CN101906652A - Lifting frame - Google Patents

Lifting frame Download PDF

Info

Publication number
CN101906652A
CN101906652A CN2010102294853A CN201010229485A CN101906652A CN 101906652 A CN101906652 A CN 101906652A CN 2010102294853 A CN2010102294853 A CN 2010102294853A CN 201010229485 A CN201010229485 A CN 201010229485A CN 101906652 A CN101906652 A CN 101906652A
Authority
CN
China
Prior art keywords
suspension
pull bar
hooks
vertical pole
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010102294853A
Other languages
Chinese (zh)
Other versions
CN101906652B (en
Inventor
武军
赵爱君
佟立军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China ENFI Engineering Corp
Original Assignee
China ENFI Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China ENFI Engineering Corp filed Critical China ENFI Engineering Corp
Priority to CN2010102294853A priority Critical patent/CN101906652B/en
Publication of CN101906652A publication Critical patent/CN101906652A/en
Application granted granted Critical
Publication of CN101906652B publication Critical patent/CN101906652B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention discloses a lifting frame which comprises a frame, a plurality of first lifting hooks, a plurality of second lifting hooks, a pull rod and a lifting lug, wherein the frame comprises a first longitudinal rod, a second longitudinal rod and a plurality of transverse rods, the first longitudinal rod and the second longitudinal rod are longitudinally and alternately arranged in parallel, the transverse rods are arranged between the first longitudinal rod and the second longitudinal rod, the plurality of first lifting hooks can be pivotally mounted on the first longitudinal rod, the plurality of second lifting hooks can be pivotally mounted on the second longitudinal rod and correspond to the plurality of first lifting hooks one by one, the pull rod can longitudinally move relative to the frame and is respectively connected with the first lifting hooks and the second lifting hooks so as to drive the first lifting hooks and the second lifting hooks to pivot, and the lifting lug is connected with the frame through hanging lifting rod so as to hoist the frame below the lifting lug. According to the lifting frame of the invention, the plurality of first lifting hooks and second lifting hooks are pivoted at 90 degrees in a horizontal direction by pulling the pull rod so as to hoist or dismount an electrolytic plate.

