CN101888593A CN2009100844146A CN200910084414A CN101888593A CN 101888593 A CN101888593 A CN 101888593A CN 2009100844146 A CN2009100844146 A CN 2009100844146A CN 200910084414 A CN200910084414 A CN 200910084414A CN 101888593 A CN101888593 A CN 101888593A
Authority
CN
China
Prior art keywords
resource
sps data
transmission
subframe
sps
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2009100844146A
Other languages
Chinese (zh)
Other versions
CN101888593B (en
Inventor
杨晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Telecommunications Technology CATT
Datang Mobile Communications Equipment Co Ltd
Original Assignee
Datang Mobile Communications Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datang Mobile Communications Equipment Co Ltd filed Critical Datang Mobile Communications Equipment Co Ltd
Priority to CN2009100844146A priority Critical patent/CN101888593B/en
Publication of CN101888593A publication Critical patent/CN101888593A/en
Application granted granted Critical
Publication of CN101888593B publication Critical patent/CN101888593B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses a method and equipment for processing resource conflict. The method comprises the following steps of: determining whether sending resources of a multicast and broadcast single-frequency network subframe conflict with sending resources of semi-persistent scheduling data or not; and after determining that the sending resources of the multicast and broadcast single-frequency network subframe conflict with the sending resources of the semi-persistent scheduling data, canceling sending the semi-persistent scheduling data on conflicting resources by a base station, and canceling receiving the semi-persistent scheduling data on the conflicting resources by user equipment. Through the method and the equipment, the problems when the multicast and broadcast single-frequency network subframe conflicts with semi-persistent scheduling resources are solved, and users can receive a semi-persistent scheduling service conveniently and also can receive the multicast and broadcast single-frequency network service.

