Prior art keywords
bamboo
wood plyboard
bracing frame
template
steel plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010102258293A
Other languages
Chinese (zh)
Other versions
CN101881078A (en
Inventor
朱奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luo Haijun
Original Assignee
罗海军
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 罗海军 filed Critical 罗海军
Priority to CN2010102258293A priority Critical patent/CN101881078B/en
Publication of CN101881078A publication Critical patent/CN101881078A/en
Application granted granted Critical
Publication of CN101881078B publication Critical patent/CN101881078B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a template for pouring a concrete floor. The template is characterized by comprising a bamboo-wood composite board, a steel plate, a coating and a support frame. The length of the template is 2 to 4 meters, and the thickness of the bamboo-wood composite board is 4 to 6 centimeters; a panel of the bamboo-wood composite board, facing the coating, is serrated; the lower part of the bamboo-wood composite board is provided with the coating with the thickness of 10 centimeters; the bamboo-wood composite board and the steel plate are bonded by using high-strength bonding glue; each 25-50m<2> is provided with one steel bar support frame, and the wing edge of the support frame is welded on the steel plate; the left of the edge of the bamboo-wood composite board is provided with a bolt, while the right is provided with a locking groove; the bamboo-wood composite boards are spliced by embedding the bolt into the locking groove; and after the bamboo-wood composite boards are spliced, an asphalt felt of 30 centimeters is paved.

Description

A kind of template that is used for pouring concrete floor
Technical field
The present invention relates to building field, particularly a kind of template that is used for pouring concrete floor.
Background technology
If in-situ reinforced concrete slab is construction stage formwork shakiness then the floor amount of deflection can occur even the concrete floor deformation crack possibly occur.In addition; In-situ reinforced concrete slab need treat that concrete reaches certain intensity rear collapsible die, but after the form removal under the deadweight effect, floor is further downwarp also; If the floor slab bottoms concrete produces excessive pulling force, the unfavorable situation that the crack enlarges then also possibly appear.
Summary of the invention
Technical problem to be solved by this invention provides a kind of template that is used for pouring concrete floor, solves the concrete floor problem of cracks.
The present invention includes bamboo-wood plyboard, steel plate, coating, bracing frame.Template length is 4~8m; Bamboo-wood plyboard thickness is 4~6cm, and bamboo-wood plyboard is done toothing towards the panel of coating, helps bamboo-wood plyboard and coating is linked to be integral body; The thick coating of 10cm is done in the bamboo-wood plyboard bottom, and coating has played anticorrosion and the fireproof effect.Bonding between bamboo-wood plyboard and the steel plate with high-strength adhesive glue, per 25~50m 2A reinforced bar support frame is set; The side weld of the bracing frame wing is connected on the steel plate, and left side, bamboo-wood plyboard edge is provided with dead bolt, and the right side is provided with locked groove; The bamboo-wood plyboard splicing realizes through dead bolt embedding locked groove; Closely overlap between plate and the plate after splicing is accomplished, form integral body, prevented the defect of template spillage.The malthoid that re-lays 30cm after the bamboo-wood plyboard splicing is as the waterproof extra play, and preventing to splice the position becomes the waterproof weak link.
The combination stressed purpose of steel plate and bamboo-wood plyboard is the load when bearing casting and compacting of concrete better, because the steel plate bearing capacity is higher, but because the economic cause steel plate can not be very thick, and thin excessively steel plate amount of deflection can occur under working load.Bamboo-wood plyboard has remedied steel sheet and under working load, has been out of shape excessive shortcoming.
Bracing frame is welded by two splayed reinforced frames that intersect vertically; It is the reinforcing bar of 10~14mm that reinforced frame adopts diameter; The bracing frame height is 8~12cm, and bracing frame top margin length is 10~15cm, and wing edge lengths is 10~15cm; Bracing frame middle part is provided with seal ring, the seal ring effect be above the blocking-up floor water along the sealing path of bracing frame.Seal ring thickness is 3~5mm, and the seal ring diameter is 5~7cm.
The present invention carries out under the situation of the normal controllable deforming of template at the concrete knot actually; So the floor deadweight can not make the floor slab bottoms concrete produce pulling force; Under (except that the floor deadweight) permanent load and the effect of flooring live load; The floor slab bottoms concrete just produces tensile stress, therefore compares with traditional floor and is not prone to the crack.In addition, in the construction stage, template provided by the invention is with concrete co-operation, therefore in operational phase easily and the in-situ reinforced concrete slab compatibility of deformation, improved structural integrity.The present invention can save the operation and the expense of formwork, form removal, can significantly improve efficiency of construction, reduces construction cost.
Description of drawings
Fig. 1 template sketch map
Fig. 2 bracing frame sketch map
In the accompanying drawing: 1, bamboo-wood plyboard, 2, steel plate, 3, coating, 4, bracing frame, 5, seal ring, 6, locked groove, 7 dead bolts.
The specific embodiment
Describe in detail below in conjunction with accompanying drawing.
Fig. 1 is the template sketch map, and Fig. 2 is the bracing frame sketch map.Present embodiment comprises bamboo-wood plyboard 1, steel plate 2, coating 3, bracing frame 4.Template length is 6m, and bamboo-wood plyboard 1 thickness is 5cm, and bamboo-wood plyboard 1 is done toothing towards the panel of coating 3, and the thick coating of 10cm 3 is done in bamboo-wood plyboard 1 bottom.Bonding between bamboo-wood plyboard 1 and the steel plate 2 with high-strength adhesive glue, per 25~50m 2A reinforced bar support frame 4 is set, and bracing frame 4 wing side welds are connected on the steel plate 2, and left side, bamboo-wood plyboard 1 edge is provided with dead bolt 7, and the right side is provided with locked groove 6, and bamboo-wood plyboard 1 splicing realizes through dead bolt 7 embedding locked grooves 6.The malthoid that re-lays 30cm after bamboo-wood plyboard 1 splicing is as the waterproof extra play.
Bracing frame 4 is welded by two splayed reinforced frames that intersect vertically, and it is the reinforcing bar of 12mm that reinforced frame adopts diameter, and bracing frame 4 highly is 10cm, and bracing frame 4 top margin length are 12cm, and wing edge lengths is 12cm, and bracing frame 4 middle parts are provided with seal ring.Seal ring 5 thickness are 4mm, and seal ring 5 diameters are 6cm.
Present embodiment can bear concrete deadweight and working load in the construction stage.Water smash moulding after, template and concrete form the composite concrete floor.Steel plate 2 and bamboo-wood plyboard 1 have increased the rigidity of floor, have improved the concrete stress performance in floor bottom.Simultaneously, the existence of bed die has delayed the floor slab bottoms crack and has occurred, and has prolonged durability of structures.After this embodiment is applied to engineering, construction period and conventional construction method reduced in comparison 40%~50%, on the duration, be able to significantly shift to an earlier date.Construction is accomplished structure and bad phenomenon such as structural cracks do not occurred.

Claims (2)

1. a template that is used for pouring concrete floor is characterized in that comprising bamboo-wood plyboard, steel plate, coating, bracing frame; Template length is 2~4m, and bamboo-wood plyboard thickness is 4~6cm, and bamboo-wood plyboard is done toothing towards the panel of coating, and the thick coating of 10cm is done in the bamboo-wood plyboard bottom, and is bonding with high-strength adhesive glue between bamboo-wood plyboard and the steel plate, per 25~50m 2A reinforced bar support frame is set, and the side weld of the bracing frame wing is connected on the steel plate, and left side, bamboo-wood plyboard edge is provided with dead bolt, and the right side is provided with locked groove, and the bamboo-wood plyboard splicing embeds locked groove through dead bolt and realizes, re-lays the malthoid of 30cm after the bamboo-wood plyboard splicing.
2. template according to claim 1 is characterized in that bracing frame is welded by two splayed reinforced frames that intersect vertically, and it is the reinforcing bar of 10~14mm that reinforced frame adopts diameter; The bracing frame height is 8~12cm; Bracing frame top margin length is 10~15cm, and wing edge lengths is 10~15cm, and the bracing frame middle part is provided with seal ring; Seal ring thickness is 3~5mm, and the seal ring diameter is 5~7cm.
CN2010102258293A 2010-07-03 2010-07-03 Template for pouring concrete floor Expired - Fee Related CN101881078B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102258293A CN101881078B (en) 2010-07-03 2010-07-03 Template for pouring concrete floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102258293A CN101881078B (en) 2010-07-03 2010-07-03 Template for pouring concrete floor

Publications (2)

Publication Number Publication Date
CN101881078A CN101881078A (en) 2010-11-10
CN101881078B true CN101881078B (en) 2012-01-04

Family

ID=43053203

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102258293A Expired - Fee Related CN101881078B (en) 2010-07-03 2010-07-03 Template for pouring concrete floor

Country Status (1)

Country Link
CN (1) CN101881078B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107119895B (en) * 2017-06-28 2023-01-17 福州华虹智能科技股份有限公司 Scaffold for underground coal mine construction

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2056175U (en) * 1989-06-24 1990-04-18 北京施工应用科学研究所 Early collapsible composite forming board of corrugated steel bar
KR20030061256A (en) * 2002-01-11 2003-07-18 기승철 Civil and architectural synthetic resin stucco
CN2627133Y (en) * 2003-05-24 2004-07-21 陈世奇 Plastic-steel composite construction engineering pattern plate
CN2801961Y (en) * 2005-06-21 2006-08-02 李哲 Assembly wood plastic composite building forming board
DE102008050391A1 (en) * 2008-06-24 2009-12-31 Ingenieurbüro Urbanek, Pfankuche & Partner Composite panels i.e. steel hard foam composite panels, connecting method for use in e.g. building construction, involves providing spring with optical marking, and producing wide covering of slot and spring

Also Published As

Publication number Publication date
CN101881078A (en) 2010-11-10

Similar Documents

Publication Publication Date Title
CN103572873B (en) Assembled integral floor and construction method thereof
CN102182141B (en) Longitudinal non-shearing-resistant T-shaped anti-pulling connecting piece and construction method thereof
CN204212286U (en) A kind of reinforced steel plate-concrete combined shear wall with ribbing
CN113202219A (en) Fully prefabricated assembled steel-concrete composite floor system and design calculation method
CN201891260U (en) Hanging template
CN104264984A (en) Formwork for concrete structure pouring and pouring construction method
CN103912133B (en) Vierendeel girder transverse stretching pre-stressed carbon fiber sheet material reinforcement means
CN103437493B (en) Connecting node of prefabricated reinforced concrete beam and construction method of connecting node
CN204112525U (en) Band perps precast shear wall structure in strong concrete precast frame
CN203783176U (en) Carbon fiber sheet reinforced structure for transverse tensioning prestress of frame beam
CN203546583U (en) Box-inside horizontal reinforcing device of concrete box-cross-section multi-beam bridge
CN114482400A (en) Superposed beam connected with prefabricated vertical component
CN101881078B (en) Template for pouring concrete floor
CN105604342A (en) Comprehensive reinforcing method for T-shaped beam of reinforced concrete frame
CN103835303A (en) Shear resisting method and structure for cast-in-place reinforced concrete
CN201176551Y (en) Precast slab for roads
CN102852279A (en) Prestressed reinforced concrete superposed beam having convex-concave superposed surfaces
CN103669193B (en) A kind of laterally assembled Wavelike steel webplate combination T beam and construction method
CN105317146A (en) Steel structure earthquake-resistant floor for construction and manufacturing method
CN202831384U (en) Double-prefabricated superposed frame beam
CN202882180U (en) Concrete laminated slab welding with steel bar and connecting with spiral bar within span
CN101525918A (en) Method for making winged steel tube-concrete composite beam
CN213086543U (en) Die carrier for processing surface layer of anchor recess at end of prefabricated box girder
CN203213595U (en) Cast-in-place concrete fence plate supporting die structure
CN210622060U (en) Assembled close amalgamation coincide floor

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: LUO HAIJUN

Free format text: FORMER OWNER: ZHU KUI

Effective date: 20111027

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20111027

Address after: 325000, No. 65, PU shoe city, Lucheng District, Zhejiang, Wenzhou

Applicant after: Luo Haijun

Address before: 325000 Wenzhou City, Ouhai province Jingshan Hill group of the building of the 302 room, room 11, Zhejiang

Applicant before: Zhu Kui

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120104

Termination date: 20150703

EXPY Termination of patent right or utility model