CN101893311A - 空调箱及其新回风段 - Google Patents
空调箱及其新回风段 Download PDFInfo
- Publication number
- CN101893311A CN101893311A CN2010102241273A CN201010224127A CN101893311A CN 101893311 A CN101893311 A CN 101893311A CN 2010102241273 A CN2010102241273 A CN 2010102241273A CN 201010224127 A CN201010224127 A CN 201010224127A CN 101893311 A CN101893311 A CN 101893311A
- Authority
- CN
- China
- Prior art keywords
- air
- fresh air
- return section
- section
- measuring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Air Conditioning Control Device (AREA)
Abstract
本发明属于空调通风领域的一种空调箱及其新回风段。该新回风段的新风入口处内侧依次设有采用DDC自动控制的风量测量和调节装置,在所述风量测量和调节装置的末端设有风量调节阀,根据风量要求调节开度。空调箱为包括上述新回风段。本发明通过在新回风段增加新风测量控制装置,根据室内实际新风需精确控制新风量,降低新风能耗,节省运行费用。该装置可实现全空气空调系统新风量精确控制,并可在过渡季节实现全新风运行策略。
Description
技术领域
本发明涉及空调通风技术,具体涉及一种空调箱,尤其是其新回风段。
背景技术
我国建筑用能占总用能的30%左右,而在建筑用能中空调用能占了很大比例。在全空气空调系统中,新风能耗又占1/3多。因此,现代的全空气空调系统需要对新风量进行精确测量与控制,且在室外空气参数合适时,空调箱应具有加大新风摄取量,采用新风免费冷却功能,从而实现部分或全部取代人工制冷,节省用能,降低系统运行费用。
现有空调箱不具备新风自动测量与控制功能,在需要实现新风量自动测量与控制的场合,必须再另外选配风量测量与控制装置。
发明内容
本发明的第一个目的是克服上述现有技术的缺陷,提供了一种空调箱的新回风段,能有效的实现全空气空调系统新风量的精确控制,并可在过渡季节实现全新风运行策略。
本发明的第二个目的是提供了一种包含上述新回风段的空调箱,将新风量精确测量和控制装置通过新回风段整合在空调箱内,形成一个整体。从而解决空调箱新风量自动测量和控制问题,有效解决系统运行中新风量准确测量、控制问题,进而降低新风能耗,节省运行费用。
本发明的第一个目的通过以下技术方案实现:
一种空调箱的新回风段,包括新风入口,在所述新风入口处内侧设有采用DDC自动控制的风量测量和调节装置,在所述风量测量和调节装置的末端设有风量调节阀,根据风量要求调节开度。
上述技术方案中,所述风量测量装置通过皮托管式风速传感器测得风速,进而计算新风量;自动控制装置根据风速传感器实测风量与设定风量的差值调节电动调节风阀,通过风阀的连续调节实现新风量的精确控制。风量测量装置和调节装置本身属于现有技术,不在本发明的保护范围内。
本发明的第二个目的是通过以下技术方案实现的:
一种空调箱,包括:新回风段、粗中效过滤段、冷热交换盘管段、加湿段及送风段依次连接,所述新回风段中包括新风入口,其特征在于:在所述新回风段的新风入口处内侧设有采用DDC自动控制的风量测量和调节装置,在所述风量测量和调节装置的末端设有风量调节阀,根据风量要求调节开度。
本发明的有益效果在于:通过在新回风段增加新风测量控制装置,根据室内实际新风需精确控制新风量,降低新风能耗,节省运行费用。该装置可实现全空气空调系统新风量精确控制,并可在过渡季节实现全新风运行策略。
附图说明
附图1为本发明实施例的结构示意图。
其中:1、新回风段;2、粗中效过滤段;3、冷热交换盘管段;4、加湿段;5、送风段;6、风量测量和调节装置;7、新风入口;8、风量调节阀;9、回风入口。
具体实施方式
下面结合附图,对本发明的实施例进行详细介绍。
如附图1所示,新回风段1包括新分入口7,在贴近新风入口内侧设有风量测量和调节装置6,风量测量和调节装置采用DDC自动控制,以调节风量调节阀8的开度。
图1所示的空调箱,包括上述新回风段1、粗中效过滤段2、冷热交换盘管段3、加湿段4及送风段5,在新回风段1的新风入口7处设置风量测量和调节装置6。空调箱工作时,进入空调箱的新风量由风量测量和调节装置6根据要求值进行控制,新风通过风量测量和调节装置进入新回风段,与回风入口9的回风混合后经粗中效过滤段2,将空气中的杂质、尘埃等污染物过滤掉,然后经冷热交换盘管段3、加湿段4处理后,经送风段5送出。
本发明很好的解决了空调系统新风量准确控制问题,有利于新风能耗的降低,运行费用的节省。
以上对本发明实施例所提供的方案详细介绍,对于本领域的一般技术人员,依据本发明实施例的思想,在具体实施方式及应用范围上均会有改变之处。综上所述,本说明书内容不应理解为对本发明的限制,凡依本发明设计思想所做的任何改变都在本发明的保护范围之内。
Claims (2)
1.一种空调箱的新回风段,包括新风入口(7),其特征在于:在所述新风入口(7)处内侧设有采用DDC自动控制的风量测量和调节装置(6),在所述风量测量和调节装置的末端设有风量调节阀(8),根据风量要求调节开度。
2.一种空调箱,包括:新回风段(1)、粗中效过滤段(2)、冷热交换盘管段(3)、加湿段(4)及送风段(5)依次连接,所述新回风段(1)中包括新风入口(7),其特征在于:在所述新回风段的新风入口(7)处内侧设有采用DDC自动控制的风量测量和调节装置(6),在所述风量测量和调节装置的末端设有风量调节阀(8),根据风量要求调节开度。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102241273A CN101893311A (zh) | 2010-07-09 | 2010-07-09 | 空调箱及其新回风段 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102241273A CN101893311A (zh) | 2010-07-09 | 2010-07-09 | 空调箱及其新回风段 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101893311A true CN101893311A (zh) | 2010-11-24 |
Family
ID=43102583
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010102241273A Pending CN101893311A (zh) | 2010-07-09 | 2010-07-09 | 空调箱及其新回风段 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101893311A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107914858A (zh) * | 2017-09-20 | 2018-04-17 | 珠海格力电器股份有限公司 | 空调器、船用空调系统 |
-
2010
- 2010-07-09 CN CN2010102241273A patent/CN101893311A/zh active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107914858A (zh) * | 2017-09-20 | 2018-04-17 | 珠海格力电器股份有限公司 | 空调器、船用空调系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105352109B (zh) | 基于气候补偿的变风量空调末端温度控制系统及方法 | |
CN103528144B (zh) | 基于绝对湿度控制的新风变风量节能方法及装置 | |
CN205481582U (zh) | 基于多变参数调节的恒温恒湿空调机组节能控制系统 | |
CN203215927U (zh) | 中央空调风量控制系统 | |
CN201819351U (zh) | 工位空调末端送风风量控制装置 | |
CN201391977Y (zh) | 变风量空调末端装置 | |
CN107914858A (zh) | 空调器、船用空调系统 | |
CN206073370U (zh) | 地铁车站公共区空调新风控制系统 | |
CN204115156U (zh) | 一种随动式空调通风控制系统 | |
CN105757890A (zh) | 一种室外冷凝器冷却风量的控制方法 | |
CN208735818U (zh) | 全自动智能节能型控温控湿通风系统 | |
CN208687874U (zh) | 风冷热泵中央空调系统 | |
CN203323256U (zh) | 一种可再设定恒定新风量的空调箱 | |
CN108036438B (zh) | 一种节能新风系统 | |
CN201715665U (zh) | 空调箱及其新回风段 | |
CN203224015U (zh) | 一种低能耗恒温恒湿调节装置 | |
CN210801548U (zh) | 出风装置及空调机组 | |
CN210568895U (zh) | 一种空调冷热水系统定流量质调节式节能控制装置 | |
CN101893311A (zh) | 空调箱及其新回风段 | |
CN202747546U (zh) | 空调智能新风控制装置 | |
CN103344030A (zh) | 一种可再设定恒定新风量的空调箱 | |
CN208567007U (zh) | 一种变流量衡温控制阀 | |
CN108800397A (zh) | 全自动智能节能型控温控湿通风系统 | |
CN205403281U (zh) | 一种室外冷凝器冷却风量的控制装置 | |
CN203928209U (zh) | 一种船用变风量空调系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20101124 |
|
WD01 | Invention patent application deemed withdrawn after publication |