CN101906941B - Integral joint tubing by upset forging processing - Google Patents

Integral joint tubing by upset forging processing Download PDF

Info

Publication number
CN101906941B
CN101906941B CN 201010219343 CN201010219343A CN101906941B CN 101906941 B CN101906941 B CN 101906941B CN 201010219343 CN201010219343 CN 201010219343 CN 201010219343 A CN201010219343 A CN 201010219343A CN 101906941 B CN101906941 B CN 101906941B
Authority
CN
China
Prior art keywords
male end
tubing
oil pipe
female end
male
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201010219343
Other languages
Chinese (zh)
Other versions
CN101906941A (en
Inventor
杜洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huludao Longyuan Oil Mechanical & Assort Equipment Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201010219343 priority Critical patent/CN101906941B/en
Publication of CN101906941A publication Critical patent/CN101906941A/en
Application granted granted Critical
Publication of CN101906941B publication Critical patent/CN101906941B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forging (AREA)

Abstract

The invention provides an integral joint tubing by upset forging processing. One end of the tubing is provided with a male end, a male end reverse angle is arranged at the periphery of tubing wall of the male end, a male end external screw thread is arranged at the outer side of the tubing wall of the male end, a left straight stand is arranged at the outer side of the tubing connected with the male end, the downwards inclining part equal to a pipe diameter is a left transition shoulder, and a ramp-transition shoulder is arranged at the outer side of the male end; an equant tubing in full length is connected with the male end and the female end, a female end straight opening is arranged at the outer end of the female end, a female end internal screw thread is arranged on the inner wall of the female end straight opening, a clearance knife is arranged at the inner side of the internal screw thread inside the female end straight opening, a balance and equant right stand is arranged on the outer wall of the tubing connected with the female end, and the right stand is connected with a right transition shoulder. The male end and the female end are processed by using an upset forging processing method. Because the upset forging processing is utilized for the male end and the female end of the tubing and the transition shoulders are arranged thereon, the integral joint tubing has the advantages of high strength and convenient restoration, prevents scratching and collision against accidents, and is suitably applied to producing the tubing in the oil extraction field.

Description

Integral joint tubing by upset forging processing
Technical field
What the present invention proposed is the petroleum machinery of mechanical field, specifically integral joint tubing by upset forging processing.
Background technology
What the present oil pipe that is used for oil exploitation adopted is the N80 material seamless steel pipe of national standard, as Φ 73 * 5.5, Φ 89 * 6.5 etc.Product requirement is processed into oil tube external thread with two ends, and then processes tubing coupling separately, by this box cupling oil pipe is connected to form the oil pipe tubing string.Its shortcoming is: assembling back box cupling has tangible shoulder with oil pipe, causes down that well operations bumps, the catching phenomenon generation; Be the heavy wall tubing screw thread as product requirement, the mother metal external diameter of pipe is little, does not satisfy the requirement of product, can only process the tubing round thread of not thickening.
The oil pipe that is used for oil exploitation adopts metal bar material machining to form usually at present, and its basic structure is: the oil pipe two ends are provided with box cupling, carry out interconnecting of oil pipe by box cupling.Because the box cupling that connects on the oil pipe is bigger than tubing diameter, so, down to the down-hole time, be subjected to the friction of the borehole wall and stop that easy and tubing centrilizer generation scratching influences the normal use of oil pipe.
Because currently used oil pipe adopts the mode of machining to carry out, its material is loose, and intensity is low, in use, and the fracture accident of becoming less severe easily.
Because present employed oil pipe is subjected to the restriction of structure, when suffering breakage, can only changes, and be not easy to repair.
Can illustrate according to above example, according to manufacture method and the architectural feature of present employed oil pipe, have many insoluble problems.
Summary of the invention
In order to overcome existing vitta structure and the existing problem of processing method, the present invention proposes integral joint tubing by upset forging processing.This oil pipe solves the problem that oil pipe connects by the two ends screw thread, solves the problem of oil pipe processing by the upsetting processing method.
The scheme that technical solution problem of the present invention adopts is: oil pipe is the tube of preseting length, and its inside is provided with tube chamber.One end of oil pipe is provided with male end, tube wall periphery in male end is provided with the male end chamfering, the tube wall outside in male end is provided with the male end external screw thread, the oil pipe outside that is connected with male end is provided with the left station of straight projection, the downward-sloping part that is equal to caliber is left transition shoulder with it, is provided with the shoulder of slope transition in the outside of male end.What be connected with female end in male end is elongated isometrical oil pipe, be provided with straight mouthful of female end in the female end outer end, be provided with the female end internal thread at the straight mouthful inwall of female end, internal thread inboard in the straight mouth of female end is provided with the sky cutter, the oil-pipe external wall that is connected with female end is provided with the isometrical right station of balance, and what be attached thereto is right transition shoulder.
Oil pipe is upset and forged processing: the seamless steel pipe of getting preseting length is made the oil pipe blank, after being heated to 800 ℃, putting into the rammer that has internal mold and forges in the machine mould, pressurization is upset and is forged, and the oil pipe external diameter is increased, and internal diameter dwindles, tube wall thickens, and cuts internal thread and external screw thread and external surface then, forms oil pipe.
Good effect: because the processing of upsetting processing method is all adopted at the two ends of oil pipe of the present invention, density is big, the intensity height; Because the changeover portion of oil pipe equates, is convenient to repair; Because changeover portion do not have shoulder, when preventing from going into the well with the scratching of tubing centrilizer phase; Because oil pipe relatively directly connects, and is not easy to occur the connection accident.The suitable for producing oil pipe is used.
Description of drawings
Fig. 1 is vitta structure figure of the present invention
Among the figure, 01. male end, 02. female end, 1. male end chamfering, the 01.1. left station, 01.2. left side transition shoulder, the 02.1. right station, the right transition shoulder of 02.2., 2. male end external screw thread, the 3. empty cutter of female end, 4. female end internal thread, 5. female end is straight mouthful, 6. the male end shoulder.
The specific embodiment
According to shown in Figure 1, oil pipe is the tube of preseting length, and its inside is provided with tube chamber.One end of oil pipe is provided with male end 01, tube wall periphery in male end is provided with male end chamfering 1, the tube wall outside in male end is provided with male end external screw thread 2, the oil pipe outside that is connected with male end is provided with the left station 01.1 of straight projection, the downward-sloping part that is equal to caliber is left transition shoulder 01.2 with it, is provided with the shoulder 6 of slope transition in the outside of male end.What be connected with female end in male end is elongated isometrical oil pipe, be provided with straight mouthful 5 of female end in female end 02 outer end, be provided with female end internal thread 4 at the straight mouthful inwall of female end, internal thread inboard in the straight mouth of female end is provided with sky cutter 3, the oil-pipe external wall that is connected with female end is provided with the isometrical right station of balance 02.1, and what be attached thereto is right transition shoulder 02.2.
Oil pipe is upset and forged processing: the seamless steel pipe of getting preseting length is made the oil pipe blank, after being heated to 800 ℃, putting into the rammer that has internal mold and forges in the machine mould, pressurization is upset and is forged, and the oil pipe external diameter is increased, and internal diameter dwindles, tube wall thickens, and cuts internal thread and external screw thread and external surface then, forms oil pipe.
The connection of oil pipe of the present invention: when an oil pipe was connected with another root oil pipe, its male end was inserted in the straight mouth of female end, fixes by male end external screw thread and the screwed connection of female end internal thread, and oil pipe can infinitely be prolonged.Owing to cancelled traditional box cupling, and directly be threaded by the male and female end, institute is not so that underground work has the card of bumping phenomenon.
The advantage of oil pipe of the present invention
1, because the mother metal metallographic structure has been improved by upsetting in mother metal pipe two ends, improves intensity, increase the service life.
2, because the oil pipe two ends all adopt the upsetting processing method to process, and therefore, density is big, the intensity height can be used in the jumping-up processing of various oil pipes, sleeve pipe.
3, left station equates with right station, is convenient to repair.
4, left transition shoulder and right transition shoulder do not have the outstanding shoulder of high point, when preventing from going into the well with the scratching of tubing centrilizer phase.
5, oil pipe directly is connected with female end by male end, reduces the generation that comes off with phenomenon of rupture.
Oil pipe of the present invention is used for recovering the oil in the oil field and various oil pipe, sleeve pipe thickening.
Be applicable to various steel pipe jumping-ups and be connected.
Interchangeable with plain tubing, versatility is good.
Endoporus and external diameter can strengthen or dwindle.
One time jumping-up can repeatedly be repaired, and can realize energy-conservation.

Claims (2)

1. integral joint tubing by upset forging processing, it is characterized in that: an end of oil pipe is provided with male end (01), be provided with male end chamfering (1) in the tube wall periphery of male end, the tube wall outside in male end is provided with male end external screw thread (2), the oil pipe outside that is connected with male end is provided with the left station (01.1) of straight projection, sloping down to the part that is equal to caliber with it is left transition shoulder (01.2), be provided with the shoulder (6) of slope transition in the outside of male end, what be connected with female end in male end is the oil pipe of elongated equal diameter, be provided with female end straight mouthful (5) in female end (02) outer end, be provided with female end internal thread (4) at the straight mouthful inwall of female end, internal thread inboard in the straight mouth of female end is provided with sky cutter (3), the oil-pipe external wall that is connected with female end is provided with the right station (02.1) constant with the parallel diameter of oil pipe tube chamber, and what be attached thereto is right transition shoulder (02.2).
2. integral joint tubing by upset forging processing according to claim 1, it is characterized in that: oil pipe upsetting processing: the seamless steel pipe of getting preseting length is made the oil pipe blank, after being heated to 800 ℃, put in the upsetter mould that has internal mold, the pressurization upsetting increases the oil pipe external diameter, internal diameter dwindles, tube wall thickens, and cuts internal thread and external screw thread and external surface then, forms oil pipe.
CN 201010219343 2010-07-07 2010-07-07 Integral joint tubing by upset forging processing Active CN101906941B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010219343 CN101906941B (en) 2010-07-07 2010-07-07 Integral joint tubing by upset forging processing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010219343 CN101906941B (en) 2010-07-07 2010-07-07 Integral joint tubing by upset forging processing

