CN101928580A - Method for mounting dry quenching circulating fan - Google Patents

Method for mounting dry quenching circulating fan Download PDF

Info

Publication number
CN101928580A
CN101928580A CN2009100534864A CN200910053486A CN101928580A CN 101928580 A CN101928580 A CN 101928580A CN 2009100534864 A CN2009100534864 A CN 2009100534864A CN 200910053486 A CN200910053486 A CN 200910053486A CN 101928580 A CN101928580 A CN 101928580A
Authority
CN
China
Prior art keywords
mounting
equipment
blower fan
bearing
fan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2009100534864A
Other languages
Chinese (zh)
Other versions
CN101928580B (en
Inventor
颜钰
魏伟
张峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Wuye Construction Of Zhongye Chenggong Coltd
Original Assignee
Shanghai Wuye Construction Of Zhongye Chenggong Coltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Wuye Construction Of Zhongye Chenggong Coltd filed Critical Shanghai Wuye Construction Of Zhongye Chenggong Coltd
Priority to CN 200910053486 priority Critical patent/CN101928580B/en
Publication of CN101928580A publication Critical patent/CN101928580A/en
Application granted granted Critical
Publication of CN101928580B publication Critical patent/CN101928580B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The invention relates to the field of metallurgical equipment mounting, in particular to a method for mounting a dry quenching circulating fan. The method sequentially comprises the following steps of: (a) basically checking and accepting; (b) setting foundation bolts and a seat slurry pier device as well as opening a box to check equipment; (c) mounting a fan, a bearing and a motor base; (d) carrying out primary grouting of the foundation bolts of the equipment; (e) mounting a lower bearing block; (f) mounting a lower shell of the fan; (g) mounting a rotor; (h) mounting an upper bearing case cover, an upper slip and a shaft seal; (i) mounting an upper shell of the fan and a shaft seal; (j) mounting the motor; (k) correcting a coupling; (l) mounting an adjustment and execution mechanism of the inlet and the outlet of the fan; (m) carrying out secondary grouting on an equipment foundation; (n) mounting expansion joints of the inlet and the outlet; (o) mounting a circulating cooling water system and an accessory system; and (p) carrying out test run of the equipment. Through strictly designing normative mounting and detecting standards, the invention has the advantages of simple debugging method, safety, reliability and high working efficiency.

Description

Method for mounting dry quenching circulating fan
Technical field
The present invention relates to the metallurgical equipment installing area, be specially a kind of method for mounting dry quenching circulating fan.
Background technology
Dry quenching(of coke) is that new in the world at present of being born smelts power-saving technology, and its English name is Coke Dry Quenching, is called for short CDQ.Dry coke quenching is to be thermal barrier with circulated inert gas, discharges below by recirculation blower cold recycle gas being imported red burnt cooling room cooling down high-temperature coke to 250 ℃.Cycling hot conductance behind the absorption coke heat is gone into waste heat boiler and is reclaimed heat, produces steam.After recycle gas cooling, the dedusting, return cooling room through blower fan again, so red Jiao of circulation cooling.The steam that coke dry quenching boiler produces or incorporate factory's internal steam pipe net into or send to generating.Dry Quenching Technology is great energy-conservation project, owing to finish the quenching process in closed system, compare with common coke wet quenching, but the discharging of basically eliminate phenol, HCN, H2S, NH3 reduces burnt dirt discharging, and saves the quenching water.Recirculation blower is the visual plant of dry coke quenching gas-circulating system, is responsible for using sending into quenching stove internal recycle after the gas pressurization of closed cycle continuously.The blower fan overwhelming majority that present domestic dry coke quenching engineering is adopted is not to be with the frequency conversion centrifugal fan of fluid-flywheel clutch, and it mainly is made up of base, top and the bottom housing, front and back bearings, rotor, craniocaudal axis envelope and motor etc.Because Dry Quenching Technology belongs to emerging field, only there is enterprise of the man a few family of very few number in the unit of domestic this method of employing, also is in the stage of fumbling for the installation of dry coke quenching equipment, exists much not science, irrational place, the installation process complexity.
Summary of the invention
In order to overcome the defective of prior art, a kind of safe and reliable metallurgical equipment installation method is provided, the invention discloses a kind of method for mounting dry quenching circulating fan.
The present invention reaches goal of the invention by following technical solution:
A kind of method for mounting dry quenching circulating fan, carry out successively as follows: a. inspects for acceptance on the basis, b. wall screw, seat slurry pier is provided with and the equipment OOBA, c. blower fan, bearing and motor base are installed, d. equipment wall screw once grouting, e. the lower shaft bearing is installed, f. the blower fan lower case is installed, g. rotor is installed, h. plumer block loam cake, Shang watt and an envelope install, i. blower fan upper body and axle envelope are installed, j. motor is installed, k. shaft coupling is proofreaied and correct, l. blower fan is imported and exported and is regulated topworks's installation, m. Equipment Foundations back-grouting, n. importing and exporting expansion joint installs, o. recirculated cooling water and subsystem are installed and the p. equipment shakedown, it is characterized in that:
When c. blower fan, bearing and motor base are installed, the lifting of rotor and casing keeps level, and when base plate was installed, reference center and absolute altitude absolute altitude reference point that blower fan mounting center and absolute altitude benchmark are set with dry quenching system were installed, adjust center, absolute altitude and the levelness of base plate
When e. the lower shaft bearing is installed, remove two bearings box cover and last watt, adjust diaxon bearing center, width between centers, absolute altitude and levelness; Adjust two bearings coordinate height; Check bearing shell sphere and casing ball-and-socket contact area and tolerance clearance with the red lead staining method, check the gap when not tighting a bolt between bearing support and the base,
When g. rotor is installed, after bearing support is adjusted qualified and cleaned up, with the rotor hoisted in position; Measure and adjust the rotor levelness with combined diagram level or frame level; Check the contact area of adjusting rotor journal and bearing shell and push up gap, side clearance, the bearing shell surface contacts with axle journal should be even,
H. the plumer block loam cake, Shang watt and an envelope when installing, the shrink range between bearing and the step cover is 0.03~0.06,
When i. blower fan upper body and axle envelope are installed, fit in the junction surface of last lower housing, uses sealing cord and seal gum sealing between the bonding surface,
P. during equipment shakedown, carry out successively by the examination of a. motor list, the debugging of b. fans entrance damper and c. location and motor-blower fan trial trip.
Described method for mounting dry quenching circulating fan, it is characterized in that: front opening blower fan circulating cooling water pipe and N2 tube valve water supply air feed before the p. equipment shakedown, the fixation of taking measures of movable sleeve before the electric motor starting on the half a coupler, the qualified back of motor monomer trial trip connects shaft coupling, drive blower fan and carry out trial trip, standard-sized sheet goes out air-valve before the fan starting, full cut-off air intake valve, elder generation's electric motor, behind the no abnormal phenomenon in each position and the friction sound, starter motor, after treating that blower fan reaches specified speed, slowly open the air intake valve again, in the variation of the whole process monitoring motor current value of opening the air intake valve, regulate the aperture of air intake valve, segmentation is carried out from the trial trip of the little rated load of loading.
The present invention is by the installation and the detection reference of strict design specifications, and adjustment method is simple, and is safe and reliable, the operating efficiency height.
Description of drawings
Fig. 1 is a schema of the present invention;
Fig. 2 is the schema of equipment shakedown among the present invention.
Embodiment
Below further specify the present invention by specific embodiment.
Embodiment 1
A kind of method for mounting dry quenching circulating fan, carry out successively as follows: a. inspects for acceptance on the basis, b. wall screw, seat slurry pier is provided with and the equipment OOBA, c. blower fan, bearing and motor base are installed, d. equipment wall screw once grouting, e. the lower shaft bearing is installed, f. the blower fan lower case is installed, g. rotor is installed, h. plumer block loam cake, Shang watt and an envelope install, i. blower fan upper body and axle envelope are installed, j. motor is installed, k. shaft coupling is proofreaied and correct, l. blower fan is imported and exported and is regulated topworks's installation, m. Equipment Foundations back-grouting, n. importing and exporting expansion joint installs, o. recirculated cooling water and subsystem are installed and the p. equipment shakedown.