Description

A kind of processing method of resource contention and equipment
Technical field
The present invention relates to wireless communication field, particularly a kind of processing method of resource contention and equipment.
Background technology
Present LTE (Long Term Evolution, Long Term Evolution) be to adopt the mode of high-level signaling to notify UE (User Equipment in, subscriber equipment) MBSFN (MBSFN MulticastBroadcast Single Frequency Network, the Multicast Broadcast Single Frequency Network) subframe of system's use.
36.331 the ASN.1 to MBSFN among the v8.5.0 (Abstract Syntax Notation One, ASN 1) describes as follows:
MBSFN-SubframeConfig::= SEQUENCE{
radioframeAllocationPeriod ENUMERATED{n?1,n2,n4,n8,n16,
n32},
radioframeAllocationOffset INTEGER(0..7),
subframeAllocation CHOICE{
oneFrame BIT?STRING(SIZE(6)),
fourFrames BIT?STRING(SIZE(24))
}
MBSFN is divided into two ranks: Radio Frame (radio frames) and Sub Frame (subframe).
1)Radio?Frame。
Radio frames distributes the mode of employing Period (cycle) and offset (skew) to represent, the MBSFN radio frames will appear in the position of satisfying following formula at SFN (system frame number, System Frame Number):
SFN mod radioFrameAllocationPeriod=radioFrameAllocationOffset (the SFN mould radio frames assignment cycle equals radio frames assignment skew)
2)Sub?Frame
What sub-frame allocation was followed is bitmap (bit mapping) mode, has two kinds specifically:
(1) single radio frames bitmap
OneFrame BIT STRING (SIZE (6)) (a framing bit string (big or small 6 bits))
(2) continuous four radio frames bitmap
FourFrames BIT STRING (SIZE (24)) (four framing bit strings (big or small 24 bits))
For FDD (Frequency division duplex, Frequency Division Duplexing (FDD)), MBSFN subframe available in each radio frames is: #1, #2, #3, #6, #7, #8, and corresponding to 6 bits of bitmap.
For TDD (Time Division Duplex, time division duplex), MBSFN subframe available in each radio frames is: #3, #4, #7, #8, #9, corresponding to preceding 5 bits of bitmap, last 1 bit of bitmap does not use.It should be noted that for TDD sub-frame of uplink can not be assigned to the MBSFN subframe.
When subframe is assigned as four continuous radio frames bitmap, according to 1) in radio frames distribute SFN that formula calculates original position for these four radio frames.At this moment the assignment period of MBSFN subframe is 40ms, and the assignment period of MBSFN subframe all is the integral multiple of 10ms under remaining situation.Be to be 10ms, 20ms, 40ms, 80ms, 160ms, 32ms in the cycle.
Fig. 1 is a MBSFN sub-frame allocation schematic diagram, and as shown in the figure, the assignment period of radio frames is 20ms during the MBSFN sub-frame allocation, and subframe is 1,3,7,8 subframes.
SPS (semi-persistent schedule, semi-continuous scheduling) then, adopts the mode of PDCCH (physical downlink control channel, Physical Downlink Control Channel) resource allocation and activation to transmit by the cycle of system configuration SPS.Be the ASN.1 among 36.331 v8.5.0 below to descending SPS configuration:
SPS-ConfigDL::= CHOICE{
release NULL,
setup SEQUENCE{
semiPersistSchedIntervalDL EUMERATED{
sf10,sf20,sf32,sf40,sf64,sf80,
sf128,sf160,sf320,sf640,spare6,
spare5,spare4,spare3,spare2,
spare1},
numberOfConfSPS-Processes INTEGER(1..8),
n1-PUCCH-AN-PersistentList
N1-PUCCH-AN-PersistentList,
...
}
SemiPersistSchedIntervalDL represents the cycle of descending SPS, numberOfConfSPS-Processes represents to keep for HARQ (the Hybrid Automatic RepeatRequest of SPS, mixed automatic repeat request) process number, n1-PUCCH-AN-PersistentList represent to keep for ACK (affirmation) the feedback resources index of SPS transmission.
The cycle of SPS is 10ms, 20ms, 32ms, 40ms, 64ms, 80ms, 128ms, 160ms, 320ms, 640ms as can be seen from this parameter of semiPersistSchedIntervalDL.
Fig. 2 is that descending SPS uses schematic diagram, and the example of a descending SPS use as shown is:
It is 32ms that system gives its SPS cycle by RRC (Radio Resource Control, Radio Resource control) signaling UE network configuration.And activate the use of UESPS in the subframe 3 of radio frames 1, and distribute the SPS resource of UE use by PDCCH.Then receive the SPS data on the resource that UE is will be in the subframe behind each 32ms identical.
SPS is that LTE is in order to support the semi-continuous scheduling of the relative and dynamic dispatching that business such as VOIP (Voice over IP, IP-based voice transfer) are introduced.Can be introduced at the R9 of LTE stage MBMS, LTE can adopt proprietary MBSFN subframe to send the MBMS business, and SPS also can dispose relatively more fixing resource for a user.The deficiencies in the prior art are: under certain configuration, will produce resource that sends the MBSFN subframe and the afoul problem of resource that sends the SPS data.
Summary of the invention
The invention provides a kind of processing method and equipment of resource contention, producing the data transmission problems that occurs when the resource that sends the MBSFN subframe is conflicted mutually with the resource that sends the SPS data in order to solve in the prior art.
A kind of processing method of resource contention is provided in the embodiment of the invention, has comprised the steps:
Determine whether the transmission resource of Multicast Broadcast Single Frequency Network MBSFN subframe conflicts with the transmission resource of semi-continuous scheduling SPS data;
Behind the transmission resource contention of the transmission resource of determining the MBSFN subframe and SPS data, the base station cancellation sends the SPS data on the resource that clashes, and the user equipment (UE) cancellation receives the SPS data on the resource that clashes.
Preferably, further comprise:
UE receives the MBSFN subframe on the resource location that clashes.
Preferably, further comprise:
The base station sends the SPS data on the descending sub frame of determining according to preset rules after sending the SPS data on the resource that cancellation is clashing;
UE receives the SPS data on the descending sub frame of determining according to preset rules after receiving the SPS data on the resource that cancellation is clashing.
Preferably, the descending sub frame of determining according to preset rules is the nearest descending sub frame of transmitting time.
Preferably, further comprise:
The base station sends the SPS data on predetermined resource location after sending the SPS data on the resource that cancellation is clashing, the described information of resource location that pre-determines is by signaling indication UE;
UE receives the SPS data on predetermined resource location after receiving the SPS data on the resource that cancellation is clashing, described predetermined resource location is determined according to the indication of described signaling.
Preferably, activate time and the resource that the SPS data send according to physical downlink control channel PDCCH, and the transmission cycle of SPS data, determine to send the resource location of SPS data on the Physical Resource Block PRB of the subframe of radio frames, and, according to the pattern pattern of MBSFN configuration, the resource location of transmission MBSFN subframe also when the subframe of radio frames, is determined the transmission resource contention of the transmission resource and the SPS data of MBSFN subframe.
A kind of base station also is provided in the embodiment of the invention, has comprised:
The conflict determination module is used for determining whether the transmission resource of MBSFN subframe conflicts with the transmission resource of SPS data;
Sending module is used for behind the transmission resource contention of the transmission resource of determining the MBSFN subframe and SPS data, and cancellation sends the SPS data on the resource that clashes.
Preferably, described sending module is further used for sending the SPS data on the descending sub frame of determining according to preset rules after sending the SPS data on the resource that cancellation is clashing.
Preferably, described sending module is further used for determining that according to preset rules the nearest descending sub frame of transmitting time is for sending the descending sub frame of SPS data.
Preferably, further comprise: indicating module, be used for by signaling to UE indication behind the transmission resource contention of the transmission resource of MBSFN subframe and SPS data, the predetermined resource location that sends the SPS data;
