CN101914999A - 整体化机房快速集成通信装置 - Google Patents
整体化机房快速集成通信装置 Download PDFInfo
- Publication number
- CN101914999A CN101914999A CN 201010257108 CN201010257108A CN101914999A CN 101914999 A CN101914999 A CN 101914999A CN 201010257108 CN201010257108 CN 201010257108 CN 201010257108 A CN201010257108 A CN 201010257108A CN 101914999 A CN101914999 A CN 101914999A
- Authority
- CN
- China
- Prior art keywords
- machine room
- tower body
- communication device
- tower
- integrative
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Support Of Aerials (AREA)
Abstract
本发明涉及一种通信设备装置,公开了一种用于无线通信用的整体化机房快速集成通信装置。它包括塔体(5)和设于塔体(5)顶端的天线支架(6),所述塔体(5)为管塔或桁架塔结构,所述塔体(5)设于整体化机房(2)上部,整体化机房(2)设置于一布置在地面上的预制配重式基础(1)上,所述整体化机房(2)与塔体(5)之间设有至少四根将所述整体化机房(2)与塔体(5)牢固连接在一起的塔体斜撑(4)。本发明将塔体、整体化机房、预制配重式基础三者结合为一体,利用预制配重式基础整体抗倾覆,具有结构合理、紧凑、使用方便、可靠,占地面积省,避免混凝土垫层施工,场地适应性高,能在四小时之内完成基站部署和投入运行等优点。
Description
技术领域
本发明涉及一种通信设备装置,尤其涉及一种用于无线通信用的快速集成通信装置。
背景技术
现有技术中,为解决搬迁区域民扰和网络覆盖要求,各通信运营商主要采用快速集成通信装置进行网络部署。一般都是采用管塔或桁架塔与机房外框架连接的、且塔体可以借助动力源实现塔体自升降的快速集成通信装置进行网络部署。但是由于机房仅是容纳基站通信设备的容器,不能承受塔体荷载,因而塔体不能直接与机房连接。为保证基站装置的正常使用及维护,须单独在机房外部设置机房外框架承受塔体荷载,在运输宽度受限的条件下,机房内部净空间受到限制,难于满足业主对基站机房空间的要求;同时机房外框架由于制造及安装工艺原因,不能做成整体式的,必然有一个组装程序,无形中增加使用和维护成本。
发明内容
本发明针对现有技术中存在的机房不能直接承受塔体荷载,在运输宽度受限的条件下,机房内部净空间受到限制,难于满足业主对基站机房空间的要求等缺点,而提供了一种在保证通信质量的前提下,能够进行快速安装集成、迅速高效投入运行的整体化机房快速集成通信装置。本发明突破性地将机房外框架与机房本体有机融为一体,机房不再简单地充当容纳通信设备的容器,而转变成了既承受外部高耸塔体(比如30m)荷载又容纳通信设备的房屋,机房直接承受塔体荷载,在占地面积保持不变的前提下,节约了机房外框架的空间,最大限度提高机房净空间,满足业主对基站机房的空间要求;机房本体与机房外框架融合,省去了机房外框架的安装程序,降低基站的制造、安装、使用及维护成本。
为了解决上述技术问题,本发明通过下述技术方案得以解决:
整体化机房快速集成通信装置,包括塔体和设于塔体顶端的天线支架,所述塔体为管塔或桁架塔结构,所述塔体设于整体化机房上部,整体化机房设置于一布置在地面上的预制配重式基础上,所述整体化机房与塔体之间设有至少四根将所述整体化机房与塔体牢固连接在一起的塔体斜撑;所述整体化机房包括机房骨架和机房本体,机房骨架和机房本体采用一体式结构融合而成。
本技术方案区别于传统的机房外单独设置机房外框架的结构,机房不再简单地充当容纳通信设备的容器,而转变成了既承受外部高耸塔体(比如30m)荷载又容纳通信设备的房屋,整体化机房直接承受塔体荷载,在占地面积保持不变的前提下,节约了机房外框架的空间,最大限度提高机房净空间,满足业主对基站机房的空间要求;机房本体与机房骨架架相融合,省去了机房外框架的安装程序。
作为优选,所述塔体固定设于整体化机房的顶部正中央。
作为优选,所述整体化机房顶面四周设有保护围栏。兼有防护和美观的作用。
作为优选,所述保护围栏通过连接件固定装设在整体化机房顶面四周。
作为优选,所述塔体为升降式铁塔。
作为优选,所述塔体由带法兰的塔段相互连接而成,不带升降功能。
作为优选,所述预制配重式基础由至少一根预制混凝土地梁构成。
作为优选,所述预制配重式基础由至少一根预制混凝土底板构成。
作为优选,所述预制配重式基础通过活动拉杆或固定拉杆与整体化机房连接在一起,且通过活动拉杆或固定拉杆上的螺母可调节式连接。
本发明将塔体、整体化机房、预制配重式基础三者结合为一体,同时将铁塔置于机房房顶中央,利用预制配重式基础整体抗倾覆,具有结构合理、紧凑、使用方便、可靠,占地面积省,避免混凝土垫层施工,场地适应性高,能在四小时之内完成基站部署和投入运行等优点。
附图说明
图1为本发明实施例1的结构示意图。
图2为图1的俯视图。
图3为本发明实施例2的结构示意图。
图4为图3的俯视图。
图5为本发明实施例中机房骨架的结构示意图。
图6为图5的俯视图。
图7为本发明实施例中带保护围栏的整体化机房的结构示意图。
图8为图7的俯视图。
具体实施方式
下面结合附图1至图8与实施例对本发明作进一步详细描述:
实施例1整体化机房快速集成通信装置,如图1和图2所示,包括塔体5和设于塔体5顶端的天线支架6,所述塔体5为管塔或桁架塔结构,所述塔体5设于整体化机房2上部,整体化机房2设置于一布置在地面上的预制配重式基础1上,所述整体化机房2与塔体5之间设有至少四根将所述整体化机房2与塔体5牢固连接在一起的塔体斜撑4。
其中,所述整体化机房2包括机房骨架21和机房本体22,机房骨架21和机房本体22采用一体式结构融合而成;塔体5固定设于整体化机房2的顶部正中央;整体化机房2顶面四周设有保护围栏3,保护围栏3通过连接件固定装设在整体化机房2顶面四周。机房骨架21的结构示意图如图5和6所示,带保护围栏3的整体化机房2的结构示意图如图7和8所示。
本实施例1中,所述塔体5为升降式铁塔。
所述预制配重式基础1由至少一根预制混凝土地梁或底板构成。
预制配重式基础1通过活动拉杆或固定拉杆与整体化机房2连接在一起,且通过活动拉杆或固定拉杆上的螺母可调节式连接。
本发明在到达现场后的整个实施过程是:场地平整,利用碎石垫平安装基础面;将预制混凝土地梁吊运到碎石基础面上,按预定要求排布部署地梁,地梁调整水平;把整体化机房2吊至地梁正上方,在整体化机房2底部穿入拉杆,带上调节螺母,缓慢放下整体化机房2,将拉杆全部放入预制混凝土地梁预制孔,穿入地梁紧固垫片和螺母,拧紧,逐个调整拉杆上的螺母,将整体化机房2调节至预定要求;吊起塔体5至整体化机房2顶部正中央,利用螺栓穿过塔体5底部法兰和整体化机房2的顶部法兰连接孔,把塔体5(升降式铁塔)固定在整体化机房2顶部正中央;吊机起吊塔体斜撑4至塔体5和整体化机房2之间,分别穿入连接螺栓将塔体斜撑4与塔体5及整体化机房2牢固连接成一体;利用塔体5自身升降装置将铁塔升高至预定高度,在铁塔塔段重叠处运用抱刳将紧邻塔段牢固连接;人工爬至须放置天线位置,将天线支架6安装到塔体上;保护围栏3通过特殊连接件牢固连接在整体化机房2的顶面四周;调节塔体斜撑4的支座,使塔体5垂直度满足使用要求。本发明所述天线支架6至少由两段支架相接组成。
本发明实施例主要由整体化机房2、塔体5(升降式铁塔)、预制配重式基础1三部分组成,无需进行机房外框架装配。它能有效提高快速集成通信装置的场地适应性,可以真正的快速布置,对于解决民扰区域的快速网络覆盖不失为更好的方案。
实施例2整体化机房快速集成通信装置,如图3和图4所示。本实施例中,图3所示的塔体5由带法兰的塔段相互连接构成,无升降功能,其他与实施例1相同。
本发明所用塔体有两种结构形式,如实施例1所述,塔体5为升降式铁塔,又如实施例2所述,塔体5为无升降功能的法兰连接塔体。这两种塔体均放置于整体化机房2顶部正中央,但不限于此两种结构和安装方式。
本发明技术方案取消了机房外框架的制作与安装,使结构更加简洁、安装更加快捷、简便、高效,既节省了机房外框架的加工成本,又减少了整个装置部署所使用的时间。同时在占地面积不变的前提下,机房内部净使用空间最大化地提高,满足业主提高机房设备容量的要求。
总之,以上所述仅为本发明的较佳实施例,凡依本发明申请专利范围所作的均等变化与修饰,皆应属本发明专利的涵盖范围。
Claims (9)
1.整体化机房快速集成通信装置,包括塔体(5)和设于塔体(5)顶端的天线支架(6),其特征在于:所述塔体(5)为管塔或桁架塔结构,所述塔体(5)设于整体化机房(2)上部,整体化机房(2)设置于一布置在地面上的预制配重式基础(1)上,所述整体化机房(2)与塔体(5)之间设有至少四根将所述整体化机房(2)与塔体(5)牢固连接在一起的塔体斜撑(4);所述整体化机房(2)包括机房骨架(21)和机房本体(22),机房骨架(21)和机房本体(22)采用一体式结构融合而成。
2.根据权利要求1所述的整体化机房快速集成通信装置,其特征在于:所述塔体(5)固定设于整体化机房(2)的顶部正中央。
3.根据权利要求1或2所述的整体化机房快速集成通信装置,其特征在于:所述整体化机房(2)顶面四周设有保护围栏(3)。
4.根据权利要求3所述的整体化机房快速集成通信装置,其特征在于:所述保护围栏(3)通过连接件固定装设在整体化机房(2)顶面四周。
5.根据权利要求1所述的整体化机房快速集成通信装置,其特征在于:所述塔体(5)为升降式铁塔。
6.根据权利要求1所述的整体化机房快速集成通信装置,其特征在于:所述塔体(5)由带法兰的塔段相互连接而成。
7.根据权利要求1所述的整体化机房快速集成通信装置,其特征在于:所述预制配重式基础(1)由至少一根预制混凝土地梁构成。
8.根据权利要求1所述的整体化机房快速集成通信装置,其特征在于:所述预制配重式基础(1)由至少一根预制混凝土底板构成。
9.根据权利要求7或8所述的整体化机房快速集成通信装置,其特征在于:所述预制配重式基础(1)通过活动拉杆或固定拉杆与整体化机房(2)连接在一起,且通过活动拉杆或固定拉杆上的螺母可调节式连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010257108 CN101914999A (zh) | 2010-08-19 | 2010-08-19 | 整体化机房快速集成通信装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010257108 CN101914999A (zh) | 2010-08-19 | 2010-08-19 | 整体化机房快速集成通信装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101914999A true CN101914999A (zh) | 2010-12-15 |
Family
ID=43322617
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010257108 Pending CN101914999A (zh) | 2010-08-19 | 2010-08-19 | 整体化机房快速集成通信装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101914999A (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102900252A (zh) * | 2012-10-31 | 2013-01-30 | 湖南省邮电规划设计院有限公司 | 一种速建式集成组装通信基站及其组装方法 |
CN103410367A (zh) * | 2013-07-08 | 2013-11-27 | 浙江和勤通信工程有限公司 | 景观风情小站 |
CN106639390A (zh) * | 2016-11-03 | 2017-05-10 | 宜兴市申益体育设施有限公司 | 一种可自动升降式垫层升降柱结构 |
CN106760890A (zh) * | 2017-02-28 | 2017-05-31 | 德阳市恒达灯具制造有限公司 | 基座及采用该基座的集成式防盗基站 |
CN107355125A (zh) * | 2016-05-09 | 2017-11-17 | 衡水科航金属结构有限公司 | 一种集成环保快装基站 |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2281510A1 (en) * | 1997-02-25 | 1998-09-11 | Monosite, Inc. | Integrated communications equipment enclosure and antenna tower |
US6557312B2 (en) * | 2000-08-24 | 2003-05-06 | Mcginnis Henry J. | Prefabricated-building tower foundation |
CN2780903Y (zh) * | 2005-01-05 | 2006-05-17 | 李震 | 移动式通讯塔 |
CN101289905A (zh) * | 2008-05-22 | 2008-10-22 | 电联工程技术有限公司 | 快速集成通信装置 |
CN201176728Y (zh) * | 2008-03-07 | 2009-01-07 | 上海同演建筑科技有限公司 | 拉索自立塔体和机房一体化通信铁塔 |
CN201180382Y (zh) * | 2008-01-29 | 2009-01-14 | 东莞市一信通信科技有限公司 | 一体化通信杆铁甲舱体 |
CN201268968Y (zh) * | 2008-10-10 | 2009-07-08 | 后德虎 | 一体化节能通信机房和通信塔 |
CN201486200U (zh) * | 2009-08-06 | 2010-05-26 | 天津市大正通讯工程有限公司 | 自带机房式钢管塔 |
CN101769089A (zh) * | 2009-12-31 | 2010-07-07 | 电联工程技术有限公司 | 自带配重式快速集成通信装置 |
CN201778510U (zh) * | 2010-08-19 | 2011-03-30 | 电联工程技术有限公司 | 整体化机房快速集成通信装置 |
-
2010
- 2010-08-19 CN CN 201010257108 patent/CN101914999A/zh active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2281510A1 (en) * | 1997-02-25 | 1998-09-11 | Monosite, Inc. | Integrated communications equipment enclosure and antenna tower |
US6557312B2 (en) * | 2000-08-24 | 2003-05-06 | Mcginnis Henry J. | Prefabricated-building tower foundation |
CN2780903Y (zh) * | 2005-01-05 | 2006-05-17 | 李震 | 移动式通讯塔 |
CN201180382Y (zh) * | 2008-01-29 | 2009-01-14 | 东莞市一信通信科技有限公司 | 一体化通信杆铁甲舱体 |
CN201176728Y (zh) * | 2008-03-07 | 2009-01-07 | 上海同演建筑科技有限公司 | 拉索自立塔体和机房一体化通信铁塔 |
CN101289905A (zh) * | 2008-05-22 | 2008-10-22 | 电联工程技术有限公司 | 快速集成通信装置 |
CN201268968Y (zh) * | 2008-10-10 | 2009-07-08 | 后德虎 | 一体化节能通信机房和通信塔 |
CN201486200U (zh) * | 2009-08-06 | 2010-05-26 | 天津市大正通讯工程有限公司 | 自带机房式钢管塔 |
CN101769089A (zh) * | 2009-12-31 | 2010-07-07 | 电联工程技术有限公司 | 自带配重式快速集成通信装置 |
CN201778510U (zh) * | 2010-08-19 | 2011-03-30 | 电联工程技术有限公司 | 整体化机房快速集成通信装置 |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102900252A (zh) * | 2012-10-31 | 2013-01-30 | 湖南省邮电规划设计院有限公司 | 一种速建式集成组装通信基站及其组装方法 |
CN102900252B (zh) * | 2012-10-31 | 2014-11-26 | 湖南省邮电规划设计院有限公司 | 一种速建式集成组装通信基站及其组装方法 |
CN103410367A (zh) * | 2013-07-08 | 2013-11-27 | 浙江和勤通信工程有限公司 | 景观风情小站 |
CN103410367B (zh) * | 2013-07-08 | 2016-06-01 | 浙江和勤通信工程有限公司 | 景观风情小站 |
CN107355125A (zh) * | 2016-05-09 | 2017-11-17 | 衡水科航金属结构有限公司 | 一种集成环保快装基站 |
CN106639390A (zh) * | 2016-11-03 | 2017-05-10 | 宜兴市申益体育设施有限公司 | 一种可自动升降式垫层升降柱结构 |
CN106760890A (zh) * | 2017-02-28 | 2017-05-31 | 德阳市恒达灯具制造有限公司 | 基座及采用该基座的集成式防盗基站 |
CN106760890B (zh) * | 2017-02-28 | 2022-05-17 | 德阳市恒达灯具制造有限公司 | 基座及采用该基座的集成式防盗基站 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20220145658A1 (en) | Systems and methods for self-standing, self-supporting, rapid-deployment, movable communications towers | |
CN101914999A (zh) | 整体化机房快速集成通信装置 | |
CN103132766B (zh) | 用于升高输电线路塔接腿的桁架及架设方法 | |
CN202202587U (zh) | 一种通讯基站 | |
CN201778510U (zh) | 整体化机房快速集成通信装置 | |
WO2020159926A1 (en) | Multi-column wind turbine tower and erection method | |
CN101769089A (zh) | 自带配重式快速集成通信装置 | |
CN201635472U (zh) | 自带配重式快速集成通信装置 | |
CN202138956U (zh) | 电气盘柜起吊安装装置 | |
CN104652853B (zh) | 快速起吊安装建筑结构 | |
CN202248995U (zh) | 一种适合山地使用的快速集成通信装置 | |
CN203626356U (zh) | 快速通信管塔 | |
CN205811032U (zh) | 一种屋面小型化快装式通信天线支撑杆 | |
CN204920399U (zh) | 一种便于安装的通信塔 | |
CN203742233U (zh) | 无损伤式屋面通信塔 | |
CN202012216U (zh) | 整体式机房通信装置 | |
CN108411805B (zh) | 一种快铺直升机停机坪单元及停机坪 | |
CN202248994U (zh) | 用于受限场地的便携式通信装置 | |
CN202550057U (zh) | 天线抱杆装置 | |
CN113175196A (zh) | 索网施工平台 | |
CN201486200U (zh) | 自带机房式钢管塔 | |
CN201167125Y (zh) | 屋面通信天线装置 | |
JPH05286694A (ja) | 外部式鉄塔組立工法と外部式鉄塔組立クレーン | |
CN217379219U (zh) | 一种预制式钢结构变电站平台 | |
CN214657111U (zh) | 高边坡组合式支护结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20101215 |