CN101887369A - Problem and task integrating method and system based on collaboration development environment - Google Patents

Problem and task integrating method and system based on collaboration development environment Download PDF

Info

Publication number
CN101887369A
CN101887369A CN2010102383359A CN201010238335A CN101887369A CN 101887369 A CN101887369 A CN 101887369A CN 2010102383359 A CN2010102383359 A CN 2010102383359A CN 201010238335 A CN201010238335 A CN 201010238335A CN 101887369 A CN101887369 A CN 101887369A
Authority
CN
China
Prior art keywords
task
relevant
related needs
current problem
iteration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010102383359A
Other languages
Chinese (zh)
Inventor
卞功杰
李志�
刘江宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CVIC Software Engineering Co Ltd
Original Assignee
CVIC Software Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CVIC Software Engineering Co Ltd filed Critical CVIC Software Engineering Co Ltd
Priority to CN2010102383359A priority Critical patent/CN101887369A/en
Publication of CN101887369A publication Critical patent/CN101887369A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a problem and task integrating method based on a collaboration development environment, which comprises the following steps of: selecting one type of problem as a current problem and creating the current problem; and when judging that a task related to the current problem needs to be created, determining the task, and interrelating the task with the current problem. In the problem and task integrating method based on the collaboration development environment, when the problem is created, the related task thereof is directly determined, and the problem and the task are related, thus, when the problem is operated, the related task thereof is directly called for operation which is simple and convenient.

Description

Based on the problem of cooperative development environment and the integrated approach and the system of task
Technical field
The present invention relates to the software administration technical field, more particularly, relate to a kind of integrated approach of problem and the task based on cooperative development environment.
Background technology
In the present cooperative development environment, problem and task are independent mutually, and concrete, the typing of problem information, problem distribution, Status Change and problem statistical work are to be finished separately by issue track and management tool; And the tracking of the establishment of task, distribution and Task Progress, Status Change, statistical work are to be finished by the task management instrument.
In the ordinary course of things, after problem is created, also need to create relative task to address this problem, and, after problem is solved, need the change problem state with sign, at this moment, also need to change the state of the task relevant with problem, synchronous to realize both.
Yet, in the prior art, can only finish the operation relevant just because of described issue track with management tool with problem, described task management instrument can only be finished the operation relevant with task, caused problem of being mutually related and task to adopt two separate operations, concrete, described issue track and management tool are created problem, create the task relevant with described problem by described task management instrument again; Described task management tool change task status, by the state of the described issue track problem relevant with the management tool change, thus, operating process certainly will be complicated again.
Summary of the invention
In view of this, the invention provides a kind of based on the problem of cooperative development environment and the integrated approach and the system of task, to realize the simple and convenient operation of finishing problem and relative task.
A kind of integrated approach of problem and the task based on cooperative development environment comprises:
Selected one type problem is current problem and this current problem of establishment;
When judgement needs to create the task relevant with described current problem, determine described task, it is associated with described current problem.
Preferably, described set the tasks into:
Judge whether to exist the task relevant with described current problem, if, then choose this task, if not, create the task relevant with described current problem; Perhaps, create described task.
Preferably, described creation task comprises:
Determine the relevant iteration of described current problem and task;
Determine the related needs of described current problem and task;
According to described relevant iteration and related needs creation task.
Preferably, determine that described relevant iteration is:
When there is described relevant iteration in judgement, choose this relevant iteration, create described relevant iteration when judging when not having described relevant iteration; Perhaps, create described problem and relevant iteration with its relevant task.
Preferably, determine that described related needs is:
When there is described related needs in judgement, choose this related needs, when there is not described related needs in judgement, create described related needs; Perhaps, create described related needs.
A kind of integrated system of problem and the task based on cooperative development environment comprises:
The problem types selected cell, the problem that is used for selected a type is a current problem;
The problem creating unit is used to create described current problem;
The task determining unit is used for determining described task when judging that needs are created the task relevant with described current problem;
Task and problem associative cell are used for related described definite task and current problem.
Preferably, described task determining unit comprises:
Choose TU task unit, be used for when there be the task relevant with described current problem in judgement, choosing this task;
The task creation unit is used for creating described task when there be not the task relevant with described current problem in judgement, perhaps, creates being associated with described current problem of task.
Preferably, described task creation unit comprises:
Relevant iteration is chosen the unit, is used for choosing this relevant iteration when judging when having described relevant iteration;
Relevant iteration creating unit is used for creating described related needs when there is not described related needs in judgement; Perhaps, create described problem and relevant iteration with its relevant task;
Related needs is chosen the unit, is used for choosing this related needs when there is described related needs in judgement;
The related needs creating unit is used for creating described related needs when judging when not having described related needs, perhaps, creates described problem and related needs with its relevant task.
From above-mentioned technical scheme as can be seen, the integrated approach of problem and the task based on cooperative development environment disclosed by the invention, during the establishment problem, directly determine relative task, and with both associations, like this, when problem is operated, can directly call relative task, operate, simple and convenient.
Description of drawings
In order to be illustrated more clearly in the embodiment of the invention or technical scheme of the prior art, to do to introduce simply to the accompanying drawing of required use in embodiment or the description of the Prior Art below, apparently, accompanying drawing in describing below only is some embodiments of the present invention, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 be the embodiment of the invention disclosed a kind of based on cooperative development environment problem and the process flow diagram of the integrated approach of task;
Fig. 2 is the process flow diagram of the disclosed task creation method of the embodiment of the invention;
Fig. 3 be the embodiment of the invention disclosed a kind of based on cooperative development environment problem and the structural representation of the integrated system of task;
Fig. 4 is the structural representation of the disclosed task determining unit of the embodiment of the invention;
Fig. 5 is the structural representation of the disclosed task creation of embodiment of the invention unit.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the invention, the technical scheme in the embodiment of the invention is clearly and completely described, obviously, described embodiment only is the present invention's part embodiment, rather than whole embodiment.Based on the embodiment among the present invention, those of ordinary skills belong to the scope of protection of the invention not making the every other embodiment that is obtained under the creative work prerequisite.
The embodiment of the invention discloses a kind of based on the problem of cooperative development environment and the integrated approach and the system of task, to realize being definite being associated of the task of problem of establishment simply and easily with it, and after realizing the change task status simply and easily, the state of the problem that change is associated with it.
As shown in Figure 1, describedly comprise based on the problem of cooperative development environment and the integrated approach of task:
Step S11, selected one type problem are current problem and this current problem of establishment;
Step S12, when judge to need creating the task relevant with described current problem, determine described task, it is associated with described current problem.
And being associated of problem and task specifically refers to both ID are associated.
Owing in the cooperative development environment, have polytype problem, after one type problem was created and sets up this problem and task related, the problem that can select other types was a current problem, carries out the integrating process of problem and task.
Generally speaking, the method for selected problem types is divided into two kinds, and a kind of for replacing, promptly the problem of Xuan Ding another kind of type covers the current problem of this moment, makes it become current problem; Another kind of for keeping the problem of current type, the problem of selected another kind of type is set to current problem.
Concrete, setting the tasks in the said method is divided into two kinds of situations, and a kind of situation is: after creating current problem, need judge whether to exist being associated with it of task, if exist, so just directly select this task, it is associated with current problem; If there is no, then create being associated of task with described current problem.Another kind of situation is: after creating current problem, directly create relative task.
Specify the process of creation task by the following examples.
As shown in Figure 2, the constructive process of task comprises:
Step S21, determine the relevant iteration of described current problem and task;
Concrete, determine that the mode of this iteration is divided into two kinds equally, a kind of form if exist, is then directly chosen this relevant iteration for judging whether to exist the relevant iteration of described current problem and task earlier, if there is no, then creates and is somebody's turn to do relevant iteration; Another kind of form is directly to create the relevant iteration of described current problem and task, does not carry out deterministic process in advance, promptly no matter whether has this relevant iteration, all carries out creation operation again.
Step S22, determine the related needs of described current problem and task;
Identical with the method for the above-mentioned relevant iteration of determining described current problem and task, the method of determining this related needs also is two kinds, a kind ofly be: the related needs that judges whether to exist described current problem and task, if exist, then directly choose this related needs, if there is no, then create this related needs; Another kind of form is directly created the related needs of described current problem and task for not carrying out deterministic process in advance, promptly no matter whether has this related needs, all carries out creation operation again.
Step S23, according to described relevant iteration and related needs creation task.
Below be example with the state of change problem and relative task, simple declaration is to the operation of problem and relative task.
After revising task status, judge earlier whether related problem of this task, as otherwise end withdraw from, if, then call this problem after, change its state.
Concrete, if task status is not finished by finishing to change into, then problem state can change into and repairing; If task status is not finished by finishing to change into, then problem state can change into and opening.
The integrated approach of problem and the task based on cooperative development environment disclosed by the invention when creating problem, is directly determined relative task, and with both associations, like this, when problem is operated, can directly call relative task, operate, simple and convenient.
The embodiment of the invention also discloses a kind of integrated system of problem and the task based on cooperative development environment, as shown in Figure 3, comprise: problem types selected cell 101, problem creating unit 102, task determining unit 103 and task and problem associative cell 104, wherein:
It is current problem that problem types selected cell 101 is used for selected one type problem; Problem creating unit 102 is used to create described current problem; Task determining unit 103 is used for determining described task when judging that needs are created the task relevant with described current problem; Task is used for related described definite task and current problem with problem associative cell 104.
Concrete, as shown in Figure 4, task determining unit 103 comprises: choose TU task unit 201 and task creation unit 202, wherein:
Task is chosen unit 201 and is used for choosing this task when there be the task relevant with described current problem in judgement; Task creation unit 202 is used for creating described task when there be not the task relevant with described current problem in judgement, perhaps, directly creates being associated with described current problem of task.
As shown in Figure 5, task creation unit 202 comprises: relevant iteration is chosen unit 301, relevant iteration creating unit 302, related needs and is chosen unit 303 and related needs creating unit 304, wherein:
Relevant iteration is chosen unit 301, is used for choosing this relevant iteration when judging when having described relevant iteration;
Relevant iteration creating unit 302 is used for creating described related needs when there is not described related needs in judgement; Perhaps, directly create described problem and relevant iteration with its relevant task;
Related needs is chosen unit 303, is used for choosing this related needs when there is described related needs in judgement;
Related needs creating unit 304 is used for creating described related needs when judging when not having described related needs, perhaps, directly creates described problem and related needs with its relevant task.
Disclosed problem and the disclosed problem and the integrated approach of task based on cooperative development environment of the integrated system of task and the foregoing description based on cooperative development environment of present embodiment is corresponding, the concrete course of work of this system sees also the disclosed content of the foregoing description, repeats no more herein.
To the above-mentioned explanation of the disclosed embodiments, make this area professional and technical personnel can realize or use the present invention.Multiple modification to these embodiment will be conspicuous concerning those skilled in the art, and defined herein General Principle can realize under the situation that does not break away from the spirit or scope of the present invention in other embodiments.Therefore, the present invention will can not be restricted to these embodiment shown in this article, but will meet and principle disclosed herein and features of novelty the wideest corresponding to scope.

Claims (8)

1. the integrated approach based on the problem and the task of cooperative development environment is characterized in that, comprising:
Selected one type problem is current problem and this current problem of establishment;
When judgement needs to create the task relevant with described current problem, determine described task, it is associated with described current problem.
2. method according to claim 1 is characterized in that, described set the tasks into:
Judge whether to exist the task relevant with described current problem, if, then choose this task, if not, create the task relevant with described current problem; Perhaps, create described task.
3. method according to claim 2 is characterized in that, described creation task comprises:
Determine the relevant iteration of described current problem and task;
Determine the related needs of described current problem and task;
According to described relevant iteration and related needs creation task.
4. method according to claim 3 is characterized in that, determines that described relevant iteration is:
When there is described relevant iteration in judgement, choose this relevant iteration, create described relevant iteration when judging when not having described relevant iteration; Perhaps, create described problem and relevant iteration with its relevant task.
5. method according to claim 3 is characterized in that, determines that described related needs is:
When there is described related needs in judgement, choose this related needs, when there is not described related needs in judgement, create described related needs; Perhaps, create described related needs.
6. the integrated system based on the problem and the task of cooperative development environment is characterized in that, comprising:
The problem types selected cell, the problem that is used for selected a type is a current problem;
The problem creating unit is used to create described current problem;
The task determining unit is used for determining described task when judging that needs are created the task relevant with described current problem;
Task and problem associative cell are used for related described definite task and current problem.
7. system according to claim 6 is characterized in that, described task determining unit comprises:
Choose TU task unit, be used for when there be the task relevant with described current problem in judgement, choosing this task;
The task creation unit is used for creating described task when there be not the task relevant with described current problem in judgement, perhaps, creates being associated with described current problem of task.
8. system according to claim 7 is characterized in that, described task creation unit comprises:
Relevant iteration is chosen the unit, is used for choosing this relevant iteration when judging when having described relevant iteration;
Relevant iteration creating unit is used for creating described related needs when there is not described related needs in judgement; Perhaps, create described problem and relevant iteration with its relevant task;
Related needs is chosen the unit, is used for choosing this related needs when there is described related needs in judgement;
The related needs creating unit is used for creating described related needs when judging when not having described related needs, perhaps, creates described problem and related needs with its relevant task.
CN2010102383359A 2010-07-28 2010-07-28 Problem and task integrating method and system based on collaboration development environment Pending CN101887369A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102383359A CN101887369A (en) 2010-07-28 2010-07-28 Problem and task integrating method and system based on collaboration development environment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102383359A CN101887369A (en) 2010-07-28 2010-07-28 Problem and task integrating method and system based on collaboration development environment

Publications (1)

Publication Number Publication Date
CN101887369A true CN101887369A (en) 2010-11-17

Family

ID=43073299

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102383359A Pending CN101887369A (en) 2010-07-28 2010-07-28 Problem and task integrating method and system based on collaboration development environment

Country Status (1)

Country Link
CN (1) CN101887369A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102622258A (en) * 2011-01-31 2012-08-01 国际商业机器公司 Device and method for acquiring business information in software project

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1622100A (en) * 2003-11-24 2005-06-01 顺德市顺达电脑厂有限公司 Object-oriented project lifecycle management system and method therefor
CN101174208A (en) * 2007-11-28 2008-05-07 山东浪潮齐鲁软件产业股份有限公司 Method for implementing software assembly line platform
CN101403965A (en) * 2008-11-18 2009-04-08 四川赛文纳克软件有限公司 Integration type iteration software development process control system and method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1622100A (en) * 2003-11-24 2005-06-01 顺德市顺达电脑厂有限公司 Object-oriented project lifecycle management system and method therefor
CN101174208A (en) * 2007-11-28 2008-05-07 山东浪潮齐鲁软件产业股份有限公司 Method for implementing software assembly line platform
CN101403965A (en) * 2008-11-18 2009-04-08 四川赛文纳克软件有限公司 Integration type iteration software development process control system and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102622258A (en) * 2011-01-31 2012-08-01 国际商业机器公司 Device and method for acquiring business information in software project

Similar Documents

Publication Publication Date Title
CN100442230C (en) Method and system for software multi-version upgrading
CN101650798B (en) Flow modeling method
CN101960439B (en) Client environment creates system and client environment creation method
WO2007021474A8 (en) Method and apparatus for managing patchable software systems
WO2005121945A3 (en) Method and system for creating, sustaining and using a transactional bill of materials (t-bom tm)
CN102651007A (en) Method and device for managing database indexes
DE60003457D1 (en) METHOD AND SYSTEM FOR CONFIGURING COMPONENTS, OUTPUTABLE IN A NETWORK
WO2004077292A3 (en) System and apparatus for eliminating user interaction during hardware configuration at system boot
CN103593456A (en) Form user-defined design method and device
CN103729340A (en) Method and device for editing table in webpage
CN101593294A (en) The method and system of dynamic-configuration workflow
CN101714093A (en) Three-section type double-backup Loader upgrading method of set-top box
US20130104101A1 (en) Sequence program creating apparatus
CN103197927B (en) A kind of method that realizes of Workflow and system thereof
CN101453511B (en) Method for mobile phone platform UI interface adaptation
CN101887369A (en) Problem and task integrating method and system based on collaboration development environment
CN102129385B (en) Management method capable of dynamically expanding management function of virtual machine
CN104035799A (en) Method for customizable upgrading of software
CA2435252A1 (en) System and method for creating mark-making tools
CN102681861B (en) Method and device for installing software
CN101110022A (en) Method for implementing workflow model by software
CN110941422A (en) Code automatic generation method, code generator and readable storage medium
EP2169489B1 (en) Method for implementing production processes
CN109976750A (en) A kind of configuration of component source code and component method of cutting out based on embedded developping system
CN108121695A (en) A kind of edit methods of file, device and medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20101117