CN101922313B - Method for suppressing steam turbine for geothermal power generation from scaling - Google Patents

Method for suppressing steam turbine for geothermal power generation from scaling Download PDF

Info

Publication number
CN101922313B
CN101922313B CN 200910052779 CN200910052779A CN101922313B CN 101922313 B CN101922313 B CN 101922313B CN 200910052779 CN200910052779 CN 200910052779 CN 200910052779 A CN200910052779 A CN 200910052779A CN 101922313 B CN101922313 B CN 101922313B
Authority
CN
China
Prior art keywords
steam
geothermal
pure water
control valve
power generation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200910052779
Other languages
Chinese (zh)
Other versions
CN101922313A (en
Inventor
戚雁俊
王学江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CN 200910052779 priority Critical patent/CN101922313B/en
Publication of CN101922313A publication Critical patent/CN101922313A/en
Application granted granted Critical
Publication of CN101922313B publication Critical patent/CN101922313B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

The invention relates to a method for suppressing a steam turbine for geothermal power generation from scaling. The method comprises the following steps of: connecting the steam turbine for geothermal power generation with one end of a three-way valve, and connecting the other end of the three-way valve with a geothermal steam pipeline through a geothermal steam pipeline control valve; connecting the third end of the three-way valve with a pure water steam pipeline control valve, a steam storage pot and a steam generator; vaporizing pure water through the steam generator to obtain pure steam and concentrating the pure steam into the steam storage pot; and controlling the on-off of the geothermal steam pipeline control valve and the pure steam pipeline control valve by utilizing a coordinated control loop to ensure that geothermal steam and pure water steam are alternately introduced into the steam turbine for geothermal power generation. In the invention, the pure water steam is alternately introduced, thereby the steam purity is improved, the continuous stable state of a steam chamber, a steam turbine nozzle and the surface of a moving blade is broken, and the scaling in the steam turbine nozzle, the surface of the moving blade and the whole steam chamber is suppressed; scales can be scoured; and the effect for suppressing scaling can be better with higher frequency and longer persistent acting time.

Description

A kind of method that suppresses steam turbine for geothermal power generation from scaling
Technical field
The present invention relates to a kind of method that suppresses fouling, especially relate to a kind of method that suppresses steam turbine for geothermal power generation from scaling.
Background technique
Promote in the process of power generation turbine work at geothermal vapour, geothermal vapour is in the nozzle of steam turbine, and heat energy changes kinetic energy into, when then geothermal vapour is flowed through moving vane, pushing turbine vane rotary acting is transformed into mechanical energy with this part kinetic energy of geothermal vapour.
Geothermal vapour refers to the steam that extracts or the saturated vapour that produces through steam-water separator or development unit from geothermal well.From underground, a lot of geothermal vapours contain and have corrosive H based on geothermal vapour 2S, CO 2With impurity such as boron, silica, iron, sodium and chlorine.In the transformation of energy of steam turbine, its temperature and pressure changes due to geothermal vapour, and this this impurity usually can be attached to the surface of nozzle of steam turbine and moving vane with the form of fouling, or even the steam chest of the geothermal vapour whole steam turbine that can feed through to.
The purity of geothermal vapour has the factor of very big impact on the reliability of power generation turbine, when turbine fouling is serious, not only can make nozzle area reduce and then reduce output, reduce the transformation of energy of steam turbine, and can produce serious underdeposit corrosion, also can make generating difficulty, also can be due to the fouling of nozzle and contacting of moving vane, and can cause moving vane breakage accident.
Tie general dissolubility salt crust for steam turbine, effective drop low-load steam flush or shutdown steam flush method solve; Tie the silicon dirt for steam turbine, general method is to shut down artificial treatment.CN1042365C discloses a kind of method and device that cleans Steam Turbine of Silicon Deposit, and it utilizes NaOH or the KOH alkali lye of 4-13wt%, at suitable temperature, make on turbine rotor and dividing plate with SiO 2Be that main silicon dirt is partly dissolved, utilize its penetrating power, make not molten silicon dirty loose, recycling is cleaned the isolated plant circulation flushing, and the silicon dirt is washed away or washes out, and then the auxiliary physical means that rushes and scrape, brush with water is removed remaining silicon dirt part.
Usually, silicon and silicate can be the chemical species of multiple low solubility according to different condition, comprise monomer, oligomer and colloid silicon, magnesium silicate, calcium silicate and other silicate.This mixture is usually with the term Alternate of silicon or silica or silicon and silicate.If silicon concentration surpasses its solubility, it can deposit and form or a kind of glass coating or an adhesion fouling.In the ground thermal process, comprise the generating of geothermal vapour driving steam turbine, can prevent that with the way that the control temperature is fallen siliceous deposits is on equipment surface.
US Patent No. 6223535 discloses from geothermal power plant and has anticipated and geothermal vapour steam turbine condensate system, collection contains boron, arsenic, the method for the pollutants such as mercury, emphasize and to carry out cleaning to containing boron vapour, cause the impurity of steam turbine corrosion and fouling to eliminate chlorion and other.
After the mechanism of having studied " scale adheres to ", diagnosis nozzle back side Yin Wendu can be evaporated again higher than vapor (steam) temperature and steam, and apart from the about downstream side of 55% position of front acies, it is that the scale of NaCl is separated out that main component is arranged; Nozzle outside of belly Yin Wendu is lower than vapor (steam) temperature and SiO 2Slowly begin to concentrate, it is SiO that main component is arranged near the acies of back 2The scale basis of separating out on, CN1031421C discloses the method for nozzle used in geothermal turbines and antiscale thereof.Namely be provided with cooling water path at underground heat in steam turbine initial segment nozzle, make the latter's inlet side path and the cooling water inlet path UNICOM that is located at the inside-and-outside ring chamber, make simultaneously its outlet side path and coolant outlet path UNICOM.Utilize this structure, cooling water is defeated by cooling water path in nozzle from the cooling water supply source, cause the surface temperature of nozzle to descend, stop thus the evaporation again of effluent on blade surface and concentrated, and prevented separating out of scale.
US Patent No. 6860718 discloses a kind of geothermal steam turbine rotor blade that improves, the parts such as nozzle and turbine rotor, and under the geothermal vapour working environment, opposing corrosion and erosion increase the service life and effectively prevent aging geothermal steam turbine.
Certainly, also have CN2400434Y to disclose a kind of high-pressure electrostatic descaling device that is mainly used in the Cooling Tubes of Condenser scale removal of steam turbine subsidiary engine and prevents from generating incrustation scale, required electrostatic high-pressure several ten thousand volts.
Adopt the washing agent scale removal need to shut down processing; The scale removal of high-pressure electrostatic is the subsidiary engine Cooling Tubes of Condenser scale removal for steam turbine; Act locally on nozzle used in geothermal turbines and antiscale thereof, do not relate to other parts of moving vane and steam chest; The cleaning in advance of geothermal vapour, although considered elimination chlorion and other impurity comprehensively, but be subject to the impact of geothermal vapour utilization ratio and steam turbine for geothermal power generation running parameter, rarely fall separating out of the solubility that may cause and silicon and silicate because of temperature, the fouling on nozzle of steam turbine and moving vane surface still can produce; And improve the parts such as geothermal steam turbine rotor blade, nozzle and turbine rotor, and can only play opposing corrosion and corrode, be not suppress or prevent fouling, when turbine fouling is serious, the reliability of steam turbine for geothermal power generation there is great impact.
Summary of the invention
Purpose of the present invention is exactly to provide a kind of method of improving steam working medium purity, suppressing the inhibition steam turbine for geothermal power generation from scaling of fouling successful for the defective that overcomes above-mentioned prior art existence.
Purpose of the present invention can be achieved through the following technical solutions:
A kind of method that suppresses steam turbine for geothermal power generation from scaling is characterized in that, the method comprises the following steps:
(1) with steam turbine for geothermal power generation connecting tee valve one end, the other end of triple valve connects the geothermal vapour pipeline through geothermal vapour pipe control valve, the 3rd end of triple valve connects pure water steam line control valve, gas storage tank and steam generator successively, geothermal vapour pipe control valve, chain control loop and pure water steam line control valve connect through return, consist of chain response;
(2) pure water obtains pure water steam through the steam generator vaporization, and pure water steam concentrates in gas storage tank;
(3) utilize chain control loop, control geothermal vapour pipe control valve and pure water steam line control valve and open or close, geothermal vapour and pure water steam are alternately passed into to steam turbine for geothermal power generation.
The number of times that the middle geothermal vapour of described step (3) and pure water steam alternately pass into steam turbine for geothermal power generation is 2-6 time/hour.
In described step (3) geothermal vapour and pure water steam alternately pass into the time of steam turbine for geothermal power generation be 20-360 second/time.
Compared with prior art, the physical property of the pure water steam working medium of checker of the present invention is hot steam equally, and chemical purity is better than geothermal vapour, and designing and calculating foundation and the running parameter of all steam turbine for geothermal power generation do not change because of pure water steam working medium.When improving steam working medium purity, destroyed in steam chest and the continous-stable state on nozzle of steam turbine and moving vane surface, suppress surface and the interior fouling of whole steam chest of nozzle of steam turbine and moving vane.Directly checker pure water steam working medium regularly, can also wash away processing to the fouling that has just produced.The frequency of checker is higher, and the time of continuous action is longer, and its effect that suppresses fouling is better.
Description of drawings
Fig. 1 is steam turbine for geothermal power generation checker working medium pipeline schematic diagram in embodiment 1.
In figure, 1 is that geothermal vapour pipe control valve, 2 is that pure water steam line control valve, 3 is that triple valve, 4 is that geothermal vapour, 5 is that pure water, 6 is that steam turbine for geothermal power generation, 7 is that gas storage tank, 8 is that steam generator, 9 is chain control loop.
Embodiment
The present invention is described in detail below in conjunction with the drawings and specific embodiments.
Embodiment 1
A kind of method that suppresses steam turbine for geothermal power generation from scaling, as shown in Figure 1, the method comprises the following steps:
(1) steam turbine for geothermal power generation 6 is connected with an end of triple valve 3 through the geothermal vapour pipeline, the other end of triple valve 3 is connected through the end of geothermal vapour pipeline with geothermal vapour pipe control valve 1, geothermal vapour pipe control valve 1 the other end connecting tube, be connected with geothermal vapour 4 in pipeline, the 3rd gateway of triple valve 3 is connected through the end of pure water steam line with pure water steam line control valve 2, the other end of pure water steam line control valve 2 is connected with gas storage tank 7, gas storage tank 7 is connected with steam generator 8 through pipeline, geothermal vapour pipe control valve 1, chain control loop 9 and pure water steam line control valve 2 connect through return, consist of chain response,
(2) deionized water 5 obtains pure water steam through steam generator 8 vaporizations, and pure water steam concentrates in gas storage tank 7;
(3) utilize chain control loop 9, open geothermal vapour pipe control valve 1, close pure water steam line control valve 2, pass into geothermal vapour in steam turbine for geothermal power generation, then close geothermal vapour pipe control valve 1, open pure water steam line control valve 2, pass into pure water steam in steam turbine for geothermal power generation, the number of times that geothermal vapour and pure water steam alternately pass into steam turbine for geothermal power generation is 2 times/hour, each endurance is 180 seconds, steam turbine for geothermal power generation power is 1MW, the initial steam pressure of geothermal vapour is 0.09MPa, throttle flow is 17.0t/h, the initial steam pressure of pure water steam is 0.10MPa.
Embodiment 2
A kind of method that suppresses steam turbine for geothermal power generation from scaling, the method comprises the following steps:
(1) steam turbine for geothermal power generation is connected with an end of triple valve through the geothermal vapour pipeline, the other end of triple valve is connected through the end of geothermal vapour pipeline with geothermal vapour pipe control valve, geothermal vapour pipe control valve the other end connecting tube, be connected with geothermal vapour in pipeline, the 3rd gateway of triple valve is connected through the end of pure water steam line with pure water steam line control valve, the other end of pure water steam line control valve is connected with gas storage tank, gas storage tank is connected with steam generator through pipeline, geothermal vapour pipe control valve, chain control loop and pure water steam line control valve connect through return, consist of chain response,
(2) deionized water obtains pure water steam through the steam generator vaporization, and pure water steam concentrates in gas storage tank;
(3) utilize chain control loop, open geothermal vapour pipe control valve, close pure water steam line control valve, pass into geothermal vapour in steam turbine for geothermal power generation, then close geothermal vapour pipe control valve, open pure water steam line control valve, pass into pure water steam in steam turbine for geothermal power generation, the number of times that geothermal vapour and pure water steam alternately pass into steam turbine for geothermal power generation is 3 times/hour, each endurance is 120 seconds, steam turbine for geothermal power generation power is 1MW, the initial steam pressure of geothermal vapour is 0.09MPa, throttle flow is 17.0t/h, the initial steam pressure of pure water steam is 0.10MPa.
Embodiment 3
A kind of method that suppresses steam turbine for geothermal power generation from scaling, the method comprises the following steps:
(1) steam turbine for geothermal power generation is connected with an end of triple valve through the geothermal vapour pipeline, the other end of triple valve is connected through the end of geothermal vapour pipeline with geothermal vapour pipe control valve, geothermal vapour pipe control valve the other end connecting tube, be connected with geothermal vapour in pipeline, the 3rd gateway of triple valve is connected through the end of pure water steam line with pure water steam line control valve, the other end of pure water steam line control valve is connected with gas storage tank, gas storage tank is connected with steam generator through pipeline, geothermal vapour pipe control valve, chain control loop and pure water steam line control valve connect through return, consist of chain response,
(2) advanced desalination water obtains pure water steam through the steam generator vaporization, and pure water steam concentrates in gas storage tank;
(3) utilize chain control loop, open geothermal vapour pipe control valve, close pure water steam line control valve, pass into geothermal vapour in steam turbine for geothermal power generation, then close geothermal vapour pipe control valve, open pure water steam line control valve, pass into pure water steam in steam turbine for geothermal power generation, the number of times that geothermal vapour and pure water steam alternately pass into steam turbine for geothermal power generation is 4 times/hour, each endurance is 90 seconds, steam turbine for geothermal power generation power is 1MW, the initial steam pressure of geothermal vapour is 0.09MPa, throttle flow is 17.0t/h, the initial steam pressure of pure water steam is 0.11MPa.
Embodiment 4
A kind of method that suppresses steam turbine for geothermal power generation from scaling, the method comprises the following steps:
(1) steam turbine for geothermal power generation is connected with an end of triple valve through the geothermal vapour pipeline, the other end of triple valve is connected through the end of geothermal vapour pipeline with geothermal vapour pipe control valve, geothermal vapour pipe control valve the other end connecting tube, be connected with geothermal vapour in pipeline, the 3rd gateway of triple valve is connected through the end of pure water steam line with pure water steam line control valve, the other end of pure water steam line control valve is connected with gas storage tank, gas storage tank is connected with steam generator through pipeline, geothermal vapour pipe control valve, chain control loop and pure water steam line control valve connect through return, consist of chain response,
(2) deionized water obtains pure water steam through the steam generator vaporization, and pure water steam concentrates in gas storage tank;
(3) utilize chain control loop, open geothermal vapour pipe control valve, close pure water steam line control valve, pass into geothermal vapour in steam turbine for geothermal power generation, then close geothermal vapour pipe control valve, open pure water steam line control valve, pass into pure water steam in steam turbine for geothermal power generation, the number of times that geothermal vapour and pure water steam alternately pass into steam turbine for geothermal power generation is 6 times/hour, each endurance is 60 seconds, steam turbine for geothermal power generation power is 1MW, the initial steam pressure of geothermal vapour is 0.09MPa, throttle flow is 17.0t/h, the initial steam pressure of pure water steam is 0.11MPa.
Embodiment 5
A kind of method that suppresses steam turbine for geothermal power generation from scaling, the method comprises the following steps:
(1) steam turbine for geothermal power generation is connected with an end of triple valve through the geothermal vapour pipeline, the other end of triple valve is connected through the end of geothermal vapour pipeline with geothermal vapour pipe control valve, geothermal vapour pipe control valve the other end connecting tube, be connected with geothermal vapour in pipeline, the 3rd gateway of triple valve is connected through the end of pure water steam line with pure water steam line control valve, the other end of pure water steam line control valve is connected with gas storage tank, gas storage tank is connected with steam generator through pipeline, geothermal vapour pipe control valve, chain control loop and pure water steam line control valve connect through return, consist of chain response,
(2) deionized water obtains pure water steam through the steam generator vaporization, and pure water steam concentrates in gas storage tank;
(3) utilize chain control loop, open geothermal vapour pipe control valve, close pure water steam line control valve, pass into geothermal vapour in steam turbine for geothermal power generation, then close geothermal vapour pipe control valve, open pure water steam line control valve, pass into pure water steam in steam turbine for geothermal power generation, the number of times that geothermal vapour and pure water steam alternately pass into steam turbine for geothermal power generation is 2 times/hour, each endurance is 360 seconds, steam turbine for geothermal power generation power is 3MW, the initial steam pressure of geothermal vapour is 0.17MPa, throttle flow is 25.5t/h, the initial steam pressure of pure water steam is 0.18MPa.
Embodiment 6
(1) steam turbine for geothermal power generation is connected with an end of triple valve through the geothermal vapour pipeline, the other end of triple valve is connected through the end of geothermal vapour pipeline with geothermal vapour pipe control valve, geothermal vapour pipe control valve the other end connecting tube, be connected with geothermal vapour in pipeline, the 3rd gateway of triple valve is connected through the end of pure water steam line with pure water steam line control valve, the other end of pure water steam line control valve is connected with gas storage tank, gas storage tank is connected with steam generator through pipeline, geothermal vapour pipe control valve, chain control loop and pure water steam line control valve connect through return, consist of chain response,
(2) deionized water obtains pure water steam through the steam generator vaporization, and pure water steam concentrates in gas storage tank;
(3) utilize chain control loop, open geothermal vapour pipe control valve, close pure water steam line control valve, pass into geothermal vapour in steam turbine for geothermal power generation, then close geothermal vapour pipe control valve, open pure water steam line control valve, pass into pure water steam in steam turbine for geothermal power generation, the number of times that geothermal vapour and pure water steam alternately pass into steam turbine for geothermal power generation is 3 times/hour, each endurance is 240 seconds, steam turbine for geothermal power generation power is 3MW, the initial steam pressure of geothermal vapour is 0.17MPa, throttle flow is 25.5t/h, the initial steam pressure of pure water steam is 0.19MPa.
Embodiment 7
(1) steam turbine for geothermal power generation is connected with an end of triple valve through the geothermal vapour pipeline, the other end of triple valve is connected through the end of geothermal vapour pipeline with geothermal vapour pipe control valve, geothermal vapour pipe control valve the other end connecting tube, be connected with geothermal vapour in pipeline, the 3rd gateway of triple valve is connected through the end of pure water steam line with pure water steam line control valve, the other end of pure water steam line control valve is connected with gas storage tank, gas storage tank is connected with steam generator through pipeline, geothermal vapour pipe control valve, chain control loop and pure water steam line control valve connect through return, consist of chain response,
(2) advanced desalination water obtains pure water steam through the steam generator vaporization, and pure water steam concentrates in gas storage tank;
(3) utilize chain control loop, open geothermal vapour pipe control valve, close pure water steam line control valve, pass into geothermal vapour in steam turbine for geothermal power generation, then close geothermal vapour pipe control valve, open pure water steam line control valve, pass into pure water steam in steam turbine for geothermal power generation, the number of times that geothermal vapour and pure water steam alternately pass into steam turbine for geothermal power generation is 4 times/hour, each endurance is 180 seconds, steam turbine for geothermal power generation power is 3MW, the initial steam pressure of geothermal vapour is 0.17MPa, throttle flow is 25.5t/h, the initial steam pressure of pure water steam is 0.20MPa.
Embodiment 8
(1) steam turbine for geothermal power generation is connected with an end of triple valve through the geothermal vapour pipeline, the other end of triple valve is connected through the end of geothermal vapour pipeline with geothermal vapour pipe control valve, geothermal vapour pipe control valve the other end connecting tube, be connected with geothermal vapour in pipeline, the 3rd gateway of triple valve is connected through the end of pure water steam line with pure water steam line control valve, the other end of pure water steam line control valve is connected with gas storage tank, gas storage tank is connected with steam generator through pipeline, geothermal vapour pipe control valve, chain control loop and pure water steam line control valve connect through return, consist of chain response,
(2) advanced desalination water obtains pure water steam through the steam generator vaporization, and pure water steam concentrates in gas storage tank;
(3) utilize chain control loop, open geothermal vapour pipe control valve, close pure water steam line control valve, pass into geothermal vapour in steam turbine for geothermal power generation, then close geothermal vapour pipe control valve, open pure water steam line control valve, pass into pure water steam in steam turbine for geothermal power generation, the number of times that geothermal vapour and pure water steam alternately pass into steam turbine for geothermal power generation is 6 times/hour, each endurance is 120 seconds, steam turbine for geothermal power generation power is 3MW, the initial steam pressure of geothermal vapour is 0.17MPa, throttle flow is 25.5t/h, the initial steam pressure of pure water steam is 0.20MPa.
According to different steam turbine for geothermal power generation and process parameter in embodiment 1-8, calculate the consumption at pure water steam, as shown in table 1.
Table 1 pure water steam consumption
Figure GDA00002709999700081

