CN101867433A - 具有实时监测调控特性的电力通信同步网全同步演进方法 - Google Patents
具有实时监测调控特性的电力通信同步网全同步演进方法 Download PDFInfo
- Publication number
- CN101867433A CN101867433A CN201010189974A CN201010189974A CN101867433A CN 101867433 A CN101867433 A CN 101867433A CN 201010189974 A CN201010189974 A CN 201010189974A CN 201010189974 A CN201010189974 A CN 201010189974A CN 101867433 A CN101867433 A CN 101867433A
- Authority
- CN
- China
- Prior art keywords
- prc
- clock
- monitoring
- electric power
- power communication
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 57
- 238000004891 communication Methods 0.000 title claims abstract description 28
- 230000001360 synchronised effect Effects 0.000 title claims abstract description 21
- 238000000034 method Methods 0.000 title claims abstract description 18
- 230000001105 regulatory effect Effects 0.000 title claims abstract description 8
- 229910052792 caesium Inorganic materials 0.000 claims description 9
- TVFDJXOCXUVLDH-UHFFFAOYSA-N caesium atom Chemical compound [Cs] TVFDJXOCXUVLDH-UHFFFAOYSA-N 0.000 claims description 9
- 230000005540 biological transmission Effects 0.000 claims description 5
- 238000005259 measurement Methods 0.000 claims description 5
- 230000015556 catabolic process Effects 0.000 claims description 3
- 238000006731 degradation reaction Methods 0.000 claims description 3
- 238000000691 measurement method Methods 0.000 claims description 2
- 230000001276 controlling effect Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 5
- 230000006866 deterioration Effects 0.000 description 3
- 230000008859 change Effects 0.000 description 2
- 230000003872 anastomosis Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 239000008358 core component Substances 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 230000006855 networking Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
Images
Landscapes
- Synchronisation In Digital Transmission Systems (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010189974 CN101867433B (zh) | 2010-05-25 | 2010-05-25 | 具有实时监测调控特性的电力通信同步网全同步演进方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010189974 CN101867433B (zh) | 2010-05-25 | 2010-05-25 | 具有实时监测调控特性的电力通信同步网全同步演进方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101867433A true CN101867433A (zh) | 2010-10-20 |
CN101867433B CN101867433B (zh) | 2013-12-18 |
Family
ID=42959010
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010189974 Active CN101867433B (zh) | 2010-05-25 | 2010-05-25 | 具有实时监测调控特性的电力通信同步网全同步演进方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101867433B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103049038A (zh) * | 2011-10-17 | 2013-04-17 | 卡斯柯信号有限公司 | 用于三取二安全系统的硬件时钟同步电路 |
CN105759599A (zh) * | 2014-12-17 | 2016-07-13 | 国家电网公司 | 一种用电信息采集系统主站时钟的校准系统及其方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2002075561A1 (de) * | 2001-03-15 | 2002-09-26 | Robert Bosch Gmbh | Verfahren und vorrichtung zur synchronisation der zykluszeit von mehreren ttcan-bussen sowie entsprechendes bussystem |
WO2006037007A2 (en) * | 2004-09-28 | 2006-04-06 | Quartex, Division Of Primex, Inc. | Wireless synchronous time system with solar powered transceiver |
CN1936605A (zh) * | 2006-10-10 | 2007-03-28 | 浙江大学 | 一种同步时标可自由设定的广域电网相量同步测量装置 |
CN101242231A (zh) * | 2008-03-03 | 2008-08-13 | 电子科技大学 | 面向电力系统同步相量测量的时钟同步装置 |
CN101350520A (zh) * | 2008-09-17 | 2009-01-21 | 中国南方电网有限责任公司 | 一种基于电网综合信息的保护控制系统和方法 |
CN201226521Y (zh) * | 2008-02-28 | 2009-04-22 | 江苏电力调度通信中心 | 时间同步监测系统 |
CN201425705Y (zh) * | 2009-05-08 | 2010-03-17 | 上海汉鼎电力科技有限公司 | 电力系统时间同步装置 |
-
2010
- 2010-05-25 CN CN 201010189974 patent/CN101867433B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2002075561A1 (de) * | 2001-03-15 | 2002-09-26 | Robert Bosch Gmbh | Verfahren und vorrichtung zur synchronisation der zykluszeit von mehreren ttcan-bussen sowie entsprechendes bussystem |
WO2006037007A2 (en) * | 2004-09-28 | 2006-04-06 | Quartex, Division Of Primex, Inc. | Wireless synchronous time system with solar powered transceiver |
CN1936605A (zh) * | 2006-10-10 | 2007-03-28 | 浙江大学 | 一种同步时标可自由设定的广域电网相量同步测量装置 |
CN201226521Y (zh) * | 2008-02-28 | 2009-04-22 | 江苏电力调度通信中心 | 时间同步监测系统 |
CN101242231A (zh) * | 2008-03-03 | 2008-08-13 | 电子科技大学 | 面向电力系统同步相量测量的时钟同步装置 |
CN101350520A (zh) * | 2008-09-17 | 2009-01-21 | 中国南方电网有限责任公司 | 一种基于电网综合信息的保护控制系统和方法 |
CN201425705Y (zh) * | 2009-05-08 | 2010-03-17 | 上海汉鼎电力科技有限公司 | 电力系统时间同步装置 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103049038A (zh) * | 2011-10-17 | 2013-04-17 | 卡斯柯信号有限公司 | 用于三取二安全系统的硬件时钟同步电路 |
CN103049038B (zh) * | 2011-10-17 | 2015-10-14 | 卡斯柯信号有限公司 | 用于三取二安全系统的硬件时钟同步电路 |
CN105759599A (zh) * | 2014-12-17 | 2016-07-13 | 国家电网公司 | 一种用电信息采集系统主站时钟的校准系统及其方法 |
Also Published As
Publication number | Publication date |
---|---|
CN101867433B (zh) | 2013-12-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8275487B2 (en) | Electric power system automation using time coordinated instructions | |
CN106788838B (zh) | 一种电力时间同步系统鲁棒控制的系统及方法 | |
KR101980821B1 (ko) | 전력 변환기 및 그 제어 방법 | |
WO2015023478A2 (en) | Delay compensation for variable cable length | |
CN102361353B (zh) | 基于双时间尺度延时估计的断面生数据对齐方法 | |
US20150219074A1 (en) | Wind power plant control system, wind power plant including wind power plant control system and method of controlling wind power plant | |
CN108111245A (zh) | 光纤传输通道时钟同步系统及其方法 | |
CN104683088B (zh) | 多基准同步方法、装置及系统 | |
CN109407040A (zh) | 一种智能电能表校准方法、装置、设备及存储介质 | |
CN109638872A (zh) | 场控级电网控制方法、装置、系统及其存储介质 | |
CN110798276A (zh) | 一种智能变电站sdn网络的时间同步方法与系统 | |
CN101867433B (zh) | 具有实时监测调控特性的电力通信同步网全同步演进方法 | |
US8718086B2 (en) | Method for communication in a HVDC power transmission system, controller unit and computer program product | |
CN103338102A (zh) | 一种核电厂内时间同步系统 | |
JP2009112148A (ja) | 電力系統の周波数調整方法および周波数調整システム | |
CN102496944A (zh) | 基于广域信息的电力系统分布式阻尼控制系统及其方法 | |
CN109756288B (zh) | 一种配电网广域测量时间同步系统 | |
CN101873188A (zh) | 基于共模共视测量技术的电力通信同步网全同步演进方法 | |
CN202940820U (zh) | 一种基于透明时钟的对时网络系统 | |
CN101895382B (zh) | 利用北斗双向通信特性的电力通信同步网全同步演进方法 | |
CN204928848U (zh) | 一种时间频率传递设备 | |
CN103078698B (zh) | 一种通道时延补偿方法 | |
CN101867432B (zh) | 主基准时钟匹配氢钟的电力通信同步网全同步演进方法 | |
CN112187392A (zh) | 一种时间信号转换成e1通信授时的操作系统 | |
US11726436B2 (en) | System and method for controlling a power generating system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: STATE ELECTRIC NET CROP. Effective date: 20130216 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20130216 Address after: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 Applicant after: China Electric Power Research Institute Applicant after: State Grid Corporation of China Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 Applicant before: China Electric Power Research Institute |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 Co-patentee after: STATE GRID CORPORATION OF CHINA Patentee after: CHINA ELECTRIC POWER RESEARCH INSTITUTE Co.,Ltd. Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 Co-patentee before: State Grid Corporation of China Patentee before: China Electric Power Research Institute |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200903 Address after: 402, 4 / F, B-3 / F, North Territory, Zhongguancun Dongsheng science and Technology Park, 66 xixiaokou Road, Haidian District, Beijing 100080 Patentee after: Beijing Dianke Zhixin Technology Co.,Ltd. Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 Co-patentee before: STATE GRID CORPORATION OF CHINA Patentee before: CHINA ELECTRIC POWER RESEARCH INSTITUTE Co.,Ltd. |