Described sending module is further used for sending the SPS data on predetermined resource location after sending the SPS data on the resource that cancellation is clashing.
Preferably, described conflict determination module is further used for activating time and the resource that the SPS data send according to PDCCH, and the transmission cycle of SPS data, determine to send the resource location of SPS data on the PRB of the subframe of radio frames, and, according to the pattern (pattern/style) of MBSFN configuration, the resource location of transmission MBSFN subframe also when the subframe of radio frames, is determined the transmission resource contention of the transmission resource and the SPS data of MBSFN subframe.
A kind of subscriber equipment also is provided in the embodiment of the invention, has comprised:
The conflict determination module is used for determining whether the transmission resource of MBSFN subframe conflicts with the transmission resource of SPS data;
Receiver module is used for behind the transmission resource contention of the transmission resource of determining the MBSFN subframe and SPS data, and cancellation receives the SPS data on the resource that clashes.
Preferably, described receiver module is further used for receiving the MBSFN subframe on the resource location that clashes.
Preferably, described receiver module is further used for receiving the SPS data on the descending sub frame of determining according to preset rules after receiving the SPS data on the resource that cancellation is clashing.
Preferably, described receiver module is further used for determining that according to preset rules the nearest descending sub frame of transmitting time is for sending the descending sub frame of SPS data.
Preferably, further comprise: the indication receiver module, be used for receiving indication, described indication comprises behind the transmission resource contention of the transmission resource of MBSFN subframe and SPS data, the resource location of the predetermined transmission in base station SPS data;
Described receiver module is further used for receiving the SPS data on predetermined resource location after receiving the SPS data on the resource that cancellation is clashing, and described predetermined resource location is determined according to described indication.
Preferably, described conflict determination module is further used for activating time and the resource that the SPS data send according to PDCCH, and the transmission cycle of SPS data, determine to send the resource location of SPS data on the PRB of the subframe of radio frames, and, according to the pattern of MBSFN configuration, the resource location of transmission MBSFN subframe also when the subframe of radio frames, is determined the transmission resource contention of the transmission resource and the SPS data of MBSFN subframe.
A kind of treatment system of resource contention is provided again in the invention process, has comprised:
The base station is used for behind the transmission resource contention of the transmission resource of determining the MBSFN subframe and SPS data, and cancellation sends the SPS data on the resource that clashes;
Subscriber equipment is used for behind the transmission resource contention of the transmission resource of determining the MBSFN subframe and SPS data, and cancellation receives the SPS data on the resource that clashes.
Beneficial effect of the present invention is as follows:
In the invention process process, behind the transmission resource contention of the transmission resource of determining the MBSFN subframe and SPS data, transmission SPS data on the resource that clashes are just cancelled in the base station, and UE also cancels reception SPS data on the resource that clashes.Thereby solved the problem of appearance in transmission in MBFSFN subframe under the resource contention situation and SPS data.
Further, the base station sends the SPS data on the descending sub frame of determining according to preset rules, and perhaps, the base station sends the SPS data on predetermined resource location, and the information of this resource location is by signaling indication UE; Accordingly, UE gets on to receive the SPS data at corresponding resource location.Thereby not only solved the problem that occurs in the moment of MBSFN subframe and SPS resource contention, also made the user can receive the SPS business easily, can receive the MBMS business again.
Description of drawings
Fig. 1 is a MBSFN sub-frame allocation schematic diagram in the background technology;
Fig. 2 is that descending SPS uses schematic diagram in the background technology;
Fig. 3 is SPS resource and a MBSFN subframe conflict schematic diagram in the background technology;
Fig. 4 is the processing method implementing procedure schematic diagram of resource contention in the embodiment of the invention;
Fig. 5 is the treatment system structural representation of resource contention in the embodiment of the invention;
Fig. 6 is an architecture of base station schematic diagram in the embodiment of the invention;
Fig. 7 is a user device architecture schematic diagram in the embodiment of the invention.
Embodiment
Below in conjunction with accompanying drawing the specific embodiment of the present invention is described.
The inventor notices in the invention process: by Fig. 1 and Fig. 2 as can be known, from the resource allocation that sends the MBSFN subframe as can be seen, the assignment period of MBSFN subframe or be the multiple of 10ms or be the 40ms cycle.And there is the cycle of 32ms, 64ms, 320ms, 640ms in the cycle that sends the SPS data, and these cycles can not divide exactly with the assignment period of MBSFN, therefore, conflict inevitably can occur when MBSFN and SPS dispose simultaneously.
Fig. 3 is a SPS resource and MBSFN subframe conflict schematic diagram, an example that embodies the prior art deficiency as shown in the figure:
The MBSFN sub-frame allocation as shown in Figure 1, the SPS resource allocation as shown in Figure 2, the subframe 7 in radio frames 7 exists SPS resource and the conflict of MBSFN subframe like this.
Based on this, provided the solution when the resource that sends MBSFN subframe and transmission SPS data clashes in the embodiment of the invention, so that the user both can receive the SPS business easily, can receive the MBMS business again.
Fig. 4 is the processing method implementing procedure schematic diagram of resource contention, as shown in the figure, can comprise the steps:
The transmission resource of step 401, the transmission resource of determining the MBSFN subframe and SPS data clashes;
Step 402, base station cancellation send the SPS data on the resource that clashes;
Step 403, UE cancellation receive the SPS data on the resource that clashes.
In the enforcement, the transmission of cancellation SPS data when clashing.In suc scheme the base station at first to judge send the MBSFN subframe resource whether with the resource contention that sends the SPS data, if conflict then cancel the SPS data and send.
UE then judge send the MBSFN subframe resource whether with the resource contention that sends the SPS data, if conflict then cancel the reception of SPS data.
Further, in the enforcement,, can receive the MBMS business in this subframe if UE need receive the MBMS business in this subframe; That is, UE receives the MBSFN subframe on the resource location that clashes.
In the enforcement, base station, UE can be in the following way when judging whether to clash:
Activate time and the resource that the SPS data send according to PDCCH, and the transmission cycle of SPS data, determine to send the resource location of SPS data at the PRB of the subframe of radio frames (physical resource block, Physical Resource Block) on, and, according to the pattern of MBSFN configuration, the resource location of transmission MBSFN subframe also when the subframe of radio frames, is determined the transmission resource contention of the transmission resource and the SPS data of MBSFN subframe.
Embodiment one
Illustrate with specific embodiment below.In concrete the enforcement will be that example describes with collision scenario shown in Figure 3.Activate time and the resource that the SPS data send according to PDCCH, and the cycle of SPS, SPS the subframe 7 of radio frames 75,6, have resource on the 7PRB, and according to the pattern of MBSFN configuration, the MBSFN subframe also occurs in the subframe 7 of radio frames 7.Then send the resource contention of the resource and the transmission MBSFN subframe of SPS data, at this moment cancel the transmission of SPS data, UE also stop at radio frames 7 subframe 75,6, the last reception of 7PRB SPS resource, if UE need receive the MBMS business then still continuing to receive the MBMS business on this subframe on this subframe.
After step 402,403, can further include in the enforcement:
The base station sends the SPS data on the descending sub frame of determining according to preset rules after sending the SPS data on the resource that cancellation is clashing;
UE receives the SPS data on the descending sub frame of determining according to preset rules after receiving the SPS data on the resource that cancellation is clashing.
In the enforcement, when conflict, cancel the SPS data and sent, then can on the follow-up descending sub frame that can send the SPS data that does not conflict, transmit the SPS data.
The SPS transmission has been cancelled in the base station after judging resource that sends the MBSFN subframe and the resource contention that sends the SPS data in suc scheme; Determine to send the descending sub frame of SPS data then according to certain rule, and send the SPS data by this descending sub frame.
Concrete, for example preset rules can be decided to be: determine on the nearest descending sub frame of transmitting time, to send.This is in order to receive the SPS data as early as possible, therefore can to send the SPS data by default rule on nearest, that do not conflict, as can to send SPS data descending sub frame.
Be meant that recently transmitting time is nearest, such as: the conflict subframe is a subframe 2, and subframe 3 be that sub-frame of uplink, subframe 4, subframe 5 is descending sub frame.So nearest subframe is a subframe 4 just, and is nearest after this subframe that refers to recently conflict certainly.If subframe 3 also is a descending sub frame, subframe should be subframe 3 so recently.
UE also when judging resource that sends the MBSFN subframe and the resource contention that sends the SPS data, having cancelled after receiving the SPS data on the conflict subframe, according to prior pre-defined rule, receives the SPS data on the descending sub frame of correspondence.Certainly, if need receiving the MBMS business in the conflict subframe, UE also receives the MBMS business in the conflict subframe.
Embodiment two
Illustrate with specific embodiment below.With collision scenario shown in Figure 3 is that example describes.Activate time and the resource that the SPS data send according to PDCCH, and the cycle of SPS, SPS the subframe 7 of radio frames 75,6, have resource on the 7PRB, and according to the pattern of MBSFN configuration, the MBSFN subframe also occurs in the subframe 7 of radio frames 7.Then send the resource contention of the resource and the transmission MBSFN subframe of SPS data, at this moment cancel the SPS data the subframe 7 of radio frames 75,6, send on the 7PRB, judge that subframe 9 is nearest, that do not conflict, as can to send SPS data descending sub frame, then subframe 95,6, send the SPS data that are cancelled transmission on the 7PRB.
UE also stop at radio frames 7 subframe 75,6, the last reception of 7PRB SPS data, and the subframe 9 of radio frames 75,6, receive the SPS data on the 7PRB, if UE need receive the MBMS business receiving the MBMS business on the conflict subframe then still continue on the conflict subframe.
After step 402,403, can further include in the enforcement:
The base station sends the SPS data on predetermined resource location after sending the SPS data on the resource that cancellation is clashing, the described information of resource location that pre-determines is by signaling indication UE;
UE receives the SPS data on predetermined resource location after receiving the SPS data on the resource that cancellation is clashing, described predetermined resource location is determined according to the indication of described signaling.
In the enforcement, the transmission of cancellation SPS data when conflict, but certain running time-frequency resource can be indicated by signaling in the base station, and will be in this transmitted over resources SPS data.
If the base station at first wants the resource of signaling notice transmission MBSFN subframe and the resource of transmission SPS data to clash in suc scheme, then need on that follow-up resource or those resources, send the SPS data of this cancellation.
Then, when the base station is judged the resource that sends the MBSFN subframe and the resource that sends the SPS data and clashed, after the transmission of cancellation SPS data, on the resource of signaling indication, send the SPS data.The scope of high-rise indication can be a descending sub frame, also can be several descending sub frames.
UE then is after judging resource that sends the MBSFN subframe and the resource contention that sends the SPS data, if because of conflict has been cancelled on the conflict subframe the reception of SPS data, so just determine descending sub frame, and on this subframe, receive the SPS data by the signaling indicating range.If need receiving the MBMS business in the conflict subframe, UE also need receive the MBMS business in the conflict subframe.
Embodiment three
Illustrate with specific embodiment below.
At first, if the base station sends the resource of MBSFN subframe by signaling UE and the resource of transmission SPS data clashes, then the SPS data will send in follow-up 2 to 3 subframes.
The collision scenario that with Fig. 3 is example is that example describes, activate time and the resource that the SPS data send according to PDCCH, and the cycle of SPS, SPS the subframe 7 of radio frames 75,6, have resource on the 7PRB, and according to the pattern of MBSFN configuration, the MBSFN subframe also occurs in the subframe 7 of radio frames 7.Then send the resource of SPS data and send the resource contention of MBSFN subframe, at this moment cancel the SPS data the subframe 7 of radio frames 75,6, send on the 7PRB, and the subframe 0 of radio frames 85,6, send the SPS data that are cancelled on the 7PRB.
UE also stop at radio frames 7 subframe 75,6, the last reception of 7PRB SPS data, and on the subframe 0 of the subframe 9 of radio frames 7 and radio frames 8, detecting the SPS business of whether depositing.UE will detect in the subframe 0 of radio frames 8 and have the SPS business, receive the SPS data then in the position of correspondence, if UE need receive the MBMS business receiving the MBMS business on the conflict subframe then still continue on the conflict subframe.
Based on same inventive concept, a kind of treatment system, base station, subscriber equipment of resource contention also are provided in the embodiment of the invention, because the principle that these equipment are dealt with problems is similar to a kind of processing method of resource contention, therefore the enforcement of these equipment can repeat part and not give unnecessary details referring to the enforcement of method.
Fig. 5 is the treatment system structural representation of resource contention, as shown in the figure, can comprise in the system:
Base station 501 is used for behind the transmission resource contention of the transmission resource of determining the MBSFN subframe and SPS data, and cancellation sends the SPS data on the resource that clashes;
Subscriber equipment 502 is used for behind the transmission resource contention of the transmission resource of determining the MBSFN subframe and SPS data, and cancellation receives the SPS data on the resource that clashes.
In the enforcement, the base station determines earlier with UE whether the transmission resource of MBSFN subframe conflicts with the transmission resource of SPS data; Behind the transmission resource contention of the transmission resource of determining the MBSFN subframe and SPS data, the base station cancellation sends the SPS data on the resource that clashes, and UE also cancels reception SPS data on the resource that clashes.
Fig. 6 is the architecture of base station schematic diagram, as shown in the figure, can comprise in the base station:
Conflict determination module 601 is used for determining whether the transmission resource of MBSFN subframe conflicts with the transmission resource of SPS data;
Sending module 602 is used for behind the transmission resource contention of the transmission resource of determining the MBSFN subframe and SPS data, and cancellation sends the SPS data on the resource that clashes.
In the enforcement, sending module can be further used for sending the SPS data on the descending sub frame of determining according to preset rules after sending the SPS data on the resource that cancellation is clashing.
Sending module is further used for determining that according to preset rules nearest descending sub frame is for sending the descending sub frame of SPS data.
In the enforcement, the base station can further include: indicating module 603, be used for by signaling to UE indication behind the transmission resource contention of the transmission resource of MBSFN subframe and SPS data, the predetermined resource location that sends the SPS data;
Under this scheme, then sending module 602 can be further used for sending the SPS data on predetermined resource location after sending the SPS data on the resource that cancellation is clashing.
Accordingly, if after UE knows the resource location that receives the SPS data according to signaling, just UE can receive the SPS data of cancellation transmission on former resource location.
In the enforcement, for recognition resource clashes, the conflict determination module can also be further used for activating time and the resource that the SPS data send according to PDCCH, and the transmission cycle of SPS data, the resource location that determine to send the SPS data on the PRB of the subframe of radio frames, and, according to the pattern of MBSFN configuration, the resource location of transmission MBSFN subframe also when the subframe of radio frames, is determined the transmission resource contention of the transmission resource and the SPS data of MBSFN subframe.
Fig. 7 is the user device architecture schematic diagram, as shown in the figure, can comprise among the UE:
Conflict determination module 701 is used for determining whether the transmission resource of MBSFN subframe conflicts with the transmission resource of SPS data;
Receiver module 702 is used for behind the transmission resource contention of the transmission resource of determining the MBSFN subframe and SPS data, and cancellation receives the SPS data on the resource that clashes.
In the enforcement, receiver module can be further used for receiving the MBSFN subframe on the resource location that clashes.
Receiver module can also be further used for receiving the SPS data on the descending sub frame of determining according to preset rules after receiving the SPS data on the resource that cancellation is clashing.
Receiver module can also be further used for determining that according to preset rules nearest descending sub frame is for sending the descending sub frame of SPS data.
In the enforcement, UE can further include: indication receiver module 703, be used for receiving indication, and described indication comprises behind the transmission resource contention of the transmission resource of MBSFN subframe and SPS data, the resource location of the predetermined transmission in base station SPS data;
Under this scheme, 702 of receiver modules can be further used for receiving the SPS data on predetermined resource location after receiving the SPS data on the resource that cancellation is clashing, and described predetermined resource location is determined according to described indication.
In the enforcement, for recognition resource clashes, the conflict determination module can also be further used for activating time and the resource that the SPS data send according to PDCCH, and the transmission cycle of SPS data, the resource location that determine to send the SPS data on the PRB of the subframe of radio frames, and, according to the pattern of MBSFN configuration, the resource location of transmission MBSFN subframe also when the subframe of radio frames, is determined the transmission resource contention of the transmission resource and the SPS data of MBSFN subframe.
For the convenience of describing, the each several part of the above device is divided into various modules with function or the unit is described respectively.Certainly, when enforcement is of the present invention, can in same or a plurality of softwares or hardware, realize the function of each module or unit.
By above-mentioned execution mode as can be seen, the present invention in force, behind the transmission resource contention of the transmission resource of finding the MBSFN subframe and SPS data, the base station cancellation sends the SPS data on the resource that clashes, and UE also cancels reception SPS data on the resource that clashes.
Further, send the SPS business of cancellation according to prior treaty rule in subsequent subframe.Also can be by modes such as the certain rules of signaling.Thereby can as soon as possible the SPS data of cancelling be sent to UE.
Because LTE can adopt proprietary MBSFN subframe to send the MBMS business, and SPS also can dispose relatively more fixing resource for a user.Therefore also will inevitably appear under certain configuration, will produce the situation of MBSFN subframe and SPS resource contention, the embodiment of the invention has then solved the problem that occurs in the moment of MBSFN subframe and SPS resource contention, thereby make the user can receive the SPS business easily, can receive the MBMS business again.
Those skilled in the art should understand that embodiments of the invention can be provided as method, system or computer program.Therefore, the present invention can adopt complete hardware embodiment, complete software implementation example or in conjunction with the form of the embodiment of software and hardware aspect.And the present invention can adopt the form that goes up the computer program of implementing in one or more computer-usable storage medium (including but not limited to magnetic disc store, CD-ROM, optical memory etc.) that wherein include computer usable program code.
The present invention is that reference is described according to the flow chart and/or the block diagram of method, equipment (system) and the computer program of the embodiment of the invention.Should understand can be by the flow process in each flow process in computer program instructions realization flow figure and/or the block diagram and/or square frame and flow chart and/or the block diagram and/or the combination of square frame.Can provide these computer program instructions to the processor of all-purpose computer, special-purpose computer, Embedded Processor or other programmable data processing device to produce a machine, make the instruction of carrying out by the processor of computer or other programmable data processing device produce to be used for the device of the function that is implemented in flow process of flow chart or a plurality of flow process and/or square frame of block diagram or a plurality of square frame appointments.
These computer program instructions also can be stored in energy vectoring computer or the computer-readable memory of other programmable data processing device with ad hoc fashion work, make the instruction that is stored in this computer-readable memory produce the manufacture that comprises command device, this command device is implemented in the function of appointment in flow process of flow chart or a plurality of flow process and/or square frame of block diagram or a plurality of square frame.
These computer program instructions also can be loaded on computer or other programmable data processing device, make on computer or other programmable devices and to carry out the sequence of operations step producing computer implemented processing, thereby the instruction of carrying out on computer or other programmable devices is provided for being implemented in the step of the function of appointment in flow process of flow chart or a plurality of flow process and/or square frame of block diagram or a plurality of square frame.
Although described the preferred embodiments of the present invention, in a single day those skilled in the art get the basic creative notion of cicada, then can make other change and modification to these embodiment.So claims are intended to all changes and the modification that are interpreted as comprising preferred embodiment and fall into the scope of the invention.
Obviously, those skilled in the art can carry out various changes and modification to the present invention and not break away from the spirit and scope of the present invention.Like this, if of the present invention these are revised and modification belongs within the scope of claim of the present invention and equivalent technologies thereof, then the present invention also is intended to comprise these changes and modification interior.

Claims (18)

1. the processing method of a resource contention is characterized in that, comprises the steps:
Determine whether the transmission resource of Multicast Broadcast Single Frequency Network MBSFN subframe conflicts with the transmission resource of semi-continuous scheduling SPS data;
Behind the transmission resource contention of the transmission resource of determining the MBSFN subframe and SPS data, the base station cancellation sends the SPS data on the resource that clashes, and the user equipment (UE) cancellation receives the SPS data on the resource that clashes.
2. the method for claim 1 is characterized in that, further comprises:
UE receives the MBSFN subframe on the resource location that clashes.
3. the method for claim 1 is characterized in that, further comprises:
The base station sends the SPS data on the descending sub frame of determining according to preset rules after sending the SPS data on the resource that cancellation is clashing;
UE receives the SPS data on the descending sub frame of determining according to preset rules after receiving the SPS data on the resource that cancellation is clashing.
4. method as claimed in claim 3 is characterized in that, the descending sub frame of determining according to preset rules is the nearest descending sub frame of transmitting time.
5. the method for claim 1 is characterized in that, further comprises:
The base station sends the SPS data on predetermined resource location after sending the SPS data on the resource that cancellation is clashing, the described information of resource location that pre-determines is by signaling indication UE;
UE receives the SPS data on predetermined resource location after receiving the SPS data on the resource that cancellation is clashing, described predetermined resource location is determined according to the indication of described signaling.
6. as the arbitrary described method of claim 1 to 5, it is characterized in that,
Activate time and the resource that the SPS data send according to physical downlink control channel PDCCH, and the transmission cycle of SPS data, determine to send the resource location of SPS data on the Physical Resource Block PRB of the subframe of radio frames, and, pattern pattern according to the MBSFN configuration, the resource location of transmission MBSFN subframe also when the subframe of radio frames, is determined the transmission resource contention of the transmission resource and the SPS data of MBSFN subframe.
7. a base station is characterized in that, comprising:
The conflict determination module is used for determining whether the transmission resource of MBSFN subframe conflicts with the transmission resource of SPS data;
Sending module is used for behind the transmission resource contention of the transmission resource of determining the MBSFN subframe and SPS data, and cancellation sends the SPS data on the resource that clashes.
8. base station as claimed in claim 7 is characterized in that, described sending module is further used for sending the SPS data on the descending sub frame of determining according to preset rules after sending the SPS data on the resource that cancellation is clashing.
9. base station as claimed in claim 8 is characterized in that, described sending module is further used for determining that according to preset rules the nearest descending sub frame of transmitting time is for sending the descending sub frame of SPS data.
10. base station as claimed in claim 7 is characterized in that, further comprises: indicating module, be used for by signaling to UE indication behind the transmission resource contention of the transmission resource of MBSFN subframe and SPS data, the predetermined resource location that sends the SPS data;
Described sending module is further used for sending the SPS data on predetermined resource location after sending the SPS data on the resource that cancellation is clashing.
11. as the arbitrary described base station of claim 7 to 10, it is characterized in that, described conflict determination module is further used for activating time and the resource that the SPS data send according to PDCCH, and the transmission cycle of SPS data, the resource location that determine to send the SPS data on the PRB of the subframe of radio frames, and, according to the pattern of MBSFN configuration, the resource location of transmission MBSFN subframe also when the subframe of radio frames, is determined the transmission resource contention of the transmission resource and the SPS data of MBSFN subframe.
12. a subscriber equipment is characterized in that, comprising:
The conflict determination module is used for determining whether the transmission resource of MBSFN subframe conflicts with the transmission resource of SPS data;
Receiver module is used for behind the transmission resource contention of the transmission resource of determining the MBSFN subframe and SPS data, and cancellation receives the SPS data on the resource that clashes.
13. subscriber equipment as claimed in claim 12 is characterized in that, described receiver module is further used for receiving the MBSFN subframe on the resource location that clashes.
14. subscriber equipment as claimed in claim 12 is characterized in that, described receiver module is further used for receiving the SPS data on the descending sub frame of determining according to preset rules after receiving the SPS data on the resource that cancellation is clashing.
15. subscriber equipment as claimed in claim 14 is characterized in that, described receiver module is further used for determining that according to preset rules the nearest descending sub frame of transmitting time is for sending the descending sub frame of SPS data.
16. subscriber equipment as claimed in claim 12, it is characterized in that, further comprise: the indication receiver module is used for receiving indication, described indication comprises behind the transmission resource contention of the transmission resource of MBSFN subframe and SPS data, the resource location of the predetermined transmission in base station SPS data;
Described receiver module is further used for receiving the SPS data on predetermined resource location after receiving the SPS data on the resource that cancellation is clashing, and described predetermined resource location is determined according to described indication.
17. as the arbitrary described subscriber equipment of claim 12 to 16, it is characterized in that, described conflict determination module is further used for activating time and the resource that the SPS data send according to PDCCH, and the transmission cycle of SPS data, the resource location that determine to send the SPS data on the PRB of the subframe of radio frames, and, according to the pattern of MBSFN configuration, the resource location of transmission MBSFN subframe also when the subframe of radio frames, is determined the transmission resource contention of the transmission resource and the SPS data of MBSFN subframe.
18. the treatment system of a resource contention is characterized in that, comprising:
The base station is used for behind the transmission resource contention of the transmission resource of determining the MBSFN subframe and SPS data, and cancellation sends the SPS data on the resource that clashes;
Subscriber equipment is used for behind the transmission resource contention of the transmission resource of determining the MBSFN subframe and SPS data, and cancellation receives the SPS data on the resource that clashes.
CN2009100844146A 2009-05-14 2009-05-14 Method and equipment for processing resource conflict Active CN101888593B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100844146A CN101888593B (en) 2009-05-14 2009-05-14 Method and equipment for processing resource conflict

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100844146A CN101888593B (en) 2009-05-14 2009-05-14 Method and equipment for processing resource conflict

Publications (2)

Publication Number Publication Date
CN101888593A true CN101888593A (en) 2010-11-17
CN101888593B CN101888593B (en) 2012-01-25

Family

ID=43074266

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100844146A Active CN101888593B (en) 2009-05-14 2009-05-14 Method and equipment for processing resource conflict

Country Status (1)

Country Link
CN (1) CN101888593B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102264039A (en) * 2011-04-29 2011-11-30 电信科学技术研究院 Method and device for implementing semi-continuous scheduling transmission
CN103313415A (en) * 2012-03-16 2013-09-18 华为技术有限公司 Scheduling information acquiring method, transmitting method and device
WO2014179963A1 (en) * 2013-05-09 2014-11-13 华为技术有限公司 Service processing method and apparatus
WO2018082686A1 (en) * 2016-11-04 2018-05-11 华为技术有限公司 Data transmission method, apparatus, system, terminal, and access network device
WO2019127551A1 (en) * 2017-12-29 2019-07-04 北京小米移动软件有限公司 Transmitting method and device and receiving method and device
WO2019192294A1 (en) * 2018-04-04 2019-10-10 电信科学技术研究院有限公司 Method for indicating to interrupt transmission, network side device and terminal
WO2023207595A1 (en) * 2022-04-29 2023-11-02 大唐移动通信设备有限公司 Resource scheduling method and apparatus, network device and network element

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005004350A (en) * 2003-06-10 2005-01-06 Sony Ericsson Mobilecommunications Japan Inc Resource management method and device, resource management program, and storage medium
WO2005119959A1 (en) * 2004-06-02 2005-12-15 Nokia Corporation Acknowledgement signaling for automatic repeat request mechanisms in wireless networkds
CN101154986A (en) * 2006-09-26 2008-04-02 大唐移动通信设备有限公司 Control method and system for transmission collision

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9160512B2 (en) 2011-04-29 2015-10-13 China Academy Of Telecommunications Technology Semi-persistent scheduling method and apparatus
CN102264039A (en) * 2011-04-29 2011-11-30 电信科学技术研究院 Method and device for implementing semi-continuous scheduling transmission
CN102264039B (en) * 2011-04-29 2013-12-11 电信科学技术研究院 Method and device for implementing semi-continuous scheduling transmission
WO2012146123A1 (en) * 2011-04-29 2012-11-01 电信科学技术研究院 Method and apparatus for semi-persistent scheduling transmission
CN103313415A (en) * 2012-03-16 2013-09-18 华为技术有限公司 Scheduling information acquiring method, transmitting method and device
CN103313415B (en) * 2012-03-16 2015-12-09 华为技术有限公司 Schedule information acquisition methods, sending method and device
WO2014179963A1 (en) * 2013-05-09 2014-11-13 华为技术有限公司 Service processing method and apparatus
CN104429106A (en) * 2013-05-09 2015-03-18 华为技术有限公司 Service processing method and apparatus
WO2018082686A1 (en) * 2016-11-04 2018-05-11 华为技术有限公司 Data transmission method, apparatus, system, terminal, and access network device
WO2019127551A1 (en) * 2017-12-29 2019-07-04 北京小米移动软件有限公司 Transmitting method and device and receiving method and device
US11528103B2 (en) 2017-12-29 2022-12-13 Beijing Xiaomi Mobile Software Co., Ltd. Transmitting method and device and receiving method and device
WO2019192294A1 (en) * 2018-04-04 2019-10-10 电信科学技术研究院有限公司 Method for indicating to interrupt transmission, network side device and terminal
CN110351864A (en) * 2018-04-04 2019-10-18 电信科学技术研究院有限公司 A kind of indicating means interrupting transmission, network side equipment and terminal
CN110351864B (en) * 2018-04-04 2021-04-09 电信科学技术研究院有限公司 Indication method for interrupting transmission, network side equipment and terminal
WO2023207595A1 (en) * 2022-04-29 2023-11-02 大唐移动通信设备有限公司 Resource scheduling method and apparatus, network device and network element

Also Published As

Publication number Publication date
CN101888593B (en) 2012-01-25

Similar Documents

Publication Publication Date Title
US11937216B2 (en) Method and apparatus for determining data feedback resource
CN101888593B (en) Method and equipment for processing resource conflict
CN108353422B (en) Method and apparatus for sidelink communication in a wireless communication system
CN105873225B (en) Resource scheduling method in unlicensed frequency band, base station and licensed assisted access node
JP6386075B2 (en) Ultra-low latency design for LTE
CN103339999B (en) Uplink/downlink scheduling information transmitting method and method of reseptance and device
WO2017133596A1 (en) Method and device for transmitting uplink control information
CN102281099B (en) Method, system and equipment for transmitting data in time division duplex (TDD) radio frame
CN102917455B (en) A kind of uplink semi-persistent scheduling resource allocation methods and device
WO2016188250A1 (en) Resource allocation method and apparatus
CN106488384B (en) Method and device for sending data packet
JP2018198449A5 (en)
CN104349483B (en) Resource regulating method and device under a kind of cooperative multipoint transmission scene
CN111818659B (en) sidelink information sending method, receiving method, terminal and control node
WO2012139465A1 (en) Method and device for scheduling multi-subframe transmission
RU2011109031A (en) SUPPORT CARRIER IN A WIRELESS COMMUNICATION SYSTEM WITH MULTIPLE CARRIERS
WO2013029545A1 (en) Data transmission method and device
WO2014121687A1 (en) Method and device for communication processing
CN102111256A (en) Method for transmitting resource indication information and device using same
US10064176B2 (en) Method and device for communication in D2D UE of TDD system
CN104618913B (en) A kind of transmission method and equipment of D2D resource allocation informations
CN102143596A (en) Wireless resource scheduling method and wireless resource scheduling system
CN105634755A (en) DMO terminal time and frequency resource using method and apparatus
CN105991274B (en) Method, feedback information transmission method and the relevant device of data transmission
WO2014101788A1 (en) Method, system, base station and user equipment for wireless communications

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: INST OF TELECOMMUNICATION SCIENCE AND TECHNOLGOY

Free format text: FORMER OWNER: DATANG MOBILE COMMUNICATION EQUIPMENT CO., LTD.

Effective date: 20110505

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100083 NO. 29, XUEYUAN ROAD, HAIDIAN DISTRICT, BEIJING TO: 100191 NO. 40, XUEYUAN ROAD, HAIDIAN DISTRICT, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20110505

Address after: 100191 Haidian District, Xueyuan Road, No. 40,

Applicant after: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

Address before: 100083 Haidian District, Xueyuan Road, No. 29,

Applicant before: DATANG MOBILE COMMUNICATIONS EQUIPMENT Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee after: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

Address before: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee before: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210527

Address after: 100085 1st floor, building 1, yard 5, Shangdi East Road, Haidian District, Beijing

Patentee after: DATANG MOBILE COMMUNICATIONS EQUIPMENT Co.,Ltd.

Address before: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee before: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY