CN101871028B CN2010102059798A CN201010205979A CN101871028B CN 101871028 B CN101871028 B CN 101871028B CN 2010102059798 A CN2010102059798 A CN 2010102059798A CN 201010205979 A CN201010205979 A CN 201010205979A CN 101871028 B CN101871028 B CN 101871028B
Authority
CN
China
Prior art keywords
valve group
reducing valve
trt
gas reducing
control module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010102059798A
Other languages
Chinese (zh)
Other versions
CN101871028A (en
Inventor
李清忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wisdri Engineering and Research Incorporation Ltd
Original Assignee
Wisdri Engineering and Research Incorporation Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from CN200910266706A external-priority patent/CN101768648A/en
Priority claimed from CN200910273505A external-priority patent/CN101760573A/en
Application filed by Wisdri Engineering and Research Incorporation Ltd filed Critical Wisdri Engineering and Research Incorporation Ltd
Priority to CN2010102059798A priority Critical patent/CN101871028B/en
Publication of CN101871028A publication Critical patent/CN101871028A/en
Application granted granted Critical
Publication of CN101871028B publication Critical patent/CN101871028B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)

Abstract

The invention provides a blast furnace top pressure control system adopting a gas dry method dust-removing device. The blast furnace top pressure control system comprises a gas diffusing tower, a gas dry method dust-removing device, a clean gas pipe network, a TRT (Blast Furnace Top Gas Recovery Turbine Unit) system, a rough gas pressure-reducing valve bank, a clean gas pressure-reducing valve bank, a TRT stator blade/quick-opening regulating valve bank, a rough gas pressure-reducing valve bank control module, a clean gas pressure-reducing valve bank control module and a TRT stator blade/quick-opening regulating valve bank control module, wherein the rough gas pressure-reducing valve bank control module, the clean gas pressure-reducing valve bank control module and the TRT stator blade/quick-opening regulating valve bank control module respectively control the rough gas pressure-reducing valve bank, the clean gas pressure-reducing valve bank and the TRT stator blade/quick-opening regulating valve bank. The invention can automatically realize the mutual switching among three sets of top pressure control equipment according to switching conditions and realize the stability of blast furnace top pressure in the switching process.

Description

Adopt the blast furnace top pressure control system of gas dry-method dust-removal device
Technical field
The present invention relates to adopt the blast furnace ironmaking gas dust removal system of dry cloth bag technology, particularly relate to raw gas reducing valve group, purified gas reducing valve group and TRT (blast-furnace top gas recovery turbine generator) three covering devices system top pressure.
Background technology
Large blast furnace coal gas is absolutely dry, and the method dust settling pocket technique is an emerging blast furnace ironmaking environment friendly dedusting technology.Compare with wet dedusting; Dry-method bag-type dust collecting has basically not water, can not produce water and pollute, and energy consumption is little; The advantage that working cost is low; Belong to the environmental protection and energy saving project, economical, societal benefits are remarkable, are positioned at first of " three do " (blast furnace gas dry dusting, converter gas dry method dedusting, dry coke quenching and the blast furnace gas excess pressure power generating) that the current emphasis of national steel industry promotes.
Along with development of material technology, dust-removal cloth-bag is general now to adopt resistant to elevated temperatures compound glass pricker dimension Nomex filter cloth to make, but the temperature that can bear also can only be within 280 ℃.In order to protect cloth bag, in a single day throat temperature surpasses this temperature, or is lower than certain temperature (as 100 ℃, be lower than dew point, the coal gas dust lumps on cloth bag easily), and coal gas just need diffuse tower and diffuse through raw gas reducing valve group, raw gas; The TRT system also may need to shut down at run duration because of trouble shooting; Blast furnace staying also needs this three covering device of raw gas reducing valve group, purified gas reducing valve group and TRT system to withdraw from adjusting with multiple wind and recovers the adjusting to top pressure; Like this, the control of top pressure will be switched between this three covers performer of raw gas reducing valve group, purified gas reducing valve group and TRT system.And during blast-furnace smelting, higher requirement is arranged to stablizing top pressure, if the top pressure fluctuation is bigger, can cause the working of a furnace unstable, even have serious accident and take place.In the process that three cover performer switch, how to adopt a kind of control method to guarantee that stable just the seeming of blast furnace top pressure is even more important.
At present; Each blast furnace basically all is that manual work is switched; Because the stator blade of TRT system/drive variable valve soon generally to be responsible for by the different posies of two posies even two factories (power source factory and iron work) respectively with thick/purified gas reducing valve group, operational coordination goes wrong often, and top pressure has than great fluctuation process; Often shift onto each other between two posies, had a strong impact on the production of normal and stable.
Summary of the invention
Technical problem to be solved by this invention is: a kind of blast furnace gas dry dusting top pressure control system is provided; When blast furnace gas dry dusting is regulated roof pressure, can between TRT system, raw gas reducing valve group, three performer of purified gas reducing valve group, realize automaticallying switch through this system.
The technical scheme that the present invention adopted is: the blast furnace top pressure control system that adopts gas dry-method dust-removal device; Comprise coal gas diffusion tower, gas dry-method dust-removal device, purified gas pipe network and TRT system; It also comprises raw gas reducing valve group, purified gas reducing valve group and TRT stator blade/open the variable valve group soon, and controls raw gas reducing valve group control module, purified gas reducing valve group control module and the TRT stator blade of these three kinds of valve groups/open soon variable valve group control module respectively;
Be divided into two-way after the blast furnace gas entering system, lead up to raw gas reducing valve group, get into the coal gas diffusion tower then; Another road is through gas dry-method dust-removal device, and then is divided into two-way, leads up to purified gas reducing valve group, and another road gets into the TRT system then through TRT stator blade/open the variable valve group soon, and this two-way converges and gets into the purified gas pipe network at last;
Raw gas reducing valve group control module, purified gas reducing valve group control module and TRT stator blade/open soon between the variable valve group control module are interconnected, and through TP, the first gas pressure transmitter, the second gas pressure transmitter before the cloth bag entering pipeline of blast furnace gas are monitored; Raw gas reducing valve group control module, purified gas reducing valve group control module and TRT stator blade/open soon variable valve group control module is also respectively to raw gas reducing valve group, purified gas reducing valve group and TRT stator blade/open the variable valve group soon to control.
Advantage of the present invention: after using this system, can realize the mutual switching between the three cover roof pressure opertaing devices automatically according to switching condition, handoff procedure can be realized the stable of blast furnace top pressure.
Description of drawings
Fig. 1 is the structured flowchart of system of the present invention.
Among Fig. 1,101: raw gas reducing valve group; 201: purified gas reducing valve group; 301: the compound expansion turbine; 302: brushless excitation generator; 401: gas dry-method dust-removal device; TE-W01: TP before the cloth bag; PE-W01A: the first gas pressure transmitter; PE-W01B: the second gas pressure transmitter; V-W11: raw gas butterfly valve; V-W12: raw gas push-pull valve; V-W21: purified gas reducing valve group back card/back board valve; V-W22: butterfly valve after the purified gas reducing valve group; The V-W31:TRT butterfly valve that enters the mouth; The V-W32:TRT push-pull valve that enters the mouth; V-W33:TRT exports push-pull valve; The V-W34:TRT exit butterfly valve; T-1: raw gas diffuses tower; PV-W11: raw gas reducing valve group first variable valve; PV-W12: raw gas reducing valve group second variable valve; PV-W13: raw gas reducing valve group range valve; PV-W14: raw gas reducing valve group SV; PV-W21: purified gas reducing valve group first variable valve; PV-W22: purified gas reducing valve group second variable valve; PV-W23: purified gas reducing valve group range valve; PV-W24: purified gas reducing valve group SV; The PV-101:TRT stator blade; PV-102:TRT cuts valve soon; PV-103:TRT drives variable valve soon; PC-W1: raw gas reducing valve group control module; PC-W2: purified gas reducing valve group control module; PC-101:TRT stator blade/open soon variable valve group control module.
Embodiment
As shown in Figure 1; Adopt the blast furnace top pressure control system of gas dry-method dust-removal device; Comprise coal gas diffusion tower T-1, gas dry-method dust-removal device 401, purified gas pipe network and TRT system; It also comprises raw gas reducing valve group 101, purified gas reducing valve group 201, TRT stator blade/open the variable valve group soon, and controls the raw gas reducing valve group control module PC-W1, purified gas reducing valve group control module PC-W2, TRT stator blade of these three kinds of valve groups/open soon variable valve group control module PC-101 respectively.
Blast furnace gas produces from blast furnace, through being divided into two-way behind the gravitational precipitator, leads up to raw gas reducing valve group 101, gets into coal gas diffusion tower T-1; Another road is divided into two-way again through gas dry-method dust-removal device 401, leads up to purified gas reducing valve group 201, and another road gets into the TRT system then through TRT stator blade/open the variable valve group soon, and this two-way converges and gets into the purified gas pipe network at last.
Raw gas reducing valve group control module PC-W1, purified gas reducing valve group control module PC-W2 and TRT stator blade/open soon between the variable valve group control module are interconnected, and through TP TE-W01, the first gas pressure transmitter PE-W01A, the second gas pressure transmitter PE-W02A before the cloth bag entering pipeline of blast furnace gas are monitored; Raw gas reducing valve group control module PC-W1, purified gas reducing valve group control module PC-W2 and TRT stator blade/open soon variable valve group control module PC-101 is also respectively to raw gas reducing valve group 101, purified gas reducing valve group 201 and TRT stator blade/open the variable valve group soon to control.
Raw gas reducing valve group 101 comprises the raw gas reducing valve group first variable valve PV-W11, the raw gas reducing valve group second variable valve PV-W12, raw gas reducing valve group range valve PV-W13 and the raw gas reducing valve group SV PV-W14 of parallel connection.Each valve of raw gas reducing valve group all is electrically connected with raw gas reducing valve group control module PC-W1.
Purified gas reducing valve group 201 comprises the purified gas reducing valve group first variable valve PV-W21, the purified gas reducing valve group second variable valve PV-W22, purified gas reducing valve group range valve PV-W23 and the purified gas reducing valve group SV PV-W24 of parallel connection.Each valve of purified gas reducing valve group all is electrically connected with purified gas reducing valve group control module PC-W2.
The TRT system comprises compound expansion turbine 301 and brushless excitation generator 302, and TRT stator blade/open the variable valve group soon comprises that TRT stator blade PV-101, TRT cut valve PV-102 soon and TRT opens variable valve PV-103 soon; One of TRT stator blade PV-101 is connected to compound expansion turbine 301; The other end is electrically connected to TRT stator blade/open soon variable valve group control module PC-101; TRT cuts between the output terminal and compound expansion turbine 301 that valve PV-102 is connected to gas dry-method dust-removal device 401 soon, and TRT opens between the input terminus of output terminal and purified gas pipe network that variable valve PV-103 is connected to gas dry-method dust-removal device 401 soon.Each valve of TRT stator blade/open soon variable valve group all with TRT stator blade/open variable valve group control module PC-101 soon to be electrically connected.
Be connected to raw gas butterfly valve V-W11 and raw gas push-pull valve V-W12 before the input terminus of raw gas reducing valve group 101; The input terminus of TRT system and output terminal are connected to TRT inlet butterfly valve V-W31, TRT inlet push-pull valve V-W32 and TRT exit butterfly valve V-W34, TRT outlet push-pull valve V-W33 respectively; Be connected to dish valve V-W22 after purified gas reducing valve group back card/back board valve V-W21 and the purified gas reducing valve group between the output terminal of purified gas reducing valve group 201 and the input terminus of purified gas pipe network.
The top pressure control method of this dry method dust-removal system is: top pressure control is respectively by TRT stator blade/open variable valve group, TRT system soon, or raw gas reducing valve group 101, coal gas diffusion tower T-1, or purified gas reducing valve group 201, purified gas pipe network are carried out.Present method comprises that also (1) top pressure control is at TRT stator blade/open the soon automatic switching procedure of variable valve group to purified gas reducing valve group 201; (2) TRT stator blade/open the soon automatic switching procedure of variable valve group to raw gas reducing valve group 101; (3) purified gas reducing valve group 201 is to TRT stator blade/open the soon automatic switching procedure of variable valve group; (4) purified gas reducing valve group 201 is to the automatic switching procedure of raw gas reducing valve group 101; (5) raw gas reducing valve group 101 is to the automatic switching procedure of purified gas reducing valve group 201; (6) raw gas reducing valve group 101 is to TRT stator blade/open the soon automatic switching procedure of variable valve group.
Raw gas reducing valve group control module PC-W1, purified gas reducing valve group control module PC-W2, TRT stator blade/open soon are provided with branch journey PID (ratio, integration, differential) setter on the variable valve group control module PC-101, or add the PID setter of feedforward.Switching process between each control module is controlled by process control module separately respectively: the top pressure set(ting)value SP that sets each PID setter respectively; The top pressure value that arrives when the PID of certain control module regulator feedback is brought into operation by this its corresponding valve of control module control during more than or equal to its top pressure set(ting)value SP.
The process of above-mentioned six kinds of automatic switchovers is: at first, in blast furnace production process, the section chief sets top pressure set(ting)value SP.Before preparing to carry out valve and automaticallying switch, regulating the system of top pressure, the top pressure of the PID setter that it is corresponding is set at SP, and etc. the top pressure set(ting)value of PID setter of to be switched system be set at SP+ Δ P, and Δ P>0.After the system of working accomplishes the top pressure adjusting, then carry out system and switch, send the SP value to treat work system PID setter earlier, SP+ Δ P value is sent to the PID setter of former work system.When former roof pressure adjusting performer is closed fully, just accomplish cutting of adjusting top pressure control and changeed.
Above-mentioned six kinds of trigger conditions of but changing process automatically are following:
(1) TRT stator blade/open the variable valve group soon to the trigger condition of purified gas reducing valve group 201 automatic switching procedures is: TRT system run duration, the TRT system breaks down or coal gas when not meeting the power generation conditions of TRT system.
(2) TRT stator blade/open the variable valve group soon to the trigger condition of raw gas reducing valve group 101 automatic switching procedures is: TRT system run duration, because of the reason of gas temperature, sack cleaner (gas dry-method dust-removal device 401) is in the time of can't receiving coal gas.
(3) purified gas reducing valve group 201 to the trigger condition of TRT stator blade/open soon variable valve group automatic switching procedure is: purified gas reducing valve group 201 run durations, and during TRT system recovery power generation conditions.
(4) purified gas reducing valve group 201 to the trigger condition of raw gas reducing valve group 101 automatic switching procedures is: purified gas reducing valve group 201 run durations, and because of the reason of gas temperature, when sack cleaner can't receive coal gas.
(5) raw gas reducing valve group 101 to the trigger condition of purified gas reducing valve group 201 automatic switching procedures is: raw gas reducing valve group 101 run durations, sack cleaner recover to receive the condition of coal gas, and the TRT system is not when possessing power generation conditions.
(6) raw gas reducing valve group 101 to the trigger condition of TRT stator blade/open soon variable valve group automatic switching procedure is: raw gas reducing valve group 101 run durations, sack cleaner recovers to receive the condition of coal gas, and the TRT system is when possessing power generation conditions.
Set forth the handoff procedure of top pressure below in conjunction with accompanying drawing.
As shown in Figure 1: the first variable valve PV-W21 of the first variable valve PV-W11 of the raw gas reducing valve group of raw gas reducing valve group, the second variable valve PV-W12 and purified gas reducing valve group, the second variable valve PV-W22 equally are respectively a minor adjustment valve and a big variable valve, adopt branch journey PID to regulate the mode that adds feedforward and carry out.When roof pressure lower; The coal gas amount hour; The raw gas reducing valve group first variable valve PV-W11 (or purified gas reducing valve group first variable valve PV-W21) minor adjustment valve is regulated, and is higher when roof pressure, regulates with the big variable valve of the raw gas reducing valve group second variable valve PV-W12 (or purified gas reducing valve group second variable valve PV-W22) when the coal gas amount is big; Each valve group can be regarded a performer respectively as, adds TRT stator blade/open soon variable valve group and constitutes 3 performer and regulate roof pressure.
This roof pressure control method is to utilize PLC (programmable logic controller) system to realize the mutual switching between the performer, is generally accomplished the control of total system by two covers or three cover PLC, specifies with regard to automatic switching procedure below:
1.TRT stator blade/opening the variable valve group soon switches to purified gas reducing valve group 201: TRT system run duration; TRT stator blade PV-101/TRT opens the corresponding top pressure set(ting)value of variable valve PV-103 soon and is set at SP; Purified gas reducing valve group 201 corresponding top pressure set(ting)values are set at SP+ Δ P; Electronic push-pull valve V-W21 and butterfly valve V-W22 after the purified gas reducing valve group 201 are in the state of opening; Purified gas reducing valve group 201 is in auto state (because of set(ting)value is SP+ Δ P, purified gas reducing valve group 201 is in the closed position).The PLC of purified gas reducing valve group control module PV-W2 receives the signal of requesting stop of TRT system fault signal or TRT system; Just send purified gas reducing valve group control module PV-W2 with the SP value; Send the corresponding TRT stator blade of TRT stator blade PV-101/open soon variable valve group control module PC-101 with SP+ Δ P value; At this moment roof pressure is transformed into purified gas reducing valve group 201 control gradually and closes fully up to TRT stator blade PV-101, and at this moment, the TRT system can shut down with grid disconnection; Also can let its phonomoter out of service, convert.
2.TRT stator blade/opening the variable valve group soon switches to raw gas reducing valve group 101: TRT system run duration; PLC judges that gas temperature is higher or lower than the temperature that sack cleaner is set; The PLC system sends instructions automatically and lights coal gas diffusion tower T-1, opens butterfly valve V-W11 and push-pull valve V-W12 before the raw gas reducing valve group 101, send raw gas reducing valve group control module PC-W1 with the SP value; SP+ Δ P value is sent the corresponding TRT stator blade of TRT stator blade PV-101/open soon variable valve group control module PC-101; At this moment roof pressure is transformed into raw gas reducing valve group 101 control gradually and closes fully up to TRT stator blade PV-101, and at this moment, the TRT system can shut down with grid disconnection; Also can let its phonomoter out of service, convert.
3. purified gas reducing valve group 201 is to the TRT stator blade/opening the variable valve group soon switches: the blast furnace roof pressure is by purified gas reducing valve group 201 conditioning periods; TRT operator send the request initiating signal, after the section chief really appointed, the TRT system got into raising speed, throw excitation, be incorporated into the power networks after; Send the corresponding TRT stator blade of TRT stator blade PV-101/open soon variable valve group control module PC-101 with the SP value; SP+ Δ P value is sent purified gas reducing valve group control module PC-W2, closes fully up to purified gas reducing valve group 201, converts.
4. purified gas reducing valve group 201 is switched to raw gas reducing valve group 101: PLC judges that gas temperature is higher or lower than the temperature that sack cleaner is set; The PLC system sends instructions automatically and lights coal gas diffusion tower T-1 coke-oven gas; And open butterfly valve V-W11 and the push-pull valve V-W12 before the raw gas reducing valve group 101; Send raw gas reducing valve group control module PC-W1 with the SP value, SP+ Δ P value is sent purified gas reducing valve group control module PC-W2, and at this moment roof pressure is transformed into 101 controls of raw gas reducing valve group gradually; Close fully up to purified gas reducing valve group 201, convert.
5. raw gas reducing valve group 101 is switched to purified gas reducing valve group 201: PLC judges that gas temperature meets sack cleaner and receives the temperature of gas requirement; Send instructions and open the sack cleaner casing and go into the outbound valve; And electronic push-pull valve V-W21 and butterfly valve V-W22 after the clean coal air valve group; Send purified gas reducing valve group control module PC-W2 with the SP value, SP+ Δ P value is sent raw gas reducing valve group control module PC-W1, closes fully up to raw gas reducing valve group 101; Close electric butterfly valve V-W11 and push-pull valve V-W12 before coal gas diffusion tower T-1 coke-oven gas and the raw gas reducing valve group 101, convert.
6. raw gas reducing valve group 101 is to the TRT stator blade/opening the variable valve group soon switches: PLC judges that gas temperature meets sack cleaner and receives the temperature of gas requirement; And TRT operator have sent the request initiating signal; After the section chief really appointed, the TRT system got into raising speed, throw excitation, be incorporated into the power networks after, send the TRT stator blade of TRT stator blade PV-101 correspondence/open soon variable valve group control module PC-101 with SP value; SP+ Δ P value is sent raw gas reducing valve group control module PC-W1; Close fully up to raw gas reducing valve group 101, close electric butterfly valve V-W11 and push-pull valve V-W12 before coal gas diffusion tower T-1 coke-oven gas and the raw gas reducing valve group 101, convert.
This control method can utilize the PLC technology to realize the smooth conversion of automatic roof pressure control, has improved automatization level, has avoided the coordination problem of operating post; The key of control method is exactly SP value and SP+ Δ P value mutual transmission and the opportunity of transmission between the setter of three performer.
In a word; Above-mentioned six kinds of automatic switchovers; Be exactly the process of six kinds of exchange top pressure controls in fact; In blast furnace production process, the top pressure set(ting)value is set by blast furnace man's progress row, and each performer all is to carry out single PID or be with the PID of feed forward function to control automatically according to the top pressure set(ting)value; Before preparing to carry out the performer switching, two performer all are in the process of automatic adjusting roof pressure, and just the roof pressure set(ting)value is different; Regulating the performer of roof pressure, corresponding PID setter (being called " operation regulator "), the set(ting)value that obtains is exactly the roof pressure value (being called " SP ") that the section chief sets; And the PID setter of performer to be converted (being called " treating operation regulator "), the top pressure set(ting)value that obtains is the roof pressure value of setting greater than the section chief (being called " SP+ Δ P "), at this moment; Regulating the work of roof pressure is accomplished by operation regulator; Treat operation regulator,, and make performer to be converted be in the position of closing because of the top pressure set(ting)value is big; In when conversion, the SP value to be given treat operation regulator, the SP+ Δ P send former operation regulator; At this moment, tool can be closed gradually, and performer to be converted can be opened gradually; Close fully up to former tool; Conversion has just taken place in the control of regulating roof pressure, and conversion has also just taken place the function of two performer (setter that comprises them), and switching process is accomplished.
Further describe the present invention below in conjunction with embodiment.
One. the top pressure control by the step that raw gas reducing valve group 101 switches to purified gas reducing valve group 201 is:
1) treats sack cleaner bleed completion, after the explosion experiment is qualified, get into next step;
2) from automaticallying switch, selecting the semi-automatic switching: if select automatic switching mode, and the temperature that TP TE-W01 measures before the cloth bag gets into next step automatic switchover between 120 ℃~260 ℃ the time; If select semi-automatic switching mode, the then semi-automatic cloth bag that switches to reclaims status button, gets into next step semi-automatic switching then;
3) according to preceding step choice relation, through automatic or automanual mode with raw gas butterfly valve V-W11, raw gas push-pull valve V-W12, purified gas reducing valve group back card/back board valve V-W21, purified gas reducing valve group after butterfly valve V-W22, first, second variable valve of purified gas reducing valve group PV-W21/W22 be transformed into auto state;
4) purified gas reducing valve group back card/back board valve V-W21 is opened automatically, opening puts in place laggardly goes into next step;
5) butterfly valve V-W22 after the purified gas reducing valve group is opened automatically, opening puts in place laggardly goes into next step;
6) the dry cloth bag Pneumatic butterfly valve triad that enter the mouth are opened timed interval 5s between group automatically; Open the back that finishes and get into next step;
7) top pressure set(ting)value SP is delivered to purified gas reducing valve group control module PC-W2; Top pressure value SP+5KP delivers to raw gas reducing valve group control module PC-W1, and raw gas reducing valve group 101 and purified gas reducing valve group 201 all are in the state of automatic adjusting roof pressure simultaneously;
8) raw gas reducing valve group 101 is closed its first, second variable valve PV-W11/W12 automatically, and purified gas reducing valve group is opened its first, second variable valve PV-W21/W22 automatically and regulated roof pressure; The aperture of first, second variable valve of raw gas reducing valve group PV-W11/W12 gets into next step less than 5% back;
9) the reducing valve group switch to be accomplished, and closes raw gas butterfly valve V-W11, and closing puts in place laggardly goes into next step;
10) close raw gas push-pull valve V-W12 (also can have nothing to do with), closing puts in place laggardly goes into next step;
11) diffuse tower T-1 to coal gas and send out signal flame-out, diffuse the tower ignition controller and automatically perform flame-out program;
12) treat that coal gas diffusion tower T-1 is flame-out after, blast furnace gas is promptly accomplished by diffusing the switching of reclaiming.
Two. the top pressure control is following by the step that purified gas reducing valve group 201 switches to raw gas reducing valve group 101:
1) treats sack cleaner bleed completion, after the coal gas stand the test, get into next step;
2) from automaticallying switch, selecting the semi-automatic switching: if select automatic switching mode, and the temperature that TP TE-W01 measures before the cloth bag gets into next step automatic switchover between 120 ℃~260 ℃ the time; If select semi-automatic switching mode, then semi-automatic switching to diffused status button, gets into next step semi-automatic switching then;
3) according to preceding step choice relation, through automatic or automanual mode with raw gas butterfly valve V-W11, raw gas push-pull valve V-W12, purified gas reducing valve group back card/back board valve V-W21, purified gas reducing valve group after butterfly valve V-W22, first, second variable valve of raw gas reducing valve group PV-W11/W12 be transformed into auto state;
4) diffuse tower T-1 to coal gas and send out ignition signal, diffuse the tower ignition controller and automatically perform ignition procedure, get into next step after igniting is accomplished;
5) raw gas push-pull valve V-W12 is opened automatically, opening puts in place laggardly goes into next step;
6) raw gas butterfly valve V-W11 is opened automatically, opening puts in place laggardly goes into next step;
7) top pressure set(ting)value SP is delivered to raw gas reducing valve group control module PC-W1; Top pressure value SP+5KP delivers to purified gas reducing valve group control module PC-W2, and raw gas reducing valve group 101 and purified gas reducing valve group 201 all are in the state of automatic adjusting roof pressure simultaneously;
8) purified gas reducing valve group 201 is closed its first, second variable valve PV-W21/W22 automatically, and raw gas reducing valve group 101 is opened its first, second variable valve PV-W11/W12 automatically and regulated roof pressure; The aperture of treating first, second variable valve of purified gas reducing valve group PV-W21/W22 got into next step less than 5% o'clock;
9) the reducing valve group switch to be accomplished, and closes butterfly valve V-W22 after the purified gas reducing valve group, and closing puts in place laggardly goes into next step;
10) the dry cloth bag Pneumatic butterfly valve triad that enter the mouth are closed timed interval 5s between group automatically; Close the back that finishes and get into next step;
11) blast furnace gas is promptly accomplished by being recovered to the switching of diffusing.
Three. the top pressure control is following by the step that purified gas reducing valve group 201 switches to TRT stator blade/open soon variable valve group:
1) the cloth bag bleed is accomplished, and after the explosion experiment is qualified, regulates by carry out top pressure through coal gas compression release valve group 201, gets into handoff procedure then;
2) the TRT system sends the input signal, and blast furnace system gets into next step if confirm and can drop into;
3) with TRT enter the mouth butterfly valve V-W31, TRT inlet push-pull valve V-W32, TRT outlet push-pull valve V-W33, TRT exit butterfly valve V-W34, TRT stator blade/open the variable valve group soon to be transformed into auto state;
4) opening TRT outlet push-pull valve V-W33, TRT inlet push-pull valve V-W32, TRT exit butterfly valve V-W34 successively, must be just can open next valve behind the last valve open; Then the TRT butterfly valve V-W31 that enters the mouth is opened a suitable aperture; After treating that all valve opens finish, get into next step;
5) open TRT and cut valve PV-102 soon, treat that it opens to put in place and laggardly go into next step;
6) slowly open TRT stator blade PV-101, the TRT system begins raising speed, and rotating speed gets into next step to 1200r/min;
7) whether inspection TRT system exists abnormal conditions, if no abnormal entering next step;
8) the TRT system gets into the section of rising suddenly, and avoids resonance region, treats that its rotating speed gets into next step to 2700r/min;
9) the TRT system gets into excitation and prepares section, sends signal and throws excitation, treats that carrying out automatic sub-synchronous device after it boosts puts into operation;
10) the TRT system gets into to be incorporated into the power networks and prepares section, standard-sized sheet TRT inlet butterfly valve V-W31, treat that its brushless excitation generator 302 is incorporated into the power networks after, send the TRT system and drop into signal;
11) after brushless excitation generator 302 generates electricity by way of merging two or more grid systems; Top pressure value SP+5Kpa is sent to purified gas reducing valve group control module PC-W2; PV-W21/W22 closes by its first, second variable valve of control purified gas reducing valve group, and roof pressure set(ting)value SP then delivers to TRT stator blade/open soon variable valve group control module PC-101; Treat first, second variable valve of purified gas reducing valve group PV-W21/W22 close put in place after, get into next step;
12) TRT stator blade/open the variable valve group soon to obtain the top pressure control, at this time purified gas reducing valve group 201 also is in auto state.
Four, the top pressure control is following by the switch process that TRT stator blade/open soon variable valve group switches to purified gas reducing valve group 201:
1) is divided into two kinds of situation,, then gets into next step if emergency situatioies such as driving, interlock protection appear in the TRT system; If when damping down or working of a furnace shakiness are received by the TRT system, then get into 8);
2) the TRT system begins to get into the emergency stop process, gets into next step then;
3) the TRT system sends signal and makes brushless excitation generator 302 and grid disconnection; TRT cuts valve PV-102 emergency switching-off within 1 second soon simultaneously; TRT open soon variable valve PV-103 by the certain multiple of former TRT stator blade PV-101 aperture relation (as 1.5 times; Can be according to producer's data modification) to open to get into automatically and regulate, the TRT system drops into signal and resets; After treating that all valve events put in place, get into next step;
4) top pressure set(ting)value SP is delivered to purified gas reducing valve group control module PC-W2, PV-W21/W22 opens by its first, second variable valve of control purified gas reducing valve group; Top pressure value SP+5KPa is delivered to TRT stator blade/open soon variable valve group control module PC-101, open variable valve PV-103 soon by its control TRT and close; Treat TRT open soon variable valve PV-103 close put in place after, get into next step;
5) enter the mouth butterfly valve V-W31, TRT exit butterfly valve V-W34 of TRT closed automatically, treat they close put in place after, get into next step;
6) TRT push-pull valve V-W32, the TRT outlet push-pull valve V-W33 that enters the mouth is closed automatically, treat that they close to put in place and laggardly go into next step;
7) TRT system emergency stop is accomplished, and is in stopped status, regulates roof pressure by first, second variable valve of purified gas reducing valve group PV-W21/W22; Get into 14 then);
8) the TRT system receives that damping down or the working of a furnace are unstable, top pressure is crossed situation such as low, then gets into the orderly closedown process;
9) top pressure set(ting)value SP is delivered to purified gas reducing valve group control module PC-W2; PV-W21/W22 opens by its first, second variable valve of control purified gas reducing valve group, and top pressure value SP+5KPa is delivered to TRT stator blade/open soon variable valve group control module PC-101; The generated output of treating the TRT system constantly reduce to reach with electrical network require separate train value the time, get into next step;
10) separate column signal through artificial sending after confirming, with brushless excitation generator 302 and grid disconnection; Treat that brushless excitation generator 302 off-the-lines accomplish, and TRT stator blade PV-101 close put in place after, get into next step;
11) close TRT and cut valve PV-102 soon, treat that it closes to put in place and laggardly go into next step;
12) top pressure begins to be regulated by first, second variable valve of purified gas reducing valve group PV-W21/W22; Treat TRT open soon variable valve PV-103 close put in place after, get into next step;
13) TRT system orderly closedown is accomplished, and it is in stopped status, is regulated through first, second variable valve of purified gas reducing valve group PV-W21/W22 fully by top pressure, gets into next step then;
14) the top pressure control is all accomplished by the process that TRT stator blade/open soon variable valve group switches to purified gas reducing valve group 201.
Five. the top pressure control is following by the control process that raw gas reducing valve group 101 switches to TRT stator blade/open soon variable valve group:
1) the TRT system sends the input request signal, and blast furnace is confirmed and can be dropped into;
2) select automatic and automanual conversion regime,, get into next step automatic switchover if when selecting automatic conversion regime and the preceding TP TE-W01 of cloth bag to record temperature to be between 120 ℃~260 ℃; If select the then semi-automatic recovery status button that is transformed into of semi-automatic conversion regime, get into next step semi-automatic switching then;
3) through automatic or automanual mode with TRT enter the mouth butterfly valve V-W31, TRT inlet push-pull valve V-W32, TRT outlet push-pull valve V-W33, TRT exit butterfly valve V-W34 and TRT stator blade/open the variable valve group soon to be transformed into auto state, purified gas reducing valve group 201 is transformed into manual state;
4) judge that the TRT system drops into signal and whether puts 1, if, get into next step for not; If for being to go to 13);
5) with TRT export push-pull valve V-W33, TRT inlet push-pull valve V-W32, TRT exit butterfly valve V-W34 opens successively, must be just can open next valve behind the last valve open; Then the TRT butterfly valve V-W31 that enters the mouth is opened a suitable aperture; Treat to get into next step after all valve opens finish;
6) the dry cloth bag Pneumatic butterfly valve triad that enter the mouth are opened timed interval 5s between group automatically; Treat that they open the back that finishes and get into next step;
7) open TRT and cut valve PV-102 soon, treat that it opens to put in place and laggardly go into next step;
8) slowly open TRT stator blade PV-101, the TRT system begins raising speed, to 1200r/min, gets into next step;
9) whether inspection TRT system exists abnormal conditions, then gets into next step as if no abnormal;
10) the TRT system gets into the section of rising suddenly, and avoids resonance region, treats to get into next step after its rotating speed is raised to 2700r/min;
11) the TRT system gets into excitation and prepares section, sends signal and throws excitation, treats that carrying out automatic sub-synchronous device after it boosts puts into operation;
12) the TRT system gets into to be incorporated into the power networks and prepares section, standard-sized sheet TRT inlet butterfly valve V-W31, treat that brushless excitation generator 302 is incorporated into the power networks after, clash TRT and drop into signal;
13) top pressure value SP+5KPa is delivered to raw gas reducing valve group control module PC-W1; PV-W11/W12 closes by its first, second variable valve of control raw gas reducing valve group, and top pressure set(ting)value SP is delivered to TRT stator blade/open soon variable valve group control module PC-101; Treat first, second variable valve of raw gas reducing valve group PV-W11/W12 close put in place after, get into next step;
14) the reducing valve group is transformed into TRT stator blade/open soon variable valve group and regulates roof pressure and accomplish, and closes raw gas butterfly valve V-W11; Treat raw gas butterfly valve V-W11 close put in place after, get into next step;
15) close raw gas push-pull valve V-W12, treat that it closes to put in place and laggardly go into next step;
16) diffuse tower T-1 to coal gas and send out signal flame-out, diffuse the tower ignition controller and automatically perform flame-out program; After treating that coal gas diffusion tower T-1 is flame-out, get into next step;
17) first, second variable valve of purified gas reducing valve group PV-W21/W22 is set to auto state, and first, second variable valve of raw gas reducing valve group PV-W11/W12 puts manually, and top pressure value SP+5KPa is delivered to purified gas reducing valve group control module PC-W2;
18) TRT system input converts, and purified gas reducing valve group 201 also is in auto state.
Six. the top pressure control is following by the step that TRT stator blade/open soon variable valve group is converted to raw gas reducing valve group 101:
1) select to automatically switch or semi-automatic conversion regime,, get into next step automatic switchover then if when selecting TP TE-W01 records before automatic conversion regime and the cloth bag temperature between 120 ℃~260 ℃; If select then semi-automatic being transformed into of semi-automatic conversion regime to diffuse status button, get into next step semi-automatic switching then;
2) through automatic or automanual mode, diffuse tower T-1 to coal gas and send out ignition signal, diffuse the tower ignition controller and automatically perform ignition procedure; After treating that coal gas diffusion tower T-1 igniting is accomplished, get into next step;
3) open raw gas push-pull valve V-W12 automatically, treat that it opens to put in place and laggardly go into next step;
4) open raw gas butterfly valve V-W11 automatically, treat that it opens to put in place and laggardly go into next step;
5) top pressure set(ting)value SP is delivered to raw gas reducing valve group control module PC-W1, PV-W11/W12 opens by its first, second variable valve of control raw gas reducing valve group; Send TRT stator blade/open soon variable valve group control module PC-101 with top pressure value SP+5KPa; The generated output of treating brushless excitation generator 302 constantly reduce to reach with electrical network require separate train value the time, get into next step;
6) separate column signal, brushless excitation generator 302 and grid disconnection through artificial sending after confirming; Treat that off-the-line puts in place and TRT stator blade PV-101 close put in place after, get into next step;
7) close TRT and cut valve PV-102 soon, treat that it closes to put in place and laggardly go into next step;
8) the dry cloth bag Pneumatic butterfly valve triad that enter the mouth are closed timed interval 5s between group automatically; Treat dry cloth bag inlet Pneumatic butterfly valve close finish after, get into next step;
9) blast furnace gas is accomplished by being recovered to diffuse to switch.

Claims (2)

1. adopt the blast furnace top pressure control system of gas dry-method dust-removal device, comprise coal gas diffusion tower, gas dry-method dust-removal device, purified gas pipe network and TRT system, it is characterized in that:
It also comprises raw gas reducing valve group, purified gas reducing valve group and TRT stator blade/open the variable valve group soon, and controls raw gas reducing valve group control module, purified gas reducing valve group control module and the TRT stator blade of these three kinds of valve groups/open soon variable valve group control module respectively;
Blast furnace gas produces from blast furnace, through being divided into two-way behind the gravitational precipitator, leads up to raw gas reducing valve group, gets into the coal gas diffusion tower; Another road is divided into two-way again through gas dry-method dust-removal device, leads up to purified gas reducing valve group, and another road gets into the TRT system through TRT stator blade/open the variable valve group soon, and this two-way converges and gets into the purified gas pipe network at last;
Raw gas reducing valve group control module, purified gas reducing valve group control module and TRT stator blade/open soon between the variable valve group control module are interconnected, and through TP, the first gas pressure transmitter, the second gas pressure transmitter before the cloth bag entering pipeline of blast furnace gas are monitored; Raw gas reducing valve group control module, purified gas reducing valve group control module and TRT stator blade/open soon variable valve group control module is also respectively to raw gas reducing valve group, purified gas reducing valve group and TRT stator blade/open the variable valve group soon to control;
Raw gas reducing valve group comprises raw gas reducing valve group first variable valve, raw gas reducing valve group second variable valve, raw gas reducing valve group range valve and the raw gas reducing valve group SV of parallel connection;
Purified gas reducing valve group comprises purified gas reducing valve group first variable valve, purified gas reducing valve group second variable valve, purified gas reducing valve group range valve and the purified gas reducing valve group SV of parallel connection;
The TRT system comprises compound expansion turbine and brushless excitation generator, and TRT stator blade/open the variable valve group soon comprises that TRT stator blade, TRT cut valve soon and TRT drives variable valve soon; One of TRT stator blade is connected to the compound expansion turbine; The other end is connected to TRT stator blade/open soon variable valve group control module; TRT cuts between the output terminal and compound expansion turbine that valve is connected to gas dry-method dust-removal device soon, and TRT opens between the input terminus of output terminal and purified gas pipe network that variable valve is connected to gas dry-method dust-removal device soon.
2. system according to claim 1 is characterized in that: be connected to raw gas butterfly valve and raw gas push-pull valve before the input terminus of raw gas reducing valve group; The input terminus of TRT system and output terminal are connected to TRT inlet butterfly valve, TRT inlet push-pull valve and TRT exit butterfly valve, TRT respectively and export push-pull valve; Be connected to dish valve after purified gas reducing valve group back card/back board valve and the purified gas reducing valve group between the output terminal of purified gas reducing valve group and the input terminus of purified gas pipe network.
CN2010102059798A 2009-12-30 2010-06-09 Blast furnace top pressure control system adopting gas dry method dust-removing device Expired - Fee Related CN101871028B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102059798A CN101871028B (en) 2009-12-30 2010-06-09 Blast furnace top pressure control system adopting gas dry method dust-removing device

Applications Claiming Priority (7)

Application Number Priority Date Filing Date Title
CN200920269166 2009-12-30
CN200920269166.8 2009-12-30
CN200910266706.1 2009-12-30
CN200910266706A CN101768648A (en) 2009-12-30 2009-12-30 Blast furnace top pressure control system adopting gas dry-method dust-removal device
CN200910273505.4 2009-12-31
CN200910273505A CN101760573A (en) 2009-12-31 2009-12-31 Method for controlling pressure of blast furnace top by adopting gas dry dust removing device
CN2010102059798A CN101871028B (en) 2009-12-30 2010-06-09 Blast furnace top pressure control system adopting gas dry method dust-removing device

Publications (2)

Publication Number Publication Date
CN101871028A CN101871028A (en) 2010-10-27
CN101871028B true CN101871028B (en) 2012-05-23

Family

ID=42996111

Family Applications (3)

Application Number Title Priority Date Filing Date
CN2010202349404U Expired - Fee Related CN201857398U (en) 2009-12-30 2010-06-09 Blast furnace top pressure control system adopting coal gas dry method dust remover
CN2010102059798A Expired - Fee Related CN101871028B (en) 2009-12-30 2010-06-09 Blast furnace top pressure control system adopting gas dry method dust-removing device
CN2010102059196A Active CN101871027B (en) 2009-12-30 2010-06-09 Blast furnace top pressure control method adopting gas dry method dust-removing device

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN2010202349404U Expired - Fee Related CN201857398U (en) 2009-12-30 2010-06-09 Blast furnace top pressure control system adopting coal gas dry method dust remover

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN2010102059196A Active CN101871027B (en) 2009-12-30 2010-06-09 Blast furnace top pressure control method adopting gas dry method dust-removing device

Country Status (1)

Country Link
CN (3) CN201857398U (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102559964A (en) * 2012-02-10 2012-07-11 中冶南方工程技术有限公司 Feedforward control method of furnace top pressure of blast furnace
CN104462791B (en) * 2014-11-24 2018-03-13 中冶南方工程技术有限公司 A kind of method that determination TRT jerk emergency pressure reducing valve groups promptly calculate angle
CN104561412B (en) * 2014-12-01 2016-09-21 中冶南方(武汉)重工制造有限公司 The top pressure control method of bivalve reducer unit
CN112094971A (en) * 2019-06-17 2020-12-18 宝钢集团新疆八一钢铁有限公司 Four-valve-bank control optimization method for blast furnace

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4067557A (en) * 1976-07-02 1978-01-10 Kawasaki Jukogyo Kabushiki Kaisha System for changing over of blast furnace top pressure control
CN1676615A (en) * 2005-04-13 2005-10-05 浙江大学 Furnance top pressure control method based on resistance coefficient equivalent
CN1818080A (en) * 2006-01-01 2006-08-16 广东韶钢松山股份有限公司 Gas totally-drying purifying dust-collecting process of blast-furnace
JP2007254769A (en) * 2006-03-20 2007-10-04 Jfe Steel Kk Method for controlling pressure of blast furnace gas and device therefor

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4180249A (en) * 1975-03-27 1979-12-25 Agranovskaya Miriam A Installation for controlling pressure of gas under shaft top in super-capacity blast furnace
JPS5948290B2 (en) * 1979-05-18 1984-11-26 日立造船株式会社 Blast furnace top pressure power recovery method using dry dust remover
CN1175177C (en) * 2001-04-03 2004-11-10 武汉钢铁设计研究总院 Turbine generating process for one machine to recover waste gas energy from several blast furnaces
CN1216155C (en) * 2003-10-10 2005-08-24 陕西鼓风机(集团)有限公司 Automatic control method of blast-furnace top pressure stability for blast-furnace gas top pressure power generation apparatus

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4067557A (en) * 1976-07-02 1978-01-10 Kawasaki Jukogyo Kabushiki Kaisha System for changing over of blast furnace top pressure control
CN1676615A (en) * 2005-04-13 2005-10-05 浙江大学 Furnance top pressure control method based on resistance coefficient equivalent
CN1818080A (en) * 2006-01-01 2006-08-16 广东韶钢松山股份有限公司 Gas totally-drying purifying dust-collecting process of blast-furnace
JP2007254769A (en) * 2006-03-20 2007-10-04 Jfe Steel Kk Method for controlling pressure of blast furnace gas and device therefor

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张克宏.高炉炉顶压力控制技术.《电气时代》.2008,全文. *

Also Published As

Publication number Publication date
CN101871027A (en) 2010-10-27
CN101871027B (en) 2012-05-23
CN201857398U (en) 2011-06-08
CN101871028A (en) 2010-10-27

Similar Documents

Publication Publication Date Title
CN101760573A (en) Method for controlling pressure of blast furnace top by adopting gas dry dust removing device
CN101871028B (en) Blast furnace top pressure control system adopting gas dry method dust-removing device
CN101768648A (en) Blast furnace top pressure control system adopting gas dry-method dust-removal device
CN103509895A (en) Method for controlling pressure of furnace top of blast furnace by combining TRT stationary blade and pressure reducing valve group
CN201386106Y (en) Blast furnace Bischoff system residual pressure energy recovery startup and control device
CN109261076A (en) A kind of acetylene charging production system feeding control method
CN206205996U (en) A kind of gas stabilized-pressure energy recycle device for gas turbine front end
CN106403626B (en) Sintering waste heat recycling and the full-automatic activation system of Sinter air machine Unit erriger and method
CN101792831B (en) Automatic sweeping method for nitrogen replaced with gas in blast furnace gas energy recovery system pipe network
CN201554505U (en) Starting control device for blast furnace pubic type residual pressure energy reclamation
CN101935722B (en) Control method of bypass valve of energy recovery device during abnormal full close of stator blade
US20150167500A1 (en) Metallurgical plant
CN201292370Y (en) Blast furnace top pressure control rearrange apparatus
CN103398291A (en) Compressed air system of thermal power plant and classified pressure supply method for compressed air system
CN101792833B (en) Automatic sweeping method for nitrogen replaced with air in blast furnace gas energy recovery system pipe network
CN214741515U (en) Peak-regulating frequency-modulating system of thermal power plant coupling plasma pyrolysis device
CN204918633U (en) Blast furnace gas residual pressure control system that generates electricity
CN202430240U (en) Automatic startup control system for differential pressure power generation
CN101792834B (en) Automatic sweeping method for gas replaced with nitrogen in blast furnace gas energy recovery system pipe network
CN208894175U (en) A kind of acetylene charging production system feeding control device
CN104359005B (en) Automatic recycling device for discharged gas
CN205152252U (en) Blast furnace roof pressure controlling means
CN111778372B (en) Control method for pressure regulating valve bank of blast furnace top pressure
CN101899539A (en) Method for controlling overflow of blast furnace through by-pass valve of blast furnace gas energy recovery device
CN102002544B (en) Switching method for blast-furnace gas dry-wet dust removing systems

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120523

Termination date: 20150609

EXPY Termination of patent right or utility model