Finish following preparation of construction before the debugging beginning:
1. technical information is prepared
(1) dry quenching circulating fan installation plan and equipment are installed, working instructions have been complete.
(2) it is complete that recirculation blower reaches supporting at random device fabrication quality certificate or work certificate and survey report.
(3) recirculation blower factory-assembled record of survey, trial trip are write down complete.
(4) equipment vanning inventory and equipment unit packing list are complete.
(5) construction process record of search table is worked out, is put in order and finish.
2. lifting, Transport Machinery has been practicable, and worker's facility etc. have been prepared to put in place.
3. operating condition
(1) engineering technical personnel fully are familiar with " the construction organization design " of relevant drawing, design, equipment and technology file, construction inspection rules and approved, and confide a technological secret to the operating personnel by the requirement of above technical publications.
(2) transport to on-the-spot equipment preceding quality inspection all is installed, the problem that exists has been decided through consultation processing scheme with equipment manufacturing and applying unit.
(3) the installation exercise passage is all unimpeded, and platform, railing all install around the operating area, and security measures is all on board.
(4) large-scale hoisting machinery march into the arena passage and operating area complete liquidation finish, it is qualified that operation path and setting foundation capability have checked, and take measures to satisfy large-scale loop wheel machine normal operation and safety.
Can begin debugging after being ready to complete, schema as shown in Figure 1.
One, inspect for acceptance in the basis
1. monitoring device basis axial location, absolute altitude, size should meet the regulation of design document and existing national standard " mechanical means installation work construction and examination general specification " GB50231-98.
2. reserve position, the size of central position, the degree of depth, hole wall verticality and the pre-buried horizontal bar of anchor (bolt) hole in strict accordance with the requirement inspection of design document.
Two, backing plate setting
The setting of backing plate should meet the requirement of design and equipment and technology file, when design and the no standard of equipment and technology file, should adopt a slurry method that backing plate is set, selecting for use and being provided with of backing plate should be carried out according to the regulation of " parallels is made and selected the operating technique rules for use " Q/WYJ001-04-2006 and " mechanical means installation work construction and examination general specification " GB50231-98.
Three, equipment OOBA
Unpacking of recirculation blower should be carried out under the relevant personnel of construction unit participate in, and should meet the following requirements:
By the equipment unit packing list check blower fan part, parts and auxiliary equipment and should be complete;
2. check the main installation dimension at impeller, casing and other position, and should conform to design;
3. each machined surface of blower fan exposed parts is answered non-corroding; The main position of major parts such as the impeller of rotor and axle journal, parts should not have damage and significantly the distortion.
Four, blower fan, bearing and motor base installation,
1. the carrying of recirculation blower and lifting should be selected the lifting Transport Machinery that is complementary with its weight;
2. when equipment carrying and lifting, sfgd. should be arranged, suspension centre should be at the marker location of equipment and tr, should not cause equipment distortion and damage because of carrying and lifting;
3. the rotor journal position should be as the position of tying, and the lifting of rotor and casing should keep level, and must not tie of rope damages surface of the work.
Five, the recirculation blower base is installed
1. mounting center and absolute altitude benchmark
Reference center and absolute altitude absolute altitude reference point that recirculation blower mounting center and absolute altitude benchmark are set with dry quenching system are installed.
2. center, absolute altitude and the levelness permissible variation of adjusting base plate meet the requirement of design and equipment and technology file, when design and the no standard of equipment and technology file, the center permissible variation is ± 2mm that the absolute altitude permissible variation is ± 1mm that the levelness permissible variation is 0.5/1000.
Six, bearing support is installed
1. remove two bearings box cover and last watt, adjust the requirement that diaxon bearing center, width between centers, absolute altitude and levelness permissible variation meet design and equipment and technology file, when design and the no standard of equipment and technology file, the center permissible variation is ± 2mm, the absolute altitude permissible variation is ± 1mm, plumer block split vertical equity degree permissible variation is 0.04/1000, and transverse horizontal degree permissible variation is 0.08/1000;
2. adjust two bearings coordinate height, making the non-back side of fan rotor is that free end is the slightly high 0.2~0.5mm of inboardend than back side;
3. check that bearing shell sphere and casing ball-and-socket contact area and tolerance clearance meet the requirement of design and equipment and technology file, contact should be even, and available red lead staining method is checked, as undesirable, should handle by device fabrication side, forbid sphere and casing to grind mutually, can destroy casing like this;
4. check the gap when not tighting a bolt between bearing support and the base, its gap is not more than 0.05mm.
Seven, rotor is installed
1. after bearing support is adjusted qualified and is cleaned up, with the rotor hoisted in position;
2. measure and adjust the rotor levelness with combined diagram level or frame level, rotor levelness permissible variation should meet the requirement of design and equipment and technology file, and when design and the no standard of equipment and technology file, the levelness permissible variation is 0.04/1000;
