CN101893348A - Heating and cooling system using swallet waste heat by industrial and mining enterprises - Google Patents

Heating and cooling system using swallet waste heat by industrial and mining enterprises Download PDF

Info

Publication number
CN101893348A
CN101893348A CN2010102404730A CN201010240473A CN101893348A CN 101893348 A CN101893348 A CN 101893348A CN 2010102404730 A CN2010102404730 A CN 2010102404730A CN 201010240473 A CN201010240473 A CN 201010240473A CN 101893348 A CN101893348 A CN 101893348A
Authority
CN
China
Prior art keywords
water
worker
source heat
water source
heat pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010102404730A
Other languages
Chinese (zh)
Other versions
CN101893348B (en
Inventor
黄德洪
姜官军
高慎法
曹磊
马先勇
刘波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Tongfang Energy Engineering Technology Co Ltd
Original Assignee
Shandong Tongfang Energy Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Tongfang Energy Engineering Technology Co Ltd filed Critical Shandong Tongfang Energy Engineering Technology Co Ltd
Priority to CN2010102404730A priority Critical patent/CN101893348B/en
Publication of CN101893348A publication Critical patent/CN101893348A/en
Application granted granted Critical
Publication of CN101893348B publication Critical patent/CN101893348B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/52Heat recovery pumps, i.e. heat pump based systems or units able to transfer the thermal energy from one area of the premises or part of the facilities to a different one, improving the overall efficiency
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00Climate change mitigation technologies for sector-wide applications
    • Y02P80/10Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier

Abstract

The invention discloses a heating and cooling system using swallet waste heat by industrial and mining enterprises, relating to the field of residual heat waste heat resource utilization. The heating and cooling system comprises a well-head freeze protection water source heat pump unit (5), a worker bath water source heat pump unit (6), an industrial heating and cooling water source heat pump unit (7), a mine water recycle pump (2), a primary water recycle pump (4), three secondary water recycle pumps, a bath water heating recycle pump (13), two plate-type heat exchangers and a sub-water catcher (17). In the invention, a water source heat pump technology is used and reclaimed water waste heat in a mine water treatment plant is comprehensively utilized for worker bath, industrial heating in winter, well-head freeze protection and cooling of office buildings and apartment blocks in summer; a coal-fired boiler system is thoroughly replaced; a water source heat pump system only extracts the heat of the reclaimed water of the treated mine water and domestic sewage, and additional water resources are not consumed; and the heating and cooling system has the advantages of remarkable energy saving effect, obvious economic benefit, outstanding environmental benefit and the like.

Description

Industrial and mining enterprises utilize swallet waste heating, refrigeration system
Technical field
The present invention relates to coal system waste heat used heat utilization of resources field, specifically a kind of industrial and mining enterprises utilize swallet waste heating, refrigeration system.
Background technology
In recent years, along with industrialization, Development of China's Urbanization are accelerated, China's energy-consuming growth rate is obviously faster than economic growth rate, the energy constraint contradiction of economic development faces becomes increasingly conspicuous, half of the per capita quantity not sufficient world average level of main Mineral Resources, energy utilization rate only has an appointment 32%, than low more than 10 percentage point of external advanced level." People's Republic of China's national economy and social development 11th Five-Year Plan outline " proposes the GDP energy resource consumption of Eleventh Five-Year Plan end of term unit and reduces about 20% than " 15 " end of term, and total emissions of major pollutants reduces by 10% restrictive index.During this year " two Conferences ", exploitation, development and application that state leader and expert have emphasized to vigorously support energy-saving electric heating new technology once more, advanced new technologies such as heat pump, accumulation of energy, new product, and some energy-conserving products of going into operation, moving have been carried out certainly sufficient.
Energy-conservation is long-range strategy and policy of China's economy and social development, also is to work as very urgent task of last item.Energy shortage and environmental pollution have become two global big crises, and human existence and development in serious threat.Can predict, the China's economic social development all can promote the economic restructuring and the style of economic increase to change pendulum in outstanding more strategic location in the future for a long period of time with saving energy and reduce the cost.The height of industry " surplus in the of three " (surplus temperature of the surplus vapour of waste heat) resource utilization is one of important symbol of weighing a regional economic development level and up-to-dateness; Geothermal energy also is the focus development project that the country and the world advocate energetically, and unified plan utilizes geothermal energy to help advancing the smooth implementation of " 11th Five-Year energy-saving and emission-reduction " policy.For many years, under the guiding of national policy, utilize the technology of " surplus in the of three " and geothermal energy that very big development has been arranged, utilize approach constantly to enlarge, technological transformation project is increasing year by year.
Coal enterprise is a major power consumer, existing coal enterprise adopt substantially coal-burning boiler system for the mine heating, well head is antifreeze and worker's bathing etc. provides thermal source, there is following subject matter in this coal-burning boiler system: (1) operating cost height; (2) contaminated environment is serious; (3) the annual maintenance expense of coal-burning boiler system is very high, the system maintenance complexity.And office building, apartment refrigeration system now all adopt the single cooling air source heat pump of cover system, compare with water source heat pump system, and the air source heat pump system Energy Efficiency Ratio is low, the operating cost height, and maintenance cost is big.Therefore, coal system enforcement reducing energy consumption and waste heat used heat utilization of resources engineering are very urgent.
Water source heat pump technology is the most popular power-saving technology in the world today, only needs a spot of high-grade electric energy of input, adopts " pump liter " principle of heat pump, just the low grade heat energy resource in mine water or the underground water can be converted to adaptable high-grade heat energy.The water source heat pump units heating energy efficiency ratio only consumes a spot of electric energy up to more than 4.5, just can produce up to the heat energy more than 4.5 times, and low energy consumption is pollution-free.Adopt water source heat pump system to replace coal-burning boiler system, will reduce the enterprise operation cost greatly.
Summary of the invention
For solving the technical problem of above-mentioned existence, the invention provides a kind of industrial and mining enterprises and utilize swallet waste heating, refrigeration system, replace coal-burning boiler system fully, change the usefulness energy structure of coal system, make full use of swallet used heat and underground heat, turn waste into wealth, reduce operating cost, reduce environmental pollution.
For achieving the above object, the technical solution used in the present invention is as follows:
A kind of industrial and mining enterprises utilize the swallet waste heating, refrigeration system, include the antifreeze water source heat pump units of well head, worker's bathing people from water source pump assembly, the worker extensively heats, the refrigeration water source heat pump units, the mine water circulating pump, a water-circulating pump, three secondary water-circulating pumps, bathing water heat cycles pump, two plate type heat exchangers and water collecting and diversifying device, mine pond and mine water circulating pump, plate type heat exchanger I, one time water-circulating pump connects in turn, the antifreeze water source heat pump units of well head, worker's bathing water source heat pump units and worker extensively heat, the refrigeration water source heat pump units is connected with a water-circulating pump respectively, antifreeze water source heat pump units of well head and secondary water-circulating pump I, the well head de-icer, the new blower fan group of well head connects in turn, worker's bathing water source heat pump units and secondary water-circulating pump II, plate type heat exchanger II, bathing water heat cycles pump and bath hot water case connect in turn, and the worker extensively heats, refrigeration water source heat pump units and secondary water-circulating pump III, the wide building air-conditioning device of water collecting and diversifying device and worker connects in turn.
The worker water source heat pump units inside of extensively heating, freeze carries waste-heat recoverer, and described waste-heat recoverer is connected with secondary water-circulating pump II.
The present invention adopts water source heat pump technology, the middle water used heat of comprehensive utilization mine water treatment plant, be used for worker's bathing, winter the worker extensively heat, well head is antifreeze and summer office building, apartment refrigeration, thoroughly substitute coal-burning boiler system, water source heat pump system only extracts the heat of the middle water after mine water and the sanitary sewage disposal, does not consume extra water resource.
In sum, the present invention has advantages such as energy-saving effect is remarkable, economic benefit is obvious, environmental benefit is outstanding, security of system is reliable, simple to operate, stable, automation intensity height, can realize unmanned, change the usefulness energy structure of coal system effectively, advance coal enterprise's energy-saving and emission-reduction, develop a circular economy, promote sustainable development.
Description of drawings
Accompanying drawing is a structural representation of the present invention;
The specific embodiment:
Describe the present invention below in conjunction with the drawings and specific embodiments:
As shown in drawings, system includes the antifreeze water source heat pump units 5 of well head, worker's bathing water source heat pump units 6, the worker extensively heats, refrigeration water source heat pump units 7, mine water circulating pump 2, a water-circulating pump 4, three secondary water-circulating pumps, bathing water heat cycles pump 13, two plate type heat exchangers and water collecting and diversifying device 17, mine pond 1 and mine water circulating pump 2, plate type heat exchanger I 3, one time water-circulating pump 2 connects in turn, the antifreeze water source heat pump units 5 of well head, worker's bathing water source heat pump units 6 and worker extensively heat, refrigeration water source heat pump units 7 is connected with a water-circulating pump 4 respectively, antifreeze water source heat pump units 5 of well head and secondary water-circulating pump I8, well head de-icer 9, the new blower fan group 10 of well head connects in turn, worker's bathing water source heat pump units 6 and secondary water-circulating pump II11, plate type heat exchanger II12, bathing water heat cycles pump 13 and bath hot water case 14 connect in turn, and the worker extensively heats, refrigeration water source heat pump units 7 and secondary water-circulating pump III15, the wide building air-conditioning device 17 of water collecting and diversifying device 16 and worker connects in turn.Worker water source heat pump units 7 inside of extensively heating, freeze carry heat regenerator 18, and described heat regenerator 18 is connected with secondary water-circulating pump II11.
Swallet enters day mineral well water by the down-hole by water pump and handles pond 1, mine water circulating pump 2 is sent mine water into plate type heat exchanger I3, carry out heat exchange with a water, water enters the antifreeze water source heat pump units 5 of well head, worker's bathing water source heat pump units 6 and the worker water source heat pump units 7 that extensively heats, freezes respectively by water-circulating pump 4.
The antifreeze water source heat pump units of well head 5 is extracted behind the heat of swallets heat transferred secondary cycle water, secondary cycle water with heat transferred well head de-icer 9, will enter the cold wind heating of the new blower fan group 10 of well head to satisfy the antifreeze needs of well head in winter by secondary water-circulating pump I8.
Worker's bathing water source heat pump units 6 is extracted behind the heat of swallets heat transferred secondary cycle water, secondary cycle water passes to plate type heat exchanger II12 heating bath water by secondary water-circulating pump II11, bath water after the heating by bathing water heat cycles pump 13 as power, be stored into after the heating in the bath hot water case 14, send into the needs that each bathroom satisfies worker's bathing.
The worker extensively heats, refrigeration water source heat pump units 7 is extracted behind the heat of swallets heat transferred secondary cycle water, secondary cycle water is by secondary water-circulating pump III16, water collector 16 distributes the back to the wide building air-conditioning device 17 of worker, utilize the distinctive function that can heat and can freeze of water resource heat pump, when being heat supply in winter, the wide building air-conditioning device 17 of worker is to rely on the condenser of water resource heat pump inside in work, to office building or the heating of worker apartment, summer is when freezing, the wide building air-conditioning device 17 of worker is to rely on the evaporimeter of water resource heat pump inside in work, can be to office building and worker's apartment refrigeration, realize a tractor serves several purposes, to reach the needs of Various Seasonal heating or refrigeration.And summer, worker's bathing water source heat pump units 6 as maintenance can start worker's water source heat pump units 7 that extensively heats, freezes, the heat regenerator 18 that carries by unit, with the secondary cycle water heating of worker's bathing water source heat pump units 6, to satisfy the needs of worker's bathing.
For convenience of description, whole system is divided into three subsystems, is respectively well head winterization system, worker's bath system and the wide building heating of worker, refrigeration system.Described well head winterization system comprises the antifreeze water source heat pump units 5 of well head, secondary water-circulating pump I8, well head de-icer 9, the new blower fan group 10 of well head; Worker's bath system comprises worker's bathing water source heat pump units 6, secondary water-circulating pump II11, plate type heat exchanger II12, bathing water heat cycles pump 13 and bath hot water case 14; The heating of the wide building of worker, refrigeration system comprise worker extensively heat, freeze water source heat pump units 7, secondary water-circulating pump III15, water collecting and diversifying device 16 and the wide building air-conditioning device 17 of worker.
Embodiment 1: well head is antifreeze, worker's bathing, the wide building heating of worker, three systems of refrigeration are independent separately, and wherein respectively there is 50% unit spare capacity in antifreeze, worker's bathing two systems of well head; The wide building heating of worker, refrigeration system do not have standby unit, but can provide standby for the wide building heating of worker, refrigeration system with the spare capacity of well head winterization system and worker's bath system.Select for use a cover water treatment and water charging system to be respectively three system water supplements.
According to this thinking, the well head winterization system is selected three SRSW-250-2 types (the standard condition heating capacity is 947.5kW) water source heat pump units for use, and dual-purpose one is equipped with; Three SRSW-ZGW-100M-1 types (the standard condition heating capacity is 327.4kW) water source heat pump units is selected in worker's bathing for use, and dual-purpose one is equipped with; Two SRSW-ZGW-400M-4 types (the standard condition heating capacity is 1309.5kW) water source heat pump units is selected in the wide heating of worker for use.Total heating capacity is 6443.7kW.
In the present embodiment, well head winterization system and worker's bath system respectively have 50% standby surplus, and the wide building heating of worker, refrigeration system are standby for the independent operating system does not have, and system reliability is the highest; But investment cost height, operating cost are slightly high.
Embodiment 2: well head winterization system and worker's bath system respectively are the independent operating system, but a common standby water source heat pump units, worker's bath system spare capacity is 100%, well head winterization system spare capacity is 40%; The wide building heating of worker, refrigeration system are autonomous system, do not have standby unit.
According to this thinking, worker's bath system configuration SRSW-200-2 type (the standard condition heating capacity is 769.5kW) water source heat pump units; Well head winterization system configuration two SRSW-250-2 types (the standard condition heating capacity is 947.5kW) water source heat pump units; When worker's bath system or well head winterization system heat pump break down, be its supplemental heat source by standby unit, this kind standby mode uses for emergent; The wide building heating of worker, refrigeration system are selected two SRSW-ZGW-400M-4 types (the standard condition heating capacity is 1309.5kW) water source heat pump units for use, wherein supply apartment and ore deposit office building air conditioner refrigerating a summer, and standby each other with worker's bath system.Total heating capacity is 6053kW.
In the present embodiment, the standby unit of the shared cover of well head winterization system and worker's bath system, the well head winterization system has 40% standby surplus, and worker's bath system has 100% standby surplus, the wide building heating of worker, refrigeration system are standby for the independent operating system does not have, and system reliability is higher; But investment cost height, operating cost are slightly high.
Embodiment 3: the well head winterization system adopts two water source heat pump units, and worker's bath system adopts a full recuperation of heat water source source pump, and the wide building heating of worker, refrigeration system adopt two big one little three water source heat pump units.Wherein the wide building heating of worker, the little unit of refrigeration system form unidirectional standby with well head winterization system and worker's bath system respectively, be well head winterization system or worker's bath system when in a single day breaking down, the little source pump of the wide building heating of worker, refrigeration system by backup line to well head winterization system or the heat supply of worker's bath system.This kind standby mode is the emergency power mode, and pending fault should recover the former method of operation after getting rid of immediately.
When summer, worker's bath system provides free low-temperature receiver for ore deposit office building and apartment air conditioner refrigerating when worker's bath hot water is provided.Summer when ore deposit office building and apartment air conditioner refrigerating like this, only open the requirement that the wide building heating of worker, the little unit of refrigeration system can satisfy air conditioner refrigerating, the wide building heating of worker, the big unit of refrigeration system are standby unit.This system's design can be saved 50% operating cost when summer air-conditioning freezes.
According to this thinking, the well head winterization system is selected two SRSW-250-2 types (the standard condition heating capacity is 947.5kW) water source heat pump units for use; Worker's bath system is selected a SRSW-QH200-2 type (the standard condition heating capacity is 769.5Kw, and the recovery heat is 719.2Kw) water source heat pump units for use; The wide building heating of worker, refrigeration system are selected two SRSW-ZGW-300M-2 types (the standard condition heating capacity is 950.9kW) and a SRSW-ZGW-200M-2 type (the standard condition heating capacity is 654.8kW) water source heat pump units for use, can satisfy the wide building heating requirement of worker fully.The SRSW-ZGW-200M-2 water source heat pump units of the wide building heating of worker, refrigeration system and worker's bath system can form 100% standby in addition, with the well head winterization system form 40% standby, standby temporarily when breaking down to guarantee worker's bath system and well head winterization system.
During summer, the full recuperation of heat unit of SRSW-QH200M-2 provides worker's bath hot water simultaneously, freely provides low-temperature receiver for ore deposit office building and apartment.So only open little unit of SRSW-ZGW-200M-2, can satisfy ore deposit office building and the requirement of apartment air conditioner refrigerating.This system's design can be saved 50% operating cost when summer air-conditioning freezes.
In the present embodiment, the wide building heating of worker, refrigerant system design two big one little three water source heat pump units, two water source heat pump units of well head winterization system design, water source heat pump units of worker's bath system design.Under normal circumstances, three systems are independent operating all, and only when well head winterization system or worker's bath system broke down, the wide building heating of worker, the little source pump of refrigeration system were done standby for well head winterization system or worker's bath system temporarily, after the system that treats repairs, recover the wide building heating function of worker.Little unit has 40% standby surplus for the well head winterization system, and worker's bath system has 100% standby surplus.The reliability of the wide building heating of worker, refrigeration system is than scheme one and scheme two differences, and heat in the mining area, the refrigeration requirement but also can satisfy fully, and can stable operation.But investment cost is minimum, and operating cost is minimum.
In sum, the present invention integrates advanced and heats, Refrigeration Technique and Intelligent automatic-control technology, replaces coal-burning boiler system fully, has really realized energy-saving and emission-reduction, has greatly improved environment of mining area, and economic benefit and social benefit are obvious.

Claims (2)

1. industrial and mining enterprises utilize the swallet waste heating, refrigeration system, it is characterized in that, include the antifreeze water source heat pump units of well head (5), worker's bathing water source heat pump units (6), the worker extensively heats, refrigeration water source heat pump units (7), mine water circulating pump (2), a water-circulating pump (4), three secondary water-circulating pumps, bathing water heat cycles pump (13), two plate type heat exchangers and water collecting and diversifying device (17), mine pond (1) and mine water circulating pump (2), plate type heat exchanger I (3), a water-circulating pump (2) connects in turn, the antifreeze water source heat pump units of well head (5), worker's bathing water source heat pump units (6) and worker extensively heat, refrigeration water source heat pump units (7) is connected with a water-circulating pump (4) respectively, antifreeze water source heat pump units of well head (5) and secondary water-circulating pump I (8), well head de-icer (9), the new blower fan group of well head (10) connects in turn, worker's bathing water source heat pump units (6) and secondary water-circulating pump II (11), plate type heat exchanger II (12), bathing water heat cycles pump (13) and bath hot water case (14) connect in turn, and the worker extensively heats, refrigeration water source heat pump units (7) and secondary water-circulating pump III (15), the wide building air-conditioning device of water collecting and diversifying device (16) and worker (17) connects in turn.
2. a kind of industrial and mining enterprises according to claim 1 utilize swallet waste heating, refrigeration system, it is characterized in that, worker water source heat pump units (7) inside of extensively heating, freeze carries waste-heat recoverer (19), and described waste-heat recoverer (18) is connected with secondary water-circulating pump II (11).
CN2010102404730A 2010-07-30 2010-07-30 Heating and cooling system using swallet waste heat by industrial and mining enterprises Expired - Fee Related CN101893348B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102404730A CN101893348B (en) 2010-07-30 2010-07-30 Heating and cooling system using swallet waste heat by industrial and mining enterprises

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102404730A CN101893348B (en) 2010-07-30 2010-07-30 Heating and cooling system using swallet waste heat by industrial and mining enterprises

Publications (2)

Publication Number Publication Date
CN101893348A true CN101893348A (en) 2010-11-24
CN101893348B CN101893348B (en) 2012-05-23

Family

ID=43102619

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102404730A Expired - Fee Related CN101893348B (en) 2010-07-30 2010-07-30 Heating and cooling system using swallet waste heat by industrial and mining enterprises

Country Status (1)

Country Link
CN (1) CN101893348B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102225036A (en) * 2011-03-15 2011-10-26 李隆 Heat pump type hydrotherapy instrument and bio-feedback music colorful light physical hydrotherapy method
CN104329760A (en) * 2014-11-13 2015-02-04 中冶北方(大连)工程技术有限公司 System and method for comprehensive utilization of ground heat of mine water drainage
CN104566960A (en) * 2013-10-23 2015-04-29 洛阳中懋环保设备有限公司 Mining area water source comprehensive utilization device for producing hot water
CN106196799A (en) * 2016-08-25 2016-12-07 浙江夏王纸业有限公司 One utilizes public water delivery low-temperature receiver amount to replace production body paper thermal device
CN110043313A (en) * 2019-04-18 2019-07-23 太原向明智能装备股份有限公司 One kind is provided multiple forms of energy to complement each other coal mine methane heat pump wellhead anti-freezing system
CN110344881A (en) * 2019-08-01 2019-10-18 中煤科工(天津)清洁能源研究院有限公司 A kind of equipment system utilized based on remaining hot water
CN113294193A (en) * 2021-05-17 2021-08-24 昆明理工大学 Internal circulation energy-saving mine air conditioning system method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003214722A (en) * 2002-01-21 2003-07-30 Jmc Geothermal Engineering Co Ltd Air conditioning/hot water supply method and system using water heat source heat pump
CN2602322Y (en) * 2002-12-10 2004-02-04 何满潮 Multiple heating source linkage operation air-conditioning system
JP2005049016A (en) * 2003-07-29 2005-02-24 Sato Sogo Keikaku:Kk Geothermal heat pump system
CN200968747Y (en) * 2006-11-20 2007-10-31 尤相武 Heat and cold supplier synchronous operation apparatus of heat pump set
CN201043829Y (en) * 2007-06-01 2008-04-02 山东泰山能源有限责任公司协庄煤矿 Mine water source heat pump air conditioning device
CN201460813U (en) * 2009-05-13 2010-05-12 鹿松年 Wellhead anti-freezing heating system by using mine water residual heat to supply heat
CN101775967A (en) * 2009-12-09 2010-07-14 山东同方能源工程技术有限公司 Energy-saving anti-freezing system for coal mine well port

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003214722A (en) * 2002-01-21 2003-07-30 Jmc Geothermal Engineering Co Ltd Air conditioning/hot water supply method and system using water heat source heat pump
CN2602322Y (en) * 2002-12-10 2004-02-04 何满潮 Multiple heating source linkage operation air-conditioning system
JP2005049016A (en) * 2003-07-29 2005-02-24 Sato Sogo Keikaku:Kk Geothermal heat pump system
CN200968747Y (en) * 2006-11-20 2007-10-31 尤相武 Heat and cold supplier synchronous operation apparatus of heat pump set
CN201043829Y (en) * 2007-06-01 2008-04-02 山东泰山能源有限责任公司协庄煤矿 Mine water source heat pump air conditioning device
CN201460813U (en) * 2009-05-13 2010-05-12 鹿松年 Wellhead anti-freezing heating system by using mine water residual heat to supply heat
CN101775967A (en) * 2009-12-09 2010-07-14 山东同方能源工程技术有限公司 Energy-saving anti-freezing system for coal mine well port

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
《暖通空调》 20091231 刘军等 地热尾水+水源热泵技术的应用 第139-143,93页 1-2 第39卷, 第4期 2 *
《河北煤炭》 20091231 施长信等 水源热泵技术在煤矿上的应用 第53-54页 1-2 , 第3期 2 *
《节能》 20041231 王紫雯等 矿山井下水生态优化设计方法研究 第11-14页 1-2 , 第3期 2 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102225036A (en) * 2011-03-15 2011-10-26 李隆 Heat pump type hydrotherapy instrument and bio-feedback music colorful light physical hydrotherapy method
CN102225036B (en) * 2011-03-15 2013-01-09 李隆 Heat pump type hydrotherapy instrument and bio-feedback music colorful light physical hydrotherapy method
CN104566960A (en) * 2013-10-23 2015-04-29 洛阳中懋环保设备有限公司 Mining area water source comprehensive utilization device for producing hot water
CN104329760A (en) * 2014-11-13 2015-02-04 中冶北方(大连)工程技术有限公司 System and method for comprehensive utilization of ground heat of mine water drainage
CN104329760B (en) * 2014-11-13 2017-07-25 中冶北方(大连)工程技术有限公司 The underground heat utilization system and method for mine drainage
CN106196799A (en) * 2016-08-25 2016-12-07 浙江夏王纸业有限公司 One utilizes public water delivery low-temperature receiver amount to replace production body paper thermal device
CN110043313A (en) * 2019-04-18 2019-07-23 太原向明智能装备股份有限公司 One kind is provided multiple forms of energy to complement each other coal mine methane heat pump wellhead anti-freezing system
CN110344881A (en) * 2019-08-01 2019-10-18 中煤科工(天津)清洁能源研究院有限公司 A kind of equipment system utilized based on remaining hot water
CN113294193A (en) * 2021-05-17 2021-08-24 昆明理工大学 Internal circulation energy-saving mine air conditioning system method

Also Published As

Publication number Publication date
CN101893348B (en) 2012-05-23

Similar Documents

Publication Publication Date Title
CN101893348B (en) Heating and cooling system using swallet waste heat by industrial and mining enterprises
CN203518141U (en) Data machine room full-year cooling air-conditioning system with condensation heat recycling function
EP2910693B1 (en) District public water supply pipe network system compatible for source side water for ground source heat pump system and reclaimed water
CN105444247B (en) Regional energy supply system based on comprehensive recycling of various low-grade waste heat
CN202675723U (en) Energy-saving composite driven lithium bromide absorption-type air source heat pump
CN202158688U (en) Heating and cooling system by means of mine inflow waste heat in industrial and mining enterprises
Mansurova Application of renewable energy sources in buildings
CN201007231Y (en) Mine total energy approach device of coal mine mash gas engines
Peng et al. Enhancement technology of underground water flow field in coal mine to improve energy efficiency of heat pump system in geothermal energy development
CN100532915C (en) Wind, solar energy and electricity integrated heating device and heating method for crude oil gathering and transportation
CN105464732B (en) Industrial low-grade waste heat energy supply system
CN104896798A (en) Low-grade and heat-grading recycling heat pump hoisting system and waste heat grading recycling method thereof
CN203501528U (en) Direct-expansion type ground-source heat pump air conditioner cold and hot water unit
CN110578951A (en) deep well heat energy comprehensive utilization system
Huang et al. Feasibility of heat recovery for district heating based on cloud computing industrial park
CN216114281U (en) Comprehensive energy supply system for coal mine
CN201561604U (en) Waste-heat recovery unit of esterified steam
CN210951973U (en) Multi-energy complementary type regional energy station
CN103075776A (en) Intelligent water cold-accumulation (seawater energy) energy-saving central air conditioner system
CN211177514U (en) Fluid heating road snow melting system with energy gradient utilization
CN114322037A (en) Energy-saving industrial energy station utilizing waste heat recovery and clean energy and operation control method
CN113776110A (en) Comprehensive energy supply system for coal mine
CN203240834U (en) Waste heat refrigeration recycling system
CN203009038U (en) Oil and gas field combination station distributed energy system
CN102748896A (en) Integrated system combining complementary power supply device, heat supply and refrigeration

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120523

Termination date: 20140730

EXPY Termination of patent right or utility model