Publications (2)

Publication Number Publication Date
CN101906941A CN101906941A (en) 2010-12-08
CN101906941B true CN101906941B (en) 2013-08-28

Family

ID=43262508

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010219343 Active CN101906941B (en) 2010-07-07 2010-07-07 Integral joint tubing by upset forging processing

Country Status (1)

Country Link
CN (1) CN101906941B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102563220A (en) * 2010-12-16 2012-07-11 株式会社新三兴钢管 Threaded steel pipe for piping

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5133576A (en) * 1991-02-28 1992-07-28 Barnhill W J Carbide coated blast tube construction for use in oil and gas well completion across perforations
CN2351541Y (en) * 1998-08-27 1999-12-01 辽河石油勘探局钻井二公司 Non-hoop double-stage synchronous screwed pipe
CN101041173A (en) * 2007-02-14 2007-09-26 杨波 Method and device for the forming of upsetting die of integral joint oil tubing
CN201159053Y (en) * 2007-07-13 2008-12-03 杨波 End main body shaping integral joint tubing

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5133576A (en) * 1991-02-28 1992-07-28 Barnhill W J Carbide coated blast tube construction for use in oil and gas well completion across perforations
CN2351541Y (en) * 1998-08-27 1999-12-01 辽河石油勘探局钻井二公司 Non-hoop double-stage synchronous screwed pipe
CN101041173A (en) * 2007-02-14 2007-09-26 杨波 Method and device for the forming of upsetting die of integral joint oil tubing
CN201159053Y (en) * 2007-07-13 2008-12-03 杨波 End main body shaping integral joint tubing

Also Published As

Publication number Publication date
CN101906941A (en) 2010-12-08

Similar Documents

Publication Publication Date Title
CN101906941B (en) Integral joint tubing by upset forging processing
WO2016091871A1 (en) Tubular component with a helical abutment
CN104259331B (en) The manufacture method of Φ 512mm × 37mm Hi-grade steel coupling blank
CN202954751U (en) Thread casing pipe connector capable of being quickly screwed on and screwed off
CN101439385A (en) Drill rocker end upsetting method
CN104343398A (en) Polygonal pyramid quick-plugging sealed auger stem
CN101718176A (en) Coupling thread-off stopper
CN104959504B (en) The Forging Technology of one-body molded Three-edged drill stem
CN201507512U (en) High-strength connection structure for steel pipe
CN204098797U (en) A kind of upset end electric resistance welding connects heavy weight drill pipe
CN201826763U (en) Externally thickened tubing and casing
CN205135439U (en) It rights sucker rod to spout nickel anticreep
CN102587845A (en) Air-sealing casing screwed connector interchangeable with API (American petroleum institute) round thread
CN201443306U (en) Lengthening and reinforced oil pipe cross-over joint
CN205243443U (en) High -anti -torsion drill pipe connector
CN201943592U (en) Novel external thickening oil pipe and sleeve
CN201074482Y (en) Connection structure for sealing pipeline of circular ring and conus
CN204002598U (en) Without thickening monolithic heavy weight drill pipe
CN215256070U (en) Double-helix directional drill rod
CN204299493U (en) Two rank air-tight oil casing nipple
CN207086814U (en) A kind of upsetting hollow sucker rod forging and molding mold
CN217558271U (en) Connecting mechanism of elliptical continuous sucker rod
CN209035536U (en) A kind of drilling rod
CN103089165A (en) Double-step threaded buckle for connecting drill rod for well drilling
CN204324754U (en) Tower machine standard knot Novel connection female connector

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HULUDAO LONGYUAN OIL MECHANICAL + ASSORT EQUIPMENT

Free format text: FORMER OWNER: DU YANG

Effective date: 20140620

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20140620

Address after: 125003 Huludao Economic Development Zone, Liaoning, Mount Huangshan street, No. 57

Patentee after: Huludao Longyuan Oil Mechanical & Assort Equipment Co., Ltd.

Address before: 125003 Huludao province Liaoning city Longgang District Jinhu Road Longyuan extraction equipment Co. Ltd

Patentee before: Du Yang