3. check the contact area of adjustment rotor journal and bearing shell and the requirement that gap, top, side clearance meet design and equipment and technology file, when design and the no standard of equipment and technology file, the bearing shell surface contacts with axle journal should be even, contacting surface should be less than 60 °, the obvious boundary that do not have between contact surface and the noncontact face, axially contact length should be less than 80% of bearing shell length, as undesirable, then should repair and scrape and adjust, until qualified;
4. thrust block and thrust button contacts the requirement that requirement and end play should meet design and equipment and technology file, when design and the no standard of equipment and technology file, the contact of thrust disc or thrust shaft collars should be even, contact area should be more than 70%, the gap of thrust disc can be detected with dial gauge, as undesirable, then should adjust;
5. after every data are adjusted passed examination, detect the levelness of adjusting bearing support and rotor once more.
Eight, the plumer block loam cake, Shang watt and an envelope install
1. behind conscientious bearing cleaning case and the bearing shell, can install watt and wiper ring, oil ring should correctly be installed no jam phenomenon by the requirement of design and equipment and technology file.
2. check that thermometer and oil ring have or not and bump the card phenomenon, if any bumping card, the processing of then need taking measures;
3. the bearing box cover is installed, and the casing split should seal by the equipment and technology documentation requirements, must not leakage of oil, install the regulation model is injected in the back in bearing by the requirement of equipment and technology file lubricating oil;
4. the shrink range between bearing and the step cover should meet the requirement of design and equipment and technology file, when design and the no standard of equipment and technology file, gets 0.03~0.06, and present embodiment gets 0.05, as undesirable, then should adjust.
Nine, the blower fan upper body is installed
1. the blower fan upper body is installed, should fit in the junction surface of last lower housing, its local gap should not meet the regulation of equipment and technology file before not tighting a bolt, when the no standard of equipment and technology file, its gap width should be greater than 0.12mm, between the bonding surface, by the requirement of equipment and technology file sealing cord and seal gum sealing;
2. all of blower housing inside are threaded and should tighten by the moment of equipment and technology files specify;
3. utilize blower fan lower housing bearing to adjust the radius clearance of blower fan front and back two blast inlets or sealing-ring and rotor wheel and the requirement that depth of penetration meets design and equipment and technology file, the gap of front and back two air draught circles and rotor wheel should be even, the too small phenomenon in no jam or gap can be carried out the connection that air door is regulated topworks and import baffle plate after qualified;
4. seal in strict accordance with the assemble case two end axles that requires of equipment and technology file, each position of components and order should be correct, and the radius clearance between axle and watertight chest meets the requirement of equipment and technology file.
Ten, shaft coupling is proofreaied and correct
Utilize dial gauge to proofread and correct shaft coupling, the radial displacement of shaft coupling, axis tilt and the gap should meet the requirement of design and equipment and technology file, proofread and correct and just can carry out back-grouting after qualified.
11, trial trip
The trial trip schema as shown in Figure 2.
One, the prerequisite precondition of blower fan trial trip
1. the installation work before the blower fan trial trip finishes, and examination finishes on inspection;
2. auxiliary equipments such as recirculated cooling water, lubricated, gas (vapour), hydraulic pressure, electric, instrument control all finish by system check, and should reach the requirement of trial trip;
3. equipment has been carried out in accordance with regulations cleaning, inspection, the cleaning before the trial trip, guarantees that all foreign matters are removed in the blower fan, and need lubricant housings such as fan bearing are by equipment and technology file the annotated lubricating oil or the lubricating grease of regulatory specifications and quantity;
4. the blower fan surrounding environment is thoroughly cleaned, and setting completed for the necessary security measures of trial trip, and the safety custody personnel have arranged to put in place;
Valve member and control device should be in equipment and technology file defined make blower fan be minimum load the time enable position;
6. the moving fan rotor of dish should not have jam and scratching phenomenon, confirms that the turning direction of impeller meets the regulation of equipment and technology file.
Two, trial trip main points
1. the recirculation blower trial trip must be carried out under the guidance of device fabrication side according to the requirement of equipment and technology file;
2. trial trip front opening blower fan circulating cooling water pipe and N 2Tube valve water supply air feed;
3. carry out the trial trip of motor monomer on request, confirm that vibration, temperature rise, noise and the current value etc. of motor should meet the regulation of design and equipment and technology file, the fixation of should taking measures of the movable sleeve before the electric motor starting on the half a coupler;
4. the qualified back of motor monomer trial trip connects shaft coupling, drives blower fan and carries out trial trip;
5. standard-sized sheet goes out air-valve, full cut-off air intake valve before the fan starting.Elder generation's electric motor, behind the no abnormal phenomenon in each position and the friction sound, starter motor, treat that blower fan reaches specified speed after, slowly open the air intake valve again, in the look over one's shoulder variation of motor current value of the whole process of opening the air intake valve, be strictly on guard against the excessive burn-out motor of electric current;
6. according to the regulation of equipment and technology file, regulate the aperture of air intake valve, segmentation is carried out from the trial trip of the little rated load of loading, and each section break(ing)-in-period should meet the regulation of equipment and technology file and standard, checks that following project also should meet the regulation of design and equipment and technology file:
(1) working order of blower fan has or not abnormal noise, abnormal vibrations;
(2) temperature of bearing, vibration, noise;
(3) motor current value, noise, temperature;
(4) the lubricated and wear pattern of bearing, axle journal;
(5) lubricating oil temperature, pressure;
(6) temperature of cooling water, flow;
(7) flow of N2, pressure.

Claims (2)

1. method for mounting dry quenching circulating fan, carry out successively as follows: a. inspects for acceptance on the basis, b. wall screw, seat slurry pier is provided with and the equipment OOBA, c. blower fan, bearing and motor base are installed, d. equipment wall screw once grouting, e. the lower shaft bearing is installed, f. the blower fan lower case is installed, g. rotor is installed, h. plumer block loam cake, Shang watt and an envelope install, i. blower fan upper body and axle envelope are installed, j. motor is installed, k. shaft coupling is proofreaied and correct, l. blower fan is imported and exported and is regulated topworks's installation, m. Equipment Foundations back-grouting, n. importing and exporting expansion joint installs, o. recirculated cooling water and subsystem are installed and the p. equipment shakedown, it is characterized in that:
When c. blower fan, bearing and motor base are installed, the lifting of rotor and casing keeps level, and when base plate was installed, reference center and absolute altitude absolute altitude reference point that blower fan mounting center and absolute altitude benchmark are set with dry quenching system were installed, adjust center, absolute altitude and the levelness of base plate
When e. the lower shaft bearing is installed, remove two bearings box cover and last watt, adjust diaxon bearing center, width between centers, absolute altitude and levelness; Adjust two bearings coordinate height; Check bearing shell sphere and casing ball-and-socket contact area and tolerance clearance with the red lead staining method, check the gap when not tighting a bolt between bearing support and the base,
When g. rotor is installed, after bearing support is adjusted qualified and cleaned up, with the rotor hoisted in position; Measure and adjust the rotor levelness with combined diagram level or frame level; Check the contact area of adjusting rotor journal and bearing shell and push up gap, side clearance, the bearing shell surface contacts with axle journal should be even,
H. the plumer block loam cake, Shang watt and an envelope when installing, the shrink range between bearing and the step cover is 0.03~0.06,
When i. blower fan upper body and axle envelope are installed, fit in the junction surface of last lower housing, uses sealing cord and seal gum sealing between the bonding surface,
P. during equipment shakedown, carry out successively by the examination of a. motor list, the debugging of b. fans entrance damper and c. location and motor one blower fan trial trip.
2. method for mounting dry quenching circulating fan as claimed in claim 1 is characterized in that: front opening blower fan circulating cooling water pipe and N before the p. equipment shakedown 2Tube valve water supply air feed, the fixation of taking measures of movable sleeve before the electric motor starting on the half a coupler, the qualified back of motor monomer trial trip connects shaft coupling, drive blower fan and carry out trial trip, standard-sized sheet goes out air-valve before the fan starting, full cut-off air intake valve, elder generation's electric motor, the no abnormal phenomenon in each position and the friction sound after, starter motor, treat that blower fan reaches specified speed after, slowly open the air intake valve again, in the variation of the whole process monitoring motor current value of opening the air intake valve, regulate the aperture of air intake valve, segmentation is carried out from the trial trip of the little rated load of loading.
CN 200910053486 2009-06-19 2009-06-19 Method for mounting dry quenching circulating fan Active CN101928580B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200910053486 CN101928580B (en) 2009-06-19 2009-06-19 Method for mounting dry quenching circulating fan

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200910053486 CN101928580B (en) 2009-06-19 2009-06-19 Method for mounting dry quenching circulating fan

Publications (2)

Publication Number Publication Date
CN101928580A true CN101928580A (en) 2010-12-29
CN101928580B CN101928580B (en) 2013-05-15

Family

ID=43368019

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200910053486 Active CN101928580B (en) 2009-06-19 2009-06-19 Method for mounting dry quenching circulating fan

Country Status (1)

Country Link
CN (1) CN101928580B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112361917A (en) * 2020-11-16 2021-02-12 中国二冶集团有限公司 Installation and construction method of regenerative fan
CN116379011A (en) * 2023-03-29 2023-07-04 华能山东发电有限公司烟台发电厂 Fan spindle installation method and device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1267704A (en) * 2000-03-23 2000-09-27 上海宝钢集团公司 Maintenance method and equipment for cooling section of dry coke extinguishing tank
JP2001192662A (en) * 2000-01-07 2001-07-17 Nippon Steel Corp Coke dry quenching facility
CN2454377Y (en) * 2000-12-08 2001-10-17 于彦奎 Dry coke-quenching dust-collecting apparatus
CN101104808A (en) * 2006-12-10 2008-01-16 孙明君 Dry quenching coke fitting device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001192662A (en) * 2000-01-07 2001-07-17 Nippon Steel Corp Coke dry quenching facility
CN1267704A (en) * 2000-03-23 2000-09-27 上海宝钢集团公司 Maintenance method and equipment for cooling section of dry coke extinguishing tank
CN2454377Y (en) * 2000-12-08 2001-10-17 于彦奎 Dry coke-quenching dust-collecting apparatus
CN101104808A (en) * 2006-12-10 2008-01-16 孙明君 Dry quenching coke fitting device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112361917A (en) * 2020-11-16 2021-02-12 中国二冶集团有限公司 Installation and construction method of regenerative fan
CN116379011A (en) * 2023-03-29 2023-07-04 华能山东发电有限公司烟台发电厂 Fan spindle installation method and device

Also Published As

Publication number Publication date
CN101928580B (en) 2013-05-15

Similar Documents

Publication Publication Date Title
CN106224018A (en) A kind of coal unit steam turbine the whole series Start-up and Adjustment method and system
CN101928580B (en) Method for mounting dry quenching circulating fan
CN108731729B (en) Generator sealing tile simulation experiment bench
CN101928577B (en) Installation method of coke dry-quenching discharging device
US20080308128A1 (en) Automated system for waterwall cleaning and inspection
JP7438679B2 (en) Boiler tube leak early detection system and method
CN116436219A (en) Method for installing generator of nuclear power unit
Standard Mechanical vibration-evaluation of machine vibration by measurements on non-rotating parts
CN101928573A (en) Test run method of dry quenching mechanical equipment
KR101433476B1 (en) Diagnostic apparatus for tube leak and dust accumulation of boiler
Alagöz et al. Importance of real-time hydro power plant condition monitoring systems and contribution to electricity production
Stegemann et al. Monitoring and vibrational diagnostic of rotating machinery in power plants
Sedenka et al. Deployment of technical diagnostics during commissioning of small pumped storage hydropower plant
CN104989664A (en) A centrifugal fan device
Juneja et al. Study on Turbine Maintenance: Overhauling, Emergency shutdown, Fault trading
Stepanov et al. Single-Cylinder Steam Turbine for Powers Up to 100 MW with Axial Exhaust Pipe
Kumar et al. Save Your Centrifugal Machinery During Commissioning
Valenti Upgrading aging steam turbines
Brown A Case Study from a Nuclear Power-Plant
Wright et al. Paper 8: Maintenance Planning Applied to Plant Auxiliaries in the Central Electricity Generating Board
Alkhowaiter Investigation and Resolution of Repetitive Fractionator Bottom Pump Failures
Avrutsky et al. An analysis of problems arising during operation of the perm district power plant 800-MW power unit at sliding pressure
PLANT ioaoi
Almasi Advanced gas turbine packaging
McDonald et al. Maintenance considerations in the design of the direct-cycle nuclear gas turbine power plant

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant