CN101875789B - Coal directly-liquefied residue composite modified asphalt and preparation method thereof - Google Patents

Coal directly-liquefied residue composite modified asphalt and preparation method thereof Download PDF

Info

Publication number
CN101875789B
CN101875789B CN2010102163202A CN201010216320A CN101875789B CN 101875789 B CN101875789 B CN 101875789B CN 2010102163202 A CN2010102163202 A CN 2010102163202A CN 201010216320 A CN201010216320 A CN 201010216320A CN 101875789 B CN101875789 B CN 101875789B
Authority
CN
China
Prior art keywords
liquefied residue
coal directly
modified asphalt
coal
preparation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010102163202A
Other languages
Chinese (zh)
Other versions
CN101875789A (en
Inventor
艾涛
赵鹏
王振军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changan University
Original Assignee
Changan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changan University filed Critical Changan University
Priority to CN2010102163202A priority Critical patent/CN101875789B/en
Publication of CN101875789A publication Critical patent/CN101875789A/en
Application granted granted Critical
Publication of CN101875789B publication Critical patent/CN101875789B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working-Up Tar And Pitch (AREA)
  • Compositions Of Macromolecular Compounds (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention provides coal directly-liquefied residue composite modified asphalt and a preparation method thereof. The preparation method comprises the following steps of: adding oil and colloid into the melted coal directly-liquefied residue; and stirring the mixture uniformly to prepare the modified asphalt for a road. The modified asphalt has the advantages of simple manufacturing process, low cost, high performance and wide market application prospect, and is preferred modified asphalt for building high-grade roads.

Description

A kind of coal directly-liquefied residue composite modified asphalt and preparation method thereof
Technical field
The invention belongs to traffic ground surface material technical field, be specifically related to a kind of method of utilizing coal directly-liquefied residue to prepare modifying asphalt.
Background technology
As everyone knows, in coal system oil tech, direct coal liquefaction technology has begun heavy industrialization in China to be used, but the processing of the residue that produces in the DCL/Direct coal liquefaction process but still is not well solved.
Because the world energy sources crisis, oil and related products price thereof rise steadily, and cause asphalt price also to improve constantly, and also make the Road construction material cost constantly increase.In order to reduce the use cost of petroleum pitch, people turn to the utilization of coal directly-liquefied residue to sight, and this is because coal directly-liquefied residue contains bituminous matter and oil content, and is similar a bit to pitch on the composition, have to replace or the possibility of modified oil pitch.
Chinese patent application (application number: 200610012547.9), a kind of road asphalt modifier and application method thereof are disclosed, coal directly-liquefied residue is crushed to below 100 orders exactly, with pitch be that 5-30% mixes 100-250 ℃ of scope by the weight ratio that coal directly-liquefied residue accounts for modifying asphalt, the modifying asphalt that obtains.Yet, research (king stockaded village rosy clouds are arranged again, Yang Jianli, Liu Zhenyu. coal directly-liquefied residue is to the preliminary assessment of modifying road asphalt effect. the chemistry of fuel journal, 2007,35 (1): the modifying asphalt that is obtained when 109-1120) having only interpolation less than the coal directly-liquefied residue of 7% weight ratio in showing just has use value, and after residue content improves again, because the pitch embrittlement, low-temperature performance is bad, is difficult to satisfy the pavement performance requirement.
Chinese patent application (application number 200710178082.9) discloses a kind of method for preparing modifying asphalt with coal directly-liquefied residue, the matrix pitch of the molten state of the coal directly-liquefied residue of 150-280 ℃ molten state and 100-180 ℃ is stirred under 150-280 ℃, form melts, thereby obtain modifying asphalt, this method distinct issues are matrix pitch experience high temperature when mixing, very easily cause the aging of matrix pitch, and because the coal directly-liquefied residue volume that the preparation modifying asphalt uses is little, this is concerning digesting a large amount of coal directly-liquefied residues, and its effect is too little.
Summary of the invention
The object of the present invention is to provide a kind of method of utilizing coal directly-liquefied residue directly to prepare modifying asphalt, this method is simple, and production cost is low, controllability is strong, and the performance of modified bitumen of preparation meets every index of modified oil pitch.
In order to realize above-mentioned technical assignment, the present invention adopts following technical scheme to be achieved.
A kind of coal directly-liquefied residue composite modified asphalt, it is to be made according to weight percent by following raw material: coal directly-liquefied residue: 70~80%, oil content: 15~30%, colloid: 5~10%, the per-cent sum of raw material is 100%.
Described coal directly-liquefied residue is that the softening temperature of discharging from vacuum distillation apparatus after the DCL/Direct coal liquefaction is not higher than 180 ℃, and solids content is no more than the coal residue of 50% weight percent; Described oil content is wherein one or more mixtures of phthalate, epoxy compounds, naphthenic oil, fatty hydrocarbon ils, aromatic hydrocarbon oil, turps, Stockholm tar, tung oil, citrate, aliphatic dicarboxylic acid ester, monocarboxylate, trimellitate or phosphoric acid ester; Described colloid is wherein one or more mixtures of Gum Rosin, coumarone indene resin, novolac resin, low-molecular-weight polyamide resin, vinyl acetate resin, carbon 5 petroleum resin or carbon 9 petroleum resin.
The preparation method of above-mentioned coal directly-liquefied residue composite modified asphalt, can follow following steps: choose coal directly-liquefied residue according to weight percent: 70~80%, oil content: 15~30%, colloid: 5~10% as raw material, and at normal temperatures raw material is mixed, be warming up to 90~160 ℃ then, obtained modified asphalt material in 30~45 minutes afterwards through high speed dispersor high speed dispersion, mixing.
Coal directly-liquefied residue of the present invention directly prepares the method for modifying asphalt, and method is simple, production cost is low, workable, and the performance of modified bitumen of preparation all can meet every index of modified oil pitch.This method has significant values to the rational and efficient use of coal directly-liquefied residue, and the while is significant equally for saving Road construction cost, energy-conserving and environment-protective.
Modified asphalt material according to the present invention's preparation can be used as the road surface of motorway or the pavement material of bridge floor in addition, and wide market application prospect is all arranged.
Embodiment
It is according to three principles that chemical composition bituminous matter, oil content and colloid play a role separately that constitute petroleum pitch that the present invention utilizes coal directly-liquefied residue to prepare modifying asphalt, i.e. the contour warm nature energy of bituminous matter decision bituminous softening temperature; Oil content decision bituminous denseness and pliability have very big influence to the bituminous ductility; Colloid is given pitch plasticity-, flowability and agglutinating value(of coal), and bituminous ductility is also had very big influence.Through discovering, owing to lack oil content and glial component in the conventional pitch in the coal directly-liquefied residue, in coal directly-liquefied residue, add an amount of oil content and colloid, can be prepared into modifying asphalt.This method realizes replacing petroleum pitch, widely applies coal directly-liquefied residue in constructing road, can turn waste into wealth, and has widened the coal directly-liquefied residue range of application, is worth for realizing recycling economy performance certain economic.
The present invention is described in more detail below in conjunction with embodiment, it is emphasized that these embodiment are more excellent examples, is used for further understanding the present invention, the invention is not restricted to following examples.
Embodiment 1:
100kg is an example with the preparation coal directly-liquefied residue composite modified asphalt, and is raw materials used as follows:
Coal directly-liquefied residue 70kg, chip solid;
Epoxy soybean oil 25kg, relative molecular weight is about 1000, light yellow sticky oily liquids;
Low-molecular-weight polyamide resin 5kg, relative molecular weight is about 1000, brown liquid.
Its preparation method is as follows:
Above-mentioned raw materials joined in the stainless steel vessel simultaneously under normal temperature condition, stir, be heated to 140 ℃, disperseed 30 minutes with high speed dispersor then, obtain modifying asphalt sample 1.
Embodiment 2:
100kg is an example with the preparation coal directly-liquefied residue composite modified asphalt, and is raw materials used as follows:
Coal directly-liquefied residue 80kg, chip solid; Tri-n-butyl citrate 5kg, colourless oil liquid, relative molecular weight 360, nontoxic, volatility is low; Naphthenic oil 10kg, oily liquids; Carbon 5 petroleum resin 5kg, faint yellow or light brown sheet or blocks of solid, molecular-weight average 400-2000.
Its preparation method is as follows:
Above-mentioned raw materials joined in the stainless steel vessel simultaneously under normal temperature condition, stir, be heated to 150 ℃, disperseed 40 minutes with high speed dispersor then, obtain modifying asphalt sample 2.
Embodiment 3:
100kg is an example with the preparation coal directly-liquefied residue composite modified asphalt, and is raw materials used as follows:
Coal directly-liquefied residue 75kg, chip solid;
Epoxy soybean oil monooctyl ester 10kg, light yellow oily liquid, relative molecular weight 424;
Trimellitic acid three (2-ethyl) is own) ester 10kg, transparent sticky shape liquid, relative molecular weight 547;
Gum Rosin 5kg, faint yellow or light brown sheet or blocks of solid, molecular-weight average 400-2000 is broken for small pieces or the piece of particle diameter less than 5mm.
Its preparation method is as follows:
Above-mentioned raw materials joined in the stainless steel vessel simultaneously under normal temperature condition, stir, be heated to 150 ℃, disperseed 40 minutes with high speed dispersor then, obtain modifying asphalt sample 3.
Embodiment 4:
100kg is an example with the preparation coal directly-liquefied residue composite modified asphalt, and is raw materials used as follows:
Coal directly-liquefied residue 70kg, chip solid;
Epoxy soybean oil monooctyl ester 10kg, light yellow oily liquid, relative molecular weight 424;
Tung oil 12kg, transparent liquid;
Gum Rosin 5kg, faint yellow or light brown sheet or blocks of solid, molecular-weight average 400-2000 is broken for small pieces or the piece of particle diameter less than 5mm;
Low-molecular-weight polyamide resin 3kg, relative molecular weight is about 1000, brown liquid.
Its preparation method is as follows:
Above-mentioned raw materials joined in the stainless steel vessel simultaneously under normal temperature condition, stir, be heated to 150 ℃, disperseed 40 minutes with high speed dispersor then, obtain modifying asphalt sample 4.
The comparative example:
The state that the applicant produces Beijing Yanshan Petrochemical Company creates a New type of S BS as asphalt modifier, matrix pitch adopts the Korea S AH-70 heavy traffic paving asphalt of import, prepare the SBS modifying asphalt, and test comparison with the performance of sample 1, sample 2, sample 3 and sample 4.Test method is operated according to JTT052-2000 " highway engineering pitch and the bituminous concrete mixture tentative specification " related specifications of the Ministry of Communications's promulgation, and experimental result sees table 1:
Table 1. modifying asphalt comparison of test results table
Figure 558667DEST_PATH_IMAGE001
As can be seen from the above table, sample 1, sample 2, sample 3, sample 4 are compared with the SBS modifying asphalt, the performance of sample 1, sample 2, sample 3, sample 4 and SBS modifying asphalt close.
Use above 5 kinds of modified asphalt manufacturing AC-13 bituminous concretes, the mineral aggregate gradation of asphalt is an AC-13C type intermediate value, building stones adopt Tongchuan, Shaanxi building stones, carry out experiment of thimble test (wheel tracking test) Marshall and freeze thawing splitting experiment respectively, and its The performance test results sees Table 2.
Table 2. bituminous concrete performance
Figure 600179DEST_PATH_IMAGE002
Data analysis from table 2, the modifying asphalt pavement performance of coal directly-liquefied residue preparation of the present invention all is close to or higher than the pavement performance of SBS modifying asphalt, therefore, the modifying asphalt of coal directly-liquefied residue of the present invention preparation can replace the SBS modifying asphalt used always, be used for mating formation of high class pavement, this is significant for reducing road bitumen concrete material cost.

Claims (2)

1. coal directly-liquefied residue composite modified asphalt, it is characterized in that: it is to be made according to weight percent by following raw material: coal directly-liquefied residue: 70~80%, oil content: 15~30%, colloid: 5~10%, the per-cent sum of raw material is 100%;
Described coal directly-liquefied residue is that the softening temperature of discharging from vacuum distillation apparatus after the DCL/Direct coal liquefaction is not higher than 180 ℃, and solids content is no more than the coal residue of 50% weight percent;
Described oil content is wherein one or more mixtures of phthalate, epoxy compounds, fatty hydrocarbon ils, aromatic hydrocarbon oil, turps, Stockholm tar, rosin ester, citrate, aliphatic dicarboxylic acid ester, monocarboxylate, trimellitate or phosphoric acid ester;
Described colloid is wherein one or more mixtures of Gum Rosin, coumarone indene resin, novolac resin, low-molecular-weight polyamide resin, vinyl acetate resin, carbon 5 petroleum resin or carbon 9 petroleum resin.
2. the preparation method of the described coal directly-liquefied residue composite modified asphalt of claim 1, it is characterized in that: choose coal directly-liquefied residue according to weight percent: 70~80%, oil content: 15~30%, colloid: 5~10% as raw material, and at normal temperatures raw material is mixed, be warming up to 90~160 ℃ then, obtained coal directly-liquefied residue composite modified asphalt in 30~45 minutes afterwards through high speed dispersor high speed dispersion, mixing.
CN2010102163202A 2010-07-05 2010-07-05 Coal directly-liquefied residue composite modified asphalt and preparation method thereof Expired - Fee Related CN101875789B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102163202A CN101875789B (en) 2010-07-05 2010-07-05 Coal directly-liquefied residue composite modified asphalt and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102163202A CN101875789B (en) 2010-07-05 2010-07-05 Coal directly-liquefied residue composite modified asphalt and preparation method thereof

Publications (2)

Publication Number Publication Date
CN101875789A CN101875789A (en) 2010-11-03
CN101875789B true CN101875789B (en) 2011-09-28

Family

ID=43018476

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102163202A Expired - Fee Related CN101875789B (en) 2010-07-05 2010-07-05 Coal directly-liquefied residue composite modified asphalt and preparation method thereof

Country Status (1)

Country Link
CN (1) CN101875789B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109593370A (en) * 2017-09-30 2019-04-09 神华集团有限责任公司 Road asphalt modifier and modified pavement asphalt and preparation method thereof and asphalt

Families Citing this family (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101885976B (en) * 2010-07-02 2013-07-24 神华集团有限责任公司 Method for extracting heavy liquefaction oil and intermediate-phase bitumen matter from coal liquefaction residuals and application thereof
CN103030982B (en) * 2013-01-06 2015-07-08 北京建筑大学 Method for preparing mixed asphalt
CN104513488B (en) * 2013-09-30 2017-11-14 神华集团有限责任公司 Road asphalt modifier and modified pavement asphalt containing coal directly-liquefied residue and preparation method thereof
CN103497523B (en) * 2013-10-22 2015-02-04 山西省交通科学研究院 Producing method for coal and oil coprocessing residue modified petroleum asphalt
CN104403331A (en) * 2014-09-29 2015-03-11 神华集团有限责任公司 Waterproof coiled material and method for preparing waterproof coiled material by using coal liquefaction residues
CN104389253B (en) * 2014-11-07 2017-12-12 长安大学 A kind of cement stabilized recycled concrete aggregate basic unit or the design method of underlayment
CN104358201B (en) * 2014-11-07 2017-12-26 长安大学 A kind of design method of Bituminous stabilized regenerated aggregate layer
CN104591575B (en) * 2015-01-26 2016-05-25 北京建筑大学 A kind of preparation method of coal directly-liquefied residue Stability of Modified Asphalt Mortar
CN105986536B (en) * 2015-02-10 2018-08-28 鄂尔多斯市紫瑞天成工贸有限公司 A method of it is paved the way using coal directly-liquefied residue
CN105986535B (en) * 2015-02-10 2019-01-18 北京紫瑞天成科技有限公司 A method of it is built the road using coal directly-liquefied residue
CN105348829B (en) * 2015-12-09 2017-06-20 焦作大学 A kind of method that building asphalt is prepared with coal liquifaction residue
CN105802652B (en) * 2016-05-23 2019-04-05 神华集团有限责任公司 A kind of coal liquefaction residue modified pitch and its preparation method and application
CN106317920A (en) * 2016-08-22 2017-01-11 长安大学 Coal liquefaction residue compound asphalt and preparation method thereof
CN106433166A (en) * 2016-09-30 2017-02-22 陕西延长石油(集团)有限责任公司炼化公司 Coal-based asphaltic sand-modified asphalt and preparation method thereof
CN106987146A (en) * 2017-04-25 2017-07-28 镇江越辉市政工程有限公司 Seep water road surface novel asphalt and preparation method thereof
CN107011687A (en) * 2017-04-25 2017-08-04 镇江越辉市政工程有限公司 Improve additive of ductility and preparation method thereof after pitch or modified pitch low-temperature ductility and aging
CN107488351A (en) * 2017-08-17 2017-12-19 江苏诺路桥工程检测有限公司 Pouring asphalt cementitious matter prepared by a kind of coal liquefaction residue and preparation method thereof
CN109593371B (en) * 2017-09-30 2021-07-09 神华集团有限责任公司 Road asphalt modifier, modified road asphalt, preparation method of modified road asphalt and asphalt mixture
CN109593368B (en) * 2017-09-30 2022-04-19 国家能源投资集团有限责任公司 Road asphalt modifier, modified road asphalt, preparation method of modified road asphalt and asphalt mixture
CN108517127B (en) * 2018-04-26 2021-10-29 上海公路桥梁(集团)有限公司 Coal direct liquefaction residue hard hot asphalt grouting material and preparation method thereof
CN111138870B (en) * 2019-02-14 2022-03-22 兰州石化职业技术学院 Cresol residue modified asphalt and preparation method and application thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3215726A1 (en) * 1982-04-28 1983-11-03 Rheinische Braunkohlenwerke AG, 5000 Köln Process for the further treatment of residues from the hydrogenating liquefaction of coal
CN101161778A (en) * 2007-11-26 2008-04-16 神华集团有限责任公司 Method for preparing modified asphalt
CN101275023A (en) * 2007-03-30 2008-10-01 上海群康沥青科技有限公司 Rubber asphalt

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3215726A1 (en) * 1982-04-28 1983-11-03 Rheinische Braunkohlenwerke AG, 5000 Köln Process for the further treatment of residues from the hydrogenating liquefaction of coal
CN101275023A (en) * 2007-03-30 2008-10-01 上海群康沥青科技有限公司 Rubber asphalt
CN101161778A (en) * 2007-11-26 2008-04-16 神华集团有限责任公司 Method for preparing modified asphalt

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
朱伟平.煤直接液化残渣改性沥青的研究.《神华科技》.2009,第7卷(第6期),第68-71页,第85页. *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109593370A (en) * 2017-09-30 2019-04-09 神华集团有限责任公司 Road asphalt modifier and modified pavement asphalt and preparation method thereof and asphalt
CN109593370B (en) * 2017-09-30 2022-06-21 国家能源投资集团有限责任公司 Road asphalt modifier, modified road asphalt, preparation method of modified road asphalt and asphalt mixture

Also Published As

Publication number Publication date
CN101875789A (en) 2010-11-03

Similar Documents

Publication Publication Date Title
CN101875789B (en) Coal directly-liquefied residue composite modified asphalt and preparation method thereof
Geng et al. Laboratory performance evaluation of a cold patching asphalt material containing cooking waste oil
CN101863637B (en) Paving asphalt concrete additive and preparation method thereof
CN101161778B (en) Method for preparing modified asphalt
CN104830076B (en) A kind of preparation method of scrap rubber cracking conversion modified pitch
CN101475746A (en) Waste asphalt reclaiming agent and preparation thereof
CN105754356A (en) Asphalt regenerant as well as preparation method and application thereof
CN105859175A (en) Plant-mixed warm regenerated asphalt mixture of large-proportion RAP material
CN104592773A (en) Warm-mixing SMA (styrene maleic anhydride)-modified asphalt concrete modified particle and preparation method thereof
CN108587202A (en) A kind of bottom of tower oil rubber modified bitumen and preparation method thereof
CN101307184B (en) Bitumen regenerant
CN109535747A (en) No. 30 hard road bitumens of one kind and preparation method thereof
CN101348350A (en) Waste rubber powder composite modified asphalt and preparation thereof
CN102718439B (en) Method for road engineering by mixing plant asphalt and petroleum asphalt
CN114716839A (en) Modified asphalt for heavy-duty pavement, modified asphalt mixture and preparation method thereof
CN104987738A (en) Waste rubber modified asphalt
CN103173025B (en) Method for preparing road asphalt by direct coal liquefaction residue
CN102093725A (en) Modified road asphalt and preparation method thereof
CN105985655B (en) A kind of asphalt mixture additive and preparation method thereof using coal directly-liquefied residue preparation
CN112852176B (en) High-modulus asphalt and preparation method thereof
CN103804933A (en) Quick dry type asphalt regenerant for asphalt pavement and preparation method of asphalt regenerant
CN102964851A (en) Preparation method of rosin-base asphalt additive
CN105936749A (en) Method for preparing colored asphalt cementing materials from catalytic cracking slurry oil
CN104441290A (en) Mixing method for modified biological asphalt mixture
CN109575613A (en) A method of asphalt modifier is prepared using useless lubricating grease, gear oil and coal tar

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110928

Termination date: 20140705

EXPY Termination of patent right or utility model