Description

Suspension bracket
Technical field
The present invention relates to the electrolysis tech field, especially relate to a kind of suspension bracket that is used for the handling electrolytic pole board.
Background technology
In the traditional technology, electrolytic pole board is hung by the fixed hook, and electrolytic pole board need be put into electrolyzer or when electrolyzer takes out, operate inconvenience, and also comparatively heavy.In addition, low precision when placing electrolytic pole board in electrolyzer has reduced the electrolytic pole board efficiency of assembling.
Summary of the invention
The present invention is intended to solve at least one of technical problem that exists in the prior art.For this reason, one object of the present invention is to propose a kind of easy to operate and suspension bracket that is used for the handling electrolytic pole board that precision is high.
To achieve these goals, the present invention proposes a kind of suspension bracket, comprises framework, and described framework comprises first and second vertical poles that parallel interval longitudinally is arranged and is installed in a plurality of cross bars between described first and second vertical poles; A plurality of first suspension hooks, described a plurality of first suspension hooks are pivotably mounted on described first vertical pole; A plurality of second suspension hooks, described a plurality of second suspension hooks are pivotably mounted on described second vertical pole and are corresponding one by one with described a plurality of first suspension hooks respectively; Pull bar, described pull bar are movable along the longitudinal and link to each other with first and second suspension hooks respectively and pivot to drive described first and second suspension hooks with respect to described framework; And hanger, wherein said hanger links to each other with framework by suspension rod so that described framework is lifted on the hanger below.
According to suspension bracket of the present invention, make a plurality of first and second suspension hooks realize that in the horizontal direction 90 degree pivot by the pulling pull bar, so that hang or separate the extension electrolytic pole board.
In addition, the suspension bracket that is used for the handling electrolytic pole board according to the present invention also has following additional technical feature:
Be formed with a plurality of first through holes that in the vertical direction connects first vertical pole on described first vertical pole along the longitudinal direction, the upper end of described a plurality of first suspension hooks is passed described a plurality of first through hole respectively and is stretched out from the end face of first vertical pole, be formed with a plurality of second through holes that in the vertical direction connects second vertical pole on described second vertical pole along the longitudinal direction, the upper end of described a plurality of second suspension hooks is passed described a plurality of second through hole respectively and is stretched out from the end face of second vertical pole.
Described first and second through holes are respectively longitudinally uniformly-spaced and along laterally being formed on correspondingly on first and second vertical poles.Like this, when making the pulling pull bar, the angle that a plurality of first suspension hooks and a plurality of second suspension hooks pivot is identical respectively, is convenient to hang or separates the extension electrolytic pole board.
Be respectively equipped with guide pin bushing up and down in the position corresponding with each first through hole on the upper and lower surface of described first vertical pole, guide pin bushing and its upper end were stretched out above guide pin bushing with bolt and are cooperated about wherein first suspension hook passed; Be respectively equipped with guide pin bushing up and down in the position corresponding with each second through hole on the upper and lower surface of described second vertical pole, guide pin bushing and its upper end were stretched out above guide pin bushing with bolt and are cooperated about wherein second suspension hook passed.
Described suspension bracket further comprises a plurality of first web plates, and first end of described a plurality of first web plates links to each other with the upper end of first suspension hook respectively and its second end links to each other rotationally with pull bar respectively; With a plurality of second web plates, first end of described a plurality of second web plates links to each other with the upper end of second suspension hook respectively and its second end links to each other rotationally with pull bar respectively.
Described pull bar comprises first pull bar and second pull bar, and described first pull bar links to each other with a plurality of first suspension hooks and second pull bar links to each other with a plurality of second suspension hooks.
Vertical two ends of described first pull bar and second pull bar link to each other by first and second handles respectively.
Be provided with insulating part between described hanger and the suspension rod.
Described suspension bracket further comprises retaining plate, and described hanger is installed on the described retaining plate and the upper end of described suspension rod links to each other with described retaining plate respectively, and wherein said insulating part is arranged between described retaining plate and the described hanger.
Described hanger is inverted U-shaped, and two free ends of described hanger are connected with described bolt of fixing plate respectively.
According to suspension bracket of the present invention, can make the hook lifting of hanging electrolytic pole board or move by lifting or mobile hanger, simple to operation, and the precision height.
Additional aspect of the present invention and advantage part in the following description provide, and part will become obviously from the following description, or recognize by practice of the present invention.
Description of drawings
Above-mentioned and/or additional aspect of the present invention and advantage are from obviously and easily understanding becoming the description of embodiment in conjunction with following accompanying drawing, wherein:
Fig. 1 is the front view that is used for the suspension bracket of handling electrolytic pole board according to of the present invention;
Fig. 2 is the enlarged view of A portion among Fig. 1;
Fig. 3 is the vertical view of the suspension bracket shown in Fig. 1;
Fig. 4 is the left view of the suspension bracket shown in Fig. 1;
Fig. 5 is the enlarged view of B portion among Fig. 4;
Fig. 6 is the bracing frame in the suspension bracket shown in Fig. 1 and the cooperation diagrammatic cross-section of supporting seat;
Fig. 7 a is that the master of the pull bar in the suspension bracket shown in Fig. 1 looks synoptic diagram; With
Fig. 7 b is the schematic top plan view of the pull bar in the suspension bracket shown in Fig. 1.
Embodiment
Describe embodiments of the invention below in detail, the example of described embodiment is shown in the drawings, and wherein identical from start to finish or similar label is represented identical or similar elements or the element with identical or similar functions.Below by the embodiment that is described with reference to the drawings is exemplary, only is used to explain the present invention, and can not be interpreted as limitation of the present invention.
In description of the invention, term " vertically ", " laterally ", " on ", close the orientation of indication such as D score or position is based on orientation shown in the drawings or position relation, only be the present invention for convenience of description rather than require the present invention therefore can not be interpreted as limitation of the present invention with specific orientation structure and operation.
Below with reference to the suspension bracket that be used for handling electrolytic pole board of Fig. 1-Fig. 7 b description according to the embodiment of the invention.
As Fig. 1-shown in Figure 4, comprise according to the suspension bracket of the embodiment of the invention: framework 1, a plurality of first suspension hook 21, a plurality of second suspension hook 22, pull bar 4 and hanger 5.
As Fig. 1, Fig. 3 and shown in Figure 4, framework 1 is lifted on hanger 5 belows by a plurality of suspension rods 6.Alternatively, for installation frame more firmly, available 12 suspension rods 6 are installed in the periphery of framework 1.Be provided with insulating part 8 between hanger 5 and the suspension rod 6, alternatively, insulating part 8 is a dead ring.Further, also comprise retaining plate 7 according to suspension bracket of the present invention, alternatively, retaining plate 7 can be steel plate.Hanger 5 is installed on the retaining plate 7 and the upper end of suspension rod 6 links to each other with retaining plate 7 respectively, and wherein insulating part 8 is arranged between retaining plate 7 and the hanger 5, as shown in Figure 2.In an example of the present invention, hanger 5 is inverted U-shaped, and two free ends of hanger 5 are connected by bolt 9 with retaining plate 7 respectively.Be provided with like this so that lifting mechanism comes lifting and moves described suspension bracket by lifting and mobile described hanger.
As shown in Figure 3, framework 1 comprise first vertical pole 11, second vertical pole 12 that parallel interval longitudinally is arranged and be installed in first vertical pole 11 and second vertical pole 12 between a plurality of cross bars 13.Wherein, a plurality of first suspension hooks 21 are pivotably mounted on first vertical pole 11.And a plurality of second suspension hooks 22 are pivotably mounted on second vertical pole 12 and corresponding one by one with a plurality of first suspension hooks 21 respectively, as shown in Figure 4, these a plurality of one to one first suspension hooks 21 and second suspension hook 22 are used for hanging a plurality of electrolytic pole boards 10, wherein, electrolytic pole board 10 is pre-formed two hangers can hanging respectively at first suspension hook 21 and second suspension hook 22 when casting, like this, suspension bracket of the present invention can be placed in the electrolyzer by handling electrolytic pole board 10.
In an example of the present invention, as shown in Figure 4 and Figure 5, be formed with a plurality of first through holes 111 that in the vertical direction connects first vertical pole 11 on first vertical pole 11 along the longitudinal direction, the upper end of a plurality of first suspension hooks 21 is passed a plurality of first through holes 111 respectively and is stretched out from the end face of first vertical pole 11.Similarly, be formed with a plurality of second through holes 121 that in the vertical direction connects second vertical pole 12 on second vertical pole 12 along the longitudinal direction, the upper end of a plurality of second suspension hooks 22 is passed a plurality of second through holes 121 respectively and is stretched out from the end face of second vertical pole 12.Alternatively, first through hole 111 and second through hole 121 are respectively longitudinally uniformly-spaced and along laterally being formed on correspondingly on first vertical pole 11 and second vertical pole 12.
As shown in Figure 5, in another example of the present invention, be respectively equipped with guide pin bushing 14 up and down in the position corresponding with each first through hole 111 on the upper and lower surface of first vertical pole 11, wherein first suspension hook 21 passes up and down guide pin bushing 14 and its upper end and stretches out above guide pin bushing 14 with bolt 9 and cooperate.Similarly, be respectively equipped with guide pin bushing 14 up and down in the position corresponding with each second through hole 121 on the upper and lower surface of second vertical pole 12, wherein second suspension hook 22 passes up and down guide pin bushing 14 and its upper end and stretches out above guide pin bushing 14 with bolt 9 and cooperate.
In another example of the present invention, on outermost two cross bars in vertical two ends of framework 1, be formed with supporting seat 15 respectively at least, as shown in Figure 6, be suitable for cooperating pull bar 4 is slidably mounted on the framework 1 with supporting cover 16.Alternatively, rise to fovea superior the middle part of this supporting cover 16, is suitable for holding the rod member of pull bar 4.Wherein, supporting seat 15 and supporting cover 16 can cooperate by bolt.
