CN101873659B - The implementation method that measurement report reports and device - Google Patents

The implementation method that measurement report reports and device Download PDF

Info

Publication number
CN101873659B
CN101873659B CN200910135430.3A CN200910135430A CN101873659B CN 101873659 B CN101873659 B CN 101873659B CN 200910135430 A CN200910135430 A CN 200910135430A CN 101873659 B CN101873659 B CN 101873659B
Authority
CN
China
Prior art keywords
time length
triggered time
measurement report
message
subscriber equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200910135430.3A
Other languages
Chinese (zh)
Other versions
CN101873659A (en
Inventor
陈中明
黄亚达
施小娟
杜忠达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN200910135430.3A priority Critical patent/CN101873659B/en
Publication of CN101873659A publication Critical patent/CN101873659A/en
Application granted granted Critical
Publication of CN101873659B publication Critical patent/CN101873659B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses implementation method and device that a kind of measurement report reports, the method comprises: network side sends message to subscriber equipment, so that subscriber equipment is according to information reporting measurement report, wherein, message comprises: the first triggered time length and the second triggered time length, first triggered time length is for determining whether CSG cell carries out reporting of measurement report, and the second triggered time length is for determining whether macrocell carries out reporting of measurement report.The present invention reduces the switching times of UE, provide the user stable high-quality service.

Description

The implementation method that measurement report reports and device
Technical field
The present invention relates to the communications field, the implementation method reported in particular to a kind of measurement report and device.
Background technology
Operator's networking cost is saved while the high-quality service of cheap rate is provided to user, more efficiently utilize network, propose one-stop radio access scheme, introduce the radio reception device that one is called Home eNodeB (Home NB or HeNB).This radio reception device can provide the function of various wireless access, user uses this equipment during in places such as family, market, company or schools, it is preferential that operator can provide on rate, can reduce the load that normal cells is also called macrocell, be a kind of well in-door covering optimization method simultaneously.
This Home eNodeB is the one of NodeB or eNodeB, its some cell set covered get married the overlay area of base station, front yard, Home eNodeB only allows the access of the user through authorizing and provides service for these users, therefore the community that this Home eNodeB covers is otherwise known as non-public authorized user group (Closed Subscriber Group is called for short CSG) community.To subscriber equipment (UserEquipment, referred to as UE), CSG cell shows that this community is a CSG cell by carrying a CSG instruction in broadcast.User terminal is according to whether supporting that CSG is divided into two classes, and a class supports the subscriber equipment (CSGUE) of CSG, and another kind of is the subscriber equipment (non-CSG UE) not supporting CSG.Have the advantage on rate due to CSG cell, can alleviate again the load of macrocell simultaneously, CSG UE can as much as possible by authorized CSG cell access network.Virtual network operator can retain a part of physical resource when the network planning, such as, physical layer identifications (Physical Cell identity, referred to as PCI) is special in CSG cell, and this configuration can be informed to UE by modes such as broadcast or signalings.By the scanning of physical layer, UE can judge whether community is CSG cell.In addition, an optimum frequency allowed can be selected voluntarily to use when CSG cell is set up, and the setting of CSG cell is do not predict for macrocell.
In cell mobile communication systems, cell reselection and switching are its important functions.In order to realize cell reselection smoothly, UE needs to measure the signal quality of different districts, so that it is resident to select suitable community to carry out.When UE is after certain community and network connect, UE still needs to measure the signal quality of its neighbor cell, to select suitable community to switch, to meet mobility requirement.
Fig. 1 is the flow chart of measuring process in EUTRAN system, as shown in Figure 1, under connected state, the detailed process measured is: UMTS Terrestrial radio access network (the Evolved UMTS Terrestrial Radio Access Network of the evolution of network side, referred to as EUTRAN, wherein, UMTS is universal mobile telecommunications system Universal MobileTelecommunications System) Survey control message is sent to UE, wherein, this Survey control message comprises other association attributeses measured mark, measuring object, report configuration and measure.UE goes to perform measurement according to the measuring object in Survey control message, report configuration, and reports network side according to measurement result generation measurement report.
Measure mark as the whole index measuring configuration, contain two son marks, measuring object mark and report configuration mark, every height mark contains again respective association attributes, and wherein, measuring object mark contains measuring object attribute, such as, carrier frequency, Neighboring Cell List etc.; Report configuration mark contains report configuration attribute, such as, event triggers and reports or periodic report, trigger event is defined (trigger condition A1, A2 etc.) by trigger condition, thresholding, skew etc. that trigger condition is relevant, triggered time length (Time To Trigger, referred to as TTT), sluggishness, reports number of times etc.
For the measurement task that event triggers, be just considered to meet the measuring object of trigger conditions when the duration that measuring object meets the entry criteria (such as neighboring cell signal quality is better than thresholding) of event is more than or equal to TTT.After having measuring object to meet the trigger condition of event, reporting measurement reports, to network side, reports the measuring object in report to be sort according to the measuring amount of network settings, optimum above.
For the consideration of service quality, UE wishes good by signal and disturbs little community access network.Because the coverage of CSG cell is smaller, in order to reach good in-door covering effect, in some region, a lot of CSG cell can be placed, and the distribution of these CSG cell is very compact.If user moves in these regions, in succession may have the trigger condition that multiple CSG cell meets event, and reporting measurement reports is to network side.If carry out switch decision according to Current protocol specification, continuous several times may switch, greatly affect the service quality of user, have no idea in current protocol specification to solve such problem.
Switch the problem that frequently can affect the service quality of UE for UE in correlation technique, not yet propose effective solution at present.
Summary of the invention
Frequently can affect the problem of the service quality of UE for UE switching in correlation technique and propose the present invention, for this reason, main purpose of the present invention is the implementation providing a kind of measurement report of improvement to report, to solve the problem.
To achieve these goals, according to an aspect of the present invention, the implementation method that a kind of measurement report reports is provided.
The implementation method that measurement report according to the present invention reports comprises: network side sends message to subscriber equipment, so that subscriber equipment is according to information reporting measurement report, wherein, message comprises: the first triggered time length and the second triggered time length, first triggered time length is for determining whether non-public authorized user group community carries out reporting of measurement report, and the second triggered time length is for determining whether macrocell carries out reporting of measurement report.
Preferably, network side sends predetermined message to subscriber equipment, and carries Adjustment principle in predetermined message, and wherein, Adjustment principle is used to indicate subscriber equipment and adjusts the first triggered time length.
Preferably, at network side to after subscriber equipment sends message and predetermined message, said method also comprises: subscriber equipment receipt message and predetermined message, obtains Adjustment principle; Adjustment principle according to obtaining adjusts the first triggered time length.
Preferably, Adjustment principle at least comprises one of following: the signal quality of the place at subscriber equipment place and the coverage of non-public authorized user group community, non-public authorized user group community.
Preferably, above-mentioned predetermined message comprises one of following: Survey control message, broadcast.
Preferably, the first triggered time length is longer than the second triggered time length.
Preferably, above-mentioned message comprises one of following: Survey control message, broadcast.
To achieve these goals, according to a further aspect in the invention, the implement device that a kind of measurement report reports is provided.
The implement device that measurement report according to the present invention reports comprises: the first sending module, for sending message to subscriber equipment, so that subscriber equipment is according to information reporting measurement report, wherein, message comprises: the first triggered time length and the second triggered time length, first triggered time length is for determining whether non-public authorized user group community carries out reporting of measurement report, and the second triggered time length is for determining whether macrocell carries out reporting of measurement report.
Preferably, said apparatus also comprises: the second sending module, and for sending predetermined message to subscriber equipment, and carry Adjustment principle in predetermined message, wherein, Adjustment principle is used to indicate subscriber equipment and adjusts the first triggered time length.
Preferably, the first triggered time length is longer than the second triggered time length.
Pass through the present invention, adopt and the method that measurement report adopts different triggered time length is triggered for CSG cell and macrocell, solve UE in correlation technique and switch the problem that frequently can affect the service quality of UE, and then decrease the switching times of UE, stable high-quality service can be provided to user.
Accompanying drawing explanation
Accompanying drawing described herein is used to provide a further understanding of the present invention, and form a application's part, schematic description and description of the present invention, for explaining the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the flow chart of the measuring process of the embodiment of the present invention;
Fig. 2 a is the flow chart of the measuring process according to the embodiment of the present invention one;
Fig. 2 b is the schematic diagram of the measuring process according to the embodiment of the present invention one;
Fig. 3 a is the flow chart of the measuring process according to the embodiment of the present invention two;
Fig. 3 b is the schematic diagram of the measuring process according to the embodiment of the present invention two;
Fig. 4 a is the flow chart of the measuring process according to the embodiment of the present invention three;
Fig. 4 b is the schematic diagram of the measuring process according to the embodiment of the present invention three;
Fig. 5 a is the flow chart of the measuring process according to the embodiment of the present invention four;
Fig. 5 b is the schematic diagram of the measuring process according to the embodiment of the present invention four;
Fig. 6 is the preferred structure block diagram of the implement device reported according to the measurement report of the embodiment of the present invention.
Embodiment
Functional overview
The CSG cell considered is switched in order to obtain metastable can the carrying out of signal quality, improve terminal transfer efficiency, the implementation that the measurement report embodiments providing a kind of improvement reports, measurement report is triggered for CSG cell and macrocell and adopts different triggered time length, preferably, triggered time length for CSG cell is longer than the triggered time length for macrocell, namely, for CSG cell, when just this CSG cell being listed in after its signal quality continual and steady long period of time relatively within the scope can carrying out switching consideration.Here relative long period of time refers to compared with the triggered time length of macrocell, and CSG cell adopts the TTT different from macrocell, generally advises longer than the TTT of macrocell.In addition, UE can adjust this time according to the place at its place and the coverage of CSG cell or the signal quality of CSG cell.The switching times of UE can be reduced like this, stable high-quality service can be provided to user.
It should be noted that, when not conflicting, the embodiment in the application and the feature in embodiment can combine mutually.Below with reference to the accompanying drawings and describe the present invention in detail in conjunction with the embodiments.
Embodiment of the method
According to embodiments of the invention, provide the implementation method that a kind of measurement report reports, the method comprises: network side sends message to UE, so that UE is according to information reporting measurement report, wherein, message comprises: the first triggered time length and the second triggered time length, and the first triggered time length is for determining whether non-public authorized user group community carries out reporting of measurement report, and the second triggered time length is for determining whether macrocell carries out reporting of measurement report.Preferably, the first triggered time length is longer than the second triggered time length.
Further, network side can also send predetermined message to UE, and carries Adjustment principle in predetermined message, and wherein, Adjustment principle is used to indicate UE and adjusts the first triggered time length, if Adjustment principle is sky, does not need to send predetermined message.This predetermined message and above-mentioned message can be same message, also can be different message.
After this, UE receives this message and predetermined message, obtain Adjustment principle, and adjust the first triggered time length according to the Adjustment principle obtained, wherein, Adjustment principle at least comprises one of following: the signal quality of the place at UE place and the coverage of non-public authorized user group community, non-public authorized user group community.
It should be noted that, above-mentioned message and/or predetermined message can comprise one of following: Survey control message, broadcast.That is, the TTT that CSG cell can be suitable for by the dedicated signaling such as Survey control message or broadcast by network side, or Adjustment principle notice UE.
By this embodiment, adopt and the method that measurement report adopts different triggered time length is triggered for CSG cell and macrocell, solve UE in correlation technique and switch the problem that frequently can affect the service quality of UE, and then decrease the switching times of UE, stable high-quality service can be provided to user.
Be described in detail below in conjunction with the implementation procedure of example to the embodiment of the present invention.
Embodiment one is described for the situation of homogeneous-frequency adjacent-domain, and wherein, the CSG_TTT that CSG cell adopts network side to specify, the TTT that macrocell adopts network side to specify, network side configures to UE in same measurement task.Embodiment two is described for the situation of alien frequencies adjacent area, wherein, the CSG_TTT that CSG cell adopts network side to specify, and indicate UE to adjust CSG_TTT according to the place at place and the coverage of CSG cell, the TTT that macrocell adopts network side to specify, network side configures to UE in same measurement task.Embodiment three is described for the situation of different system adjacent cell, wherein, the CSG_TTT that CSG cell adopts network side to specify, and indicate UE to adjust CSG_TTT according to the signal quality of CSG cell, the TTT that macrocell adopts network side to specify, network side configures to UE in same measurement task.Embodiment four is described for the situation of alien frequencies adjacent area, and wherein, the CSG_TTT that CSG cell adopts network side to specify, the TTT that macrocell adopts network side to specify, network side configures to UE in different measurement tasks.
In the examples below, UE is in the connected state of EUTRAN, and the carrier frequency of current service cell is f1, and network side sends Survey control message to UE, wherein, this Survey control message comprises other association attributeses measured mark, measuring object, report configuration and measure.Network side can configure multiple measurement task for this UE, such as with frequency, alien frequencies, isosystem measurement event (A3, A4 etc.), UE goes to perform measurement according to the measuring object in Survey control message, report configuration, and reports network side according to measurement result generation measurement report.Macrocell called after M1, M2 etc. in measuring object, CSG cell called after C1, C2 etc.
Embodiment one
Fig. 2 a is the flow chart of the measuring process according to the embodiment of the present invention one, as shown in Figure 2 a, network sends Survey control message to UE, wherein comprising a measurement task is the trigger event (A4) that neighboring cell signal quality is better than thresholding, macrocell adopts TTT, CSG cell adopts CSG_TTT, current C SG_TTT > TTT, and the carrier frequency of measuring object is f1.UE performs measurement to measuring object after receiving this measurement task.Fig. 2 b is the schematic diagram of the measuring process according to the embodiment of the present invention one, as shown in Figure 2 b, the time of advent is when putting T1, the signal quality of community M1 in TTT all higher than thresholding, meet the trigger condition of A4, the signal quality of community C1 in TTT also all higher than thresholding, but because CSG cell needs to adopt longer CSG_TTT, therefore C1 does not meet the trigger condition of A4, and the measuring object list that the measurement report now reported comprises is M1.The time of advent is when putting T2, and the signal quality of C1 is higher than time of thresholding more than CSG_TTT, and therefore C1 meets the trigger condition of A4, reporting measurement reports, and the measuring object list comprised in this measurement report is C1, M1.
It should be noted that, the relation of above-mentioned CSG_TTT and TTT, also can be CSG_TTT < TTT.
Embodiment two
Fig. 3 a is the flow chart of the measuring process according to the embodiment of the present invention two, as shown in Figure 3 a, network sends Survey control message to UE, wherein comprising a measurement task is the trigger event (A3) that neighboring cell signal quality is better than Serving cell, macrocell adopts TTT, the skew TTT_offset of instruction TTT, here TTT_offset > 0, the i.e. CSG_TTT=TTT+TTT_offset of CSG cell employing, and indicating UE to adjust CSG_TTT according to the place at place and the coverage of CSG cell, the carrier frequency of measuring object is f2.UE performs measurement to measuring object after receiving this measurement task.
Fig. 3 b is the schematic diagram of the measuring process according to the embodiment of the present invention two, as shown in Figure 3 b, the time of advent is when putting T1, the signal quality of community M1 in TTT all higher than Serving cell, meet the trigger condition of A3, the signal quality of community C1 in TTT also all higher than Serving cell, now UE has just entered the coverage of community C1, the core not yet entering C1 covers, therefore need to adopt CSG_TTT to C1, after this UE just leaves C1, namely UE detects that the signal quality of community C1 is better than Serving cell and is not continued above CSG_TTT, analyze the trigger condition that C1 does not meet A4 thus, the measurement report now reported, the measuring object list comprised is M1.The time of advent is when putting T2, the core that UE enters community C2 covers, CSG_TTT can be adjusted to (CSG_TTT/2), as long as detect that the signal quality of C2 all just meets the trigger condition of A3 in (CSG_TTT/2) higher than Serving cell, C2 > M1 simultaneously, reporting measurement reports, the measuring object list comprised is C2, M1.
Wherein, above-mentioned CSG_TTT also can be set to TTT-TTT_offset, now TTT_offset < TTT.
Above-mentioned method of adjustment can be default (CSG_TTT/2) or (CSG_TTT/3), also can be that network side is specified by dedicated signalings such as Survey control message or broadcasts.
Above-mentioned core covers and is interpreted as the good region of cell signal quality, and such as circular cell, distance center of housing estate is less than the region of radius of society half.
Embodiment three
Fig. 4 a is the flow chart of the measuring process according to the embodiment of the present invention three, as shown in fig. 4 a, network sends Survey control message to UE, wherein comprising a measurement task is UMTS Terrestrial radio access network (UMTS Terrestrial Radio Access Network, referred to as UTRAN) neighboring cell signal quality be better than appointed threshold (B1), macrocell adopts TTT, CSG cell adopts CSG_TTT, current C SG_TTT > TTT, and when indicating UE to be within 2 communities of same carrier frequency optimum according to the signal quality of CSG cell, CSG_TTT is adjusted, the carrier frequency of measuring object is f3.UE performs measurement to measuring object after receiving this measurement task.
Fig. 4 b is the schematic diagram of the measuring process according to the embodiment of the present invention three, as shown in Figure 4 b, the time of advent is when putting T1, the signal quality of community M1, M2 in TTT all higher than thresholding, meet the trigger condition of B1, the signal quality of community C1 in TTT also all higher than thresholding, but the signal quality of community C1 is worse than M2, be not in optimum front 2 communities, need to adopt CSG_TTT, therefore C1 does not meet the trigger condition of A4, the measurement report now reported, and the measuring object list comprised is M1, M2.The time of advent, when putting T2, UE detected the signal quality of community C1 higher than thresholding in CSG_TTT, and meet the trigger condition of B1, reporting measurement reports, the measuring object list comprised is M1, M2, C1.During the time point T3 arrived, UE detects that the signal quality of community C2 is higher than M2, be in optimum front 2 communities, can adopt (CSG_TTT/2), in other words, if the signal quality of community C2 in (CSG_TTT/2) all higher than thresholding, just meet the trigger condition of B1, reporting measurement reports, the measuring object list comprised is M1, C2, M2, C1.
The relation of CSG_TTT and the TTT in the present embodiment may be (CSG_TTT/2) < TTT.
It should be noted that, above-mentioned Adjustment principle also can be " adjusting CSG_TTT when UE is according to the signal quality of CSG cell within 2 CSG cell of same carrier frequency optimum ".
Embodiment four
Fig. 5 a is the flow chart of the measuring process according to the embodiment of the present invention four, as shown in Figure 5 a, network sends Survey control message to UE, wherein comprising a measurement task (measurement is designated 1) is the trigger event (A4) that neighboring cell signal quality is better than thresholding, the macrocell of measuring object to be carrier frequency be f2, comprise parameter TTT, also comprising a measurement task (measurement is designated 2) is the trigger event (A4) that neighboring cell signal quality is better than thresholding, the CSG cell of measuring object to be carrier frequency be f2, comprises parameter CSG_TTT.Network side can inform that UE these two measures the relevance of task.Because measuring mark 1 and measuring mark 2 is different measurement tasks, the time of UE reporting measurement reports may stagger, therefore in order to accuracy and the comparativity of measurement result, the macrocell of same carrier frequency similar events sorts by UE together with the measurement result of CSG cell, reports simultaneously.UE performs measurement to measuring object after receiving measurement task.
Fig. 5 b is the schematic diagram of the measuring process according to the embodiment of the present invention four, as shown in Figure 5 b, when the time of advent puts T1, the signal quality of community M1 in TTT all higher than thresholding, meet the trigger condition of A4, the measurement report of reporting measurement mark 1, the measuring object list comprised is M1.When reaching time point T2, the signal quality of community C1 in CSG_TTT also all higher than thresholding, but be worse than M1, meet the trigger condition of A4, reporting measurement mark 2 measurement report, the measuring object list comprised is M1, C1.The time of advent is when putting T3, the signal quality of M2 higher than time of thresholding more than TTT, the signal quality of C2 higher than time of thresholding more than CSG_TTT, M2 and C2 meets the trigger condition of A4, its signal quality is C1 > M2 > C2, UE can report two measurement reports measuring task simultaneously, measure the measurement report of mark 1, the measuring object list comprised is M1, C1, M2, C2, measure the measurement report of mark 2, the measuring object list comprised is M1, C1, M2, C2.Content due to these two measurement reports is consistent, UE can do according to certain principle and optimize, such as can the measurement report of reporting measurement mark 1, or the only measurement report of reporting measurement mark 2, simultaneously informing network side is that the trigger condition which measures task due to meets the measurement report caused and reports.
Device embodiment
According to embodiments of the invention, provide the implement device that a kind of measurement report reports.This device can be applied to network side, the implementation method that the measurement report for realizing describing in said method embodiment reports.
The implement device that this measurement report reports comprises: the first sending module 2, for sending message to UE, so that UE is according to information reporting measurement report, wherein, message comprises: the first triggered time length and the second triggered time length, first triggered time length is for determining whether non-public authorized user group community carries out reporting of measurement report, and the second triggered time length is for determining whether macrocell carries out reporting of measurement report.Preferably, the first triggered time length is longer than the second triggered time length.
Fig. 6 is the preferred structure block diagram of the implement device reported according to the measurement report of the embodiment of the present invention, as shown in Figure 6, this device also comprises: the second sending module 4, for sending predetermined message to UE, and Adjustment principle is carried in predetermined message, wherein, Adjustment principle is used to indicate UE and adjusts the first triggered time length, if Adjustment principle is empty, then do not need to send predetermined message.
After this, UE receives this message and predetermined message, obtain Adjustment principle, and adjust the first triggered time length according to the Adjustment principle obtained, wherein, Adjustment principle at least comprises one of following: the signal quality of the place at UE place and the coverage of non-public authorized user group community, non-public authorized user group community.
It should be noted that, above-mentioned message and/or predetermined message can comprise one of following: Survey control message, broadcast.That is, the TTT that CSG cell can be suitable for by the dedicated signaling such as Survey control message or broadcast by network side, or Adjustment principle notice UE, the TTT that wherein CSG cell is applicable and Adjustment principle can pass through same message informing UE, also can by different message informing UE.
In sum, pass through the above embodiment of the present invention, adopt and the method that measurement report adopts different triggered time length is triggered for CSG cell and macrocell, solve UE in correlation technique and switch the problem that frequently can affect the service quality of UE, and then decrease the switching times of UE, stable high-quality service can be provided to user.
Obviously, those skilled in the art should be understood that, above-mentioned of the present invention each module or each step can realize with general calculation element, they can concentrate on single calculation element, or be distributed on network that multiple calculation element forms, alternatively, they can realize with the executable program code of calculation element, thus, they can be stored and be performed by calculation element in the storage device, or they are made into each integrated circuit modules respectively, or the multiple module in them or step are made into single integrated circuit module to realize.Like this, the present invention is not restricted to any specific hardware and software combination.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the present invention can have various modifications and variations.Within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (10)

1. the implementation method that reports of measurement report, is characterized in that, comprising:
Network side sends message to subscriber equipment, so that described subscriber equipment is according to described information reporting measurement report, wherein, described message comprises: the first triggered time length and the second triggered time length, described first triggered time length is for determining whether non-public authorized user group community carries out reporting of measurement report, and described second triggered time length is for determining whether macrocell carries out reporting of measurement report.
2. method according to claim 1, it is characterized in that, network side sends predetermined message to described subscriber equipment, and carries Adjustment principle in described predetermined message, wherein, described Adjustment principle is used to indicate the described first triggered time length of described subscriber equipment adjustment.
3. method according to claim 2, is characterized in that, after described network side sends described message and described predetermined message to described subscriber equipment, described method also comprises:
Described subscriber equipment receives described message and described predetermined message, obtains described Adjustment principle;
According to the described first triggered time length of described Adjustment principle adjustment obtained.
4. according to the method in claim 2 or 3, it is characterized in that, described Adjustment principle at least comprises one of following:
The signal quality of the place at described subscriber equipment place and the coverage of non-public authorized user group community, non-public authorized user group community.
5. according to the method in claim 2 or 3, it is characterized in that, described predetermined message comprises one of following:
Survey control message, broadcast.
6. according to the method in any one of claims 1 to 3, it is characterized in that, described first triggered time length is longer than described second triggered time length.
7. according to the method in any one of claims 1 to 3, it is characterized in that, described message comprises one of following:
Survey control message, broadcast.
8. the implement device that reports of measurement report, is characterized in that, comprising:
First sending module, for sending message to subscriber equipment, so that described subscriber equipment is according to described information reporting measurement report, wherein, described message comprises: the first triggered time length and the second triggered time length, described first triggered time length is for determining whether non-public authorized user group community carries out reporting of measurement report, and described second triggered time length is for determining whether macrocell carries out reporting of measurement report.
9. device according to claim 8, is characterized in that, also comprises:
Second sending module, for sending predetermined message to described subscriber equipment, and carries Adjustment principle in described predetermined message, and wherein, described Adjustment principle is used to indicate the described first triggered time length of described subscriber equipment adjustment.
10. device according to claim 8 or claim 9, it is characterized in that, described first triggered time length is longer than described second triggered time length.
CN200910135430.3A 2009-04-21 2009-04-21 The implementation method that measurement report reports and device Expired - Fee Related CN101873659B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910135430.3A CN101873659B (en) 2009-04-21 2009-04-21 The implementation method that measurement report reports and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910135430.3A CN101873659B (en) 2009-04-21 2009-04-21 The implementation method that measurement report reports and device

Publications (2)

Publication Number Publication Date
CN101873659A CN101873659A (en) 2010-10-27
CN101873659B true CN101873659B (en) 2015-08-12

Family

ID=42998266

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910135430.3A Expired - Fee Related CN101873659B (en) 2009-04-21 2009-04-21 The implementation method that measurement report reports and device

Country Status (1)

Country Link
CN (1) CN101873659B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102469494B (en) * 2010-11-04 2016-03-30 华为技术有限公司 Multicarrier measurement report report method and equipment
CN104244318A (en) * 2013-06-08 2014-12-24 株式会社Ntt都科摩 Method and device for adjusting time to trigger
CN107040956B (en) * 2016-02-03 2021-07-30 中国移动通信集团公司 Measurement reporting management method in Internet of things, terminal and base station
CN107864497B (en) * 2017-10-31 2021-02-23 维沃移动通信有限公司 Network switching method, mobile communication terminal and network side equipment
US11032857B2 (en) * 2018-05-17 2021-06-08 Mediatek Inc. Apparatuses and methods for synchronizing states of separate subscriber identities with network
CN109699058B (en) * 2019-01-10 2021-04-23 维沃移动通信有限公司 Cell switching method and device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1926906A (en) * 2004-03-30 2007-03-07 艾利森电话股份有限公司 Method and apparatuses for cell-differentiated handover in a mobile communications system
CN101252760A (en) * 2008-04-10 2008-08-27 中兴通讯股份有限公司 Same frequency measuring case evaluating method
CN101282559A (en) * 2008-05-16 2008-10-08 中兴通讯股份有限公司 Mobile commucation system as well as signal measurement method, base station and terminal thereof
CN101360310A (en) * 2007-07-30 2009-02-04 鼎桥通信技术有限公司 Different system event measurement control method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1926906A (en) * 2004-03-30 2007-03-07 艾利森电话股份有限公司 Method and apparatuses for cell-differentiated handover in a mobile communications system
CN101360310A (en) * 2007-07-30 2009-02-04 鼎桥通信技术有限公司 Different system event measurement control method
CN101252760A (en) * 2008-04-10 2008-08-27 中兴通讯股份有限公司 Same frequency measuring case evaluating method
CN101282559A (en) * 2008-05-16 2008-10-08 中兴通讯股份有限公司 Mobile commucation system as well as signal measurement method, base station and terminal thereof

Also Published As

Publication number Publication date
CN101873659A (en) 2010-10-27

Similar Documents

Publication Publication Date Title
US11463948B2 (en) Communications devices and methods for selecting a wireless access interface
US9462516B2 (en) Method and apparatus for frequency access restriction in cellular communications
KR101533852B1 (en) Transmission of special neighbor cell lists
US8331939B2 (en) Method and apparatus for neighbor cell configuration and method and apparatus for femtocell base station configuration
CN101925087B (en) A kind of measurement report method of closed user group cell
EP1987628B1 (en) Method and apparatus for providing access for a limited set of mobile stations to a restricted local access point
CN102378206B (en) Interference coordination method and system thereof, and apparatus
CN107580348B (en) Measuring method, base station and terminal of wireless communication network
JP4944135B2 (en) Avoiding jamming of restricted local access points in wireless networks
CN101873659B (en) The implementation method that measurement report reports and device
CN105208593A (en) Management method of auxiliary service district on non-authorized frequency spectrum, system and base station
CN103457652B (en) Wireless network access device and antenna selection method
CN101867966A (en) Method for reporting measurement report of closed user group cell
CN101835213A (en) Reporting method of measurement report and cell switching method
CN101841875A (en) Realization method and realization device for cell reselection
US20130183980A1 (en) Method for Acquiring Information of Home Node B, Method for Balancing Load, and Apparatuses Therefor
CN101867980B (en) The implementation method that measurement report reports and device
CN110012500B (en) Method and device for reporting measurement report
CN101990234A (en) Method, device, and terminal for reporting measurement reports
CN101990219A (en) Processing method of measurement report and user equipment
CN102196474B (en) Detect the method and system that disturb subscriber equipment closed signed user group cell
WO2010083701A1 (en) Method and device for selecting cell
CN101990276A (en) Measurement interval canceling method and user equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150812

Termination date: 20190421