Claims (3)

1. a method that suppresses steam turbine for geothermal power generation from scaling, is characterized in that, the method comprises the following steps:
(1) with steam turbine for geothermal power generation connecting tee valve one end, the other end of triple valve connects the geothermal vapour pipeline through geothermal vapour pipe control valve, the 3rd end of triple valve connects pure water steam line control valve, gas storage tank and steam generator successively, geothermal vapour pipe control valve, chain control loop and pure water steam line control valve connect through return, consist of chain response;
(2) pure water obtains pure water steam through the steam generator vaporization, and pure water steam concentrates in gas storage tank;
(3) utilize chain control loop, control geothermal vapour pipe control valve and pure water steam line control valve and open or close, geothermal vapour and pure water steam are alternately passed into to steam turbine for geothermal power generation.
2. a kind of method that suppresses steam turbine for geothermal power generation from scaling according to claim 1, is characterized in that, the number of times that the middle geothermal vapour of described step (3) and pure water steam alternately pass into steam turbine for geothermal power generation is 2-6 time/hour.
3. a kind of method that suppresses steam turbine for geothermal power generation from scaling according to claim 1, is characterized in that, in described step (3) geothermal vapour and pure water steam alternately pass into the time of steam turbine for geothermal power generation be 20-360 second/time.
CN 200910052779 2009-06-09 2009-06-09 Method for suppressing steam turbine for geothermal power generation from scaling Expired - Fee Related CN101922313B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200910052779 CN101922313B (en) 2009-06-09 2009-06-09 Method for suppressing steam turbine for geothermal power generation from scaling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200910052779 CN101922313B (en) 2009-06-09 2009-06-09 Method for suppressing steam turbine for geothermal power generation from scaling

Publications (2)

Publication Number Publication Date
CN101922313A CN101922313A (en) 2010-12-22
CN101922313B true CN101922313B (en) 2013-06-26

Family

ID=43337491

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200910052779 Expired - Fee Related CN101922313B (en) 2009-06-09 2009-06-09 Method for suppressing steam turbine for geothermal power generation from scaling

Country Status (1)

Country Link
CN (1) CN101922313B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104533542B (en) * 2014-12-23 2016-06-29 青岛捷能汽轮机集团股份有限公司 A kind of geothermal steam turbine and main inlet throttle-stop valve thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1060352A (en) * 1991-10-29 1992-04-15 四川电力科学试验研究所 The cleaning method and the device of steam turbine silicon dirt
US6575711B1 (en) * 1999-01-29 2003-06-10 Thermodyn Method and device for controlling a turbo-machine so as to limit clogging of the turbo-machine internal parts with impurities derived from a process gas
CN1705524A (en) * 2004-02-16 2005-12-07 燃气涡轮效率股份有限公司 Method and apparatus for cleaning a turbofan gas turbine engine
CN1924302A (en) * 2006-09-15 2007-03-07 唐山三友化工股份有限公司 Method for turbine washing with damp steam
CN101298841A (en) * 2008-06-12 2008-11-05 秦皇岛首秦金属材料有限公司 Blade descaling method for blast furnace gas remaining pressure power generation turbine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1060352A (en) * 1991-10-29 1992-04-15 四川电力科学试验研究所 The cleaning method and the device of steam turbine silicon dirt
US6575711B1 (en) * 1999-01-29 2003-06-10 Thermodyn Method and device for controlling a turbo-machine so as to limit clogging of the turbo-machine internal parts with impurities derived from a process gas
CN1705524A (en) * 2004-02-16 2005-12-07 燃气涡轮效率股份有限公司 Method and apparatus for cleaning a turbofan gas turbine engine
CN1924302A (en) * 2006-09-15 2007-03-07 唐山三友化工股份有限公司 Method for turbine washing with damp steam
CN101298841A (en) * 2008-06-12 2008-11-05 秦皇岛首秦金属材料有限公司 Blade descaling method for blast furnace gas remaining pressure power generation turbine

Also Published As

Publication number Publication date
CN101922313A (en) 2010-12-22

Similar Documents

Publication Publication Date Title
JP4762555B2 (en) Power generation desalination method
CN202928442U (en) Online ultrasonic antiscaling and descaling system of turbine condenser
JP2019082314A (en) Chemical cleaning method for boiler
CN105973061B (en) A kind of descaling method of condenser of power plant
CN101922313B (en) Method for suppressing steam turbine for geothermal power generation from scaling
CN113526600B (en) Desalting and deoxidizing equipment and method
WO2012066490A1 (en) Combined cycle plant for energy production and method for operating said plant
CN102564216A (en) Method for washing condenser of thermal power plant without intermission
CN208718623U (en) A kind of scaler system for high mineralization geothermal well
CN102392702B (en) Fully-closed circulating water system for recovering latent heat of condensing generation units by utilizing air cooler
CN109763867B (en) Method and system for descaling through-flow part of steam turbine
CN101408116A (en) Electrothermic plant aqueous vapor full circle heat system and residual heat utilization process flow
CN212296511U (en) Flushing system for salt deposit of power station steam turbine
CN209672649U (en) Absorption heat pump residual neat recovering system
CN205980929U (en) Scale removal device of power plant condenser
WO2011080576A2 (en) Combined-cycle plant for the production of electric and thermal energy and method for operating said plant
CN101403574B (en) Dual-function non-condensing gas cleaner
CN102650486B (en) Closed water cooling system being capable of producing condensed water
CN206970319U (en) A kind of temporary hardness boiler feed water corrosion-mitigation scale-inhibition water treatment system
CN111256516A (en) Online cleaning method for open-type circulating condenser
CN207795328U (en) A kind of cooling system of Direct Air-Cooled formula Turbo-generator Set
CN106630044A (en) Condensated water energy resonance field refine-processing device for vapor/water circulation system of power generating boiler
CN103899369A (en) Closed water cooling system with twin-jet nozzle for evaporative cooling
CN205435760U (en) Duolite regenerating unit for condensate polishing
CN209957714U (en) Closed type scale inhibition cooling system for calcium carbide wet acetylene

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130626

Termination date: 20160609

CF01 Termination of patent right due to non-payment of annual fee