Pull bar 4 is movable along the longitudinal and link to each other with first and second suspension hooks 22 respectively to drive first suspension hook 21 and second suspension hook 22 pivots in the horizontal direction with respect to framework 1.Shown in Fig. 7 (b), pull bar 4 comprises that vertical two ends of first pull bar 41 and second pull bar, 42, the first pull bars 41 and second pull bar 42 link to each other with second handle 44 by first handle 43 respectively.Alternatively, shown in Fig. 7 (a), first handle, 43 and second handle 44 is positioned at vertical plane, perhaps the plane at first handle, 43 and second handle, 44 places and first pull bar 41 and plane, second pull bar, 42 place are predetermined angular, so that spur pull bar 4 by pulling first handle 43 or second handle 44.
First pull bar 41 links to each other with a plurality of first suspension hooks 21, and second pull bar 42 links to each other with a plurality of second suspension hooks 22, thereby spur first handle, 43 or second handle win suspension hook 21 and second suspension hook 22 are pivoted in the horizontal direction, first suspension hook 21 and second suspension hook 22 can be distinguished two hangers of hook and release electrolytic pole board 10 thus.Because first through hole 111 and second through hole 121 longitudinally equally spaced are formed on respectively on first vertical pole 11 and second vertical pole 12, when making pulling pull bar 4, a plurality of first suspension hooks 21 are identical respectively with the angle that a plurality of second suspension hooks 22 pivot, and are convenient to hang or discharge electrolytic pole board 10.
As shown in Figure 4 and Figure 5, in another example of the present invention, suspension bracket also further comprises a plurality of first web plates 31 and a plurality of second web plate 32.First end of a plurality of first web plates 31 links to each other with the upper end of first suspension hook 21 respectively, and its second end links to each other rotationally with pull bar 4 respectively.First end of a plurality of second web plates 32 links to each other with the upper end of second suspension hook 22 respectively, and its second end links to each other rotationally with pull bar 4 respectively.Alternatively, be parallel to each other a plurality of second web plates 32 between a plurality of first web plates 31.
Introduce according to the operation that is used for the suspension bracket of handling electrolytic pole board of the present invention below.
At first, when lifting electrolytic pole board 10, as shown in Figure 3, pulling pull bar 4, for example make pull bar 4 move right by spurring second handle 44, in Fig. 1 and Fig. 3, second handle 44 moves to position shown in the solid line from position shown in the dotted line, pull bar 4 drives first suspension hook 21 and second suspension hook 22 respectively in the horizontal direction in opposite direction to extrinsic deflection by first web plate 31 and second web plate 32 thus, for example see from the top down, first suspension hook 21 rotates counterclockwise in the horizontal direction, and second suspension hook 22 clockwise rotates, thus the hook portion of first suspension hook 21 and second suspension hook 22 from each other over against position deviation open.
Certainly, need to prove, when first pull bar 41 does not link to each other with the second in command 44 by the first in command 43 with second pull bar 42, even first pull bar 41 and second pull bar 42 can move separately, so for example spur first pull bar 41 and second pull bar 42 respectively along opposite direction, the hook portion of first suspension hook 21 and second suspension hook 22 can back to, also can point to identical or opposite in the vertical, no matter the hook portion of first suspension hook 21 and second suspension hook 22 is towards same direction or opposite direction or back to, the hangers that they can not hook electrolytic pole board 10.
Then suspension bracket is moved to the position at electrolytic pole board 10 places, then, pulling pull bar 4, for example move to position shown in the dotted line from the solid line position shown in Fig. 1 and Fig. 3 by spurring first handle 43, pull bar 4 is moved to the left, pull bar 4 drives first suspension hook 21 and second suspension hook 22 respectively by first web plate 31 and second web plate 32 and realizes 90 degree deflections in the horizontal direction thus, thereby the hook portion of first suspension hook 21 and second suspension hook 22 front is relative and the hangers of hook electrolytic pole board 10, electrolytic pole board 10 is hung on suspension bracket like this, is convenient to put into or hang electrolyzer.
And unloading is during electrolytic pole board 10, and pulling pull bar 4 earlier makes suspension hook 21 and second suspension hook 22 upper deflecting in the horizontal direction of winning, and two hangers of electrolytic pole board 10 discharged, thereby make electrolytic pole board be released.
According to suspension bracket of the present invention, make a plurality of first and second suspension hooks pivot in the horizontal direction by the pulling pull bar, so that hang or discharge electrolytic pole board.In addition, can make the hook lifting of hanging electrolytic pole board or move by lifting or mobile hanger, simple to operation, and the precision height.
Certainly, suspension bracket according to the present invention is not limited to the above-mentioned handling electrolytic pole board that is used for, and also can be used for easy to operate lifting of any similar need or mobile extension hanging piece.
Make according to available steel such as the framework of suspension bracket of the present invention, pull bars.
Although illustrated and described embodiments of the invention, those having ordinary skill in the art will appreciate that: can carry out multiple variation, modification, replacement and modification to these embodiment under the situation that does not break away from principle of the present invention and aim, scope of the present invention is limited by claim and equivalent thereof.

Claims (10)

1. a suspension bracket is characterized in that, comprising:
Framework, described framework comprise first and second vertical poles that parallel interval longitudinally is arranged and are installed in a plurality of cross bars between described first and second vertical poles;
A plurality of first suspension hooks, described a plurality of first suspension hooks are pivotably mounted on described first vertical pole;
A plurality of second suspension hooks, described a plurality of second suspension hooks are pivotably mounted on described second vertical pole and are corresponding one by one with described a plurality of first suspension hooks respectively;
Pull bar, described pull bar are movable along the longitudinal and link to each other with first and second suspension hooks respectively and pivot to drive described first and second suspension hooks with respect to described framework; With
Hanger, described hanger link to each other with framework by suspension rod so that described framework is lifted on the hanger below.
2. suspension bracket according to claim 1, it is characterized in that, be formed with a plurality of first through holes that in the vertical direction connects first vertical pole on described first vertical pole along the longitudinal direction, the upper end of described a plurality of first suspension hooks is passed described a plurality of first through hole respectively and is stretched out from the end face of first vertical pole, be formed with a plurality of second through holes that in the vertical direction connects second vertical pole on described second vertical pole along the longitudinal direction, the upper end of described a plurality of second suspension hooks is passed described a plurality of second through hole respectively and is stretched out from the end face of second vertical pole.
3. suspension bracket according to claim 2 is characterized in that, described first and second through holes are respectively longitudinally uniformly-spaced and along laterally being formed on correspondingly on first and second vertical poles.
4. suspension bracket according to claim 2, it is characterized in that, be respectively equipped with guide pin bushing up and down in the position corresponding with each first through hole on the upper and lower surface of described first vertical pole, guide pin bushing and its upper end were stretched out above guide pin bushing with bolt and are cooperated about wherein first suspension hook passed; Be respectively equipped with guide pin bushing up and down in the position corresponding with each second through hole on the upper and lower surface of described second vertical pole, guide pin bushing and its upper end were stretched out above guide pin bushing with bolt and are cooperated about wherein second suspension hook passed.
5. suspension bracket according to claim 2 is characterized in that, further comprises:
A plurality of first web plates, first end of described a plurality of first web plates link to each other with the upper end of first suspension hook respectively and its second end links to each other rotationally with pull bar respectively; With
A plurality of second web plates, first end of described a plurality of second web plates link to each other with the upper end of second suspension hook respectively and its second end links to each other rotationally with pull bar respectively.
6. suspension bracket according to claim 1 is characterized in that, described pull bar comprises first pull bar and second pull bar, and described first pull bar links to each other with a plurality of first suspension hooks and second pull bar links to each other with a plurality of second suspension hooks.
7. suspension bracket according to claim 6 is characterized in that, vertical two ends of described first pull bar and second pull bar link to each other by first and second handles respectively.
8. suspension bracket according to claim 1 is characterized in that, is provided with insulating part between described hanger and the suspension rod.
9. suspension bracket according to claim 8, it is characterized in that, further comprise retaining plate, described hanger is installed on the described retaining plate and the upper end of described suspension rod links to each other with described retaining plate respectively, and wherein said insulating part is arranged between described retaining plate and the described hanger.
10. suspension bracket according to claim 9 is characterized in that described hanger is inverted U-shaped, and two free ends of described hanger are connected with described bolt of fixing plate respectively.
CN2010102294853A 2010-07-12 2010-07-12 Lifting frame Active CN101906652B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102294853A CN101906652B (en) 2010-07-12 2010-07-12 Lifting frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102294853A CN101906652B (en) 2010-07-12 2010-07-12 Lifting frame

Publications (2)

Publication Number Publication Date
CN101906652A true CN101906652A (en) 2010-12-08
CN101906652B CN101906652B (en) 2011-11-30

Family

ID=43262230

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102294853A Active CN101906652B (en) 2010-07-12 2010-07-12 Lifting frame

Country Status (1)

Country Link
CN (1) CN101906652B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103539002A (en) * 2013-10-17 2014-01-29 江西稀有稀土金属钨业集团有限公司 Lifting device for electrolytic copper plates
CN104962981A (en) * 2015-08-05 2015-10-07 新疆中泰化学股份有限公司 Lifting device and locating device special for electrolytic tank
CN105088323A (en) * 2015-08-12 2015-11-25 深圳市环翔精饰工业有限公司 Plate type electroplating hanger
CN110656367A (en) * 2019-11-12 2020-01-07 浙江科腾紧固件股份有限公司 Suspension bracket for electroplating

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2316294Y (en) * 1998-03-05 1999-04-28 吴奉奖 Hanger for surface treatment of long pipe
CN101029697A (en) * 2007-03-29 2007-09-05 江阴市焱鑫石化电力机械有限公司 Arc spring supporting cradles on shoulders
CN101029696A (en) * 2007-03-29 2007-09-05 江阴市焱鑫石化电力机械有限公司 Arc spring cradles on shoulders
CN101046261A (en) * 2007-04-19 2007-10-03 大连康维科技有限公司 Energy-saving vertical pipe support with low noble metal consumption
CN200955073Y (en) * 2006-09-26 2007-10-03 云南驰宏锌锗股份有限公司 Rotary self-locking type electrolytic cathode plate suspension frame
CN201068364Y (en) * 2007-07-12 2008-06-04 泰豪科技股份有限公司 Generator rotor varnished hanger
CN201109686Y (en) * 2007-10-25 2008-09-03 青岛港(集团)有限公司 Special hoisting bar for freezing live cargo
CN201152686Y (en) * 2007-12-17 2008-11-19 贵阳铝镁设计研究院 Handle structure of furnace lid hanging stent
CN201217709Y (en) * 2008-07-10 2009-04-08 重庆大有表面技术有限公司 Self-weight locking type chemical self-electrophoretic plating universal hanging rack
CN201349102Y (en) * 2008-12-09 2009-11-18 江西赣西供电公司 Suspension bracket for generally overhauling isolating switch

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2316294Y (en) * 1998-03-05 1999-04-28 吴奉奖 Hanger for surface treatment of long pipe
CN200955073Y (en) * 2006-09-26 2007-10-03 云南驰宏锌锗股份有限公司 Rotary self-locking type electrolytic cathode plate suspension frame
CN101029697A (en) * 2007-03-29 2007-09-05 江阴市焱鑫石化电力机械有限公司 Arc spring supporting cradles on shoulders
CN101029696A (en) * 2007-03-29 2007-09-05 江阴市焱鑫石化电力机械有限公司 Arc spring cradles on shoulders
CN101046261A (en) * 2007-04-19 2007-10-03 大连康维科技有限公司 Energy-saving vertical pipe support with low noble metal consumption
CN201068364Y (en) * 2007-07-12 2008-06-04 泰豪科技股份有限公司 Generator rotor varnished hanger
CN201109686Y (en) * 2007-10-25 2008-09-03 青岛港(集团)有限公司 Special hoisting bar for freezing live cargo
CN201152686Y (en) * 2007-12-17 2008-11-19 贵阳铝镁设计研究院 Handle structure of furnace lid hanging stent
CN201217709Y (en) * 2008-07-10 2009-04-08 重庆大有表面技术有限公司 Self-weight locking type chemical self-electrophoretic plating universal hanging rack
CN201349102Y (en) * 2008-12-09 2009-11-18 江西赣西供电公司 Suspension bracket for generally overhauling isolating switch

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103539002A (en) * 2013-10-17 2014-01-29 江西稀有稀土金属钨业集团有限公司 Lifting device for electrolytic copper plates
CN103539002B (en) * 2013-10-17 2015-10-28 江西稀有稀土金属钨业集团有限公司 A kind of electrolytic copper plate hanging apparatus
CN104962981A (en) * 2015-08-05 2015-10-07 新疆中泰化学股份有限公司 Lifting device and locating device special for electrolytic tank
CN105088323A (en) * 2015-08-12 2015-11-25 深圳市环翔精饰工业有限公司 Plate type electroplating hanger
CN110656367A (en) * 2019-11-12 2020-01-07 浙江科腾紧固件股份有限公司 Suspension bracket for electroplating

Also Published As

Publication number Publication date
CN101906652B (en) 2011-11-30

Similar Documents

Publication Publication Date Title
CN101906652B (en) Lifting frame
CN201793758U (en) Hanging bracket
CN202273397U (en) Lifting device for reversal hanging lifting frame
CN107119921B (en) A kind of skyscraper Bailey beam Demolition Construction method
US7562430B2 (en) Pin changing device and method
CN107117386B (en) A kind of insulator bracket
CN213537032U (en) Special clamp crown block for carbon pre-roasting anode workshop
CN107504817B (en) Gas cylinder upper frame pushing device
EP2511222A1 (en) Method for controlling a concrete mix casting equipment dismountably attached to a crane and a concrete mix casting equipment dismountably attached to a crane
CN105000460B (en) Special lifting device for assembly of stacking machine empty container lifting appliance
CN209940341U (en) Anti-inclined lifting device of electric hoist
CN207403416U (en) One kind is mostly used economic accounting bill frame
CN202718382U (en) Cradle used for building and having anti-collision function
CN110790201A (en) Elevator with hanging box
CN105525308B (en) A kind of cell cover plate grabbing device
CN104973504B (en) Hoisting mechanism
CN208456091U (en) Lifting platform for elevator hoistway
CN211283632U (en) Elevator with hanging box
CN216070028U (en) Energy-saving and labor-saving electromechanical engineering construction device
CN214003778U (en) Lifting appliance for lifting cathode carbon blocks of electrolytic cell
CN105356361B (en) Simple messenger wire support frame
CN216786861U (en) Quick detaching device for bottom die of bent cap
CN216583792U (en) Special hoisting structure for hoisting tunnel arc-shaped part
CN204162355U (en) A kind of high pedestal jib crane rapid traverse frock
CN221440136U (en) Container lifting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant