Prior art keywords
sub
district
state
attribute
configuration parameter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010102258965A
Other languages
Chinese (zh)
Other versions
CN101895973B (en
Inventor
张鹏
赵训威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Liansheng Technology Co., Ltd.
Original Assignee
New Postcom Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by New Postcom Equipment Co Ltd filed Critical New Postcom Equipment Co Ltd
Priority to CN2010102258965A priority Critical patent/CN101895973B/en
Publication of CN101895973A publication Critical patent/CN101895973A/en
Application granted granted Critical
Publication of CN101895973B publication Critical patent/CN101895973B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

The invention relates to an automatic management method and an automatic management system for realizing energy saving (ES). In the method, an ES management entity is preset. The method comprises the following steps of: A, when ES management entity receives an ES starting command sent by an operational maintaining entity OM, judging whether a cell radio frequency RF configuration parameter set which is acquired by the ES management entity dynamically and is required by the ES starting command exists or not, and if the cell radio frequency RF configuration parameter set does not exist, executing the step B, or if the cell radio frequency RF configuration parameter set exists, executing the step C; B, acquiring the cell RF configuration parameter set dynamically, and executing the step C; and C, allocating the corresponding cell according to the cell RF configuration parameter set. In the method, the ES management entity dynamically acquires the cell RF configuration parameter set required by the ES starting command unlike the conventional RS mechanism in which the cell RF configuration parameters, such as cell RF closing determination, required by the ES starting command are input manually by users, so the working capacity of deployment is reduced greatly, the energy saving is realized dynamically, and resources are saved.

Description

A kind of automatic management method and system that realizes energy saving
Technical field
The present invention relates to wireless communication technology, particularly a kind of automatic management method and system that realizes energy saving (ES:EnergySaving).
Background technology
In wireless communication technology, LTE Inter-eNB scene is made up of the sub-district under the different e NB in the LTE system, specifically as shown in Figure 1.In LTE Inter-eNB scene; usually can make the radio frequency (RF) of all sub-districts be in opening; and in the practical application; the traffic carrying capacity of some sub-districts seldom; and this traffic carrying capacity can be provided by other sub-districts; based on this, the mode that this RF that makes all sub-districts is in opening can cause the serious wasting of resources, also can increase wireless signal and pollute.
For fear of the problems referred to above, prior art has proposed energy saving (ES:Energy Saving) mechanism.Why adopting this mechanism, mainly is because by day, and the personnel in office area increase, the corresponding increase of traffic carrying capacity, and uptown number is seldom; Evening is then opposite.In view of the situation, this mechanism requires to close daytime the RF of sub-district in a part of residential area, opens this buttoned-up RF evening again, and closes the RF of sub-district in the part office area at night, opens this buttoned-up RF daytime again.
In above-mentioned mechanism, need to do some and dispose, need close etc. such as the RF that disposes which sub-district, and these map out the work and adopt the capable modes of the manual input command of user to be configured, this can strengthen the workload of deployment; And, after being closed, the RF of sub-district can influence the network coverage, and in order to guarantee the network coverage, also need the user to import some by hand and adjust configuration, this has also increased workload, and has increased the dependence of existing ES mechanism to the user greatly.
Summary of the invention
The invention provides a kind of automatic management method and system that realizes energy saving, dynamically realize energy saving, significantly reduce deployment workload.
Technical scheme provided by the invention comprises:
A kind of automatic management method of realizing energy saving in the method, need set in advance the ES management entity; This method comprises:
A, described ES management entity judge the current sub-district radio frequency configuration parameter set that whether has the described ES open command needs that dynamically obtained by self when receiving the ES open command of Operation and Maintenance entity OM transmission, if not, and execution in step B; If, execution in step C;
B dynamically obtains cell RF configuration parameter set, afterwards execution in step C;
C is according to described cell RF configuration parameter set configuration respective cell.
A kind of automated management system that realizes energy saving, this system comprises: Operation and Maintenance entity OM and ES management entity; Wherein,
Described OM is used for sending the ES open command to described ES management entity;
Described ES management entity is used to judge the current sub-district radio frequency configuration parameter set that whether has the described ES open command needs that dynamically obtained by self, if not, dynamically obtain cell RF configuration parameter set, and according to the RF configuration parameter set configuration respective cell of obtaining, if, according to described RF configuration parameter set configuration respective cell.
As can be seen from the above technical solutions, among the present invention, by setting in advance the ES management entity, dynamically obtain the cell RF configuration parameter set that described ES open command needs by this ES management entity, rather than import cell RF configuration parameter that the ES open command needs by hand by the user in the existing RS mechanism and need close such as the RF of which sub-district etc., this significantly reduces deployment workload, has dynamically realized energy saving, saves resource.
Description of drawings
Fig. 1 is an existing LTE Inter-eNB scene schematic diagram;
The system construction drawing that Fig. 2 provides for the embodiment of the invention;
The method flow diagram that Fig. 3 provides for the embodiment of the invention;
The flow chart of step 303 correspondence that Fig. 4 provides for the embodiment of the invention;
The LTE Inter-eNB scene schematic diagram that Fig. 5 a to Fig. 5 b provides for the embodiment of the invention;
The structure chart of the ES management algorithm module that Fig. 6 provides for the embodiment of the invention.
Embodiment
In order to make the purpose, technical solutions and advantages of the present invention clearer, describe the present invention below in conjunction with the drawings and specific embodiments.
Referring to Fig. 2, the system construction drawing that Fig. 2 provides for the embodiment of the invention.As shown in Figure 2, this system can comprise: Operation and Maintenance entity (OM), ES management entity and an above radio access node.
In the said system structure, according to the present embodiment applied scene, its concrete structure is also different when specific implementation for the wireless access entity.Such as, if application scenarios is LTE, then the wireless access entity is Radio Access Network (RAN) node, if application scenarios is LTE-A, then this wireless access entity is eNB, if application scenarios is UTRAN, then this wireless access entity is RNC, if application scenarios is GERAN, then this wireless access entity is BSC.
In the said system structure, the ES management entity is a logic entity, can be independent of the OM and the wireless access entity of described system, also can be arranged in described OM or one of them the wireless access entity, and the embodiment of the invention does not specifically limit.It is mainly used in sets the ES attribute of each sub-district in the network.
Here, the ES attribute of sub-district mainly comprises at least one in " not allowing ES " attribute, " ES state " attribute and " covering the adjustment state " attribute.Comprise that with the ES attribute " not allowing ES " attribute, " ES state " attribute and " covering the adjustment state " attribute three are example below, respectively it is described one by one.
Wherein, " not allowing ES " attribute of sub-district is meant whether allow this sub-district to enter the ES state, as not allowing this sub-district to enter the ES state, then can not turn-off the radio frequency of this sub-district, as allow this sub-district to enter the ES state, then can turn-off the radio frequency of this sub-district, here, for ease of describing, first sign can be set represent not allow this sub-district to enter the ES state such as Y, second sign is set represents to allow this sub-district to enter the ES state such as N.Need to prove attribute just represents whether allow the sub-district to enter the ES state " not allow ES " here, and does not mean that this sub-district necessarily enters the ES state or enters the ES state scarcely.
" ES state " attribute of sub-district is meant the current ES state that whether enters in this sub-district.Usually, just meaningful effective " not allowing ES " attribute being provided with of being that second when sign should " ES state " attribute.Here,, the 3rd this sub-district of sign expression is set enters the ES state, promptly need to turn-off the radio frequency of this sub-district for ease of describing; The 4th this sub-district of sign expression is set does not enter the ES state, the promptly current radio frequency that does not need to turn-off this sub-district.Need to prove that above-mentioned the 3rd sign can equate that the 4th sign and remaining another identity equality specifically do not limit here with above-mentioned first sign and second one of them that identifies.
Whether " covering the adjustment state " attribute of sub-district is meant by the end of the covering of this sub-district being adjusted at present.Usually, after the sub-district entered the ES state, the RF of himself was closed, and had not also had the network coverage with regard to corresponding, and so, " covering the adjustment state " attribute of this sub-district is also just nonsensical.That is to say that " covering the adjustment state " attribute of sub-district is only just meaningful effective when " not allowing ES " attribute is first sign.Here, for ease of describing, the 5th sign expression is set the covering of this sub-district is adjusted, the 6th sign expression is not adjusted the covering of this sub-district.Need to prove that above-mentioned the 5th sign can equate that the 6th sign and remaining another identity equality specifically do not limit here with above-mentioned first sign and second one of them that identifies.
Consider that to make the present techniques scheme clearer, carry out visualization with the attribute of following table 1 pair sub-district and describe.Table 1
Sub-district ID Do not allow the ES attribute The ES status attribute Cover and adjust status attribute Explain
Sub-district 1 Second sign Effectively, can be the 3rd sign or the 4th sign NA (invalid) If the ES status attribute is the 3rd sign, then turn-off the RF of sub-district 1, if be the 4th sign, then do not turn-off the RF of sub-district 1.
Sub-district 2 First sign NA (invalid) Effectively, can be the 5th sign or the 6th sign Not closing the RF of sub-district 2, is the 5th sign if cover the adjustment status attribute, has then adjusted covering of sub-district 2
Lid if be the 6th sign, is not then adjusted the covering of sub-district 2
So far, finished description to the attribute of the sub-district that the present invention relates to.
Need to prove, above-mentioned ES management entity is carried out by dynamic coordinate between this ES management entity, OM and the radio access node three the setting operation of each sub-district ES attribute, this operation can tentatively be built up the back at network (being designated as situation 1) taken place, also can be when this ES management entity receive the ES open command that OM issues, (being designated as situation 2) takes place behind the current ES attribute that does not have above-mentioned each sub-district that configures.Below how the ES management entity being carried out setting operation is described.
Referring to Fig. 3, the flow chart that Fig. 3 provides for the embodiment of the invention.This flow process is applied to system architecture shown in Figure 2.In this flow process, if be example with situation 1, then when first establishing network, OM closes the ES management entity, and " not allowing ES " attribute that disposes all sub-districts in the network of this construction is first sign.Afterwards, after network tentatively builds up, carry out flow process as shown in Figure 3 according to actual needs.If with situation 2 is example, promptly send the ES open command to the ES management entity at OM, when the ES management entity is judged the current cell RF configuration parameter set (being designated as the second following cell RF configuration parameter set) that does not have described ES open command needs that dynamically obtained by self, execution flow process as shown in Figure 3.Here, the set of RF configuration parameter mainly comprises the ES attribute of sub-district and the RF configuration parameter of sub-district correspondence.
Based on top description, as shown in Figure 3, this flow process can may further comprise the steps:
Step 301, OM starts the ES management entity.
Step 302, " not allowing ES " attribute that the ES management entity disposes all sub-districts in this current network is that second sign, " ES state " attribute are that the 4th sign and " covering the adjustment state " attribute are the 6th sign, and the current ES attribute in each sub-district in the record network, and corresponding RF configuration parameter, form first cell RF configuration parameter set.
Here, the RF configuration parameter of sub-district is the transmitting power of sub-district, the inclination angle etc. of bursting at the seams.
Step 303, ES time period and ES configuration scope that the ES management entity sends according to OM, and the traffic carrying capacity of interior each sub-district of described ES time period of WAP (wireless access point) transmission determines to enter in the described network sub-district of ES state.
Here, can carry out by operation shown in Figure 4 during the definite specific implementation of step 303.Referring to Fig. 4, the flow chart of step 303 correspondence that Fig. 4 provides for the embodiment of the invention.As shown in Figure 4, this flow process can may further comprise the steps:
The described ES that step 401, ES management entity send according to WAP (wireless access point) in the time period traffic volume measurement of each sub-district obtain each sub-district at the average traffic T of this ES in the time period.
Step 402, the ES management entity is made as not set condition with the state of all sub-districts in the described ES configuration scope; And these all sub-districts are formed current candidate cell set.
Step 403, ES management entity are selected the sub-district of average traffic maximum from current candidate cell set, be first sign with " not allowing ES " attribute configuration of this sub-district, and the state of this sub-district of mark is set condition.
Here, if the number of the sub-district of average traffic maximum greater than 1, is then chosen one wantonly from the sub-district of this average traffic maximum, perhaps select one of them according to actual conditions, present embodiment does not limit.
Step 404 still remains second sign with " not allowing ES " attributes of all adjacent sub-districts of the sub-district selected in this step 403, and determines that these all adjacent sub-districts are the sub-district that enters the ES state, and the state of these all adjacent sub-districts of mark is set condition.
Whether step 405 is gone back existence and is the sub-district of set condition not in each adjacent adjacent cells of cells in the determining step 404, if, current candidate cell set is formed in the sub-district of this existence, return execution in step 403, if not, then execution in step 406.
Here, if the sub-district of selecting in the step 403 is the sub-district A shown in Fig. 5 a, all adjacent sub-districts of the sub-district A that then mentions in step 404 are that sub-district F is to sub-district K.So, when carrying out this step 405, each adjacent adjacent cells of cells is the adjacent sub-district of sub-district F to sub-district K in the mentioned step 404 of this step 405.
Step 406 judges that whether going back existence in the described ES scope is the sub-district of set condition not, if, this status indication is not formed current candidate cell set for the sub-district of set condition, return execution in step 403, otherwise, finish current flow process.
So far, by flow process shown in Figure 4, can determine that non-conterminous sub-district in the candidate cell set is first sign such as " not allowing ES " attribute of the sub-district A to E shown in Fig. 5 a, be that sub-district A to E does not enter the ES state, and " not allowing ES " attribute of other sub-districts be second the sign promptly enter the ES state, promptly other sub-districts are the sub-district that enters the ES state.
Step 304, the ES management entity is notified to radio access node with the sign of the sub-district that step 303 is determined, and " ES state " attribute of being revised this cell ID corresponding district by this radio access node is the 3rd sign, that is: make this sub-district enter the ES state.
In this step 304, make this sub-district enter the ES state is just closed this sub-district by radio access node RF.
So far, can realize making the RF of part sub-district in the network to close, reach the purpose of saving resource by above-mentioned steps.
One skilled in the art will appreciate that if the sub-district enters the ES state in the network, promptly close the RF of sub-district, then may cause in the network some sub-district to exist and not cover a little, promptly occur covering leak, this covering leak can cause unstable networks.For avoiding this covering leak, then need to carry out following step 305.
Step 305, radio access node detects in the network whether have the covering leak, if, detected covering leak is reported to the ES management entity, and execution in step 306; Otherwise, return the detection in the execution in step 305, if there is not the covering leak within the continuous setting-up time, then carry out following step 309.
Here, the detection in the step 305 can be regular execution, also can be executed in real time, and the embodiment of the invention does not specifically limit.How to detect whether there is the covering leak in the network as for WAP (wireless access point), it can adopt existing testing mechanism to detect fully, no longer describes in detail here.
If the sub-district A to E shown in Fig. 5 a does not enter the ES state, and other sub-districts enter the ES state, when then entering the ES state in other sub-districts, coverage in the network is shown in Fig. 5 b, and in Fig. 5 b, the coverage of sub-district A to E is respectively each circle shown in Fig. 5 b, so, as can be seen, the zone that belongs to sub-district F of Fig. 5 b arrow indication is the zone that the covering of sub-district A to E does not relate to, and has promptly occurred not covering a little among the F of sub-district.
Step 306, the ES management entity covers leak at each, judges whether the RF configuration parameter of the sub-district that detects this covering leak is adjusted to maximum, if, execution in step 307; Otherwise, execution in step 308.
Here, covering leak is to judge by detecting the covering that does not enter the sub-district of ES state in the network, that is to say that the sub-district that detects this covering leak in the step 306 is specially detected sub-district when judging this covering leak, the current ES state that is not in this sub-district.Shown in Fig. 5 b, sub-district F is in the ES state, and sub-district A is not in the ES state, if radio access node finds that by the covering of detected cells A sub-district F causes this sub-district F the covering leak to occur owing to being in the ES state in step 305.So, when carrying out this step 306, whether the RF configuration parameter that the ES management entity just needs to judge the sub-district A that is not in the ES state is adjusted to maximum.
Step 307, ES management entity are reported to OM, the sub-district of leak occurred covering by artificial unlatching.Cover leaks all after the judgement in the completing steps 306 at all, execution in step 305.
Be example still with Fig. 5 b, if the zone of arrow points is when the RF of sub-district A configuration parameter is adjusted to maximum, still detect this zone for covering leak in step 305, so, when carrying out this step 307, the sub-district that the covering leak appears in artificial unlatching is the sub-district F shown in Fig. 5 b, here, opens the sub-district F that the covering leak occurs and is specially: make sub-district F no longer be in the ES state.
Step 308 makes radio access node increase the RF configuration parameter of this sub-district, and " the cover adjustment state " attribute that disposes this sub-district is the 5th sign.Cover leaks all after the judgement in the completing steps 306 at all, execution in step 305.
Here, step 308 further comprises: radio access node reports the controlled result of RF configuration parameter of sub-district to OM, so that OM upgrades the RF configuration parameter of this sub-district.
Need to prove that as a kind of expansion of the embodiment of the invention, step 308 specifically can comprise:
Step 3081 judges whether the RF configuration parameter that detects the sub-district that covers leak is adjusted, if then execution in step 3082; Otherwise, execution in step 3083.
Step 3082 makes radio access node open the sub-district that leak occurs covering.
Here, step 3082 is specially: making radio access node is described the 4th sign with " ES state " attribute modification of this sub-district, so that this sub-district no longer enters the ES state.
Need to prove that step 3082 further comprises: the result that reporting cell is opened is to OM, so that OM upgrades the ES state of sub-district.
Step 3083, determine to increase the RF configuration parameter that this detects the sub-district that covers leak, and be notified to radio access node, increase the RF configuration parameter of this sub-district by this radio access node, and five sign of " covering the adjustment state " attribute for the covering of this sub-district is adjusted that disposes this sub-district.
Here, step 3083 further comprises: the result that the RF configuration parameter of reporting cell is increased is to OM, so that OM upgrades the RF configuration parameter of sub-district.
Step 309 makes the current ES attribute in each sub-district in the ES management entity record network, and corresponding RF configuration parameter, forms second cell RF configuration parameter set.
That is to say, when carrying out this step 309, based on the purpose of saving resource, finished setting to the ES attribute and the corresponding RF configuration parameter of each sub-district in the network, this setting is that the dynamic coordinate between OM, radio access node and the ES management entity is finished fully.
If with situation 1 is example, then in the subsequent network running, it can followingly be operated: OM sends a command to the ES management entity according to current actual conditions, if this orders the open command into ES, then the ES management entity is configured each sub-district in the network according to second cell RF configuration parameter set, if order then is configured each sub-district in the network according to first cell RF configuration parameter set for the ES shutdown command.
If with situation 2 is example, then after executing above-mentioned steps 309, the ES management entity is configured each sub-district in the network according to second cell RF configuration parameter set.Certainly, if in the subsequent network running, receive the ES shutdown command, then each sub-district in the network is configured according to first cell RF configuration parameter set.
So far, by top description, realized the flow process of the method that the embodiment of the invention provides.
Need to prove that corresponding to method shown in Figure 3, in the system shown in Figure 2, described OM is used for sending the ES open command to described ES management entity; Described ES management entity is used to judge the current cell RF configuration parameter set (being designated as second cell RF configuration parameter set) that whether has the described ES open command needs that dynamically obtained by self, if not, dynamically obtain cell RF configuration parameter set, and according to the RF configuration parameter set configuration respective cell of obtaining, if, according to described RF configuration parameter set configuration respective cell.
Wherein, described ES management entity comprises information gathering module and ES management algorithm module;
Wherein, described information gathering module is used to collect ES time period and the ES configuration scope that described OM sends, and the traffic carrying capacity of each sub-district of interior its management of described ES time period of WAP (wireless access point) transmission;
And described ES management algorithm module, it is the core of ES management entity, the structure during specific implementation can comprise as shown in Figure 6:
Dispensing unit is used at each sub-district of current network, disposes four sign of " ES state " attribute of this sub-district for the current ES of the not being in state in this sub-district of expression;
Determining unit, be used for the ES time period, ES configuration scope and the described ES that collect according to described information gathering module in the time period traffic carrying capacity of each sub-district determine that described network enters the sub-district of ES state, send amendment advice to the radio access node that is used to manage this sub-district of determining;
Record cell, be used for when knowing that described network does not occur covering leak within setting-up time, current " ES state " attribute in each sub-district in the record network, and the current RF configuration parameter in this sub-district form described RF configuration parameter set (being designated as second cell RF configuration parameter set);
Receive the radio access node of described amendment advice, revise three sign of " ES state " attribute of each sub-district of determining, so that this sub-district of determining enters the ES state for the current ES of the being in state in this sub-district of expression.
Preferably, described dispensing unit further disposes " not allowing ES " attribute of each sub-district in the current network for representing that allowing this sub-district to carry out second of ES state identifies; And can comprise during described determining unit specific implementation:
The statistics subelement, be used for the described ES that collects according to described information gathering module in the time period traffic volume measurement of each sub-district obtain each sub-district at the average traffic T of this ES in the time period;
State is provided with subelement, is used for the state of all sub-districts in the described ES configuration scope is made as not set condition, and current candidate cell set is formed in these all sub-districts;
The first mark subelement, be used for selecting the sub-district of average traffic maximum from described current candidate cell set, " not allowing ES " attribute configuration of this sub-district is not carried out first sign of ES state for expression does not allow this sub-district, and the state of this sub-district of mark is set condition;
The second mark subelement, " not allowing ES " attribute that is used for all adjacent sub-districts of the sub-district that will select remains described second sign, and determines that these all adjacent sub-districts are the sub-district that enters the ES state, and the state of these all adjacent sub-districts of mark is set condition;
Judgment sub-unit, whether each the adjacent adjacent cells of cells that is used for judging the described sub-district of selecting goes back existence is the sub-district of set condition not, if, current candidate cell set is formed in the sub-district of this existence, trigger the described first mark subelement and carry out selection operation; If not,
Continue to judge that whether going back existence in the described ES configuration scope is the sub-district of set condition not, if, state is not formed current candidate cell set for the sub-district of set condition, trigger described first mark subelement execution selection operation, if not, process ends.
Preferably, described dispensing unit further disposes six sign of " covering the adjustment state " attribute for representing the covering of this sub-district not to be adjusted of each sub-district in the current network; And can comprise during described record cell specific implementation:
Determine subelement, when being used to receive the covering leak of described radio access node report, cover leak at each, determine detected sub-district when judging this covering leak, and whether the RF configuration parameter of judging this sub-district is adjusted to maximum, wherein, described covering leak is judged by the covering that does not enter the sub-district of ES state in the detection current network by described radio access node;
Send subelement, be used in the judged result of described definite subelement when being, report to OM, " ES state " attribute that is disposed the sub-district that described definite subelement determines by the user is described the 3rd sign, so that this sub-district does not enter the ES state, trigger radio access node afterwards and cover the leak judgement;
Trigger subelement, be used in the judged result of described definite subelement for not the time, trigger the RF configuration parameter that described radio access node increases the sub-district that described definite subelement determines, and five sign of " covering the adjustment state " attribute for the covering of this sub-district is adjusted that disposes this sub-district, trigger radio access node afterwards and cover the leak judgement;
The record subelement, when being used in setting-up time, not receiving the covering leak of described radio access node report, current " ES state " attribute, " not allowing ES " attribute, " covering the adjustment state " attribute in each sub-district in the record network, and corresponding RF configuration parameter, form described RF configuration parameter set (being designated as second cell RF configuration parameter set).
More than the structure of ES management algorithm module shown in Figure 2 is described in detail.
As can be seen from the above technical solutions, among the present invention, by setting in advance the ES management entity, dynamically obtain the cell RF configuration parameter set that described ES open command needs by this ES management entity, rather than import cell RF configuration parameter that the ES open command needs by hand by the user in the existing RS mechanism and need close such as the RF of which sub-district etc., this significantly reduces deployment workload, has dynamically realized energy saving, saves resource.
The above only is preferred embodiment of the present invention, and is in order to restriction the present invention, within the spirit and principles in the present invention not all, any modification of being made, is equal to replacement, improvement etc., all should be included within the scope of protection of the invention.

Claims (10)

1. an automatic management method of realizing energy saving (ES) is characterized in that, sets in advance the ES management entity; This method comprises:
A, described ES management entity judge the current sub-district radio frequency configuration parameter set that whether has the described ES open command needs that dynamically obtained by self when receiving the ES open command of Operation and Maintenance entity OM transmission, if not, and execution in step B; If, execution in step C;
B dynamically obtains cell RF configuration parameter set, afterwards execution in step C;
C is according to described cell RF configuration parameter set configuration respective cell.
2. method according to claim 1 is characterized in that, described cell RF configuration parameter set is obtained by following steps:
B1, at each sub-district in the current network, described ES management entity disposes four sign of " ES state " attribute of this sub-district for the current ES of the not being in state in this sub-district of expression;
B2, ES time period and ES configuration scope that described ES management entity sends according to described OM, and WAP (wireless access point) in described ES time period of sending the traffic carrying capacity of each sub-district determine to enter in the described network sub-district of ES state, and " ES state " attribute that triggers each sub-district that described radio access node determines by modification makes this sub-district enter the ES state for the 3rd sign of the current ES of the being in state in this sub-district of expression;
B3, described ES management entity know that described network does not occur covering leak within setting-up time, then write down current " ES state " attribute in each sub-district in the network, and the current RF configuration parameter in this sub-district, form described RF configuration parameter set.
3. method according to claim 2 is characterized in that, described step B1 further comprises:
" not allowing ES " attribute of each sub-district carries out second sign of ES state for expression allows this sub-district in the described ES management entity configuration current network;
The determining of described step B2 comprises:
The described ES that B21, described ES management entity send according to described WAP (wireless access point) in the time period traffic volume measurement of each sub-district obtain each sub-district at the average traffic T of this ES in the time period;
B22, described ES management entity is made as not set condition with the state of all sub-districts in the described ES configuration scope, and current candidate cell set is formed in these all sub-districts;
B23, described ES management entity is selected the sub-district of average traffic maximum from described current candidate cell set, " not allowing ES " attribute configuration of this sub-district is not carried out first sign of ES state for expression does not allow this sub-district, and the state of this sub-district of mark is set condition;
B24 remains described second sign with " not allowing ES " attributes of all adjacent sub-districts of the sub-district selected among the described step B23, and determines that these all adjacent sub-districts are the sub-district that enters the ES state, and the state of these all adjacent sub-districts of mark is set condition;
B25 judges that whether going back existence among the described step B24 in each adjacent adjacent cells of cells is the sub-district of set condition not, if, current candidate cell set is formed in the sub-district of this existence, return execution in step B23, if not, execution in step B26;
B26 judges that whether going back existence in the described ES configuration scope is the sub-district of set condition not, if, state is not formed current candidate cell set for the sub-district of set condition, return execution in step B23, otherwise, finish current flow process.
4. method according to claim 3 is characterized in that, described step B1 further comprises:
The 6th sign that " covering the adjustment state " attribute of each sub-district is not adjusted the covering of this sub-district for expression in the described ES management entity configuration current network; Described step B3 comprises:
B31, described radio access node judges whether there is the covering leak in the described network by detecting the covering that does not enter the sub-district of ES state in the current network, if, detected covering leak is reported to described ES management entity, and execution in step B32; Otherwise, continue to carry out described detection, if described network does not exist covering leak, then execution in step B35 within described setting-up time;
B32 covers leak at each, and described ES management entity is determined detected sub-district when judging this covering leak, and judges whether the RF configuration parameter of this sub-district is adjusted to maximum, if, execution in step B33; Otherwise, execution in step B34;
B33, described ES management entity report that to OM " ES state " attribute that is disposed this sub-district by the user is described the 3rd sign, so that this sub-district no longer enters the ES state; Return step B31 afterwards;
B34 makes described radio access node increase the RF configuration parameter of this sub-district, and five sign of " covering the adjustment state " attribute for the covering of this sub-district is adjusted that disposes this sub-district; Return step B31 afterwards;
B35 makes current " ES state " attribute, " not allowing ES " attribute, " covering the adjustment state " attribute in each sub-district in the described ES management entity record network, and corresponding RF configuration parameter, forms described RF configuration parameter set.
5. method according to claim 4 is characterized in that, described step B34 comprises:
Whether " covering the adjustment state " attribute of the sub-district that determining step B32 determines is described the 5th sign, if, triggering described radio access node is described the 4th sign with " ES state " attribute modification of this sub-district, so that this sub-district no longer enters the ES state, returns step B31 afterwards; If not, then determine to increase the RF configuration parameter of this sub-district, and execution in step B34.
6. method according to claim 4, it is characterized in that, described step B1 further comprises: current " ES state " attribute, " not allowing ES " attribute, " covering the adjustment state " attribute in each sub-district in the record network, and corresponding RF configuration parameter, form another RF configuration parameter set that the ES shutdown command needs, so that described ES management entity is when receiving the ES shutdown command that OM sends, according to described another cell RF configuration parameter set configuration respective cell.
7. an automated management system that realizes energy saving (ES) is characterized in that this system comprises: Operation and Maintenance entity OM and ES management entity; Wherein,
Described OM is used for sending the ES open command to described ES management entity;
Described ES management entity is used to judge the current sub-district radio frequency configuration parameter set that whether has the described ES open command needs that dynamically obtained by self, if not, dynamically obtain cell RF configuration parameter set, and according to the RF configuration parameter set configuration respective cell of obtaining, if, according to described RF configuration parameter set configuration respective cell.
8. system according to claim 7 is characterized in that, described system also comprises an above radio access node; Each WAP (wireless access point) is used to send the traffic carrying capacity of each sub-district of its management in the described ES time period to described ES management entity;
Described OM also is used for sending ES time period and ES configuration scope to described ES management entity;
Described ES management entity comprises information gathering module and ES management algorithm module; Wherein,
Described information gathering module is used to collect described ES time period, ES configuration scope and the traffic carrying capacity of each sub-district in the described ES time period;
Described ES management algorithm module comprises:
Dispensing unit is used at each sub-district of current network, disposes four sign of " ES state " attribute of this sub-district for the current ES of the not being in state in this sub-district of expression;
Determining unit, be used for the ES time period, ES configuration scope and the described ES that collect according to described information gathering module in the time period traffic carrying capacity of each sub-district determine that described network enters the sub-district of ES state, send amendment advice to the radio access node that is used to manage this sub-district of determining;
Record cell is used for when knowing that described network does not occur covering leak within setting-up time, and current " ES state " attribute in each sub-district in the record network, and the current RF configuration parameter in this sub-district form described RF configuration parameter set;
Receive the radio access node of described amendment advice, revise three sign of " ES state " attribute of each sub-district of determining, so that this sub-district of determining enters the ES state for the current ES of the being in state in this sub-district of expression.
9. system according to claim 8 is characterized in that, " not allowing ES " attribute that described dispensing unit further disposes each sub-district in the current network carries out second sign of ES state for expression allows this sub-district; Described determining unit comprises:
The statistics subelement, be used for the described ES that collects according to described information gathering module in the time period traffic volume measurement of each sub-district obtain each sub-district at the average traffic T of this ES in the time period;
State is provided with subelement, is used for the state of all sub-districts in the described ES configuration scope is made as not set condition, and current candidate cell set is formed in these all sub-districts;
The first mark subelement, be used for selecting the sub-district of average traffic maximum from described current candidate cell set, " not allowing ES " attribute configuration of this sub-district is not carried out first sign of ES state for expression does not allow this sub-district, and the state of this sub-district of mark is set condition;
The second mark subelement, " not allowing ES " attribute that is used for all adjacent sub-districts of the sub-district that will select remains described second sign, and determines that these all adjacent sub-districts are the sub-district that enters the ES state, and the state of these all adjacent sub-districts of mark is set condition;
Judgment sub-unit, whether each the adjacent adjacent cells of cells that is used for judging the described sub-district of selecting goes back existence is the sub-district of set condition not, if, current candidate cell set is formed in the sub-district of this existence, trigger the described first mark subelement and carry out selection operation; If not,
Continue to judge that whether going back existence in the described ES configuration scope is the sub-district of set condition not, if, state is not formed current candidate cell set for the sub-district of set condition, trigger described first mark subelement execution selection operation, if not, process ends.
10. system according to claim 9 is characterized in that, described dispensing unit further disposes six sign of " covering the adjustment state " attribute for representing the covering of this sub-district not to be adjusted of each sub-district in the current network; Described record cell comprises:
Determine subelement, when being used to receive the covering leak of described radio access node report, cover leak at each, determine detected sub-district when judging this covering leak, and whether the RF configuration parameter of judging this sub-district is adjusted to maximum, wherein, described covering leak is judged by the covering that does not enter the sub-district of ES state in the detection current network by described radio access node;
Send subelement, be used in the judged result of described definite subelement when being, report to OM, " ES state " attribute that is disposed the sub-district that described definite subelement determines by the user is described the 3rd sign, so that this sub-district does not enter the ES state, trigger radio access node afterwards and cover the leak judgement;
Trigger subelement, be used in the judged result of described definite subelement for not the time, trigger the RF configuration parameter that described radio access node increases the sub-district that described definite subelement determines, and five sign of " covering the adjustment state " attribute for the covering of this sub-district is adjusted that disposes this sub-district, trigger radio access node afterwards and cover the leak judgement;
The record subelement, when being used in setting-up time, not receiving the covering leak of described radio access node report, current " ES state " attribute, " not allowing ES " attribute, " covering the adjustment state " attribute in each sub-district in the record network, and corresponding RF configuration parameter, form described RF configuration parameter set.
CN2010102258965A 2010-07-09 2010-07-09 Automatic management method and automatic management system for realizing energy saving Expired - Fee Related CN101895973B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102258965A CN101895973B (en) 2010-07-09 2010-07-09 Automatic management method and automatic management system for realizing energy saving

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102258965A CN101895973B (en) 2010-07-09 2010-07-09 Automatic management method and automatic management system for realizing energy saving

Publications (2)

Publication Number Publication Date
CN101895973A true CN101895973A (en) 2010-11-24
CN101895973B CN101895973B (en) 2013-04-24

Family

ID=43104992

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102258965A Expired - Fee Related CN101895973B (en) 2010-07-09 2010-07-09 Automatic management method and automatic management system for realizing energy saving

Country Status (1)

Country Link
CN (1) CN101895973B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105682208A (en) * 2016-03-17 2016-06-15 京信通信技术(广州)有限公司 Small cell energy saving method and local controller

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101400125A (en) * 2008-10-15 2009-04-01 中兴通讯股份有限公司 Method and device for controlling base station energy saving by base station controller
CN101426264A (en) * 2007-11-02 2009-05-06 中兴通讯股份有限公司 Method for lowering node B power consumption in TD-SCDMA system
US20090147872A1 (en) * 2007-12-06 2009-06-11 Chia-Chin Chong Method of ranging signal design and transmission for mimo-ofdma initial ranging process
CN101742620A (en) * 2008-11-26 2010-06-16 中国移动通信集团湖南有限公司 Method, device and system of reducing energy consumption of base station
CN101754336A (en) * 2008-12-17 2010-06-23 中兴通讯股份有限公司 Base station power-saving method and system based on LTE TDD system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101426264A (en) * 2007-11-02 2009-05-06 中兴通讯股份有限公司 Method for lowering node B power consumption in TD-SCDMA system
US20090147872A1 (en) * 2007-12-06 2009-06-11 Chia-Chin Chong Method of ranging signal design and transmission for mimo-ofdma initial ranging process
CN101400125A (en) * 2008-10-15 2009-04-01 中兴通讯股份有限公司 Method and device for controlling base station energy saving by base station controller
CN101742620A (en) * 2008-11-26 2010-06-16 中国移动通信集团湖南有限公司 Method, device and system of reducing energy consumption of base station
CN101754336A (en) * 2008-12-17 2010-06-23 中兴通讯股份有限公司 Base station power-saving method and system based on LTE TDD system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105682208A (en) * 2016-03-17 2016-06-15 京信通信技术(广州)有限公司 Small cell energy saving method and local controller

Also Published As

Publication number Publication date
CN101895973B (en) 2013-04-24

Similar Documents

Publication Publication Date Title
CN110139289B (en) Scheduling method and scheduling system
CN103404196B (en) Shunt processing method, control unit and system
CN101873596A (en) Method and system for optimizing network coverage and capacity
CN104137595A (en) Self-organizing network function interaction
CN102256307A (en) Method and system for balancing distributed load in LTE (Long Term Evolution) access network
CN103118405B (en) Test system and test method of UE (User Experience) moving between communities
CN101754306A (en) Switching processing method, femtocell gateway and network system
CN101931977B (en) Method and device for optimizing ping-pong switching
CN112235804B (en) Base station remote unit dynamic grouping method and device, and cell networking method and system
CN103813370B (en) The method set up and safeguarded for the automatic neighbor lists of WLAN
WO2012146109A1 (en) Capacity stations activation method, wireless communication device and system
CN103369572A (en) Load-based automatic neighbor relation (ANR) optimizing method in long-term evolution system
TW201844060A (en) Data driven management method and apparatus for base stations
AU2022367098A1 (en) Method, apparatus and system for optimizing network capacity
CN105430693B (en) Multi-user's switching method based on service feature in a kind of 5G network
WO2022030713A1 (en) Configuring resources in a self-organizing network
CN105472711B (en) A kind of base station control method, device and base station
CN101895973B (en) Automatic management method and automatic management system for realizing energy saving
CN103517308A (en) Cell interrupt detecting method based on neighbor cell reference signal receiving power list
CN102647737B (en) Method and system for self optimization of wireless parameters
CN105722165B (en) Handoff parameter self-configuration method based on the perception of high frequency failed handoff
CN104105097A (en) Frequency allocation method, frequency allocation device and base station
CN103037443B (en) Coordinate method and the device of cell outage compensation and capacity optimization
CN110519821B (en) Method for selecting wireless sensor network cluster head of intelligent power distribution network
CN113905324A (en) Anchor point station determining method, device, equipment and readable medium based on NSA mode

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHENYANG XINYOU COMMUNICATION EQUIPMENT CO., LTD.

Free format text: FORMER OWNER: NEW POST COMMUNICATION EQUIPMENT CO., LTD.

Effective date: 20150619

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150619

Address after: 110136 Shenyang, Shenbei New Area Province Economic Development Zone, justice, Shen North Road, No. 51, No.

Patentee after: Shenyang New Postcom Equipment Co., Ltd.

Address before: 510663, No. 3, color road, Science City, Guangzhou Development Zone, Guangdong

Patentee before: New Post Communication Equipment Co., Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170626

Address after: 110136 Shenyang, Shenbei New Area Province Economic Development Zone, justice, Shen North Road, No. 51, No.

Patentee after: Shenyang Liansheng Technology Co., Ltd.

Address before: 110136 Shenyang, Shenbei New Area Province Economic Development Zone, justice, Shen North Road, No. 51, No.

Patentee before: Shenyang New Postcom Equipment Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130424

Termination date: 20200709

CF01 Termination of patent right due to non-payment of annual fee