and storage threshold;
During the 404:IP-CAN session termination, PCEF sends IP-CAN session termination Indication message, the consumption information of carrying duration and/or the flow of IP-CAN session in this message to PCRF;
405~406: identical with step 308~309.
The present invention also provides a kind of system that upgrades the business information in the user-subscribed database, comprising: PCEF, PCRF and SPR, wherein:
PCEF, be used for PCRF with the consumption information of IP-CAN session or surplus information reporting to SPR before, report duration that PCRF issues and/or the consumption information of flow threshold to PCRF;
PCRF, when being used for the arbitrary IP-CAN session termination when user equipment (UE), with the consumption information of IP-CAN session or surplus information reporting to SPR; Consumption information comprises: the consumption information of the duration of IP-CAN session and/or flow; Surplus information comprises: SPR is to the surplus information of duration and/or the flow of the IP-CAN session of PCRF appointment.If duration and/or flow threshold equal duration and/or the flow of SPR appointment, PCRF consumption information that PCEF is reported then, the consumption information as the IP-CAN session reports SPR; If PCEF reported consumption information to PCRF, the consumption that reports of the cumulative PCEF of PCRF then obtains the consumption of IP-CAN session, carry out with the consumption information reporting of IP-CAN session to SPR or
PCRF adopts duration and/or the flow of SPR appointment, deducts the consumption of IP-CAN session, obtains the surplus of duration and/or the flow of SPR appointment, carries out the surplus information reporting to SPR.
SPR is used for according to consumption information or surplus information the surplus information of the duration of storing user subscription and/or flow; After receiving consumption information, read duration that the user of current storage contracts and/or the surplus information of flow, from the surplus of current storage, deduct the consumption that PCRF reports, obtain duration that the user contracts and/or the real surplus amount of flow, adopt the information of this real surplus amount that calculates, upgrade duration that the user of current storage contracts and/or the surplus information of flow;
After receiving surplus information, if the duration that the user that SPR is the current storage of SPR to duration and/or the flow of the IP-CAN session of PCRF appointment contracts and/or the surplus of flow, then SPR adopts received surplus information, upgrades duration that the user of current storage contracts and/or the surplus information of flow;
If the part of the duration that the user that SPR is the current storage of SPR to duration and/or the flow of the IP-CAN session of PCRF appointment contracts and/or the surplus of flow, another part of the surplus of SPR duration that the user of current storage is contracted and/or flow then, add the surplus that PCRF reports, obtain duration that the user contracts and/or the real surplus amount of flow, adopt the information of this real surplus amount that calculates, upgrade duration that the user of current storage contracts and/or the surplus information of flow.
The above is the preferred embodiments of the present invention only, is not limited to the present invention, and for a person skilled in the art, the present invention can have various modifications and variations.Within the spirit and principles in the present invention all, any modification of doing, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (10)

1. a method of upgrading the business information in the user-subscribed database is characterized in that, comprising:
When the arbitrary procotol of user equipment (UE) connects Access Network IP-CAN session termination, "Policy and Charging Rules Function entity PCRF with the consumption information of described IP-CAN session or surplus information reporting to user-subscribed database SPR; Described IP-CAN session comprises: when having a plurality of IP-CAN to exist under the same APN APN, this IP-CAN session refers to last the IP-CAN session under this APN;
SPR upgrades according to the described information that receives.
2. the method for claim 1 is characterized in that,
Described consumption information comprises: the consumption information of the duration of described IP-CAN session and/or flow;
Described surplus information comprises: the surplus information of the duration of described IP-CAN session and/or flow.
3. method as claimed in claim 2 is characterized in that,
Before described PCRF gives described SPR with the consumption information of described IP-CAN session or surplus information reporting, also comprise: during described IP-CAN session termination, strategy and charging execution function entity PCEF report duration that described PCRF issues and/or the consumption information of flow threshold to described PCRF;
If described duration and/or flow threshold equal duration and/or the flow of SPR appointment, described PCRF consumption information that described PCEF is reported then, the consumption information as described IP-CAN session reports described SPR; If described PCEF reported consumption information to described PCRF, the consumption that reports of the cumulative PCEF of described PCRF then obtains the consumption of IP-CAN session, carry out with the consumption information reporting of described IP-CAN session to SPR or
Described PCRF adopts duration and/or the flow of described SPR appointment, deducts the consumption of IP-CAN session, obtains the surplus of duration and/or the flow of described SPR appointment, carries out describedly to give described SPR with the surplus information reporting.
4. method as claimed in claim 3 is characterized in that, after described SPR receives the consumption information of described IP-CAN session, and according to this consumption information, the duration that the renewal user contracts and/or the surplus information of flow, concrete grammar is:
Described SPR reads duration that the user of current storage contracts and/or the surplus information of flow, from the surplus of current storage, deduct the consumption that described PCRF reports, obtain duration that the user contracts and/or the real surplus amount of flow, adopt the information of this real surplus amount that calculates, upgrade duration that the user of current storage contracts and/or the surplus information of flow.
5. method as claimed in claim 3 is characterized in that, after described SPR receives the surplus information of described IP-CAN session, and according to this surplus information, the duration that the renewal user contracts and/or the surplus information of flow, concrete grammar is:
The duration that if the duration of described IP-CAN session and/or flow are the user of the current storage of SPR contracts and/or the surplus of flow, then SPR adopts received surplus information, upgrades duration that the user of current storage contracts and/or the surplus information of flow;
The part of the duration that if the duration of described IP-CAN session and/or flow are the user of the current storage of SPR contracts and/or the surplus of flow, another part of the surplus of SPR duration that the user of current storage is contracted and/or flow then, add the surplus that the above PCRF reports, obtain duration that the user contracts and/or the real surplus amount of flow, adopt the information of this real surplus amount that calculates, upgrade duration that the user of current storage contracts and/or the surplus information of flow.
6. system that upgrades the business information in the user-subscribed database, comprising: "Policy and Charging Rules Function entity PCRF, user-subscribed database SPR is characterized in that:
Described PCRF is used for giving described SPR with consumption information or the surplus information reporting of described IP-CAN session when arbitrary procotol of user equipment (UE) connects Access Network IP-CAN session termination; Described IP-CAN session comprises: when having a plurality of IP-CAN to exist under the same APN APN, this IP-CAN session refers to last the IP-CAN session under this APN;
Described SPR is used for according to described consumption information or surplus information, the duration that the renewal user contracts and/or the surplus information of flow.
7. system as claimed in claim 6 is characterized in that,
Described consumption information comprises: the consumption information of the duration of described IP-CAN session and/or flow;
Described surplus information comprises: the surplus information of the duration of described IP-CAN session and/or flow.
8. system as claimed in claim 7 is characterized in that, this system also comprises: strategy and charging execution function entity PCEF;
Described PCEF, be used for described PCRF with the consumption information of described IP-CAN session or surplus information reporting to described SPR before, report duration that described PCRF issues and/or the consumption information of flow threshold to described PCRF;
If described duration and/or flow threshold equal duration and/or the flow of SPR appointment, described PCRF consumption information that described PCEF is reported then, the consumption information as described IP-CAN session reports described SPR; If described PCEF reported consumption information to described PCRF, the consumption that reports of the cumulative PCEF of described PCRF then obtains the consumption of IP-CAN session, carry out with the consumption information reporting of described IP-CAN session to SPR or
Described PCRF adopts duration and/or the flow of described SPR appointment, deducts the consumption of IP-CAN session, obtains the surplus of duration and/or the flow of described SPR appointment, carries out describedly to give described SPR with the surplus information reporting.
9. system as claimed in claim 8 is characterized in that,
Described SPR is according to described consumption information, and the method for the duration that the renewal user contracts and/or the surplus information of flow is:
Described SPR reads duration that the user of current storage contracts and/or the surplus information of flow, from the surplus of current storage, deduct the consumption that described PCRF reports, obtain duration that the user contracts and/or the real surplus amount of flow, adopt the information of this real surplus amount that calculates, upgrade duration that the user of current storage contracts and/or the surplus information of flow.
10. system as claimed in claim 8 is characterized in that,
Described SPR is according to described surplus information, and the method for the duration that the renewal user contracts and/or the surplus information of flow is:
The duration that if the duration of described IP-CAN session and/or flow are the user of the current storage of SPR contracts and/or the surplus of flow, then SPR adopts received surplus information, upgrades duration that the user of current storage contracts and/or the surplus information of flow;
The part of the duration that if the duration of described IP-CAN session and/or flow are the user of the current storage of SPR contracts and/or the surplus of flow, another part of the surplus of SPR duration that the user of current storage is contracted and/or flow then, add the surplus that the above PCRF reports, obtain duration that the user contracts and/or the real surplus amount of flow, adopt the information of this real surplus amount that calculates, upgrade duration that the user of current storage contracts and/or the surplus information of flow.
CN200910168413XA 2009-06-26 2009-08-12 Method and system for updating service information in subscription profile repository Active CN101931930B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN200910168413XA CN101931930B (en) 2009-06-26 2009-08-12 Method and system for updating service information in subscription profile repository
PCT/CN2009/076193 WO2010148621A1 (en) 2009-06-26 2009-12-29 Method and system for updating service information in subscriber profile repository

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN200910151624 2009-06-26
CN200910151624.2 2009-06-26
CN200910168413XA CN101931930B (en) 2009-06-26 2009-08-12 Method and system for updating service information in subscription profile repository

Publications (2)

Publication Number Publication Date
CN101931930A CN101931930A (en) 2010-12-29
CN101931930B true CN101931930B (en) 2013-03-20

Family

ID=43370786

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910168413XA Active CN101931930B (en) 2009-06-26 2009-08-12 Method and system for updating service information in subscription profile repository

Country Status (2)

Country Link
CN (1) CN101931930B (en)
WO (1) WO2010148621A1 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102868988B (en) * 2011-07-05 2016-03-30 中国电信股份有限公司 Based on the method for processing business of policy and charging control and system in wireless network
CN102388634B (en) * 2011-09-05 2015-07-29 华为技术有限公司 A kind of flow charging method, device and system
CN105718483B (en) * 2014-12-04 2020-10-16 南京中兴新软件有限责任公司 Method and device for SPR data access of user subscription database
CN106470412B (en) * 2015-08-20 2021-08-24 中兴通讯股份有限公司 Terminal offline method, standby PCRF device, user subscription data device and system
CN107786315B (en) * 2016-08-29 2021-11-12 中兴通讯股份有限公司 Usage quota authorization method and device

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101166101A (en) * 2007-09-25 2008-04-23 中兴通讯股份有限公司 Method for real time triggering the network session interaction via user subscription information update
CN101431420A (en) * 2008-11-25 2009-05-13 中兴通讯股份有限公司 Policy and charging control method and system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8086216B2 (en) * 2007-01-31 2011-12-27 Alcatel Lucent Mobility aware policy and charging control in a wireless communication network

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101166101A (en) * 2007-09-25 2008-04-23 中兴通讯股份有限公司 Method for real time triggering the network session interaction via user subscription information update
CN101431420A (en) * 2008-11-25 2009-05-13 中兴通讯股份有限公司 Policy and charging control method and system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
3GPP TSG SA.Policy and charging control architecture.《3GPP TS 23.203 v9.1.0》.2009,全文. *

Also Published As

Publication number Publication date
WO2010148621A1 (en) 2010-12-29
CN101931930A (en) 2010-12-29

Similar Documents

Publication Publication Date Title
CN102083035B (en) Method and system for implementing usage monitoring control
CN101730048B (en) A kind of information transferring method and system
CN102075900B (en) Method and system for realizing quantity monitoring and controlling
KR101414921B1 (en) Managing ip -can subscriber sessions in response to changes related to the subscriber
US8949447B2 (en) Optimized interface between two network elements operating under an authentication, authorization and accounting protocol
CN102075894B (en) Selection method and system for policy and charging rules function entity
US20130044646A1 (en) Policy application method for machine type communication, and policy and charging enforcement function
KR101655641B1 (en) Temporarily disable out-of-credit pcc rule
CN104685919A (en) Congestion control for radio access networks (RAN)
CN102014517A (en) Method and system for transmitting bearer control mode under roaming scene
CN101692727A (en) Method for controlling policy and charging and grouped data network gateway
CN101931930B (en) Method and system for updating service information in subscription profile repository
JP5727052B2 (en) Temporary subscription record
WO2015143851A1 (en) Usage monitoring method, apparatus and system
CN102056117B (en) Based on strategy and the charging method of charging control architecture and system
CN104581670A (en) Application access control method and application function physical device
CN102316432A (en) Consumption monitoring method and system
CN108011725A (en) A kind of policy control method, apparatus and system
CN102098647B (en) Method and system for realizing online charging in roaming architecture
CN103313431A (en) TDF (Traffic Detection Function) processing method and PCRF (Policy and Charging Rules Function)
CN102711086A (en) Method for processing sponsored data connectivity and policy and charging rules function (PCRF) entity
CN101998339B (en) Method and device for controlling policy and charging based on service using time
KR20150006026A (en) Per flow and per session metering limit application
CN101730049B (en) Method and system for realizing accounting control
CN102098648A (en) Roaming charging method and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant